St. Augustine Impact Fees by Project Type
St. Augustine: Single-Family Impact Fees
A new single-family home in St. Augustine pays $16,901.51 per unit in impact fees (rates sourced October 27, 2026). Of that, St. Johns County-levied fees account for $6,082.00 and municipal or utility fees for $10,819.51.
The largest line items are County Educational Facilities Impact Fee ($6,082.00), Water Connection Fee (City of St. Augustine) ($2,682.00) and Sewer Tap Fee (City of St. Augustine) — gravity tap, new shallow lateral ($1,657.67 tap + $719.78 right-of-way restoration) ($2,377.45).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full St. Augustine Impact Fee Schedule
- Water Connection Fee (City of St. Augustine)$2,682.00City of St. Augustine UtilitiesCity of St. Augustine water connection fee (FY 2027 Utility Rates and Fees, Exhibit A, effective October 1, 2026): $2,682.00 for one residential ERC inside the city (300 gallons per day at $8.94 per gallon). Connection charges step each October 1 with the CPI. The city utility service area also extends outside city limits, where rates differ.
- Water Tap and Meter Fee (City of St. Augustine) — 3/4 in. meter ($938.98 tap and meter + $719.78 right-of-way restoration)$1,658.76City of St. Augustine UtilitiesOne-time City of St. Augustine Utilities charge for a new 3/4 in. water service installed by the city, FY 2027 fees effective October 1, 2026: $938.98 for the tap and meter plus $719.78 right-of-way restoration per tap installed without a road cut ($1,439.55 with a road cut, jack and bore or directional drill). The city charges 1 in. $1,404.65 and 2 in. $4,697.08 for tap and meter. Setting a meter on an existing service costs $547.47 (3/4 in.); where a contractor installs the service, the city charges a tap fee of $166.86 (3/4 in.) plus an inspection fee. Connection charges step each October 1 with the CPI.
- Sewer Tap Fee (City of St. Augustine) — gravity tap, new shallow lateral ($1,657.67 tap + $719.78 right-of-way restoration)$2,377.45City of St. Augustine UtilitiesOne-time City of St. Augustine Utilities sewer tap where the city taps a gravity main and installs a new lateral less than 5 feet deep, FY 2027 fees effective October 1, 2026: $1,657.67 plus $719.78 right-of-way restoration per tap installed without a road cut ($1,439.55 with a road cut). Other city-installed taps: existing lateral $497.30, deep lateral (over 5 feet) $2,418.11, 2 in. force main $2,418.11, low-pressure connection with station $8,470.44, each plus restoration. Where a contractor makes the tap, the city charges $468.94 (gravity) or $783.03 (force main) plus an inspection fee. Charges step each October 1 with the CPI.
- Sewer Connection Fee (City of St. Augustine)$2,001.30Outside Northwest Area overlayCity of St. Augustine UtilitiesCity of St. Augustine sewer connection fee (FY 2027 Utility Rates and Fees, Exhibit A, effective October 1, 2026): $2,001.30 for one residential ERC inside the city (210 gallons per day at $9.53 per gallon). Properties inside the city's Northwest Area Forcemain Overlay also pay a forcemain surcharge of $1,226.40 per ERC (the Northwest Area overlay option). Connection charges step each October 1 with the CPI. Outside-city rates differ.
- Mobility Fee (City of St. Augustine) — 2,000 heated sf × $1.05/sf$2,100.00City of St. AugustineCity of St. Augustine Mobility Fee, effective May 17, 2022 (Ord. 2022-01), charged in lieu of road and transportation impact fees; the county does not levy its road impact fee inside the city. The residential rate is $1.05 per heated and cooled square foot, so a 2,000 sq ft home pays $2,100. One citywide benefit district; assessed at building permit application and paid before the permit is issued.
- County Educational Facilities Impact Fee$6,082.001,801-2,500 sq ftSt. Johns County (School District)St. Johns County Educational Facilities (school) impact fee, Phase 1 effective 3/4/2026: 1,801-2,500 sq ft dwelling = $6,082 (typical single-family home). Inside the City of St. Augustine only the county school impact fee applies; the city's transportation impact is covered by the separate city Mobility Fee. Steps up each March 4 through 3/4/2030.
Where in St. Johns County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours.
St. Augustine: Multifamily Impact Fees
A new multifamily unit in St. Augustine pays $13,148.51 per unit in impact fees (rates sourced October 27, 2026). Of that, St. Johns County-levied fees account for $3,379.00 and municipal or utility fees for $9,769.51.
The largest line items are County Educational Facilities Impact Fee (MF, rep 801-1,250 sq ft) ($3,379.00), Water Connection Fee (City of St. Augustine, MF) ($2,682.00) and Sewer Tap Fee (City of St. Augustine, MF) — gravity tap, new shallow lateral ($1,657.67 tap + $719.78 right-of-way restoration) ($2,377.45).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full St. Augustine Impact Fee Schedule
- Water Connection Fee (City of St. Augustine, MF)$2,682.00City of St. Augustine UtilitiesCity of St. Augustine water connection fee (FY 2027 Utility Rates and Fees, Exhibit A, effective October 1, 2026): $2,682.00 for one residential ERC inside the city, assessed per multifamily unit (each dwelling unit is one ERC). Connection charges step each October 1 with the CPI. The city utility service area also extends outside city limits, where rates differ.
- Water Tap and Meter Fee (City of St. Augustine, MF) — 3/4 in. meter ($938.98 tap and meter + $719.78 right-of-way restoration)$1,658.76City of St. Augustine UtilitiesOne-time City of St. Augustine Utilities charge per water service installed by the city, shown for the smallest 3/4 in. meter, FY 2027 fees effective October 1, 2026: $938.98 for the tap and meter plus $719.78 right-of-way restoration per tap installed without a road cut. A building on one larger service pays once at that size (1 in. $1,404.65, 2 in. $4,697.08, larger at cost plus 25%, plus restoration). Setting a meter on an existing service or a contractor-installed tap is charged instead of the city tap. Charges step each October 1 with the CPI.
- Sewer Tap Fee (City of St. Augustine, MF) — gravity tap, new shallow lateral ($1,657.67 tap + $719.78 right-of-way restoration)$2,377.45City of St. Augustine UtilitiesOne-time City of St. Augustine Utilities sewer tap per connection where the city taps a gravity main and installs a new lateral less than 5 feet deep, FY 2027 fees effective October 1, 2026: $1,657.67 plus $719.78 right-of-way restoration per tap installed without a road cut. A building on one connection pays once. Other city-installed taps: existing lateral $497.30, deep lateral $2,418.11, 2 in. force main $2,418.11, each plus restoration; contractor taps $468.94 (gravity) or $783.03 (force main) plus an inspection fee. Charges step each October 1 with the CPI.
- Sewer Connection Fee (City of St. Augustine, MF)$2,001.30Outside Northwest Area overlayCity of St. Augustine UtilitiesCity of St. Augustine sewer connection fee (FY 2027 Utility Rates and Fees, Exhibit A, effective October 1, 2026): $2,001.30 for one residential ERC inside the city, assessed per multifamily unit (each dwelling unit is one ERC). Properties inside the city's Northwest Area Forcemain Overlay also pay a forcemain surcharge of $1,226.40 per ERC (the Northwest Area overlay option). Connection charges step each October 1 with the CPI.
- Mobility Fee (City of St. Augustine, MF) — 1,000 heated sf × $1.05/sf$1,050.00City of St. AugustineCity of St. Augustine Mobility Fee, effective May 17, 2022 (Ord. 2022-01), charged in lieu of road and transportation impact fees; the county does not levy its road impact fee inside the city. The residential rate is $1.05 per heated and cooled square foot, so a 1,000 sq ft unit pays $1,050. One citywide benefit district; assessed at building permit application and paid before the permit is issued.
- County Educational Facilities Impact Fee (MF, rep 801-1,250 sq ft)$3,379.00St. Johns County (School District)St. Johns County Educational Facilities (school) impact fee, Phase 1 effective 3/4/2026: 801-1,250 sq ft unit = $3,379 (the bracket a typical multifamily unit falls into). Inside the City of St. Augustine only the county school impact fee applies; the city's transportation impact is covered by the separate city Mobility Fee. Steps up each March 4 through 3/4/2030.
Where in St. Johns County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours.
St. Augustine: Commercial Impact Fees
Commercial development in St. Augustine pays $3.42 per square foot in impact fees, plus $9,185.18 in one-time water and sewer connection fees (rates sourced October 27, 2026).
For a 50,000 sq ft building, that comes to about $180,185.18. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (City of St. Augustine) ($2,682.00 one-time), Sewer Tap Fee (City of St. Augustine) — gravity tap, new shallow lateral ($1,657.67 tap + $719.78 right-of-way restoration) ($2,377.45 one-time) and Water Tap and Meter Fee (City of St. Augustine) — 1 in. meter ($1,404.65 tap and meter + $719.78 right-of-way restoration) ($2,124.43 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Mobility Fee (City of St. Augustine, Commercial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full St. Augustine Impact Fee Schedule
- Water Connection Fee (City of St. Augustine)$2,682.00 one-timeCity of St. Augustine UtilitiesCity of St. Augustine water connection fee (FY 2027 Utility Rates and Fees, Exhibit A, effective October 1, 2026): $8.94 per gallon per day of the use's listed flow under Code Sec. 26-53, shown for one residential ERC (300 gallons per day). Nonresidential connections pay for their listed flow, so larger uses pay proportionally more. Connection charges step each October 1 with the CPI. Tap, meter and right-of-way restoration charges are separate.
- Water Tap and Meter Fee (City of St. Augustine) — 1 in. meter ($1,404.65 tap and meter + $719.78 right-of-way restoration)$2,124.43 one-timeCity of St. Augustine UtilitiesOne-time City of St. Augustine Utilities charge for a new 1 in. water service installed by the city, FY 2027 fees effective October 1, 2026: $1,404.65 for the tap and meter plus $719.78 right-of-way restoration per tap installed without a road cut ($1,439.55 with a road cut, jack and bore or directional drill). Tap and meter: 3/4 in. $938.98, 2 in. $4,697.08; larger services and special installations at cost plus 25%. Setting a meter on an existing service costs $742.68 (1 in.); where a contractor installs the service, the city charges a tap fee of $332.62 (1 in.) plus an inspection fee. Connection charges step each October 1 with the CPI.
- Sewer Tap Fee (City of St. Augustine) — gravity tap, new shallow lateral ($1,657.67 tap + $719.78 right-of-way restoration)$2,377.45 one-timeCity of St. Augustine UtilitiesOne-time City of St. Augustine Utilities sewer tap where the city taps a gravity main and installs a new lateral less than 5 feet deep, FY 2027 fees effective October 1, 2026: $1,657.67 plus $719.78 right-of-way restoration per tap installed without a road cut ($1,439.55 with a road cut). Other city-installed taps: existing lateral $497.30, deep lateral (over 5 feet) $2,418.11, 2 in. force main $2,418.11, each plus restoration; extensions and special installations at cost plus 25%. Where a contractor makes the tap, the city charges $468.94 (gravity) or $783.03 (force main) plus an inspection fee. Charges step each October 1 with the CPI.
- Sewer Connection Fee (City of St. Augustine)$2,001.30 one-timeOutside Northwest Area overlayCity of St. Augustine UtilitiesCity of St. Augustine sewer connection fee (FY 2027 Utility Rates and Fees, Exhibit A, effective October 1, 2026): $9.53 per gallon per day of the use's listed flow under Code Sec. 26-53, shown for one residential ERC (210 gallons per day). Nonresidential connections pay for their listed flow, so larger uses pay proportionally more. Properties inside the city's Northwest Area Forcemain Overlay also pay a forcemain surcharge of $1,226.40 per ERC (the Northwest Area overlay option). Connection charges step each October 1 with the CPI. Tap and right-of-way restoration charges are separate.
- Mobility Fee (City of St. Augustine, Commercial)$3.42/sq ftRequires confirmationCity of St. AugustineCity of St. Augustine Mobility Fee (Code Sec. 21-64(b), Ord. 2022-01), in effect since May 17, 2022, charged per square foot of new nonresidential floor area in lieu of road impact fees; the whole city is one mobility fee benefit district. The rate shown is the codified Multi-Tenant Retail rate; local retail pays $1.71 and free-standing retail $4.67 per sq ft, and drive-throughs, fuel pumps and similar uses add per-unit fees. Under Code Sec. 21-75(b) the schedule rises each January 1, starting in 2023, by the FDOT construction cost inflation factor, so the rate in force can be higher than the codified figure.
- County Impact Fees (St. Johns County, Commercial) — city opt-out, N/A nonres$0.00St. Johns CountySt. Augustine is exempt from St. Johns County nonresidential impact fees; the City of St. Augustine Mobility Fee applies in lieu of county road impact fees.
Where in St. Johns County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
St. Augustine: Industrial Impact Fees
Industrial development in St. Augustine pays $0.58 per square foot in impact fees, plus $9,185.18 in one-time water and sewer connection fees (rates sourced October 27, 2026).
For a 50,000 sq ft building, that comes to about $38,185.18. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (City of St. Augustine) ($2,682.00 one-time), Sewer Tap Fee (City of St. Augustine) — gravity tap, new shallow lateral ($1,657.67 tap + $719.78 right-of-way restoration) ($2,377.45 one-time) and Water Tap and Meter Fee (City of St. Augustine) — 1 in. meter ($1,404.65 tap and meter + $719.78 right-of-way restoration) ($2,124.43 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Mobility Fee (City of St. Augustine, Industrial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full St. Augustine Impact Fee Schedule
- Water Connection Fee (City of St. Augustine)$2,682.00 one-timeCity of St. Augustine UtilitiesCity of St. Augustine water connection fee (FY 2027 Utility Rates and Fees, Exhibit A, effective October 1, 2026): $8.94 per gallon per day of the use's listed flow under Code Sec. 26-53, shown for one residential ERC (300 gallons per day). Nonresidential connections pay for their listed flow, so larger uses pay proportionally more. Connection charges step each October 1 with the CPI. Tap, meter and right-of-way restoration charges are separate.
- Water Tap and Meter Fee (City of St. Augustine) — 1 in. meter ($1,404.65 tap and meter + $719.78 right-of-way restoration)$2,124.43 one-timeCity of St. Augustine UtilitiesOne-time City of St. Augustine Utilities charge for a new 1 in. water service installed by the city, FY 2027 fees effective October 1, 2026: $1,404.65 for the tap and meter plus $719.78 right-of-way restoration per tap installed without a road cut ($1,439.55 with a road cut, jack and bore or directional drill). Tap and meter: 3/4 in. $938.98, 2 in. $4,697.08; larger services and special installations at cost plus 25%. Setting a meter on an existing service costs $742.68 (1 in.); where a contractor installs the service, the city charges a tap fee of $332.62 (1 in.) plus an inspection fee. Connection charges step each October 1 with the CPI.
- Sewer Tap Fee (City of St. Augustine) — gravity tap, new shallow lateral ($1,657.67 tap + $719.78 right-of-way restoration)$2,377.45 one-timeCity of St. Augustine UtilitiesOne-time City of St. Augustine Utilities sewer tap where the city taps a gravity main and installs a new lateral less than 5 feet deep, FY 2027 fees effective October 1, 2026: $1,657.67 plus $719.78 right-of-way restoration per tap installed without a road cut ($1,439.55 with a road cut). Other city-installed taps: existing lateral $497.30, deep lateral (over 5 feet) $2,418.11, 2 in. force main $2,418.11, each plus restoration; extensions and special installations at cost plus 25%. Where a contractor makes the tap, the city charges $468.94 (gravity) or $783.03 (force main) plus an inspection fee. Charges step each October 1 with the CPI.
- Sewer Connection Fee (City of St. Augustine)$2,001.30 one-timeOutside Northwest Area overlayCity of St. Augustine UtilitiesCity of St. Augustine sewer connection fee (FY 2027 Utility Rates and Fees, Exhibit A, effective October 1, 2026): $9.53 per gallon per day of the use's listed flow under Code Sec. 26-53, shown for one residential ERC (210 gallons per day). Nonresidential connections pay for their listed flow, so larger uses pay proportionally more. Properties inside the city's Northwest Area Forcemain Overlay also pay a forcemain surcharge of $1,226.40 per ERC (the Northwest Area overlay option). Connection charges step each October 1 with the CPI. Tap and right-of-way restoration charges are separate.
- Mobility Fee (City of St. Augustine, Industrial)$0.58/sq ftRequires confirmationCity of St. AugustineCity of St. Augustine Mobility Fee (Code Sec. 21-64(b), Ord. 2022-01), in effect since May 17, 2022, charged per square foot of new nonresidential floor area in lieu of road impact fees; the whole city is one mobility fee benefit district. The rate shown is the codified Industrial rate (assembly, manufacturing, nursery, outdoor storage, warehouse, utilities). Under Code Sec. 21-75(b) the schedule rises each January 1, starting in 2023, by the FDOT construction cost inflation factor, so the rate in force can be higher than the codified figure.
- County Impact Fees (St. Johns County, Industrial) — city opt-out, N/A nonres$0.00St. Johns CountySt. Augustine is exempt from St. Johns County nonresidential impact fees; the City of St. Augustine Mobility Fee applies in lieu of county road impact fees.
Where in St. Johns County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
St. Augustine: Office Impact Fees
Office development in St. Augustine pays $1.62 per square foot in impact fees, plus $9,185.18 in one-time water and sewer connection fees (rates sourced October 27, 2026).
For a 25,000 sq ft building, that comes to about $49,685.18. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (City of St. Augustine) ($2,682.00 one-time), Sewer Tap Fee (City of St. Augustine) — gravity tap, new shallow lateral ($1,657.67 tap + $719.78 right-of-way restoration) ($2,377.45 one-time) and Water Tap and Meter Fee (City of St. Augustine) — 1 in. meter ($1,404.65 tap and meter + $719.78 right-of-way restoration) ($2,124.43 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Mobility Fee (City of St. Augustine, Office) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full St. Augustine Impact Fee Schedule
- Water Connection Fee (City of St. Augustine)$2,682.00 one-timeCity of St. Augustine UtilitiesCity of St. Augustine water connection fee (FY 2027 Utility Rates and Fees, Exhibit A, effective October 1, 2026): $8.94 per gallon per day of the use's listed flow under Code Sec. 26-53, shown for one residential ERC (300 gallons per day). Nonresidential connections pay for their listed flow, so larger uses pay proportionally more. Connection charges step each October 1 with the CPI. Tap, meter and right-of-way restoration charges are separate.
- Water Tap and Meter Fee (City of St. Augustine) — 1 in. meter ($1,404.65 tap and meter + $719.78 right-of-way restoration)$2,124.43 one-timeCity of St. Augustine UtilitiesOne-time City of St. Augustine Utilities charge for a new 1 in. water service installed by the city, FY 2027 fees effective October 1, 2026: $1,404.65 for the tap and meter plus $719.78 right-of-way restoration per tap installed without a road cut ($1,439.55 with a road cut, jack and bore or directional drill). Tap and meter: 3/4 in. $938.98, 2 in. $4,697.08; larger services and special installations at cost plus 25%. Setting a meter on an existing service costs $742.68 (1 in.); where a contractor installs the service, the city charges a tap fee of $332.62 (1 in.) plus an inspection fee. Connection charges step each October 1 with the CPI.
- Sewer Tap Fee (City of St. Augustine) — gravity tap, new shallow lateral ($1,657.67 tap + $719.78 right-of-way restoration)$2,377.45 one-timeCity of St. Augustine UtilitiesOne-time City of St. Augustine Utilities sewer tap where the city taps a gravity main and installs a new lateral less than 5 feet deep, FY 2027 fees effective October 1, 2026: $1,657.67 plus $719.78 right-of-way restoration per tap installed without a road cut ($1,439.55 with a road cut). Other city-installed taps: existing lateral $497.30, deep lateral (over 5 feet) $2,418.11, 2 in. force main $2,418.11, each plus restoration; extensions and special installations at cost plus 25%. Where a contractor makes the tap, the city charges $468.94 (gravity) or $783.03 (force main) plus an inspection fee. Charges step each October 1 with the CPI.
- Sewer Connection Fee (City of St. Augustine)$2,001.30 one-timeOutside Northwest Area overlayCity of St. Augustine UtilitiesCity of St. Augustine sewer connection fee (FY 2027 Utility Rates and Fees, Exhibit A, effective October 1, 2026): $9.53 per gallon per day of the use's listed flow under Code Sec. 26-53, shown for one residential ERC (210 gallons per day). Nonresidential connections pay for their listed flow, so larger uses pay proportionally more. Properties inside the city's Northwest Area Forcemain Overlay also pay a forcemain surcharge of $1,226.40 per ERC (the Northwest Area overlay option). Connection charges step each October 1 with the CPI. Tap and right-of-way restoration charges are separate.
- Mobility Fee (City of St. Augustine, Office)$1.62/sq ftRequires confirmationCity of St. AugustineCity of St. Augustine Mobility Fee (Code Sec. 21-64(b), Ord. 2022-01), in effect since May 17, 2022, charged per square foot of new nonresidential floor area in lieu of road impact fees; the whole city is one mobility fee benefit district. The rate shown is the codified Office (bank, general, higher education, professional) rate; medical office pays $2.43 per sq ft. Under Code Sec. 21-75(b) the schedule rises each January 1, starting in 2023, by the FDOT construction cost inflation factor, so the rate in force can be higher than the codified figure.
- County Impact Fees (St. Johns County, Office) — city opt-out, N/A nonres$0.00St. Johns CountySt. Augustine is exempt from St. Johns County nonresidential impact fees; the City of St. Augustine Mobility Fee applies in lieu of county road impact fees.
Where in St. Johns County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
St. Augustine Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Brush up on impact fee basics before you budget your next project.
Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
St. Augustine Impact Fee FAQs
What are the total impact fees for a single-family home in St. Augustine, Florida?
A new single-family home in St. Augustine pays $16,901.51 per unit in combined impact fees (rates sourced October 27, 2026).
How much are commercial impact fees in St. Augustine?
Commercial development in St. Augustine pays $3.42 per square foot in impact fees, plus $9,185.18 in one-time water and sewer connection fees (assuming a 1-inch meter), about $180,185.18 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does St. Augustine charge its own impact fees?
Yes. St. Augustine levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in St. Augustine, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the St. Johns County impact fees page.