St. Augustine Beach impact fees by project type
St. Augustine Beach: Single-Family Impact Fees
A new single-family home in St. Augustine Beach pays $31,322.20 per unit in impact fees (rates sourced July 18, 2026). All of it is levied by St. Johns County.
The largest line items are Sewer Connection Fee (SJC Utility) ($5,905.25) and Water Connection Fee (SJC Utility) ($2,926.95).
County Impact Fees - 1,801-2,500 sq ft (Phase 1) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Connection Fee (SJC Utility)$2,926.95St. Johns County UtilitySt. Augustine Beach is served by St. Johns County Utility (Anastasia Island system). SJCU FY2026 Tariff Sch A: Water connection $2,926.95/ERC (1.0 ERC per dwelling). SJCU (904) 209-2700.
- Sewer Connection Fee (SJC Utility)$5,905.25St. Johns County UtilitySt. Augustine Beach served by SJCU (Anastasia Island WWTF). SJCU FY2026 Tariff Sch A: Sewer connection $5,905.25/ERC. SJCU (904) 209-2700.
- Municipal Impact Fees$0.00City of St. Augustine BeachSt. Augustine Beach levies NO municipal (city-level) impact fee. Per interlocal agreement with St. Johns County, SAB collects the COUNTY impact-fee schedule (SJC Ord. 2018-16, as amended) — see County records. $0 confirms no separate city impact fee. City Hall (904) 471-2122.
- County Impact Fees - 1,801-2,500 sq ft (Phase 1)$22,490.00Requires confirmationSt. Johns County (School District)St. Augustine Beach collects the FULL St. Johns County impact-fee schedule via interlocal agreement (SJC Ord. 2018-16, as amended) — NOT just the school fee. Representative 1,801-2,500 sf du = full combined county fee. Amount = county CURRENT Phase 1 schedule (eff. 3/4/2026, matches unincorporated). NOTE: SAB's own posted schedule (staugbch.com/media/16426) still shows the SUPERSEDED Oct-2023 figures (1,801-2,500 = $19,870; 6 categories, no Conservation) — confirm which schedule SAB currently applies and build out remaining size tiers. SJC Growth Mgmt (904) 209-0675.
Where in St. Johns County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
St. Augustine Beach: Multifamily Impact Fees
A new multifamily unit in St. Augustine Beach pays $21,947.20 per unit in impact fees (rates sourced July 18, 2026). All of it is levied by St. Johns County.
The largest line items are Sewer Connection Fee (SJC Utility, MF) ($5,905.25) and Water Connection Fee (SJC Utility, MF) ($2,926.95).
Impact Fees - Multifamily 801-1,250 sq ft (Phase 1, eff. 3/4/2026) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Connection Fee (SJC Utility, MF)$2,926.95St. Johns County UtilitySt. Augustine Beach is served by St. Johns County Utility (Anastasia Island system). SJCU FY2026 Tariff Sch A: Water connection 1.0 ERC/unit = $2,926.95. SJCU (904) 209-2700.
- Sewer Connection Fee (SJC Utility, MF)$5,905.25St. Johns County UtilitySt. Augustine Beach served by SJCU (Anastasia Island WWTF). SJCU FY2026 Tariff Sch A: Sewer connection 1.0 ERC/unit = $5,905.25. SJCU (904) 209-2700.
- Municipal Impact Fees (MF)$0.00City of St. Augustine BeachSt. Augustine Beach levies NO municipal (city-level) impact fee. Per interlocal agreement with St. Johns County, SAB collects the COUNTY impact-fee schedule (SJC Ord. 2018-16, as amended) — see County records. $0 confirms no separate city impact fee. City Hall (904) 471-2122.
- Impact Fees - Multifamily 801-1,250 sq ft (Phase 1, eff. 3/4/2026)$13,115.00Requires confirmationSt. Johns County (School District)St. Augustine Beach collects the FULL SJC impact-fee schedule via interlocal (Ord. 2018-16, as amended) — residential assessed by unit size (same schedule SF & MF), NOT just the school fee. Canonical MF 801-1,250 sf tier = current county Phase 1 (eff. 3/4/2026) combined fee $13,115 (matches unincorporated). NOTE: SAB's own posted schedule (staugbch.com/media/16426) still shows the SUPERSEDED Oct-2023 figures — confirm current schedule year + build remaining size tiers. SJC Growth Mgmt (904) 209-0675.
Where in St. Johns County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
St. Augustine Beach: Commercial Impact Fees
Commercial development in St. Augustine Beach pays $11.26 per square foot in impact fees, plus $8,832.20 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 50,000 sq ft building, that comes to about $571,982.20. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Connection Fee (SJC Utility) ($5,905.25 one-time), Water Connection Fee (SJC Utility) ($2,926.95 one-time) and Roads Impact Fee (St. Johns County, Commercial) ($7.39/sq ft).
View the full fee schedule
- Water Connection Fee (SJC Utility)$2,926.95 one-timeSt. Augustine Beach served by St. Johns County Utility (Anastasia Island system). SJCU FY2026 Rate Tariff (eff. 10/1/2025) Schedule A — nonres connection fee is demand-based per FAC 64E-6.008 (1.0 ERC = 350 gpd water); no commercial connection-fee meter table. 1.0-ERC nonres min = $2,926.95 (= residential; shared basis). Sch A(4) nonres meter-size ERU factors for sizing: 5/8"=1.0, 1"=2.5, 1.5"=5.0, 2"=8.0, 3"=15, 4"=25, 6"=60, 8"=80, 10"=115. SJCU (904) 209-2700.
- Sewer Connection Fee (SJC Utility)$5,905.25 one-timeSt. Augustine Beach served by SJCU (Anastasia Island WWTF). SJCU FY2026 Tariff (eff. 10/1/2025) Schedule A — demand-based connection fee per FAC 64E-6.008 (1.0 ERC = 280 gpd sewer); no commercial meter table. 1.0-ERC nonres min = $5,905.25 (= residential; shared basis). Sch A(4) nonres meter-size ERU factors: 5/8"=1.0,1"=2.5,1.5"=5,2"=8,3"=15,4"=25,6"=60,8"=80,10"=115. SJCU (904) 209-2700.
- City Impact Fees (City of St. Augustine Beach, Commercial)$0.00St. Augustine Beach levies NO municipal (city-level) impact fee. Per interlocal with St. Johns County (SJC Ord. 2018-16), SAB collects the COUNTY impact-fee schedule (see County records). $0 confirms no separate city impact fee. City Hall (904) 471-2122.
- Roads Impact Fee (St. Johns County, Commercial)$7.39/sq ftSJC Master Impact Fee Schedule Phase I (eff. 3/4/2026), ITE 821 Retail 40,001-150,000 sfgla (canonical ~50k sf), per 1,000 sfgla (GLA basis). Collected in St. Augustine Beach via interlocal (SJC Ord. 2018-16). SAB's own posted fee sheet still shows superseded Oct-2023 figures; county Phase I rates entered per interlocal collection of current county schedule. Schools/Parks/Conservation columns = $0 nonres. Steps up annually to Phase V (2030). SJC Growth Mgmt (904) 209-0675.
- Public Buildings Impact Fee (St. Johns County, Commercial)$2.43/sq ftSJC Master Impact Fee Schedule Phase I (eff. 3/4/2026), ITE 821 Retail 40,001-150,000 sfgla, per 1,000 sfgla. Collected in St. Augustine Beach via interlocal (SJC Ord. 2018-16). (904) 209-0675.
- Law & Jail Impact Fee (St. Johns County, Commercial)$1.20/sq ftSJC Master Impact Fee Schedule Phase I (eff. 3/4/2026), Law Enforcement & Jail column, ITE 821 Retail 40,001-150,000 sfgla, per 1,000 sfgla. Collected in St. Augustine Beach via interlocal (SJC Ord. 2018-16). (904) 209-0675.
- Fire Rescue Impact Fee (St. Johns County, Commercial)$0.24/sq ftSJC Master Impact Fee Schedule Phase I (eff. 3/4/2026), ITE 821 Retail 40,001-150,000 sfgla, per 1,000 sfgla. Collected in St. Augustine Beach via interlocal (SJC Ord. 2018-16). (904) 209-0675.
Where in St. Johns County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
St. Augustine Beach: Industrial Impact Fees
Industrial development in St. Augustine Beach pays $3.50 per square foot in impact fees, plus $8,832.20 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 50,000 sq ft building, that comes to about $183,782.20. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Connection Fee (SJC Utility) ($5,905.25 one-time), Water Connection Fee (SJC Utility) ($2,926.95 one-time) and Roads Impact Fee (St. Johns County, Industrial) ($3.08/sq ft).
View the full fee schedule
- Water Connection Fee (SJC Utility)$2,926.95 one-timeSt. Augustine Beach served by St. Johns County Utility (Anastasia Island system). SJCU FY2026 Rate Tariff (eff. 10/1/2025) Schedule A — nonres connection fee is demand-based per FAC 64E-6.008 (1.0 ERC = 350 gpd water); no commercial connection-fee meter table. 1.0-ERC nonres min = $2,926.95 (= residential; shared basis). Sch A(4) nonres meter-size ERU factors for sizing: 5/8"=1.0, 1"=2.5, 1.5"=5.0, 2"=8.0, 3"=15, 4"=25, 6"=60, 8"=80, 10"=115. SJCU (904) 209-2700.
- Sewer Connection Fee (SJC Utility)$5,905.25 one-timeSt. Augustine Beach served by SJCU (Anastasia Island WWTF). SJCU FY2026 Tariff (eff. 10/1/2025) Schedule A — demand-based connection fee per FAC 64E-6.008 (1.0 ERC = 280 gpd sewer); no commercial meter table. 1.0-ERC nonres min = $5,905.25 (= residential; shared basis). Sch A(4) nonres meter-size ERU factors: 5/8"=1.0,1"=2.5,1.5"=5,2"=8,3"=15,4"=25,6"=60,8"=80,10"=115. SJCU (904) 209-2700.
- City Impact Fees (City of St. Augustine Beach, Industrial)$0.00St. Augustine Beach levies NO municipal impact fee; collects the county schedule via interlocal (SJC Ord. 2018-16). $0 confirms no separate city fee. (904) 471-2122.
- Roads Impact Fee (St. Johns County, Industrial)$3.08/sq ftSJC Master Impact Fee Schedule Phase I (eff. 3/4/2026), ITE 110 General Light Industrial, per 1,000 sf. Collected in St. Augustine Beach via interlocal (SJC Ord. 2018-16). Schools/Parks/Conservation = $0 nonres. (904) 209-0675.
- Public Buildings Impact Fee (St. Johns County, Industrial)$0.26/sq ftSJC Master Impact Fee Schedule Phase I (eff. 3/4/2026), ITE 110 General Light Industrial, per 1,000 sf. Collected in St. Augustine Beach via interlocal (SJC Ord. 2018-16). (904) 209-0675.
- Law & Jail Impact Fee (St. Johns County, Industrial)$0.13/sq ftSJC Master Impact Fee Schedule Phase I (eff. 3/4/2026), Law Enforcement & Jail column, ITE 110 General Light Industrial, per 1,000 sf. Collected in St. Augustine Beach via interlocal (SJC Ord. 2018-16). (904) 209-0675.
- Fire Rescue Impact Fee (St. Johns County, Industrial)$0.03/sq ftSJC Master Impact Fee Schedule Phase I (eff. 3/4/2026), ITE 110 General Light Industrial, per 1,000 sf. Collected in St. Augustine Beach via interlocal (SJC Ord. 2018-16). (904) 209-0675.
Where in St. Johns County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
St. Augustine Beach: Office Impact Fees
Office development in St. Augustine Beach pays $6.60 per square foot in impact fees, plus $8,832.20 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 25,000 sq ft building, that comes to about $173,807.20. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Connection Fee (SJC Utility) ($5,905.25 one-time), Water Connection Fee (SJC Utility) ($2,926.95 one-time) and Roads Impact Fee (St. Johns County, Office) ($5.39/sq ft).
View the full fee schedule
- Water Connection Fee (SJC Utility)$2,926.95 one-timeSt. Augustine Beach served by St. Johns County Utility (Anastasia Island system). SJCU FY2026 Rate Tariff (eff. 10/1/2025) Schedule A — nonres connection fee is demand-based per FAC 64E-6.008 (1.0 ERC = 350 gpd water); no commercial connection-fee meter table. 1.0-ERC nonres min = $2,926.95 (= residential; shared basis). Sch A(4) nonres meter-size ERU factors for sizing: 5/8"=1.0, 1"=2.5, 1.5"=5.0, 2"=8.0, 3"=15, 4"=25, 6"=60, 8"=80, 10"=115. SJCU (904) 209-2700.
- Sewer Connection Fee (SJC Utility)$5,905.25 one-timeSt. Augustine Beach served by SJCU (Anastasia Island WWTF). SJCU FY2026 Tariff (eff. 10/1/2025) Schedule A — demand-based connection fee per FAC 64E-6.008 (1.0 ERC = 280 gpd sewer); no commercial meter table. 1.0-ERC nonres min = $5,905.25 (= residential; shared basis). Sch A(4) nonres meter-size ERU factors: 5/8"=1.0,1"=2.5,1.5"=5,2"=8,3"=15,4"=25,6"=60,8"=80,10"=115. SJCU (904) 209-2700.
- City Impact Fees (City of St. Augustine Beach, Office)$0.00St. Augustine Beach levies NO municipal impact fee; collects the county schedule via interlocal (SJC Ord. 2018-16). $0 confirms no separate city fee. (904) 471-2122.
- Roads Impact Fee (St. Johns County, Office)$5.39/sq ftSJC Master Impact Fee Schedule Phase I (eff. 3/4/2026), ITE 710 Office, per 1,000 sf. Collected in St. Augustine Beach via interlocal (SJC Ord. 2018-16). Schools/Parks/Conservation = $0 nonres. (904) 209-0675.
- Public Buildings Impact Fee (St. Johns County, Office)$0.63/sq ftSJC Master Impact Fee Schedule Phase I (eff. 3/4/2026), ITE 710 Office, per 1,000 sf. Collected in St. Augustine Beach via interlocal (SJC Ord. 2018-16). (904) 209-0675.
- Law & Jail Impact Fee (St. Johns County, Office)$0.33/sq ftSJC Master Impact Fee Schedule Phase I (eff. 3/4/2026), Law Enforcement & Jail column, ITE 710 Office, per 1,000 sf. Collected in St. Augustine Beach via interlocal (SJC Ord. 2018-16). (904) 209-0675.
- Fire Rescue Impact Fee (St. Johns County, Office)$0.24/sq ftSJC Master Impact Fee Schedule Phase I (eff. 3/4/2026), ITE 710 Office, per 1,000 sf. Collected in St. Augustine Beach via interlocal (SJC Ord. 2018-16). (904) 209-0675.
Where in St. Johns County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in St. Augustine Beach
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in St. Augustine Beach, Florida?
A new single-family home in St. Augustine Beach pays $31,322.20 per unit in combined impact fees (rates sourced July 18, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
How much are commercial impact fees in St. Augustine Beach?
Commercial development in St. Augustine Beach pays $11.26 per square foot in impact fees, plus $8,832.20 in one-time water and sewer connection fees, about $571,982.20 for a 50,000 sq ft building.
Does St. Augustine Beach charge its own impact fees?
No. St. Augustine Beach does not levy its own municipal impact fees. New development in St. Augustine Beach pays St. Johns County impact fees, shown on this page.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the St. Johns County impact fees page.