Live Oak impact fees by project type
Live Oak: Single-Family Impact Fees
A new single-family home in Live Oak pays $1,888.47 per unit in impact fees (rates sourced July 18, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Impact Fee (City of Live Oak) ($1,286.34) and Water Impact Fee (City of Live Oak) ($602.13).
View the full fee schedule
- Water Impact Fee (City of Live Oak)$602.13City of Live OakCity Code Appendix A Fee Schedule (Sec. 40-2), current Municode codification. Water impact fee by meter size; 3/4" (standard residential) = $602.13 within city ($662.34 outside city). Effective per current fee schedule. City of Live Oak operates its own water utility.
- Sewer Impact Fee (City of Live Oak)$1,286.34City of Live OakCity Code Appendix A Fee Schedule (Sec. 40-2), current Municode codification. Sewer impact fee by meter size; 3/4" (standard residential) = $1,286.34 within city ($1,414.98 outside city). City of Live Oak operates its own sewer utility.
- City Impact Fees (City of Live Oak)$0.00City of Live Oak$0 placeholder. Reviewed full City Code Appendix A Fee Schedule (all chapters) — Live Oak charges building-permit and utility (water/sewer/gas/reclaimed/stormwater) fees but NO parks, police, fire, transportation/mobility, or general municipal impact fees. Confirm with City Clerk 386-362-2276 if new impact fees adopted.
- County Impact Fees (Suwannee County) — in City of Live Oak$0.00Suwannee County$0 — Suwannee County has NOT adopted impact fees. County code (codified through Ord. 2025-06) contains no impact fee chapter; Commission discussed considering impact fees May 2025 but none adopted. No county transportation/school/fire impact fees apply. VERIFY: Suwannee Co Planning & Zoning 386-364-3400.
Where in Suwannee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Live Oak: Multifamily Impact Fees
A new multifamily unit in Live Oak pays $1,888.47 per unit in impact fees (rates sourced July 18, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Impact Fee (City of Live Oak, MF) ($1,286.34) and Water Impact Fee (City of Live Oak, MF) ($602.13).
View the full fee schedule
- Water Impact Fee (City of Live Oak, MF)$602.13City of Live OakCity Code Appendix A (Sec. 40-2). Water impact fee assessed by meter size, not per dwelling unit; 3/4" = $602.13 within city (default shown). MF developments pay based on installed/master meter size (larger meters cost more: 1"=$1,587.43, 1.5"=$2,791.69, 2"=$4,324.39 in-city). VERIFY MF master-meter sizing with City 386-362-2276.
- Sewer Impact Fee (City of Live Oak, MF)$1,286.34City of Live OakCity Code Appendix A (Sec. 40-2). Sewer impact fee assessed by meter size; 3/4" = $1,286.34 within city (default). Larger meters: 1"=$3,339.09, 1.5"=$5,911.82, 2"=$9,141.43 in-city. VERIFY MF master-meter sizing with City 386-362-2276.
- City Impact Fees (City of Live Oak, MF)$0.00City of Live Oak$0 placeholder. Reviewed full City Code Appendix A Fee Schedule — no parks/police/fire/transportation/general municipal impact fees. Same as SFR. Confirm with City Clerk 386-362-2276.
- County Impact Fees (Suwannee County, MF) — in City of Live Oak$0.00Suwannee County$0 — Suwannee County has not adopted impact fees. No county transportation/school/fire impact fees. VERIFY: Planning & Zoning 386-364-3400.
Where in Suwannee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Live Oak: Commercial Impact Fees
Commercial development in Live Oak pays no per-square-foot impact fees, but owes $4,926.52 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 50,000 sq ft building, that comes to about $4,926.52. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (City of Live Oak) — 1" meter ($3,339.09 one-time) and Water Impact Fee (City of Live Oak) — 1" meter ($1,587.43 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the full fee schedule
- Water Impact Fee (City of Live Oak) — 1" meter$1,587.43 one-timeCity of Live Oak water impact/capacity fee by meter size, Code Appendix A Sec. 40-2, Within-City column (current Municode codification). ONE shared meter ladder across all customer classes (nonres = residential at same meter size). Meters 3" and greater sized by employees/seats ($603.89 × Q ratio). Outside-City column ~10% higher (3/4" $662.34, 1" $1,746.17, 1.5" $3,070.86, 2" $4,756.82). Separate physical water tapping fee is Sec. 40-28. Canonical 1" default.
- Sewer Impact Fee (City of Live Oak) — 1" meter$3,339.09 one-timeCity of Live Oak sewer impact/capacity fee by meter size, Code Appendix A Sec. 40-2, Within-City column (current Municode codification). ONE shared meter ladder across all customer classes (nonres = residential at same meter size). Meters greater than 3" as recommended by city administrator and approved by city council. Outside-City column ~10% higher (3/4" $1,414.98, 1" $3,672.99, 1.5" $6,503.01, 2" $10,055.57). Separate physical sewer tapping fee is Sec. 40-119. Canonical 1" default.
- City Impact Fee (City of Live Oak, Commercial)$0.00$0 confirmed. Full City Code Appendix A Fee Schedule (Municode, current) reviewed end-to-end 2026-07-18: Live Oak levies building-permit, fire-review, solid-waste and utility (water/sewer/gas/reclaimed/stormwater) fees but NO parks, police, fire, transportation/mobility or general municipal impact fees on development. Live Oak runs its own W/S utility (fees in W/S table).
- County Impact Fee (Suwannee County, Commercial) — in City of Live Oak$0.00$0 confirmed. Suwannee County has adopted NO impact fees — county Code (Municode, codified through Ord. 2025-06, Supp. 18) has no impact-fee chapter (Ch. 70 Art. V is recurring service assessments, not impact fees). BOCC discussed considering impact fees May 2025; none adopted as of 2026-07. VERIFY Planning & Zoning 386-364-3400.
Where in Suwannee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.
Live Oak: Industrial Impact Fees
Industrial development in Live Oak pays no per-square-foot impact fees, but owes $4,926.52 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 50,000 sq ft building, that comes to about $4,926.52. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (City of Live Oak) — 1" meter ($3,339.09 one-time) and Water Impact Fee (City of Live Oak) — 1" meter ($1,587.43 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the full fee schedule
- Water Impact Fee (City of Live Oak) — 1" meter$1,587.43 one-timeCity of Live Oak water impact/capacity fee by meter size, Code Appendix A Sec. 40-2, Within-City column (current Municode codification). ONE shared meter ladder across all customer classes (nonres = residential at same meter size). Meters 3" and greater sized by employees/seats ($603.89 × Q ratio). Outside-City column ~10% higher (3/4" $662.34, 1" $1,746.17, 1.5" $3,070.86, 2" $4,756.82). Separate physical water tapping fee is Sec. 40-28. Canonical 1" default.
- Sewer Impact Fee (City of Live Oak) — 1" meter$3,339.09 one-timeCity of Live Oak sewer impact/capacity fee by meter size, Code Appendix A Sec. 40-2, Within-City column (current Municode codification). ONE shared meter ladder across all customer classes (nonres = residential at same meter size). Meters greater than 3" as recommended by city administrator and approved by city council. Outside-City column ~10% higher (3/4" $1,414.98, 1" $3,672.99, 1.5" $6,503.01, 2" $10,055.57). Separate physical sewer tapping fee is Sec. 40-119. Canonical 1" default.
- City Impact Fee (City of Live Oak, Industrial)$0.00$0 confirmed. Full City Code Appendix A Fee Schedule (Municode, current) reviewed end-to-end 2026-07-18: Live Oak levies only permit/fire-review/solid-waste/utility fees, NO parks/police/fire/transportation/general municipal impact fees on development.
- County Impact Fee (Suwannee County, Industrial) — in City of Live Oak$0.00$0 confirmed. Suwannee County has adopted NO impact fees (Code through Ord. 2025-06 has no impact-fee chapter). VERIFY Planning & Zoning 386-364-3400.
Where in Suwannee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.
Live Oak: Office Impact Fees
Office development in Live Oak pays no per-square-foot impact fees, but owes $4,926.52 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 25,000 sq ft building, that comes to about $4,926.52. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (City of Live Oak) — 1" meter ($3,339.09 one-time) and Water Impact Fee (City of Live Oak) — 1" meter ($1,587.43 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the full fee schedule
- Water Impact Fee (City of Live Oak) — 1" meter$1,587.43 one-timeCity of Live Oak water impact/capacity fee by meter size, Code Appendix A Sec. 40-2, Within-City column (current Municode codification). ONE shared meter ladder across all customer classes (nonres = residential at same meter size). Meters 3" and greater sized by employees/seats ($603.89 × Q ratio). Outside-City column ~10% higher (3/4" $662.34, 1" $1,746.17, 1.5" $3,070.86, 2" $4,756.82). Separate physical water tapping fee is Sec. 40-28. Canonical 1" default.
- Sewer Impact Fee (City of Live Oak) — 1" meter$3,339.09 one-timeCity of Live Oak sewer impact/capacity fee by meter size, Code Appendix A Sec. 40-2, Within-City column (current Municode codification). ONE shared meter ladder across all customer classes (nonres = residential at same meter size). Meters greater than 3" as recommended by city administrator and approved by city council. Outside-City column ~10% higher (3/4" $1,414.98, 1" $3,672.99, 1.5" $6,503.01, 2" $10,055.57). Separate physical sewer tapping fee is Sec. 40-119. Canonical 1" default.
- City Impact Fee (City of Live Oak, Office)$0.00$0 confirmed. Full City Code Appendix A Fee Schedule (Municode, current) reviewed end-to-end 2026-07-18: Live Oak levies only permit/fire-review/solid-waste/utility fees, NO parks/police/fire/transportation/general municipal impact fees on development.
- County Impact Fee (Suwannee County, Office) — in City of Live Oak$0.00$0 confirmed. Suwannee County has adopted NO impact fees (Code through Ord. 2025-06 has no impact-fee chapter). VERIFY Planning & Zoning 386-364-3400.
Where in Suwannee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.
Estimate your project in Live Oak
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Live Oak, Florida?
A new single-family home in Live Oak pays $1,888.47 per unit in combined impact fees (rates sourced July 18, 2026).
How much are commercial impact fees in Live Oak?
Commercial development in Live Oak pays no per-square-foot impact fees, but owes $4,926.52 in one-time water and sewer connection fees (assuming a 1-inch meter).
Does Live Oak charge its own impact fees?
Yes. Live Oak levies its own municipal impact or utility fees. Suwannee County does not currently add county-level impact fees inside Live Oak. The schedule on this page shows every fee that applies to development in Live Oak.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Suwannee County impact fees page.