Taylor County Impact Fees by Project Type
Where in Taylor County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours.
Unincorporated Taylor County: Single-Family Impact Fees
Unincorporated Taylor County does not currently levy impact fees on a new single-family home (rates sourced October 27, 2026). The schedule below documents the status of each fee.
View the Full Taylor County Impact Fee Schedule
- Water Connection Fee (Taylor County Unincorporated) — Private well$0.00None (private well)Most of unincorporated Taylor County relies on private wells, which carry no utility connection fee. Homes in the coastal Taylor Coastal Water & Sewer District pay its connection fee instead (see the option); Steinhatchee is served by the Big Bend Water Authority, whose connection charge is not shown here.
- Sewer Connection Fee (Taylor County Unincorporated) — On-site septic$0.00None (private septic)Most of unincorporated Taylor County is on on-site septic systems, which carry no sewer connection fee. In the coastal Taylor Coastal Water & Sewer District a low-pressure sewer connection requires the district's grinder pump installation instead (see the option).
- City Impact Fees (Taylor County Unincorporated)$0.00Taylor CountyNo municipal impact fees apply in unincorporated Taylor County; municipal fees apply only within incorporated Perry. County-level fees are shown on the county record.
- County Impact Fees (Taylor County)$0.00Taylor CountyTaylor County has not adopted development impact fees. The county Land Development Code provides only concurrency review and a proportionate fair-share transportation program (case-by-case mitigation), not a flat impact fee. There is no county school impact fee.
Where in Taylor County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours.
Unincorporated Taylor County: Multifamily Impact Fees
Unincorporated Taylor County does not currently levy impact fees on a new multifamily unit (rates sourced October 27, 2026). The schedule below documents the status of each fee.
View the Full Taylor County Impact Fee Schedule
- Water Connection Fee (Taylor County Unincorporated, MF) — Private well$0.00None (private well)Most of unincorporated Taylor County relies on private wells, which carry no utility connection fee. Homes in the coastal Taylor Coastal Water & Sewer District pay its connection fee instead (see the option); Steinhatchee is served by the Big Bend Water Authority, whose connection charge is not shown here.
- Sewer Connection Fee (Taylor County Unincorporated, MF) — On-site septic$0.00None (private septic)Most of unincorporated Taylor County is on on-site septic systems, which carry no sewer connection fee. In the coastal Taylor Coastal Water & Sewer District a low-pressure sewer connection requires the district's grinder pump installation instead (see the option).
- City Impact Fees (Taylor County Unincorporated, MF)$0.00Taylor CountyNo municipal impact fees apply in unincorporated Taylor County; municipal fees apply only within incorporated Perry. County-level fees are shown on the county record.
- County Impact Fees (Taylor County, MF)$0.00Taylor CountyTaylor County has not adopted development impact fees. The county Land Development Code provides only concurrency review and a proportionate fair-share transportation program (case-by-case mitigation), not a flat impact fee. There is no county school impact fee.
Where in Taylor County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.
Unincorporated Taylor County: Commercial Impact Fees
Unincorporated Taylor County does not currently levy impact fees on commercial development (rates sourced October 27, 2026). The schedule below documents the adopted zero or exempt status for each fee.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Taylor County Impact Fee Schedule
- Water Connection Fee (Taylor County Unincorporated) — Private well$0.00None (private well)Most of unincorporated Taylor County relies on private wells, which carry no utility connection fee. Sites in the coastal Taylor Coastal Water & Sewer District pay its connection fee instead (see the option); Steinhatchee is served by the Big Bend Water Authority, whose connection charge is not shown here.
- Sewer Connection Fee (Taylor County Unincorporated) — On-site septic$0.00None (private septic)Most of unincorporated Taylor County is on on-site septic systems, which carry no sewer connection fee. In the coastal Taylor Coastal Water & Sewer District a low-pressure sewer connection requires the district's grinder pump installation instead (see the option).
- City Impact Fees (Taylor County Unincorporated, Commercial)$0.00Unincorporated Taylor County has no municipal government, so no city impact fee applies. Taylor County levies no development impact fee either.
- County Impact Fees (Taylor County, Commercial) — Unincorporated$0.00Taylor County has not adopted development impact fees. The county Land Development Code provides concurrency review and proportionate fair-share transportation mitigation (case by case), not a flat impact fee.
Where in Taylor County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.
Unincorporated Taylor County: Industrial Impact Fees
Unincorporated Taylor County does not currently levy impact fees on industrial development (rates sourced October 27, 2026). The schedule below documents the adopted zero or exempt status for each fee.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Taylor County Impact Fee Schedule
- Water Connection Fee (Taylor County Unincorporated) — Private well$0.00None (private well)Most of unincorporated Taylor County relies on private wells, which carry no utility connection fee. Sites in the coastal Taylor Coastal Water & Sewer District pay its connection fee instead (see the option); Steinhatchee is served by the Big Bend Water Authority, whose connection charge is not shown here.
- Sewer Connection Fee (Taylor County Unincorporated) — On-site septic$0.00None (private septic)Most of unincorporated Taylor County is on on-site septic systems, which carry no sewer connection fee. In the coastal Taylor Coastal Water & Sewer District a low-pressure sewer connection requires the district's grinder pump installation instead (see the option).
- City Impact Fees (Taylor County Unincorporated, Industrial)$0.00Unincorporated Taylor County has no municipal government, so no city impact fee applies. Taylor County levies no development impact fee either.
- County Impact Fees (Taylor County, Industrial) — Unincorporated$0.00Taylor County has not adopted development impact fees. The county Land Development Code provides concurrency review and proportionate fair-share transportation mitigation (case by case), not a flat impact fee.
Where in Taylor County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.
Unincorporated Taylor County: Office Impact Fees
Unincorporated Taylor County does not currently levy impact fees on office development (rates sourced October 27, 2026). The schedule below documents the adopted zero or exempt status for each fee.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Taylor County Impact Fee Schedule
- Water Connection Fee (Taylor County Unincorporated) — Private well$0.00None (private well)Most of unincorporated Taylor County relies on private wells, which carry no utility connection fee. Sites in the coastal Taylor Coastal Water & Sewer District pay its connection fee instead (see the option); Steinhatchee is served by the Big Bend Water Authority, whose connection charge is not shown here.
- Sewer Connection Fee (Taylor County Unincorporated) — On-site septic$0.00None (private septic)Most of unincorporated Taylor County is on on-site septic systems, which carry no sewer connection fee. In the coastal Taylor Coastal Water & Sewer District a low-pressure sewer connection requires the district's grinder pump installation instead (see the option).
- City Impact Fees (Taylor County Unincorporated, Office)$0.00Unincorporated Taylor County has no municipal government, so no city impact fee applies. Taylor County levies no development impact fee either.
- County Impact Fees (Taylor County, Office) — Unincorporated$0.00Taylor County has not adopted development impact fees. The county Land Development Code provides concurrency review and proportionate fair-share transportation mitigation (case by case), not a flat impact fee.
Taylor County Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Taylor County Impact Fee FAQs
How much are commercial impact fees in Taylor County?
Unincorporated Taylor County does not currently levy impact fees on commercial development.
Do cities in Taylor County charge their own impact fees?
Yes. Every incorporated city applies its own fee schedule. 1 of 1 cities in Taylor County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.