Perry impact fees by project type
Perry: Single-Family Impact Fees
A new single-family home in Perry pays $848.28 per unit in impact fees (rates sourced July 18, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Impact Fee (City of Perry) — 15 FU × $29.89/FU ($448.28) and Water Connection Fee (City of Perry) ($400.00).
View the full fee schedule
- Water Connection Fee (City of Perry)$400.00City of PerryCity of Perry operates its own water utility. New residential service connection = $400 (3/4" meter); business/commercial $600. Meters larger than 3/4" add tapping fee + material/labor. Source: Municode Appendix A, Sec. 50-624(b) (Ord. No. 1033, eff. 9-26-2023). No separate water capacity/impact fee in Perry's code — this connection fee is the one-time water charge.
- Sewer Impact Fee (City of Perry) — 15 FU × $29.89/FU$448.28City of PerrySewer impact fee = $2.15 × 13.9 × total plumbing fixture units = $29.89/FU (Municode Appendix A, Sec. 50-227; Ord. No. 891, 6-14-2011). Verified current 7/17/2026 — §50-227 formula unchanged (the 2023 Ord. 1033 updated only the monthly rate sections 50-226/50-624, not the impact fee). Modeled at the canonical SFR 3BR/2BA = 15 FU → $448.28. Separate $100 min sewer connection/inspection charge per Sec. 50-225. Authority: City of Perry.
- City Impact Fees (City of Perry)$0.00City of Perry$0 placeholder — documents review. Reviewed Perry's consolidated fee schedule (Municode Appendix A) and full chapter list: the city charges building permit, zoning, subdivision and utility fees only. No parks/recreation, police, fire, EMS, transportation/mobility, or general-government impact fees adopted. Appendix A eff. through Ord. 1033 (2023).
- County Impact Fees (Taylor County)$0.00Taylor County$0 placeholder — Taylor County has NOT adopted development impact fees. No impact-fee chapter exists in the county Code of Ordinances (Supp. 20, Apr 2025); the Land Development Code (Ch. 42) contains only concurrency (Art. III) and a Proportionate Fair-Share Transportation Program (Sec. 42-271 et seq.) — case-by-case mitigation, not a flat impact fee. No county school impact fee (rural district). Applies to city + unincorporated.
Where in Taylor County are you building?
Each jurisdiction applies its own fee schedule. Pick yours.
Perry: Multifamily Impact Fees
A new multifamily unit in Perry pays at least $298.85 per unit in impact fees (rates sourced July 18, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Impact Fee (City of Perry, MF) — 10 FU × $29.89/FU ($298.85).
Water Connection Fee (City of Perry, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Connection Fee (City of Perry, MF)Requires confirmationCity of Perry$0 ⚠️ VERIFY — Per Sec. 50-624(b), apartment complexes with more than one unit per building require a master meter, and the tapping fee is assessed on a per-unit basis plus material and labor; the flat per-unit amount is not published in the code. SFR base connection is $400 (3/4"). Confirm MF per-unit connection amount with City Hall (850) 584-7161.
- Sewer Impact Fee (City of Perry, MF) — 10 FU × $29.89/FU$298.85City of PerrySewer impact fee = $2.15 × 13.9 × total plumbing fixture units = $29.89/FU (Municode Appendix A, Sec. 50-227; Ord. No. 891, 6-14-2011). Verified current 7/17/2026. Same per-FU formula as SFR; modeled at the canonical MF 2BR/2BA unit = 10 FU → $298.85 per unit (fewer fixtures than the SFR house). Separate $100 min sewer connection/inspection per Sec. 50-225.
- City Impact Fees (City of Perry, MF)$0.00City of Perry$0 placeholder — documents review. Perry's consolidated fee schedule (Municode Appendix A) + full chapter list show only building permit, zoning, subdivision and utility fees. No parks, police, fire, EMS, transportation/mobility, or general-government impact fees adopted.
- County Impact Fees (Taylor County, MF)$0.00Taylor County$0 placeholder — Taylor County has NOT adopted development impact fees. No impact-fee chapter in county code (Supp. 20, Apr 2025); Land Development Code (Ch. 42) has only concurrency + Proportionate Fair-Share Transportation (Sec. 42-271 et seq.), not a flat impact fee. No county school impact fee.
Where in Taylor County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Perry: Commercial Impact Fees
Commercial development in Perry pays no per-square-foot impact fees, but owes $600.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 50,000 sq ft building, that comes to at least $600.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (City of Perry) ($600.00 one-time).
Sewer Impact Fee (City of Perry) — per fixture unit is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Connection Fee (City of Perry)$600.00 one-timeBusiness/commercial water service connection $600 (one-time) — Municode Appendix A §50-624(b), Ord. 1033 eff. 9-26-2023. City of Perry operates its own water utility. Meters larger than 3/4" add tapping fee + material/labor (quoted, not published). No separate water capacity/impact fee in Perry's code. (Residential connection is $400 for comparison.) Authority: City of Perry.
- Sewer Impact Fee (City of Perry) — per fixture unitContact jurisdiction/utility to verifySewer impact fee = $2.15 × 13.9 × total plumbing fixture units = $29.89 per fixture unit (Municode Appendix A §50-227; Ord. 891, 6-14-2011). Formula verified current 7/2026 (unchanged by 2023 Ord. 1033, which updated only monthly-rate sections). Applies to all building types by fixture-unit count — no meter/ERU table. Separate $100 minimum sewer connection/inspection charge per §50-225. Authority: City of Perry.
- City Impact Fees (City of Perry, Commercial)$0.00$0 — Perry levies no nonresidential impact/development fees. Full consolidated fee schedule (Municode Appendix A, thru Ord. 1033, 2023) + chapter list reviewed: only building permit, zoning, subdivision, and utility fees. No transportation/mobility, parks, police, fire, or EMS impact fees. Confirmed $0 (Commercial).
- County Impact Fees (Taylor County, Commercial)$0.00$0 — Taylor County has adopted NO development impact fees (no impact-fee chapter in county Code, Supp. 20 Apr 2025; LDC Ch. 42 has only concurrency Art. III + Proportionate Fair-Share Transportation §42-271 et seq., case-by-case mitigation, not a flat impact fee). Applies within Perry. Confirmed $0 (Commercial).
Where in Taylor County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.
Perry: Industrial Impact Fees
Industrial development in Perry pays no per-square-foot impact fees, but owes $600.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 50,000 sq ft building, that comes to at least $600.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (City of Perry) ($600.00 one-time).
Sewer Impact Fee (City of Perry) — per fixture unit is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Connection Fee (City of Perry)$600.00 one-timeBusiness/commercial water service connection $600 (one-time) — Municode Appendix A §50-624(b), Ord. 1033 eff. 9-26-2023. City of Perry operates its own water utility. Meters larger than 3/4" add tapping fee + material/labor (quoted, not published). No separate water capacity/impact fee in Perry's code. (Residential connection is $400 for comparison.) Authority: City of Perry.
- Sewer Impact Fee (City of Perry) — per fixture unitContact jurisdiction/utility to verifySewer impact fee = $2.15 × 13.9 × total plumbing fixture units = $29.89 per fixture unit (Municode Appendix A §50-227; Ord. 891, 6-14-2011). Formula verified current 7/2026 (unchanged by 2023 Ord. 1033, which updated only monthly-rate sections). Applies to all building types by fixture-unit count — no meter/ERU table. Separate $100 minimum sewer connection/inspection charge per §50-225. Authority: City of Perry.
- City Impact Fees (City of Perry, Industrial)$0.00$0 — Perry levies no nonresidential impact/development fees. Full consolidated fee schedule (Municode Appendix A, thru Ord. 1033, 2023) + chapter list reviewed: only building permit, zoning, subdivision, and utility fees. No transportation/mobility, parks, police, fire, or EMS impact fees. Confirmed $0 (Industrial).
- County Impact Fees (Taylor County, Industrial)$0.00$0 — Taylor County has adopted NO development impact fees (no impact-fee chapter in county Code, Supp. 20 Apr 2025; LDC Ch. 42 has only concurrency Art. III + Proportionate Fair-Share Transportation §42-271 et seq., case-by-case mitigation, not a flat impact fee). Applies within Perry. Confirmed $0 (Industrial).
Where in Taylor County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.
Perry: Office Impact Fees
Office development in Perry pays no per-square-foot impact fees, but owes $600.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 25,000 sq ft building, that comes to at least $600.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (City of Perry) ($600.00 one-time).
Sewer Impact Fee (City of Perry) — per fixture unit is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Connection Fee (City of Perry)$600.00 one-timeBusiness/commercial water service connection $600 (one-time) — Municode Appendix A §50-624(b), Ord. 1033 eff. 9-26-2023. City of Perry operates its own water utility. Meters larger than 3/4" add tapping fee + material/labor (quoted, not published). No separate water capacity/impact fee in Perry's code. (Residential connection is $400 for comparison.) Authority: City of Perry.
- Sewer Impact Fee (City of Perry) — per fixture unitContact jurisdiction/utility to verifySewer impact fee = $2.15 × 13.9 × total plumbing fixture units = $29.89 per fixture unit (Municode Appendix A §50-227; Ord. 891, 6-14-2011). Formula verified current 7/2026 (unchanged by 2023 Ord. 1033, which updated only monthly-rate sections). Applies to all building types by fixture-unit count — no meter/ERU table. Separate $100 minimum sewer connection/inspection charge per §50-225. Authority: City of Perry.
- City Impact Fees (City of Perry, Office)$0.00$0 — Perry levies no nonresidential impact/development fees. Full consolidated fee schedule (Municode Appendix A, thru Ord. 1033, 2023) + chapter list reviewed: only building permit, zoning, subdivision, and utility fees. No transportation/mobility, parks, police, fire, or EMS impact fees. Confirmed $0 (Office).
- County Impact Fees (Taylor County, Office)$0.00$0 — Taylor County has adopted NO development impact fees (no impact-fee chapter in county Code, Supp. 20 Apr 2025; LDC Ch. 42 has only concurrency Art. III + Proportionate Fair-Share Transportation §42-271 et seq., case-by-case mitigation, not a flat impact fee). Applies within Perry. Confirmed $0 (Office).
Where in Taylor County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.
Estimate your project in Perry
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Perry, Florida?
A new single-family home in Perry pays $848.28 per unit in combined impact fees (rates sourced July 18, 2026).
How much are commercial impact fees in Perry?
Commercial development in Perry pays no per-square-foot impact fees, but owes $600.00 in one-time water and sewer connection fees. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
Does Perry charge its own impact fees?
Yes. Perry levies its own municipal impact or utility fees. Taylor County does not currently add county-level impact fees inside Perry. The schedule on this page shows every fee that applies to development in Perry.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Taylor County impact fees page.