IMPACTFEES.ORG

Perry, Florida Impact Fees

Perry applies its own fee schedule. Taylor County does not currently add county-level impact fees inside city limits. A new single-family home pays $848.28 per unit (rates sourced ). The full breakdown is below.

Perry impact fees by project type

Perry: Single-Family Impact Fees

A new single-family home in Perry pays $848.28 per unit in impact fees (rates sourced July 29, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Impact Fee (City of Perry) — 15 FU × $29.89/FU ($448.28) and Water Connection Fee (City of Perry) ($400.00).

View the full Perry impact fee schedule
Water$400.00
  • Water Connection Fee (City of Perry)
    City of Perry
    City of Perry operates its own water utility. A new residential water service connection is $400 for a standard 3/4-inch meter (business/commercial $600). Meter sizes larger than 3/4-inch add a tapping fee plus material and labor. Perry has no separate water capacity/impact fee — this connection charge is the one-time water fee. Rate current under Ord. No. 1033 (eff. 9-26-2023).
    $400.00
Sewer$448.28
  • Sewer Impact Fee (City of Perry) — 15 FU × $29.89/FU
    City of Perry
    City of Perry sewer impact fee = $2.15 × 13.9 × total plumbing fixture units ($29.89 per fixture unit), shown here for a canonical 3-bed/2-bath home (15 fixture units) = $448.28. A separate $100 minimum sewer connection/inspection charge applies. Fee set by Ord. No. 891 (6-14-2011); per-fixture-unit formula unchanged.
    $448.28
City$0.00
  • City Impact Fees (City of Perry)
    City of Perry
    The City of Perry has not adopted parks, police, fire, EMS, transportation/mobility, or general-government impact fees. The city charges only building-permit, zoning, subdivision, and utility fees. Reviewed through the city's consolidated fee schedule (Appendix A, Ord. No. 1033).
    $0.00
County$0.00
  • County Impact Fees (Taylor County)
    Taylor County
    Taylor County has not adopted development impact fees, so no county impact fee applies within the City of Perry. The county levies only concurrency and proportionate fair-share transportation mitigation. There is no county school impact fee.
    $0.00
Total (Perry): $848.28
Sources last checked Official fee schedules:City of Perry Taylor County

Where in Taylor County are you building?

Each jurisdiction applies its own fee schedule. Pick yours.

Perry: Multifamily Impact Fees

A new multifamily unit in Perry pays $698.85 per unit in impact fees (rates sourced July 29, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Connection Fee (City of Perry, MF) ($400.00) and Sewer Impact Fee (City of Perry, MF) — 10 FU × $29.89/FU ($298.85).

View the full Perry impact fee schedule
Water$400.00
  • Water Connection Fee (City of Perry, MF)
    City of Perry
    City of Perry charges the $400 residential water connection (tapping) fee on a per-unit basis for multi-unit buildings. Apartment complexes require a master meter (larger than 3/4-inch), so the master meter's tapping, material, and labor are billed in addition to the per-unit charge. Basis: Code §50-624(b).
    $400.00
Sewer$298.85
  • Sewer Impact Fee (City of Perry, MF) — 10 FU × $29.89/FU
    City of Perry
    City of Perry sewer impact fee = $2.15 × 13.9 × total plumbing fixture units ($29.89 per fixture unit), shown here for a canonical 2-bed/2-bath apartment unit (10 fixture units) = $298.85 per unit — fewer fixtures than a single-family house. A separate $100 minimum sewer connection/inspection charge applies. Fee set by Ord. No. 891 (6-14-2011).
    $298.85
City$0.00
  • City Impact Fees (City of Perry, MF)
    City of Perry
    The City of Perry has not adopted parks, police, fire, EMS, transportation/mobility, or general-government impact fees. The city charges only building-permit, zoning, subdivision, and utility fees. Reviewed through the city's consolidated fee schedule (Appendix A, Ord. No. 1033).
    $0.00
County$0.00
  • County Impact Fees (Taylor County, MF)
    Taylor County
    Taylor County has not adopted development impact fees, so no county impact fee applies within the City of Perry. The county levies only concurrency and proportionate fair-share transportation mitigation. There is no county school impact fee.
    $0.00
Total (Perry): $698.85
Sources last checked Official fee schedules:City of Perry Taylor County

Where in Taylor County are you building?

Each jurisdiction applies its own fee schedule. Pick yours.

Perry: Commercial Impact Fees

Commercial development in Perry pays no per-square-foot impact fees, but owes $600.00 in one-time water and sewer connection fees (rates sourced July 29, 2026).

For a 50,000 sq ft building, that comes to at least $600.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (City of Perry) ($600.00 one-time).

Sewer Impact Fee (City of Perry) — per fixture unit is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full Perry impact fee schedule
Water$600.00 one-time
  • Water Connection Fee (City of Perry)
    One-time commercial water service connection fee, effective September 26, 2023. Applies to City of Perry water utility customers. Meters larger than 3/4" incur an additional tapping fee based on material and labor cost. No separate water capacity or impact fee applies.
    $600.00 one-time
Sewer$0.00
  • Sewer Impact Fee (City of Perry) — per fixture unit
    Sewer impact fee assessed by plumbing fixture unit: $29.89 per fixture unit (derived as $2.15 × 13.9 × total fixture units). Charged to all building types by fixture-unit count; no meter or ERU basis. A separate $100 minimum sewer connection/inspection charge also applies. Rate current as of 2026.
    Contact jurisdiction/utility to verify
Total (Perry): $600.00 one-time (≈ $600.00 at 50,000 sq ft)
Sources last checked

Where in Taylor County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.

Perry: Industrial Impact Fees

Industrial development in Perry pays no per-square-foot impact fees, but owes $600.00 in one-time water and sewer connection fees (rates sourced July 29, 2026).

For a 50,000 sq ft building, that comes to at least $600.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (City of Perry) ($600.00 one-time).

Sewer Impact Fee (City of Perry) — per fixture unit is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full Perry impact fee schedule
Water$600.00 one-time
  • Water Connection Fee (City of Perry)
    One-time commercial water service connection fee, effective September 26, 2023. Applies to City of Perry water utility customers. Meters larger than 3/4" incur an additional tapping fee based on material and labor cost. No separate water capacity or impact fee applies.
    $600.00 one-time
Sewer$0.00
  • Sewer Impact Fee (City of Perry) — per fixture unit
    Sewer impact fee assessed by plumbing fixture unit: $29.89 per fixture unit (derived as $2.15 × 13.9 × total fixture units). Charged to all building types by fixture-unit count; no meter or ERU basis. A separate $100 minimum sewer connection/inspection charge also applies. Rate current as of 2026.
    Contact jurisdiction/utility to verify
Total (Perry): $600.00 one-time (≈ $600.00 at 50,000 sq ft)
Sources last checked

Where in Taylor County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.

Perry: Office Impact Fees

Office development in Perry pays no per-square-foot impact fees, but owes $600.00 in one-time water and sewer connection fees (rates sourced July 29, 2026).

For a 25,000 sq ft building, that comes to at least $600.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (City of Perry) ($600.00 one-time).

Sewer Impact Fee (City of Perry) — per fixture unit is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full Perry impact fee schedule
Water$600.00 one-time
  • Water Connection Fee (City of Perry)
    One-time commercial water service connection fee, effective September 26, 2023. Applies to City of Perry water utility customers. Meters larger than 3/4" incur an additional tapping fee based on material and labor cost. No separate water capacity or impact fee applies.
    $600.00 one-time
Sewer$0.00
  • Sewer Impact Fee (City of Perry) — per fixture unit
    Sewer impact fee assessed by plumbing fixture unit: $29.89 per fixture unit (derived as $2.15 × 13.9 × total fixture units). Charged to all building types by fixture-unit count; no meter or ERU basis. A separate $100 minimum sewer connection/inspection charge also applies. Rate current as of 2026.
    Contact jurisdiction/utility to verify
Total (Perry): $600.00 one-time (≈ $600.00 at 25,000 sq ft)
Sources last checked

Where in Taylor County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.

Perry impact fee calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Brush up on impact fee basics before you budget your next project.

Perry impact fee FAQs

What are the total impact fees for a single-family home in Perry, Florida?

A new single-family home in Perry pays $848.28 per unit in combined impact fees (rates sourced July 29, 2026).

How much are commercial impact fees in Perry?

Commercial development in Perry pays no per-square-foot impact fees, but owes $600.00 in one-time water and sewer connection fees. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

Does Perry charge its own impact fees?

Yes. Perry levies its own municipal impact or utility fees. Taylor County does not currently add county-level impact fees inside Perry. The schedule on this page shows every fee that applies to development in Perry.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Taylor County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.