Chipley, Florida Impact Fees

Chipley applies its own fee schedule: municipal fees plus the Washington County-levied fees that apply inside city limits. Combined, a new single-family home pays $7,191.62 per unit (rates sourced ). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Chipley impact fees by project type

Chipley: Single-Family Impact Fees

A new single-family home in Chipley pays $7,191.62 per unit in impact fees (rates sourced August 15, 2026). Of that, Washington County-levied fees account for $1,046.98 and municipal or utility fees for $6,144.64.

The largest line items are Sewer Tap + Impact Fee (City of Chipley) — 4" tap $2,158.93 + $1,604.25/unit + $178.25 per add'l bath ($3,941.43), Water Tap + Impact Fee (City of Chipley) — 3/4" tap $1,439.28 + $654.79/unit + $109.14 per add'l bath ($2,203.21) and County EMS Impact Fee (Washington County) ($74.98).

County Road Impact Fee (Washington County) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full Chipley impact fee schedule
Water$2,203.21
  • Water Tap + Impact Fee (City of Chipley) — 3/4" tap $1,439.28 + $654.79/unit + $109.14 per add'l bath
    City of Chipley
    City of Chipley water tap and impact fee for a single-family home: 3/4-inch tap $1,439.28, plus a water impact fee of $654.79 per dwelling unit, plus $109.14 for each bathroom over one — $2,203.21 total under Resolution 25-03 (October 8, 2024). The tap portion increased about 3.1% effective October 2025 (Resolution 26-04); the water impact fee is unchanged. Customers outside the city limits pay a 25% surcharge.
    $2,203.21
Sewer$3,941.43
  • Sewer Tap + Impact Fee (City of Chipley) — 4" tap $2,158.93 + $1,604.25/unit + $178.25 per add'l bath
    City of Chipley
    City of Chipley sewer tap and impact fee for a single-family home: 4-inch tap $2,158.93, plus a sewer impact fee of $1,604.25 per dwelling unit, plus $178.25 for each bathroom over one — $3,941.43 total under Resolution 25-03 (October 8, 2024). The tap portion increased about 3.1% effective October 2025 (Resolution 26-04); the sewer impact fee is unchanged. Customers outside the city limits pay a 25% surcharge.
    $3,941.43
City$0.00
  • Municipal Impact Fees (City of Chipley)
    City of Chipley
    The City of Chipley levies no municipal (non-utility) impact fees on single-family homes. Its only development charges are the Chapter 42 water and sewer tap and impact fees; planning and permit application fees are review charges, not impact fees.
    $0.00
County$1,046.98
  • County Road Impact Fee (Washington County)
    Washington County Board of County Commissioners
    Washington County Road impact fee: $972.00 for a detached single-family dwelling if imposed. Inside the City of Chipley, the county road fee applies only where the city has consented to it.
    $972.00Requires confirmation
  • County EMS Impact Fee (Washington County)
    Washington County Board of County Commissioners
    Washington County Emergency Medical Services impact fee: $74.98 per dwelling unit, a flat rate with no housing-type tiers, applied countywide including within the City of Chipley. Charged at building permit; a home replacing a structure removed within the prior seven years pays no fee. Current for 2026.
    $74.98
  • County Fire Protection Impact Fee (Washington County)
    Washington County Board of County Commissioners
    The Washington County fire protection impact fee is not levied in the City of Chipley, which operates its own fire department; the county fire fee reaches a municipality only where it participates in the county fire protection system.
    $0.00
Total (Chipley): $7,191.62
Sources last checked Official fee schedules:City of Chipley Washington County Board of County Commissioners
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Washington County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Chipley: Multifamily Impact Fees

A new multifamily unit in Chipley pays at least $1,937.93 per unit in impact fees (rates sourced August 15, 2026). Of that, Washington County-levied fees account for $74.98 and municipal or utility fees for $1,862.95.

The largest line items are Sewer Impact Fee (City of Chipley, MF) — $1,247.77/unit + $178.25 per add'l bath ($1,426.02), Water Impact Fee (City of Chipley, MF) — $327.79/unit + $109.14 per add'l bath ($436.93) and County EMS Impact Fee (Washington County, MF) ($74.98).

County Road Impact Fee (Washington County, MF) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full Chipley impact fee schedule
Water$436.93
  • Water Impact Fee (City of Chipley, MF) — $327.79/unit + $109.14 per add'l bath
    Apartment house dwelling (each unit)
    City of Chipley
    City of Chipley water impact fee for a multifamily apartment unit (the canonical unit): $327.79 per unit plus $109.14 for each bathroom over one — $436.93 for a 2-bath unit. Set by Resolution 25-03 (October 8, 2024); charged per dwelling unit. A separate water tap fee applies per meter by size. Subject to annual inflation adjustment; customers outside the city limits pay a 25% surcharge.
    $436.93
Sewer$1,426.02
  • Sewer Impact Fee (City of Chipley, MF) — $1,247.77/unit + $178.25 per add'l bath
    Apartment house dwelling (each unit)
    City of Chipley
    City of Chipley sewer impact fee for a multifamily apartment unit (the canonical unit): $1,247.77 per unit plus $178.25 for each bathroom over one — $1,426.02 for a 2-bath unit. Set by Resolution 25-03 (October 8, 2024); charged per dwelling unit. A separate sewer tap fee applies. Subject to annual inflation adjustment; customers outside the city limits pay a 25% surcharge.
    $1,426.02
City$0.00
  • Municipal Impact Fees (City of Chipley, MF)
    City of Chipley
    The City of Chipley levies no municipal (non-utility) impact fees on multifamily development. Its only development charges are the Chapter 42 water and sewer tap and impact fees; site-plan review fees are not impact fees.
    $0.00
County$74.98
  • County EMS Impact Fee (Washington County, MF)
    Washington County Board of County Commissioners
    Washington County Emergency Medical Services impact fee: $74.98 per dwelling unit, charged per multifamily unit (flat, no housing-type tiers), countywide including within the City of Chipley. Charged at building permit. Current for 2026.
    $74.98
  • County Fire Protection Impact Fee (Washington County, MF)
    Washington County Board of County Commissioners
    The Washington County fire protection impact fee is not levied in the City of Chipley, which operates its own fire department; the county fire fee reaches a municipality only where it participates in the county fire protection system.
    $0.00
  • County Road Impact Fee (Washington County, MF)
    Washington County Board of County Commissioners
    Washington County publishes only a single-family detached road impact fee rate; the multifamily rate (set by land-use category in the county's Appendix D schedule) is not published, so no county road impact fee amount is established for multifamily development.
    Requires confirmation
Total (Chipley): $1,937.93
Sources last checked Official fee schedules:City of Chipley Washington County Board of County Commissioners
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Washington County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Chipley: Commercial Impact Fees

Commercial development in Chipley pays no per-square-foot impact fees, but owes $3,958.03 in one-time water and sewer connection fees (rates sourced August 15, 2026).

For a 50,000 sq ft building, that comes to at least $3,958.03. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Tap + Impact Fee (City of Chipley) — 4" tap ($2,158.93 one-time) and Water Tap + Impact Fee (City of Chipley) — 1" meter ($1,799.10 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

County EMS Impact Fee (Washington County, Commercial), County Road Impact Fee (Washington County, Commercial), and County Fire Protection Impact Fee (Washington County, Commercial) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full Chipley impact fee schedule
Water$1,799.10 one-time
  • Water Tap + Impact Fee (City of Chipley) — 1" meter
    City of Chipley
    City of Chipley water service is a meter-size tap fee (1-inch meter shown) plus a use-based water impact fee (from $654.79 per lavatory equivalent). Parcels outside the city limits pay an additional 25%. Rates adjust annually for CPI; schedule effective October 2024.
    $1,799.10 one-time
Sewer$2,158.93 one-time
  • Sewer Tap + Impact Fee (City of Chipley) — 4" tap
    City of Chipley
    City of Chipley sewer service is a tap fee (4-inch shown; larger sizes at actual cost) plus a use-based sewer impact fee (from $1,604.25 per lavatory equivalent). Parcels outside the city limits pay an additional 25%. Rates adjust annually for CPI; schedule effective October 2024.
    $2,158.93 one-time
County$0.00
  • County EMS Impact Fee (Washington County, Commercial)
    Washington County Board of County Commissioners
    Washington County assesses road, fire, and EMS impact fees on new commercial development, but has adopted a published fee schedule for residential development only; a nonresidential rate schedule is not currently published.
    Requires confirmation
  • County Road Impact Fee (Washington County, Commercial)
    Washington County Board of County Commissioners
    Washington County assesses road, fire, and EMS impact fees on new commercial development, but has adopted a published fee schedule for residential development only; a nonresidential rate schedule is not currently published.
    Requires confirmation
  • County Fire Protection Impact Fee (Washington County, Commercial)
    Washington County Board of County Commissioners
    Washington County assesses road, fire, and EMS impact fees on new commercial development, but has adopted a published fee schedule for residential development only; a nonresidential rate schedule is not currently published.
    Requires confirmation
Total (Chipley): $3,958.03 one-time (≈ $3,958.03 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Chipley Washington County Board of County Commissioners
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Washington County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Chipley: Industrial Impact Fees

Industrial development in Chipley pays no per-square-foot impact fees, but owes $3,958.03 in one-time water and sewer connection fees (rates sourced August 15, 2026).

For a 50,000 sq ft building, that comes to at least $3,958.03. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Tap + Impact Fee (City of Chipley) — 4" tap ($2,158.93 one-time) and Water Tap + Impact Fee (City of Chipley) — 1" meter ($1,799.10 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

County Fire Protection Impact Fee (Washington County, Industrial), County Road Impact Fee (Washington County, Industrial), and County EMS Impact Fee (Washington County, Industrial) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full Chipley impact fee schedule
Water$1,799.10 one-time
  • Water Tap + Impact Fee (City of Chipley) — 1" meter
    City of Chipley
    City of Chipley water service is a meter-size tap fee (1-inch meter shown) plus a use-based water impact fee (from $654.79 per lavatory equivalent). Parcels outside the city limits pay an additional 25%. Rates adjust annually for CPI; schedule effective October 2024.
    $1,799.10 one-time
Sewer$2,158.93 one-time
  • Sewer Tap + Impact Fee (City of Chipley) — 4" tap
    City of Chipley
    City of Chipley sewer service is a tap fee (4-inch shown; larger sizes at actual cost) plus a use-based sewer impact fee (from $1,604.25 per lavatory equivalent). Parcels outside the city limits pay an additional 25%. Rates adjust annually for CPI; schedule effective October 2024.
    $2,158.93 one-time
County$0.00
  • County Fire Protection Impact Fee (Washington County, Industrial)
    Washington County Board of County Commissioners
    Washington County assesses road, fire, and EMS impact fees on new commercial development, but has adopted a published fee schedule for residential development only; a nonresidential rate schedule is not currently published.
    Requires confirmation
  • County Road Impact Fee (Washington County, Industrial)
    Washington County Board of County Commissioners
    Washington County assesses road, fire, and EMS impact fees on new commercial development, but has adopted a published fee schedule for residential development only; a nonresidential rate schedule is not currently published.
    Requires confirmation
  • County EMS Impact Fee (Washington County, Industrial)
    Washington County Board of County Commissioners
    Washington County assesses road, fire, and EMS impact fees on new commercial development, but has adopted a published fee schedule for residential development only; a nonresidential rate schedule is not currently published.
    Requires confirmation
Total (Chipley): $3,958.03 one-time (≈ $3,958.03 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Chipley Washington County Board of County Commissioners
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Washington County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Chipley: Office Impact Fees

Office development in Chipley pays no per-square-foot impact fees, but owes $3,958.03 in one-time water and sewer connection fees (rates sourced August 15, 2026).

For a 25,000 sq ft building, that comes to at least $3,958.03. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Tap + Impact Fee (City of Chipley) — 4" tap ($2,158.93 one-time) and Water Tap + Impact Fee (City of Chipley) — 1" meter ($1,799.10 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

County Fire Protection Impact Fee (Washington County, Office), County EMS Impact Fee (Washington County, Office), and County Road Impact Fee (Washington County, Office) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full Chipley impact fee schedule
Water$1,799.10 one-time
  • Water Tap + Impact Fee (City of Chipley) — 1" meter
    City of Chipley
    City of Chipley water service is a meter-size tap fee (1-inch meter shown) plus a use-based water impact fee (from $654.79 per lavatory equivalent). Parcels outside the city limits pay an additional 25%. Rates adjust annually for CPI; schedule effective October 2024.
    $1,799.10 one-time
Sewer$2,158.93 one-time
  • Sewer Tap + Impact Fee (City of Chipley) — 4" tap
    City of Chipley
    City of Chipley sewer service is a tap fee (4-inch shown; larger sizes at actual cost) plus a use-based sewer impact fee (from $1,604.25 per lavatory equivalent). Parcels outside the city limits pay an additional 25%. Rates adjust annually for CPI; schedule effective October 2024.
    $2,158.93 one-time
County$0.00
  • County Fire Protection Impact Fee (Washington County, Office)
    Washington County Board of County Commissioners
    Washington County assesses road, fire, and EMS impact fees on new commercial development, but has adopted a published fee schedule for residential development only; a nonresidential rate schedule is not currently published.
    Requires confirmation
  • County EMS Impact Fee (Washington County, Office)
    Washington County Board of County Commissioners
    Washington County assesses road, fire, and EMS impact fees on new commercial development, but has adopted a published fee schedule for residential development only; a nonresidential rate schedule is not currently published.
    Requires confirmation
  • County Road Impact Fee (Washington County, Office)
    Washington County Board of County Commissioners
    Washington County assesses road, fire, and EMS impact fees on new commercial development, but has adopted a published fee schedule for residential development only; a nonresidential rate schedule is not currently published.
    Requires confirmation
Total (Chipley): $3,958.03 one-time (≈ $3,958.03 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Chipley Washington County Board of County Commissioners
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Washington County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Chipley impact fee calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Chipley impact fee FAQs

What are the total impact fees for a single-family home in Chipley, Florida?

A new single-family home in Chipley pays $7,191.62 per unit in combined impact fees (rates sourced August 15, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Chipley?

Commercial development in Chipley pays no per-square-foot impact fees, but owes $3,958.03 in one-time water and sewer connection fees (assuming a 1-inch meter). 3 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Chipley charge its own impact fees?

Yes. Chipley levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Chipley, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Washington County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000