Vernon applies its own fee schedule: municipal fees plus the Washington County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $3,184.48 per unit (rates sourced ). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Vernon Impact Fees by Project Type

Vernon: Single-Family Impact Fees

A new single-family home in Vernon pays at least $3,184.48 per unit in impact fees (rates sourced October 29, 2026). Of that, Washington County-levied fees account for $1,046.98 and municipal or utility fees for $2,137.50.

County EMS Impact Fee (Washington County), Water Tap-In / Impact Fee (City of Vernon), County Road Impact Fee (Washington County), and Sewer Tap-In / Impact Fee (City of Vernon) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Municipal Impact Fees (City of Vernon) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Vernon Impact Fee Schedule
Water$700.00
  • Water Tap-In / Impact Fee (City of Vernon)
    3/4" meter
    City of Vernon
    The City of Vernon charges a water tap-in fee of $100 inside the city ($150 outside) plus a water impact fee set by meter size under Ordinance 10-193 (adopted August 9, 2010): $600 for a 3/4-inch meter, or $700 in total for a standard home meter. Larger meters pay higher impact fees, up to $18,125 for an 8-inch meter. Impact fees outside the city limits are 25% higher, and half of the tap-in and impact fees is due as a deposit before work begins.
    $700.00Requires confirmation
Sewer$1,437.50
  • Sewer Tap-In / Impact Fee (City of Vernon)
    3/4" meter
    City of Vernon
    The City of Vernon charges a sewer tap-in fee of $200 inside the city ($450 outside) plus a wastewater impact fee set by meter size under Ordinance 10-193 (adopted August 9, 2010): $1,237.50 for a 3/4-inch meter, or $1,437.50 in total for a standard home meter. Larger meters pay higher impact fees, up to $32,625 for an 8-inch meter. Impact fees outside the city limits are 25% higher, and half of the tap-in and impact fees is due as a deposit before work begins.
    $1,437.50Requires confirmation
City$0.00
  • Municipal Impact Fees (City of Vernon)
    City of Vernon
    No municipal (non-utility) impact fee appears in the City of Vernon's ordinance record; the city's only development charges are its water and sewer tap-in and impact fees. Vernon operates its own fire department.
    Requires confirmation
County$1,046.98
  • County Road Impact Fee (Washington County)
    Washington County Board of County Commissioners
    Washington County Road impact fee: $972.00 for a detached single-family dwelling if imposed. Inside the City of Vernon, the county road fee applies only where the city has consented to it.
    $972.00Requires confirmation
  • County EMS Impact Fee (Washington County)
    Washington County Board of County Commissioners
    Washington County Emergency Medical Services impact fee: $74.98 per dwelling unit, a flat rate with no housing-type tiers, applied countywide including within the City of Vernon. Charged at building permit; a home replacing a structure removed within the prior seven years pays no fee. Current for 2026.
    $74.98Requires confirmation
  • County Fire Protection Impact Fee (Washington County)
    Washington County Board of County Commissioners
    The Washington County fire protection impact fee is not levied in the City of Vernon, which operates its own fire department; the county fire fee reaches a municipality only where it participates in the county fire protection system.
    $0.00
Total (Vernon): $3,184.48
Sources last checked Official fee schedules:City of Vernon Washington County Board of County Commissioners
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Washington County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Vernon: Multifamily Impact Fees

A new multifamily unit in Vernon pays at least $2,212.48 per unit in impact fees (rates sourced October 29, 2026). Of that, Washington County-levied fees account for $74.98 and municipal or utility fees for $2,137.50.

County EMS Impact Fee (Washington County, MF), Water Tap-In / Impact Fee (City of Vernon, MF), and Sewer Tap-In / Impact Fee (City of Vernon, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

County Road Impact Fee (Washington County, MF) is set by the county and has no published standard rate. Municipal Impact Fees (City of Vernon, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Vernon Impact Fee Schedule
Water$700.00
  • Water Tap-In / Impact Fee (City of Vernon, MF)
    3/4" meter
    City of Vernon
    The City of Vernon charges water tap-in and impact fees per meter connection under Ordinance 10-193 (adopted August 9, 2010): a $100 in-city tap-in fee plus $600 for a 3/4-inch meter, or $700 in total. A building served by one meter pays once, and a larger meter pays the higher impact fee for its size. Impact fees outside the city limits are 25% higher, and half of the fees is due as a deposit before work begins.
    $700.00Requires confirmation
Sewer$1,437.50
  • Sewer Tap-In / Impact Fee (City of Vernon, MF)
    3/4" meter
    City of Vernon
    The City of Vernon charges sewer tap-in and impact fees per meter connection under Ordinance 10-193 (adopted August 9, 2010): a $200 in-city tap-in fee plus $1,237.50 for a 3/4-inch meter, or $1,437.50 in total. A building served by one meter pays once, and a larger meter pays the higher impact fee for its size. Impact fees outside the city limits are 25% higher, and half of the fees is due as a deposit before work begins.
    $1,437.50Requires confirmation
City$0.00
  • Municipal Impact Fees (City of Vernon, MF)
    City of Vernon
    No municipal (non-utility) impact fee appears in the City of Vernon's ordinance record; the city's only development charges are its water and sewer tap-in and impact fees. Vernon operates its own fire department.
    Requires confirmation
County$74.98
  • County EMS Impact Fee (Washington County, MF)
    Washington County Board of County Commissioners
    Washington County Emergency Medical Services impact fee: $74.98 per dwelling unit, charged per multifamily unit (flat, no housing-type tiers), countywide including within the City of Vernon. Charged at building permit. Current for 2026.
    $74.98Requires confirmation
  • County Fire Protection Impact Fee (Washington County, MF)
    Washington County Board of County Commissioners
    The Washington County fire protection impact fee is not levied in the City of Vernon, which operates its own fire department; the county fire fee reaches a municipality only where it participates in the county fire protection system.
    $0.00
  • County Road Impact Fee (Washington County, MF)
    Washington County Board of County Commissioners
    Washington County publishes only a single-family detached road impact fee rate; the multifamily rate (set by land-use category in the county's Appendix D schedule) is not published, so no county road impact fee amount is established for multifamily development.
    Requires confirmation
Total (Vernon): $2,212.48
Sources last checked Official fee schedules:City of Vernon Washington County Board of County Commissioners
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Washington County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Vernon: Commercial Impact Fees

Commercial development in Vernon pays no per-square-foot impact fees, but owes $2,750.00 in one-time water and sewer connection fees (rates sourced October 29, 2026).

For a 50,000 sq ft building, that comes to at least $2,750.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Tap-In / Impact Fee (City of Vernon) and Water Tap-In / Impact Fee (City of Vernon) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

County Road Impact Fee (Washington County, Commercial) and County EMS Impact Fee (Washington County, Commercial) are set by the county and have no published standard rate. Municipal Impact Fee (City of Vernon, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Vernon Impact Fee Schedule
Water$975.00 one-time
  • Water Tap-In / Impact Fee (City of Vernon)
    1"
    City of Vernon
    City of Vernon water tap-in and impact fee for a 1-inch meter: a $100 in-city tap-in fee plus an $875 impact fee (Ordinance 10-193, adopted August 9, 2010), with no separate rate for commercial customers. Larger meters pay higher impact fees. Outside the city limits the tap-in fee is $150 and impact fees are 25% higher.
    $975.00 one-timeRequires confirmation
Sewer$1,775.00 one-time
  • Sewer Tap-In / Impact Fee (City of Vernon)
    1"
    City of Vernon
    City of Vernon sewer tap-in and impact fee for a 1-inch meter: a $200 in-city tap-in fee plus a $1,575 wastewater impact fee (Ordinance 10-193, adopted August 9, 2010), with no separate rate for commercial customers. Larger meters pay higher impact fees. Outside the city limits the tap-in fee is $450 and impact fees are 25% higher.
    $1,775.00 one-timeRequires confirmation
City$0.00
  • Municipal Impact Fee (City of Vernon, Commercial)
    City of Vernon
    No non-utility municipal impact fee appears in the City of Vernon's ordinance index; its development charges are the water and sewer tap-in and impact fees (separate records). Washington County's EMS impact fee applies countywide (separate record).
    Requires confirmation
County$0.00
  • County Fire Protection Impact Fee (Washington County, Commercial)
    Washington County Board of County Commissioners
    The Washington County fire protection impact fee is not levied in the City of Vernon, which operates its own fire department; the county fire fee reaches a municipality only where it participates in the county fire protection system.
    $0.00
  • County Road Impact Fee (Washington County, Commercial)
    Washington County Board of County Commissioners
    Inside the City of Vernon, the Washington County road impact fee applies only where the city has consented to it (Code Chapter 35). The county's nonresidential road rates (Appendix D) are not published online.
    Requires confirmation
  • County EMS Impact Fee (Washington County, Commercial)
    Washington County Board of County Commissioners
    Washington County charges an Emergency Medical Services impact fee countywide, including inside the City of Vernon (Code Chapter 35), and its Building Department states that impact fees still apply to all new commercial development. The county has not published a nonresidential EMS rate.
    Requires confirmation
Total (Vernon): $2,750.00 one-time (≈ $2,750.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Vernon Washington County Board of County Commissioners
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Washington County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Vernon: Industrial Impact Fees

Industrial development in Vernon pays no per-square-foot impact fees, but owes $2,750.00 in one-time water and sewer connection fees (rates sourced October 29, 2026).

For a 50,000 sq ft building, that comes to at least $2,750.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Tap-In / Impact Fee (City of Vernon) and Water Tap-In / Impact Fee (City of Vernon) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

County Road Impact Fee (Washington County, Industrial) and County EMS Impact Fee (Washington County, Industrial) are set by the county and have no published standard rate. Municipal Impact Fee (City of Vernon, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Vernon Impact Fee Schedule
Water$975.00 one-time
  • Water Tap-In / Impact Fee (City of Vernon)
    1"
    City of Vernon
    City of Vernon water tap-in and impact fee for a 1-inch meter: a $100 in-city tap-in fee plus an $875 impact fee (Ordinance 10-193, adopted August 9, 2010), with no separate rate for commercial customers. Larger meters pay higher impact fees. Outside the city limits the tap-in fee is $150 and impact fees are 25% higher.
    $975.00 one-timeRequires confirmation
Sewer$1,775.00 one-time
  • Sewer Tap-In / Impact Fee (City of Vernon)
    1"
    City of Vernon
    City of Vernon sewer tap-in and impact fee for a 1-inch meter: a $200 in-city tap-in fee plus a $1,575 wastewater impact fee (Ordinance 10-193, adopted August 9, 2010), with no separate rate for commercial customers. Larger meters pay higher impact fees. Outside the city limits the tap-in fee is $450 and impact fees are 25% higher.
    $1,775.00 one-timeRequires confirmation
City$0.00
  • Municipal Impact Fee (City of Vernon, Industrial)
    City of Vernon
    No non-utility municipal impact fee appears in the City of Vernon's ordinance index; its development charges are the water and sewer tap-in and impact fees (separate records). Washington County's EMS impact fee applies countywide (separate record).
    Requires confirmation
County$0.00
  • County Fire Protection Impact Fee (Washington County, Industrial)
    Washington County Board of County Commissioners
    The Washington County fire protection impact fee is not levied in the City of Vernon, which operates its own fire department; the county fire fee reaches a municipality only where it participates in the county fire protection system.
    $0.00
  • County Road Impact Fee (Washington County, Industrial)
    Washington County Board of County Commissioners
    Inside the City of Vernon, the Washington County road impact fee applies only where the city has consented to it (Code Chapter 35). The county's nonresidential road rates (Appendix D) are not published online.
    Requires confirmation
  • County EMS Impact Fee (Washington County, Industrial)
    Washington County Board of County Commissioners
    Washington County charges an Emergency Medical Services impact fee countywide, including inside the City of Vernon (Code Chapter 35), and its Building Department states that impact fees still apply to all new commercial development. The county has not published a nonresidential EMS rate.
    Requires confirmation
Total (Vernon): $2,750.00 one-time (≈ $2,750.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Vernon Washington County Board of County Commissioners
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Washington County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Vernon: Office Impact Fees

Office development in Vernon pays no per-square-foot impact fees, but owes $2,750.00 in one-time water and sewer connection fees (rates sourced October 29, 2026).

For a 25,000 sq ft building, that comes to at least $2,750.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Tap-In / Impact Fee (City of Vernon) and Water Tap-In / Impact Fee (City of Vernon) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

County Road Impact Fee (Washington County, Office) and County EMS Impact Fee (Washington County, Office) are set by the county and have no published standard rate. Municipal Impact Fee (City of Vernon, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Vernon Impact Fee Schedule
Water$975.00 one-time
  • Water Tap-In / Impact Fee (City of Vernon)
    1"
    City of Vernon
    City of Vernon water tap-in and impact fee for a 1-inch meter: a $100 in-city tap-in fee plus an $875 impact fee (Ordinance 10-193, adopted August 9, 2010), with no separate rate for commercial customers. Larger meters pay higher impact fees. Outside the city limits the tap-in fee is $150 and impact fees are 25% higher.
    $975.00 one-timeRequires confirmation
Sewer$1,775.00 one-time
  • Sewer Tap-In / Impact Fee (City of Vernon)
    1"
    City of Vernon
    City of Vernon sewer tap-in and impact fee for a 1-inch meter: a $200 in-city tap-in fee plus a $1,575 wastewater impact fee (Ordinance 10-193, adopted August 9, 2010), with no separate rate for commercial customers. Larger meters pay higher impact fees. Outside the city limits the tap-in fee is $450 and impact fees are 25% higher.
    $1,775.00 one-timeRequires confirmation
City$0.00
  • Municipal Impact Fee (City of Vernon, Office)
    City of Vernon
    No non-utility municipal impact fee appears in the City of Vernon's ordinance index; its development charges are the water and sewer tap-in and impact fees (separate records). Washington County's EMS impact fee applies countywide (separate record).
    Requires confirmation
County$0.00
  • County Fire Protection Impact Fee (Washington County, Office)
    Washington County Board of County Commissioners
    The Washington County fire protection impact fee is not levied in the City of Vernon, which operates its own fire department; the county fire fee reaches a municipality only where it participates in the county fire protection system.
    $0.00
  • County Road Impact Fee (Washington County, Office)
    Washington County Board of County Commissioners
    Inside the City of Vernon, the Washington County road impact fee applies only where the city has consented to it (Code Chapter 35). The county's nonresidential road rates (Appendix D) are not published online.
    Requires confirmation
  • County EMS Impact Fee (Washington County, Office)
    Washington County Board of County Commissioners
    Washington County charges an Emergency Medical Services impact fee countywide, including inside the City of Vernon (Code Chapter 35), and its Building Department states that impact fees still apply to all new commercial development. The county has not published a nonresidential EMS rate.
    Requires confirmation
Total (Vernon): $2,750.00 one-time (≈ $2,750.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Vernon Washington County Board of County Commissioners
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Washington County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Vernon Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Amendments since 2021 also limit how fast fees can rise: an increase of up to 25% phases in over two years and one of 25–50% over four years, no single increase may exceed 50%, and a fee can be raised no more than once every four years. Going beyond those limits requires a recent study showing extraordinary circumstances, two public workshops, and a unanimous vote of the governing body, and even then the increase is capped at 100%.

Counties and cities can both levy impact fees. Inside an incorporated city, a project usually pays the county fees that apply countywide plus any municipal fees the city has adopted; in some counties, county fees apply only in unincorporated areas. That is why totals differ between a city and the unincorporated county around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Vernon Impact Fee FAQs

What are the total impact fees for a single-family home in Vernon, Florida?

A new single-family home in Vernon pays at least $3,184.48 per unit in combined impact fees (rates sourced October 29, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Vernon?

Commercial development in Vernon pays no per-square-foot impact fees, but owes $2,750.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

Does Vernon charge its own impact fees?

Yes. Vernon levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Vernon, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes caps an increase at 50%, phased in over two to four years, and allows a fee to be raised no more than once every four years. Going beyond that requires an extraordinary-circumstances study, two public workshops, and a unanimous vote of the governing body, and is still capped at 100%.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Washington County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000