Fairfax Impact Fees by Project Type
Fairfax: Single-Family Impact Fees
A new single-family home in Fairfax pays $700.00 per unit in impact fees (rates sourced October 6, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Tap / Connection Fee (Town of Fairfax) ($350.00) and Sewer Tap / Connection Fee (Town of Fairfax) ($350.00).
View the Full Fairfax Impact Fee Schedule
- Water Tap / Connection Fee (Town of Fairfax)$350.00Town of FairfaxWater connection fee for a new 3/4 inch meter: $350 in town, $500 outside the town limits (Town of Fairfax utility billing schedule). The canonical single-family home takes the 3/4 inch meter.
- Sewer Tap / Connection Fee (Town of Fairfax)$350.00Town of FairfaxSewer connection fee for a new 4 inch or 6 inch tap: $350 in town, $600 outside the town limits (Town of Fairfax utility billing schedule).
- City Impact / Development Fees (Town of Fairfax)$0.00Town of FairfaxThe Town of Fairfax does not charge a city development impact fee. South Carolina towns can only levy impact fees under the state Development Impact Fee Act, which requires a formal fee study and an adopting ordinance, and only about two dozen South Carolina local governments have taken that step. Fairfax has adopted no such ordinance, so no impact fee applies to new construction.
- County Impact Fee (Allendale County overlay — Town of Fairfax)$0.00Allendale CountyAllendale County has not adopted a development impact fee, so no county impact fee applies in the Town of Fairfax.
Where in Allendale County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Fairfax: Multifamily Impact Fees
A new multifamily unit in Fairfax pays $700.00 per unit in impact fees (rates sourced October 6, 2026). Every line item is levied at the municipal or utility level.
Water Tap / Connection Fee (Town of Fairfax, MF) and Sewer Tap / Connection Fee (Town of Fairfax, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Fairfax Impact Fee Schedule
- Water Tap / Connection Fee (Town of Fairfax, MF)$350.00Requires confirmationTown of FairfaxWater connection fee for a new 3/4 inch meter: $350 in town, $500 outside the town limits (Town of Fairfax utility billing schedule). The town prices the fee per meter installed, not per dwelling unit; a multifamily building on one master meter pays once, and larger meters are quoted by Public Works.
- Sewer Tap / Connection Fee (Town of Fairfax, MF)$350.00Requires confirmationTown of FairfaxSewer connection fee for a new 4 inch or 6 inch tap: $350 in town, $600 outside the town limits (Town of Fairfax utility billing schedule). The town prices the fee per tap installed, not per dwelling unit; a multifamily building on one tap pays once.
- City Impact / Development Fees (Town of Fairfax, MF)$0.00Town of FairfaxThe Town of Fairfax does not charge a city development impact fee on multifamily construction. South Carolina towns can only levy impact fees under the state Development Impact Fee Act, which requires a formal fee study and an adopting ordinance, and only about two dozen South Carolina local governments have taken that step. Fairfax has adopted no such ordinance.
- County Impact Fee (Allendale County overlay — Town of Fairfax, MF)$0.00Allendale CountyAllendale County has not adopted a development impact fee, so no county impact fee applies to multifamily construction in the Town of Fairfax.
Where in Allendale County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Fairfax: Commercial Impact Fees
Commercial development in Fairfax pays no per-square-foot impact fees, but owes $700.00 in one-time water and sewer connection fees (rates sourced October 6, 2026).
For a 50,000 sq ft building, that comes to about $700.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Connection Fee (Town of Fairfax) — 4" or 6" tap ($350.00 one-time) and Water Connection Fee (Town of Fairfax) — 3/4" meter ($350.00 one-time).
View the Full Fairfax Impact Fee Schedule
- Water Connection Fee (Town of Fairfax) — 3/4" meter$350.00 one-timeTown of FairfaxWater connection fee for a new 3/4 inch meter: $350 in town, $500 outside the town limits (Town of Fairfax utility billing schedule). Larger meters are not priced on the town schedule and are quoted by Public Works.
- Sewer Connection Fee (Town of Fairfax) — 4" or 6" tap$350.00 one-timeTown of FairfaxSewer connection fee for a new 4 inch or 6 inch tap: $350 in town, $600 outside the town limits (Town of Fairfax utility billing schedule).
- City Impact / Development Fee (Town of Fairfax, Commercial)$0.00Town of FairfaxThe Town of Fairfax levies no development impact fees on nonresidential development.
- County Impact Fee (Allendale County overlay, Commercial)$0.00Allendale CountyAllendale County levies no development impact fees.
Where in Allendale County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Fairfax: Industrial Impact Fees
Industrial development in Fairfax pays no per-square-foot impact fees, but owes $700.00 in one-time water and sewer connection fees (rates sourced October 6, 2026).
For a 50,000 sq ft building, that comes to about $700.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Connection Fee (Town of Fairfax) — 4" or 6" tap ($350.00 one-time) and Water Connection Fee (Town of Fairfax) — 3/4" meter ($350.00 one-time).
View the Full Fairfax Impact Fee Schedule
- Water Connection Fee (Town of Fairfax) — 3/4" meter$350.00 one-timeTown of FairfaxWater connection fee for a new 3/4 inch meter: $350 in town, $500 outside the town limits (Town of Fairfax utility billing schedule). Larger meters are not priced on the town schedule and are quoted by Public Works.
- Sewer Connection Fee (Town of Fairfax) — 4" or 6" tap$350.00 one-timeTown of FairfaxSewer connection fee for a new 4 inch or 6 inch tap: $350 in town, $600 outside the town limits (Town of Fairfax utility billing schedule).
- City Impact / Development Fee (Town of Fairfax, Industrial)$0.00Town of FairfaxThe Town of Fairfax levies no development impact fees on nonresidential development.
- County Impact Fee (Allendale County overlay, Industrial)$0.00Allendale CountyAllendale County levies no development impact fees.
Where in Allendale County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Fairfax: Office Impact Fees
Office development in Fairfax pays no per-square-foot impact fees, but owes $700.00 in one-time water and sewer connection fees (rates sourced October 6, 2026).
For a 25,000 sq ft building, that comes to about $700.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Connection Fee (Town of Fairfax) — 4" or 6" tap ($350.00 one-time) and Water Connection Fee (Town of Fairfax) — 3/4" meter ($350.00 one-time).
View the Full Fairfax Impact Fee Schedule
- Water Connection Fee (Town of Fairfax) — 3/4" meter$350.00 one-timeTown of FairfaxWater connection fee for a new 3/4 inch meter: $350 in town, $500 outside the town limits (Town of Fairfax utility billing schedule). Larger meters are not priced on the town schedule and are quoted by Public Works.
- Sewer Connection Fee (Town of Fairfax) — 4" or 6" tap$350.00 one-timeTown of FairfaxSewer connection fee for a new 4 inch or 6 inch tap: $350 in town, $600 outside the town limits (Town of Fairfax utility billing schedule).
- City Impact / Development Fee (Town of Fairfax, Office)$0.00Town of FairfaxThe Town of Fairfax levies no development impact fees on nonresidential development.
- County Impact Fee (Allendale County overlay, Office)$0.00Allendale CountyAllendale County levies no development impact fees.
Where in Allendale County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Fairfax Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
Brush up on impact fee basics before you budget your next project.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Fairfax Impact Fee FAQs
What are the total impact fees for a single-family home in Fairfax, South Carolina?
A new single-family home in Fairfax pays $700.00 per unit in combined impact fees (rates sourced October 6, 2026).
How much are commercial impact fees in Fairfax?
Commercial development in Fairfax pays no per-square-foot impact fees, but owes $700.00 in one-time water and sewer connection fees.
Does Fairfax charge its own impact fees?
Yes. Fairfax levies its own municipal impact or utility fees. Allendale County does not currently add county-level impact fees inside Fairfax. The schedule on this page shows every fee that applies to development in Fairfax.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Allendale County impact fees page.