Bluffton Impact Fees by Project Type
Bluffton: Single-Family Impact Fees
A new single-family home in Bluffton pays $20,489.00 per unit in impact fees (rates sourced October 29, 2026). Of that, Beaufort County-levied fees account for $4,516.00 and municipal or utility fees for $15,973.00.
The largest line items are Sewer Capacity Fee (BJWSA) ($11,583.00), Water Capacity Fee (BJWSA) ($3,440.00) and Water Meter & Box Fee (BJWSA) — 3/4" meter ($950.00).
County Library Impact Fee (Beaufort County), County Parks & Recreation Impact Fee (Beaufort County), County Fire Impact Fee (Beaufort County), and County Road Impact Fee (Beaufort County) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Bluffton Impact Fee Schedule
- Water Capacity Fee (BJWSA)$3,440.00Beaufort-Jasper Water & Sewer AuthorityBeaufort-Jasper Water and Sewer Authority (BJWSA) charges a one-time water capacity fee per single-family home, effective July 1, 2026 to June 30, 2027, after a phase-in from $2,752 (February 1, 2025) and $3,100 (July 1, 2025). A meter and box assembly fee is charged separately.
- Water Meter & Box Fee (BJWSA) — 3/4" meter$950.00Beaufort-Jasper Water & Sewer AuthorityBJWSA charges a one-time meter and box assembly fee when it sets the meter, separate from the water and wastewater capacity fees. The fee depends on meter size; a standard home uses the 3/4 inch meter.
- Sewer Capacity Fee (BJWSA)$11,583.00Beaufort-Jasper Water & Sewer AuthorityBJWSA charges a one-time wastewater capacity fee per single-family home, effective July 1, 2026 to June 30, 2027, after a phase-in from $9,000 (February 1, 2025) and $10,500 (July 1, 2025). Homes on septic systems do not pay it.
- Municipal Development Impact Fee (Town of Bluffton) — none adopted$0.00Outside the listed development-agreement areasTown of BlufftonThe Town of Bluffton has no town-wide impact fee under its FY2027 fee schedule (effective July 1, 2026). A municipal improvement development fee applies only inside the named development-agreement communities; elsewhere in town only county and utility fees apply.
- County Road Impact Fee (Beaufort County)$2,844.00Requires confirmationSouth Service Area, 1,751–2,000 sfBeaufort CountyBeaufort County road impact fee per dwelling unit, by heated floor area in ten brackets, collected in the Town of Bluffton under its November 2022 agreement with the county. Bluffton is in the county's south service area. Amounts are the 2023 table; the ordinance adjusts them each year by the ENR Construction Cost Index.
- County Fire Impact Fee (Beaufort County)$877.00Requires confirmationBluffton Fire District, 1,751–2,000 sfBeaufort CountyBeaufort County fire impact fee per dwelling unit, by heated floor area in ten brackets, for the Bluffton Township Fire District, which covers the Town of Bluffton. Amounts are the 2023 table; the ordinance adjusts them each year by the ENR Construction Cost Index.
- County Parks & Recreation Impact Fee (Beaufort County)$517.00Requires confirmationSouth Service Area, 1,751–2,000 sfBeaufort CountyBeaufort County parks and recreation impact fee per dwelling unit, by heated floor area in ten brackets, in the county's south service area. Collection inside the Town of Bluffton depends on the town's agreement with the county. Amounts are the 2023 table; the ordinance adjusts them each year by the ENR Construction Cost Index.
- County Library Impact Fee (Beaufort County)$278.00Requires confirmationSouth Service Area, 1,751–2,000 sfBeaufort CountyBeaufort County library impact fee per dwelling unit, by heated floor area in ten brackets, in the county's south service area. Collection inside the Town of Bluffton depends on the town's agreement with the county. Amounts are the 2023 table; the ordinance adjusts them each year by the ENR Construction Cost Index.
Where in Beaufort County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bluffton: Multifamily Impact Fees
A new multifamily unit in Bluffton pays $13,369.00 per unit in impact fees (rates sourced October 29, 2026). Of that, Beaufort County-levied fees account for $2,461.00 and municipal or utility fees for $10,908.00.
The largest line items are Sewer Capacity Fee (BJWSA, MF) — 200 GPD × $38.61/GPD ($7,722.00), Water Capacity Fee (BJWSA, MF) — 260 GPD × $8.60/GPD ($2,236.00) and Water Meter & Box Fee (BJWSA, MF) — 3/4" meter ($950.00).
County Fire Impact Fee (Beaufort County, MF), County Library Impact Fee (Beaufort County, MF), County Parks & Recreation Impact Fee (Beaufort County, MF), and County Road Impact Fee (Beaufort County, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Bluffton Impact Fee Schedule
- Water Capacity Fee (BJWSA, MF) — 260 GPD × $8.60/GPD$2,236.00Beaufort-Jasper Water & Sewer AuthorityBJWSA charges multifamily water capacity at $8.60 per gallon per day, sized at 1.3 times the unit's wastewater loading (1 bedroom 150, 2 bedrooms 200, 3 bedrooms 250 gallons per day). The amount shown is a 2-bedroom unit (260 gallons per day), effective July 1, 2026 to June 30, 2027.
- Water Meter & Box Fee (BJWSA, MF) — 3/4" meter$950.00Beaufort-Jasper Water & Sewer AuthorityBJWSA charges a one-time meter and box assembly fee per meter, separate from the capacity fees. The default shown is the smallest (3/4 inch) meter; the fee rises with meter size, BJWSA quotes meters over 2 inches individually, and a building served by one master meter pays the fee once.
- Sewer Capacity Fee (BJWSA, MF) — 200 GPD × $38.61/GPD$7,722.00Beaufort-Jasper Water & Sewer AuthorityBJWSA charges multifamily wastewater capacity at $38.61 per gallon per day, using loadings of 150 (1 bedroom), 200 (2 bedrooms) and 250 (3 bedrooms) gallons per day per unit. The amount shown is a 2-bedroom unit, effective July 1, 2026 to June 30, 2027.
- Municipal Development Impact Fee (Town of Bluffton, MF) — none adopted$0.00Outside development-agreement areas (no town-wide fee)Town of BlufftonThe Town of Bluffton has no town-wide impact fee under its FY2027 fee schedule (effective July 1, 2026). A municipal improvement development fee applies only inside the named development-agreement communities; elsewhere in town only county and utility fees apply.
- County Road Impact Fee (Beaufort County, MF)$1,551.00Requires confirmationSouth Service Area, 1,000 sf or lessBeaufort CountyBeaufort County road impact fee per dwelling unit, by the unit's heated floor area in ten brackets (the default is a 1,000 sf unit), collected in the Town of Bluffton under its November 2022 agreement with the county. Amounts are the 2023 table; the ordinance adjusts them each year by the ENR Construction Cost Index.
- County Fire Impact Fee (Beaufort County, MF)$477.00Requires confirmationBluffton Fire District, 1,000 sf or lessBeaufort CountyBeaufort County fire impact fee per dwelling unit, by the unit's heated floor area in ten brackets (the default is a 1,000 sf unit), for the Bluffton Township Fire District, which covers the Town of Bluffton. Amounts are the 2023 table; the ordinance adjusts them each year by the ENR Construction Cost Index.
- County Parks & Recreation Impact Fee (Beaufort County, MF)$282.00Requires confirmationSouth Service Area, 1,000 sf or lessBeaufort CountyBeaufort County parks and recreation impact fee per dwelling unit, by the unit's heated floor area in ten brackets (the default is a 1,000 sf unit), in the county's south service area. Collection inside the Town of Bluffton depends on the town's agreement with the county. Amounts are the 2023 table; the ordinance adjusts them each year by the ENR Construction Cost Index.
- County Library Impact Fee (Beaufort County, MF)$151.00Requires confirmationSouth Service Area, 1,000 sf or lessBeaufort CountyBeaufort County library impact fee per dwelling unit, by the unit's heated floor area in ten brackets (the default is a 1,000 sf unit), in the county's south service area. Collection inside the Town of Bluffton depends on the town's agreement with the county. Amounts are the 2023 table; the ordinance adjusts them each year by the ENR Construction Cost Index.
Where in Beaufort County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bluffton: Commercial Impact Fees
Commercial development in Bluffton pays $5.02 per square foot in impact fees, plus $1,450.00 in one-time water and sewer connection fees (rates sourced October 29, 2026).
For a 50,000 sq ft building, that comes to at least $252,650.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Fee (BJWSA) — 1" meter ($1,450.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
County Road Impact Fee (Beaufort County, Commercial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Water Capacity Fee (BJWSA) — per gallon per day and Sewer Capacity Fee (BJWSA) — per gallon per day are set by the utility and not published online. County Fire Impact Fee (Beaufort County, Commercial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Bluffton Impact Fee Schedule
- Water Meter Fee (BJWSA) — 1" meter$1,450.00 one-timeBeaufort-Jasper Water and Sewer AuthorityBJWSA commercial meter fee for a 1 inch meter with box assembly (fiscal year July 1, 2026 to June 30, 2027). BJWSA prints prices for 3/4 and 1 inch meters; meters larger than 2 inches are quoted on the flow required.
- Water Capacity Fee (BJWSA) — per gallon per dayContact jurisdiction/utility to verifyBeaufort-Jasper Water and Sewer AuthorityBJWSA water capacity fee for commercial development, fiscal year July 1, 2026 to June 30, 2027: $8.60 per gallon per day of capacity, with water demand taken as 1.3 times the project's wastewater loading (restaurants: 20 gallons per day per seat). BJWSA publishes no minimum, so the total depends on the project's approved demand and is not added to the estimate. A separate meter fee applies.
- Sewer Capacity Fee (BJWSA) — per gallon per dayContact jurisdiction/utility to verifyBeaufort-Jasper Water and Sewer AuthorityBJWSA wastewater capacity fee for commercial development, fiscal year July 1, 2026 to June 30, 2027: $38.61 per gallon per day of projected wastewater flow (restaurants: 20 gallons per day per seat). BJWSA publishes no minimum, so the total depends on the project's approved flow and is not added to the estimate. A $100 sewer inspection fee also applies.
- Municipal Development Impact Fee (Town of Bluffton, Commercial)$0.00The Town of Bluffton has no town-wide development impact fee. Commercial projects inside certain development-agreement areas (Buckwalter, Jones Estate, New Riverside, Palmetto Bluff and others) pay a fee set by their agreement.
- County Road Impact Fee (Beaufort County, Commercial)$5.02/sq ftRequires confirmationBeaufort CountyBeaufort County road impact fee for retail and other commercial development, per 1,000 sq ft of floor area, collected in the Town of Bluffton under its agreement with the county (South service area). Amounts are the county's 2023 schedule; the ordinance adjusts them each year by the ENR Construction Cost Index before December 1, so the current rate can be higher.
- County Fire Impact Fee (Beaufort County, Commercial)Requires confirmationBeaufort CountyBeaufort County fire impact fee for commercial development in the Bluffton Fire District, set by the building's fire hazard level and floor area: $953 per equivalent dwelling unit (EDU). A low-hazard building counts 1.0 EDU for its first 1,000 sq ft, 0.8 EDU per 1,000 sq ft up to 5,000 sq ft, 0.5 EDU per 1,000 sq ft up to 10,000 sq ft and 0.1 EDU per 1,000 sq ft above that; medium-hazard factors are 1.5 times and high-hazard 2 times those. The hazard level is set at permitting, so this fee is not added to the estimate. Automatic sprinklers that the fire code does not otherwise require can qualify for a waiver. Amounts are the 2023 schedule, adjusted each year for construction costs.
Where in Beaufort County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bluffton: Industrial Impact Fees
Industrial development in Bluffton pays $1.01 per square foot in impact fees, plus $1,450.00 in one-time water and sewer connection fees (rates sourced October 29, 2026).
For a 50,000 sq ft building, that comes to at least $51,800.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Fee (BJWSA) — 1" meter ($1,450.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
County Road Impact Fee (Beaufort County, Industrial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Water Capacity Fee (BJWSA) — per gallon per day and Sewer Capacity Fee (BJWSA) — per gallon per day are set by the utility and not published online. County Fire Impact Fee (Beaufort County, Industrial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Bluffton Impact Fee Schedule
- Water Meter Fee (BJWSA) — 1" meter$1,450.00 one-timeBeaufort-Jasper Water and Sewer AuthorityBJWSA commercial meter fee for a 1 inch meter with box assembly (fiscal year July 1, 2026 to June 30, 2027). BJWSA prints prices for 3/4 and 1 inch meters; meters larger than 2 inches are quoted on the flow required.
- Water Capacity Fee (BJWSA) — per gallon per dayContact jurisdiction/utility to verifyBeaufort-Jasper Water and Sewer AuthorityBJWSA water capacity fee for commercial development, fiscal year July 1, 2026 to June 30, 2027: $8.60 per gallon per day of capacity, with water demand taken as 1.3 times the project's wastewater loading (restaurants: 20 gallons per day per seat). BJWSA publishes no minimum, so the total depends on the project's approved demand and is not added to the estimate. A separate meter fee applies.
- Sewer Capacity Fee (BJWSA) — per gallon per dayContact jurisdiction/utility to verifyBeaufort-Jasper Water and Sewer AuthorityBJWSA wastewater capacity fee for commercial development, fiscal year July 1, 2026 to June 30, 2027: $38.61 per gallon per day of projected wastewater flow (restaurants: 20 gallons per day per seat). BJWSA publishes no minimum, so the total depends on the project's approved flow and is not added to the estimate. A $100 sewer inspection fee also applies.
- Municipal Development Impact Fee (Town of Bluffton, Industrial)$0.00The Town of Bluffton has no town-wide development impact fee. Commercial projects inside certain development-agreement areas (Buckwalter, Jones Estate, New Riverside, Palmetto Bluff and others) pay a fee set by their agreement.
- County Road Impact Fee (Beaufort County, Industrial)$1.01/sq ftRequires confirmationBeaufort CountyBeaufort County road impact fee for industrial development, per 1,000 sq ft of floor area, collected in the Town of Bluffton under its agreement with the county (South service area). Amounts are the county's 2023 schedule; the ordinance adjusts them each year by the ENR Construction Cost Index before December 1, so the current rate can be higher.
- County Fire Impact Fee (Beaufort County, Industrial)Requires confirmationBeaufort CountyBeaufort County fire impact fee for industrial development in the Bluffton Fire District, set by the building's fire hazard level and floor area: $953 per equivalent dwelling unit (EDU). A low-hazard building counts 1.0 EDU for its first 1,000 sq ft, 0.8 EDU per 1,000 sq ft up to 5,000 sq ft, 0.5 EDU per 1,000 sq ft up to 10,000 sq ft and 0.1 EDU per 1,000 sq ft above that; medium-hazard factors are 1.5 times and high-hazard 2 times those. The hazard level is set at permitting, so this fee is not added to the estimate. Automatic sprinklers that the fire code does not otherwise require can qualify for a waiver. Amounts are the 2023 schedule, adjusted each year for construction costs.
Where in Beaufort County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bluffton: Office Impact Fees
Office development in Bluffton pays $2.50 per square foot in impact fees, plus $1,450.00 in one-time water and sewer connection fees (rates sourced October 29, 2026).
For a 25,000 sq ft building, that comes to at least $63,875.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Fee (BJWSA) — 1" meter ($1,450.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
County Road Impact Fee (Beaufort County, Office) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Water Capacity Fee (BJWSA) — per gallon per day and Sewer Capacity Fee (BJWSA) — per gallon per day are set by the utility and not published online. County Fire Impact Fee (Beaufort County, Office) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Bluffton Impact Fee Schedule
- Water Meter Fee (BJWSA) — 1" meter$1,450.00 one-timeBeaufort-Jasper Water and Sewer AuthorityBJWSA commercial meter fee for a 1 inch meter with box assembly (fiscal year July 1, 2026 to June 30, 2027). BJWSA prints prices for 3/4 and 1 inch meters; meters larger than 2 inches are quoted on the flow required.
- Water Capacity Fee (BJWSA) — per gallon per dayContact jurisdiction/utility to verifyBeaufort-Jasper Water and Sewer AuthorityBJWSA water capacity fee for commercial development, fiscal year July 1, 2026 to June 30, 2027: $8.60 per gallon per day of capacity, with water demand taken as 1.3 times the project's wastewater loading (restaurants: 20 gallons per day per seat). BJWSA publishes no minimum, so the total depends on the project's approved demand and is not added to the estimate. A separate meter fee applies.
- Sewer Capacity Fee (BJWSA) — per gallon per dayContact jurisdiction/utility to verifyBeaufort-Jasper Water and Sewer AuthorityBJWSA wastewater capacity fee for commercial development, fiscal year July 1, 2026 to June 30, 2027: $38.61 per gallon per day of projected wastewater flow (restaurants: 20 gallons per day per seat). BJWSA publishes no minimum, so the total depends on the project's approved flow and is not added to the estimate. A $100 sewer inspection fee also applies.
- Municipal Development Impact Fee (Town of Bluffton, Office)$0.00The Town of Bluffton has no town-wide development impact fee. Commercial projects inside certain development-agreement areas (Buckwalter, Jones Estate, New Riverside, Palmetto Bluff and others) pay a fee set by their agreement.
- County Road Impact Fee (Beaufort County, Office)$2.50/sq ftRequires confirmationBeaufort CountyBeaufort County road impact fee for office and service development, per 1,000 sq ft of floor area, collected in the Town of Bluffton under its agreement with the county (South service area). Amounts are the county's 2023 schedule; the ordinance adjusts them each year by the ENR Construction Cost Index before December 1, so the current rate can be higher.
- County Fire Impact Fee (Beaufort County, Office)Requires confirmationBeaufort CountyBeaufort County fire impact fee for office development in the Bluffton Fire District, set by the building's fire hazard level and floor area: $953 per equivalent dwelling unit (EDU). A low-hazard building counts 1.0 EDU for its first 1,000 sq ft, 0.8 EDU per 1,000 sq ft up to 5,000 sq ft, 0.5 EDU per 1,000 sq ft up to 10,000 sq ft and 0.1 EDU per 1,000 sq ft above that; medium-hazard factors are 1.5 times and high-hazard 2 times those. The hazard level is set at permitting, so this fee is not added to the estimate. Automatic sprinklers that the fire code does not otherwise require can qualify for a waiver. Amounts are the 2023 schedule, adjusted each year for construction costs.
Where in Beaufort County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bluffton Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Bluffton Impact Fee FAQs
What are the total impact fees for a single-family home in Bluffton, South Carolina?
A new single-family home in Bluffton pays $20,489.00 per unit in combined impact fees (rates sourced October 29, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
How much are commercial impact fees in Bluffton?
Commercial development in Bluffton pays $5.02 per square foot in impact fees, plus $1,450.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $252,650.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Bluffton charge its own impact fees?
Yes. Bluffton levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Bluffton, with the combined total.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.