Moncks Corner Impact Fees by Project Type
Moncks Corner: Single-Family Impact Fees
A new single-family home in Moncks Corner pays $10,805.00 per unit in impact fees (rates sourced August 14, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Development Impact Fee (Town of Moncks Corner) ($4,805.00), Sewer Impact Fee (Moncks Corner Public Works Commission) — per family unit, in-town ($2,200.00) and Water Impact Fee (Moncks Corner Public Works Commission) — 3/4 inch, in-town ($1,500.00).
View the Full Moncks Corner Impact Fee Schedule
- Water Impact Fee (Moncks Corner Public Works Commission) — 3/4 inch, in-town$1,500.00Moncks Corner Public Works Commission (Moncks Corner Water Works)Moncks Corner Public Works Commission water impact fee for a 3/4-inch meter: $1,500 inside town limits ($1,600 outside), effective February 15, 2023.
- Water Tap Fee (Moncks Corner Public Works Commission) — 3/4 inch, in-town$1,100.00Moncks Corner Public Works Commission (Moncks Corner Water Works)Moncks Corner Public Works Commission water tap fee for a 3/4-inch meter: $1,100 inside town limits ($1,200 outside), effective February 15, 2023.
- Sewer Impact Fee (Moncks Corner Public Works Commission) — per family unit, in-town$2,200.00Moncks Corner Public Works Commission (Moncks Corner Water Works)Moncks Corner Public Works Commission sewer impact fee of $2,200 per family unit inside town limits ($2,400 outside), effective February 15, 2023.
- Sewer Tap Fee (Moncks Corner Public Works Commission) — 4 inch service, in-town$1,200.00Moncks Corner Public Works Commission (Moncks Corner Water Works)Moncks Corner Public Works Commission sewer tap fee for a 4-inch service: $1,200 inside town limits ($1,300 outside), effective February 15, 2023.
- Development Impact Fee (Town of Moncks Corner)$4,805.00Town of Moncks CornerTown of Moncks Corner development impact fees adopted May 20, 2025 (Ordinance 2025-01), totaling $4,805 per single-family home, including townhomes: fire $1,200, police $710, recreation $2,213, sanitation $314 and transportation $368. Paid at building permit application, in addition to Moncks Corner Public Works Commission water and sewer fees.
- County Development Impact Fee (Berkeley County)$0.00Berkeley CountyBerkeley County does not levy a development impact fee. The county's adopted development fee schedule contains only review, inspection and administrative fees.
Where in Berkeley County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Moncks Corner: Multifamily Impact Fees
A new multifamily unit in Moncks Corner pays $8,606.00 per unit in impact fees (rates sourced August 14, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Development Impact Fee (Town of Moncks Corner, MF) ($2,606.00), Sewer Impact Fee (Moncks Corner Public Works Commission, MF) — per family unit ($2,200.00) and Sewer Tap Fee (Moncks Corner Public Works Commission, MF) ($1,200.00).
Water Impact Fee (Moncks Corner Public Works Commission, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Moncks Corner Impact Fee Schedule
- Water Impact Fee (Moncks Corner Public Works Commission, MF)$1,500.00Requires confirmationMoncks Corner Public Works Commission (Moncks Corner Water Works)Moncks Corner Public Works Commission water impact fee: $1,500 for a 3/4-inch meter inside town limits. Buildings on meters over 2 inches are assessed case by case at 250 gallons per day per unit.
- Water Tap Fee (Moncks Corner Public Works Commission, MF)$1,100.00Moncks Corner Public Works Commission (Moncks Corner Water Works)Moncks Corner Public Works Commission water tap fee of $1,100 for a 3/4-inch meter inside town limits; a building on one tap pays it once, and meters over 2 inches are billed at time and material.
- Sewer Impact Fee (Moncks Corner Public Works Commission, MF) — per family unit$2,200.00Moncks Corner Public Works Commission (Moncks Corner Water Works)Moncks Corner Public Works Commission sewer impact fee of $2,200 per family unit inside town limits ($2,400 outside), effective February 15, 2023; each apartment pays it.
- Sewer Tap Fee (Moncks Corner Public Works Commission, MF)$1,200.00Moncks Corner Public Works Commission (Moncks Corner Water Works)Moncks Corner Public Works Commission sewer tap fee of $1,200 for a 4-inch service inside town limits ($1,800 for a 6-inch service); a building on one service pays it once.
- Development Impact Fee (Town of Moncks Corner, MF)$2,606.00Town of Moncks CornerTown of Moncks Corner development impact fees adopted May 20, 2025 (Ordinance 2025-01), totaling $2,606 per multifamily unit, including duplexes and condominiums: fire $657, police $389, recreation $1,212, sanitation $172 and transportation $176. Townhomes pay the single-family rate. Paid at building permit application.
- County Development Impact Fee (Berkeley County, MF)$0.00Berkeley CountyBerkeley County does not levy a development impact fee. The county's adopted development fee schedule contains only review, inspection and administrative fees.
Where in Berkeley County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Moncks Corner: Commercial Impact Fees
Commercial development in Moncks Corner pays $3.99 per square foot in impact fees, plus $6,300.00 in one-time water and sewer connection fees (rates sourced August 14, 2026).
For a 50,000 sq ft building, that comes to about $205,650.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (Moncks Corner Public Works Commission) — 1" meter, in-town ($1,600.00 one-time), Water Tap Fee (Moncks Corner Public Works Commission) — 1" meter, in-town ($1,300.00 one-time) and Sewer Tap Fee (Moncks Corner Public Works Commission) — 4" service, in-town ($1,200.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Development Impact Fee (Town of Moncks Corner, Commercial) and Sewer Impact Fee (Moncks Corner Public Works Commission) — per UCL (250 GPD/unit), in-town are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Moncks Corner Impact Fee Schedule
- Water Impact Fee (Moncks Corner Public Works Commission) — 1" meter, in-town$1,600.00 one-timeMoncks Corner Public Works Commission water impact fee (in-town) for a 1-inch meter: $1,600 minimum. Commercial impact fees are based on unit contributory loadings (250 gallons/day per unit); the meter-size figures are the published minimum and higher-loading uses may pay more.
- Water Tap Fee (Moncks Corner Public Works Commission) — 1" meter, in-town$1,300.00 one-timeMoncks Corner Public Works Commission water tap fee (in-town) for a 1-inch meter: $1,300.
- Sewer Impact Fee (Moncks Corner Public Works Commission) — per UCL (250 GPD/unit), in-town$2,200.00 one-timeRequires confirmationMoncks Corner Public Works Commission sewer impact fee: $2,200 per contributory-loading unit (250 gallons/day). Nonresidential fees are calculated from the project's unit contributory loadings; the figure shown is the single-unit basis.
- Sewer Tap Fee (Moncks Corner Public Works Commission) — 4" service, in-town$1,200.00 one-timeMoncks Corner Public Works Commission sewer tap fee (in-town) for a 4-inch service: $1,200.
- Development Impact Fee (Town of Moncks Corner, Commercial)$3.99/sq ftRequires confirmationTown of Moncks Corner development impact fee (Ordinance No. 2025-01, adopted May 20, 2025): $3,987 per 1,000 sq ft for retail and commercial development (parks and recreation, police, fire and transportation). The adopted study provides for an annual inflation adjustment by the ENR Construction Cost Index. Charged in addition to Moncks Corner Public Works Commission water and sewer fees.
- County Development Impact Fee (Berkeley County, Commercial)$0.00Berkeley County terminated its development impact fee program in 2014; the county levies no development impact fees.
Where in Berkeley County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Moncks Corner: Industrial Impact Fees
Industrial development in Moncks Corner pays $0.83 per square foot in impact fees, plus $6,300.00 in one-time water and sewer connection fees (rates sourced August 14, 2026).
For a 50,000 sq ft building, that comes to about $47,700.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (Moncks Corner Public Works Commission) — 1" meter, in-town ($1,600.00 one-time), Water Tap Fee (Moncks Corner Public Works Commission) — 1" meter, in-town ($1,300.00 one-time) and Sewer Tap Fee (Moncks Corner Public Works Commission) — 4" service, in-town ($1,200.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Development Impact Fee (Town of Moncks Corner, Industrial) and Sewer Impact Fee (Moncks Corner Public Works Commission) — per UCL (250 GPD/unit), in-town are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Moncks Corner Impact Fee Schedule
- Water Impact Fee (Moncks Corner Public Works Commission) — 1" meter, in-town$1,600.00 one-timeMoncks Corner Public Works Commission water impact fee (in-town) for a 1-inch meter: $1,600 minimum. Commercial impact fees are based on unit contributory loadings (250 gallons/day per unit); the meter-size figures are the published minimum and higher-loading uses may pay more.
- Water Tap Fee (Moncks Corner Public Works Commission) — 1" meter, in-town$1,300.00 one-timeMoncks Corner Public Works Commission water tap fee (in-town) for a 1-inch meter: $1,300.
- Sewer Impact Fee (Moncks Corner Public Works Commission) — per UCL (250 GPD/unit), in-town$2,200.00 one-timeRequires confirmationMoncks Corner Public Works Commission sewer impact fee: $2,200 per contributory-loading unit (250 gallons/day). Nonresidential fees are calculated from the project's unit contributory loadings; the figure shown is the single-unit basis.
- Sewer Tap Fee (Moncks Corner Public Works Commission) — 4" service, in-town$1,200.00 one-timeMoncks Corner Public Works Commission sewer tap fee (in-town) for a 4-inch service: $1,200.
- Development Impact Fee (Town of Moncks Corner, Industrial)$0.83/sq ftRequires confirmationTown of Moncks Corner development impact fee (Ordinance No. 2025-01, adopted May 20, 2025): $828 per 1,000 sq ft for industrial development. The adopted study provides for an annual inflation adjustment by the ENR Construction Cost Index.
- County Development Impact Fee (Berkeley County, Industrial)$0.00Berkeley County terminated its development impact fee program in 2014; the county levies no development impact fees.
Where in Berkeley County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Moncks Corner: Office Impact Fees
Office development in Moncks Corner pays $1.82 per square foot in impact fees, plus $6,300.00 in one-time water and sewer connection fees (rates sourced August 14, 2026).
For a 25,000 sq ft building, that comes to about $51,725.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (Moncks Corner Public Works Commission) — 1" meter, in-town ($1,600.00 one-time), Water Tap Fee (Moncks Corner Public Works Commission) — 1" meter, in-town ($1,300.00 one-time) and Sewer Tap Fee (Moncks Corner Public Works Commission) — 4" service, in-town ($1,200.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Development Impact Fee (Town of Moncks Corner, Office) and Sewer Impact Fee (Moncks Corner Public Works Commission) — per UCL (250 GPD/unit), in-town are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Moncks Corner Impact Fee Schedule
- Water Impact Fee (Moncks Corner Public Works Commission) — 1" meter, in-town$1,600.00 one-timeMoncks Corner Public Works Commission water impact fee (in-town) for a 1-inch meter: $1,600 minimum. Commercial impact fees are based on unit contributory loadings (250 gallons/day per unit); the meter-size figures are the published minimum and higher-loading uses may pay more.
- Water Tap Fee (Moncks Corner Public Works Commission) — 1" meter, in-town$1,300.00 one-timeMoncks Corner Public Works Commission water tap fee (in-town) for a 1-inch meter: $1,300.
- Sewer Impact Fee (Moncks Corner Public Works Commission) — per UCL (250 GPD/unit), in-town$2,200.00 one-timeRequires confirmationMoncks Corner Public Works Commission sewer impact fee: $2,200 per contributory-loading unit (250 gallons/day). Nonresidential fees are calculated from the project's unit contributory loadings; the figure shown is the single-unit basis.
- Sewer Tap Fee (Moncks Corner Public Works Commission) — 4" service, in-town$1,200.00 one-timeMoncks Corner Public Works Commission sewer tap fee (in-town) for a 4-inch service: $1,200.
- Development Impact Fee (Town of Moncks Corner, Office)$1.82/sq ftRequires confirmationTown of Moncks Corner development impact fee (Ordinance No. 2025-01, adopted May 20, 2025): $1,817 per 1,000 sq ft for office development. The adopted study provides for an annual inflation adjustment by the ENR Construction Cost Index.
- County Development Impact Fee (Berkeley County, Office)$0.00Berkeley County terminated its development impact fee program in 2014; the county levies no development impact fees.
Where in Berkeley County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Moncks Corner Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Moncks Corner Impact Fee FAQs
What are the total impact fees for a single-family home in Moncks Corner, South Carolina?
A new single-family home in Moncks Corner pays $10,805.00 per unit in combined impact fees (rates sourced August 14, 2026).
How much are commercial impact fees in Moncks Corner?
Commercial development in Moncks Corner pays $3.99 per square foot in impact fees, plus $6,300.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $205,650.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Moncks Corner charge its own impact fees?
Yes. Moncks Corner levies its own municipal impact or utility fees. Berkeley County does not currently add county-level impact fees inside Moncks Corner. The schedule on this page shows every fee that applies to development in Moncks Corner.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Berkeley County impact fees page.