Skip to content
IMPACTFEES.ORG

Fort Lawn, South Carolina Impact Fees

Fort Lawn applies its own fee schedule: municipal fees plus the Chester County-levied fees that apply inside city limits. Combined, a new single-family home pays $10,987.56 per unit (rates sourced ). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Fort Lawn Impact Fees by Project Type

Fort Lawn: Single-Family Impact Fees

A new single-family home in Fort Lawn pays $10,987.56 per unit in impact fees (rates sourced November 4, 2026). Of that, Chester County-levied fees account for $7,567.56 and municipal or utility fees for $3,420.00.

The largest line items are Water Capital Recovery Fee (Chester Metropolitan District) — 3/4" meter ($1,770.00) and Water Tap Fee (Chester Metropolitan District) ($1,650.00).

Sewer Capital Recovery Fee (Chester County Wastewater Recovery) — LR Basin, 3/4" meter and Sewer Tap Fee (Chester County Wastewater Recovery) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Fort Lawn Impact Fee Schedule
Water$3,420.00
  • Water Capital Recovery Fee (Chester Metropolitan District) — 3/4" meter
    Chester Metropolitan District
    Effective July 1, 2026. One-time water capital recovery fee by service size: 3/4-inch $1,770, 1-inch $2,955, 2-inch $9,431; meters 3 inches and larger pay peak water demand (gallons per day) x $5.90. A standard home uses a 3/4-inch service. Separate from the water tap fee.
    $1,770.00
  • Water Tap Fee (Chester Metropolitan District)
    Chester Metropolitan District
    Effective July 1, 2026. $1,650 for a 1-inch-or-smaller simple installation; other installations are billed at cost. Separate one-time charge from the water capital recovery fee.
    $1,650.00
Sewer$7,567.56
  • Sewer Capital Recovery Fee (Chester County Wastewater Recovery) — LR Basin, 3/4" meter
    Chester County Wastewater Recovery
    Effective July 1, 2026. One-time sewer capital recovery fee by meter size where Chester County Wastewater Recovery sewer is available, shown at the higher of its two rate basins (LR); the RC/SR basin is lower and basin assignment depends on the parcel. A standard home uses a 3/4-inch meter. Meters larger than 2 inches pay per gallon per day ($16.00 LR, $7.14 RC/SR). Separate from the sewer tap fee.
    $4,000.00Requires confirmation
  • Sewer Tap Fee (Chester County Wastewater Recovery)
    Chester County Wastewater Recovery
    Effective July 1, 2026. $3,567.56 is the minimum Chester County Wastewater Recovery sewer tap fee where its sewer is available. Separate one-time charge from the sewer capital recovery fee.
    $3,567.56Requires confirmation
City$0.00
  • Development Impact Fee (Town of Fort Lawn)
    Town of Fort Lawn
    The Town of Fort Lawn has not adopted a development impact fee. South Carolina law only allows impact fees after a detailed study and ordinance, and only a small number of South Carolina jurisdictions have done so; this one is not among them.
    $0.00
County$0.00
  • County Development / Service Fee (Chester County)
    Chester County
    Chester County does not charge a development impact fee on new construction. A 2025 county measure allows the county to bill municipalities - not builders or homeowners - service fees for areas a town annexes, so no county development fee is collected on a building permit.
    $0.00
Total (Fort Lawn): $10,987.56
Sources last checked Official fee schedules:Chester Metropolitan District Chester County Wastewater Recovery Town of Fort Lawn Chester County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Chester County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Fort Lawn: Multifamily Impact Fees

A new multifamily unit in Fort Lawn pays $10,987.56 per unit in impact fees (rates sourced November 4, 2026). Of that, Chester County-levied fees account for $7,567.56 and municipal or utility fees for $3,420.00.

Water Capital Recovery Fee (Chester Metropolitan District, MF) — 3/4" meter, Sewer Capital Recovery Fee (Chester County Wastewater Recovery, MF) — LR Basin, 3/4" meter, Sewer Tap Fee (Chester County Wastewater Recovery, MF), and Water Tap Fee (Chester Metropolitan District, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Fort Lawn Impact Fee Schedule
Water$3,420.00
  • Water Capital Recovery Fee (Chester Metropolitan District, MF) — 3/4" meter
    Chester Metropolitan District
    Effective July 1, 2026. One-time water capital recovery fee by service size: 3/4-inch $1,770, 1-inch $2,955, 2-inch $9,431; meters 3 inches and larger pay peak water demand (gallons per day) x $5.90. Charged per service connection: a building on one connection pays once at its meter size. Separate from the water tap fee.
    $1,770.00Requires confirmation
  • Water Tap Fee (Chester Metropolitan District, MF)
    Chester Metropolitan District
    Effective July 1, 2026. $1,650 for a 1-inch-or-smaller simple installation; other installations are billed at cost. Charged per service connection: a building on one connection pays once. Separate from the water capital recovery fee.
    $1,650.00Requires confirmation
Sewer$7,567.56
  • Sewer Capital Recovery Fee (Chester County Wastewater Recovery, MF) — LR Basin, 3/4" meter
    Chester County Wastewater Recovery
    Effective July 1, 2026. One-time sewer capital recovery fee by meter size where Chester County Wastewater Recovery sewer is available, shown at the higher of its two rate basins (LR); basin assignment depends on the parcel. Charged per meter: an individually metered unit pays the 3/4-inch fee, while a building on one master meter pays once at its meter size. Separate from the sewer tap fee.
    $4,000.00Requires confirmation
  • Sewer Tap Fee (Chester County Wastewater Recovery, MF)
    Chester County Wastewater Recovery
    Effective July 1, 2026. $3,567.56 is the minimum Chester County Wastewater Recovery sewer tap fee where its sewer is available. Charged per sewer connection: a building on one connection pays once.
    $3,567.56Requires confirmation
City$0.00
  • Development Impact Fee (Town of Fort Lawn, MF)
    Town of Fort Lawn
    The Town of Fort Lawn has not adopted a development impact fee. South Carolina law only allows impact fees after a detailed study and ordinance, and only a small number of South Carolina jurisdictions have done so; this one is not among them.
    $0.00
County$0.00
  • County Development / Service Fee (Chester County, MF)
    Chester County
    Chester County does not charge a development impact fee on new construction. A 2025 county measure allows the county to bill municipalities - not builders or homeowners - service fees for areas a town annexes, so no county development fee is collected on a building permit.
    $0.00
Total (Fort Lawn): $10,987.56
Sources last checked Official fee schedules:Chester Metropolitan District Chester County Wastewater Recovery Town of Fort Lawn Chester County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Chester County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Fort Lawn: Commercial Impact Fees

Commercial development in Fort Lawn pays no per-square-foot impact fees, but owes $14,852.56 in one-time water and sewer connection fees (rates sourced November 4, 2026).

For a 50,000 sq ft building, that comes to about $14,852.56. The calculator below adjusts to your exact square footage.

The largest line items are Water Capital Recovery Fee (Chester Metropolitan District) — 1" meter ($2,955.00 one-time) and Water Tap Fee (Chester Metropolitan District) ($1,650.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Capital Recovery Fee (Chester County Wastewater Recovery) — LR Basin, 1" meter and Sewer Tap Fee (Chester County Wastewater Recovery) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Fort Lawn Impact Fee Schedule
Water$4,605.00 one-time
  • Water Capital Recovery Fee (Chester Metropolitan District) — 1" meter
    Chester Metropolitan District
    Effective July 1, 2026. One-time water capital recovery fee by meter size: 3/4 inch $1,770, 1 inch $2,955, 2 inch $9,431; meters 3 to 10 inches are charged peak water demand (gallons/day) x $5.90. Separate from the water tap fee.
    $2,955.00 one-time
  • Water Tap Fee (Chester Metropolitan District)
    Effective July 1, 2026. $1,650 for a 1-inch-or-smaller simple installation; larger connections billed at cost of installation. Separate one-time charge from the water capital recovery fee.
    $1,650.00 one-time
Sewer$10,247.56 one-time
City$0.00
County$0.00
Total (Fort Lawn): $14,852.56 one-time (≈ $14,852.56 at 50,000 sq ft)
Sources last checked Official fee schedules:Chester Metropolitan District Chester County Wastewater Recovery
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Chester County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Fort Lawn: Industrial Impact Fees

Industrial development in Fort Lawn pays no per-square-foot impact fees, but owes $14,852.56 in one-time water and sewer connection fees (rates sourced November 4, 2026).

For a 50,000 sq ft building, that comes to about $14,852.56. The calculator below adjusts to your exact square footage.

The largest line items are Water Capital Recovery Fee (Chester Metropolitan District) — 1" meter ($2,955.00 one-time) and Water Tap Fee (Chester Metropolitan District) ($1,650.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Capital Recovery Fee (Chester County Wastewater Recovery) — LR Basin, 1" meter and Sewer Tap Fee (Chester County Wastewater Recovery) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Fort Lawn Impact Fee Schedule
Water$4,605.00 one-time
  • Water Capital Recovery Fee (Chester Metropolitan District) — 1" meter
    Chester Metropolitan District
    Effective July 1, 2026. One-time water capital recovery fee by meter size: 3/4 inch $1,770, 1 inch $2,955, 2 inch $9,431; meters 3 to 10 inches are charged peak water demand (gallons/day) x $5.90. Separate from the water tap fee.
    $2,955.00 one-time
  • Water Tap Fee (Chester Metropolitan District)
    Effective July 1, 2026. $1,650 for a 1-inch-or-smaller simple installation; larger connections billed at cost of installation. Separate one-time charge from the water capital recovery fee.
    $1,650.00 one-time
Sewer$10,247.56 one-time
City$0.00
County$0.00
Total (Fort Lawn): $14,852.56 one-time (≈ $14,852.56 at 50,000 sq ft)
Sources last checked Official fee schedules:Chester Metropolitan District Chester County Wastewater Recovery
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Chester County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Fort Lawn: Office Impact Fees

Office development in Fort Lawn pays no per-square-foot impact fees, but owes $14,852.56 in one-time water and sewer connection fees (rates sourced November 4, 2026).

For a 25,000 sq ft building, that comes to about $14,852.56. The calculator below adjusts to your exact square footage.

The largest line items are Water Capital Recovery Fee (Chester Metropolitan District) — 1" meter ($2,955.00 one-time) and Water Tap Fee (Chester Metropolitan District) ($1,650.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Capital Recovery Fee (Chester County Wastewater Recovery) — LR Basin, 1" meter and Sewer Tap Fee (Chester County Wastewater Recovery) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Fort Lawn Impact Fee Schedule
Water$4,605.00 one-time
  • Water Capital Recovery Fee (Chester Metropolitan District) — 1" meter
    Chester Metropolitan District
    Effective July 1, 2026. One-time water capital recovery fee by meter size: 3/4 inch $1,770, 1 inch $2,955, 2 inch $9,431; meters 3 to 10 inches are charged peak water demand (gallons/day) x $5.90. Separate from the water tap fee.
    $2,955.00 one-time
  • Water Tap Fee (Chester Metropolitan District)
    Effective July 1, 2026. $1,650 for a 1-inch-or-smaller simple installation; larger connections billed at cost of installation. Separate one-time charge from the water capital recovery fee.
    $1,650.00 one-time
Sewer$10,247.56 one-time
City$0.00
County$0.00
Total (Fort Lawn): $14,852.56 one-time (≈ $14,852.56 at 25,000 sq ft)
Sources last checked Official fee schedules:Chester Metropolitan District Chester County Wastewater Recovery
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Chester County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Fort Lawn Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Fort Lawn Impact Fee FAQs

What are the total impact fees for a single-family home in Fort Lawn, South Carolina?

A new single-family home in Fort Lawn pays $10,987.56 per unit in combined impact fees (rates sourced November 4, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Fort Lawn?

Commercial development in Fort Lawn pays no per-square-foot impact fees, but owes $14,852.56 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Fort Lawn charge its own impact fees?

Yes. Fort Lawn levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Fort Lawn, with the combined total.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Chester County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000