Unincorporated Chesterfield County: Single-Family Impact Fees
A new single-family home in unincorporated Chesterfield County pays $2,200.00 per unit in impact fees (rates sourced November 4, 2026). All of it is levied by Chesterfield County.
The largest line items are Water Tap Fee — Chesterfield County Rural Water Co., 3/4" meter ($2,200.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Chesterfield County Impact Fee Schedule
- Water Tap Fee — Chesterfield County Rural Water Co., 3/4" meter$2,200.00CCRWC, 3/4" meterChesterfield County Rural Water Co., Inc. (CCRWC)Most of unincorporated Chesterfield County is served by Chesterfield County Rural Water Co., a private nonprofit, which charges $2,200 for a 3/4 inch meter tap and $3,000 for a 1 inch tap; 2 inch and larger meters are billed at cost plus 15 percent. Parcels in the southwestern county around McBee are served by Alligator Rural Water & Sewer Co. instead.
- Sewer Tap Fee (Chesterfield County - Unincorporated) — no county sewer utility$0.00None — no county sewer utilityChesterfield County does not operate a sewer utility, so no county sewer tap fee applies in unincorporated areas. Development there typically relies on septic systems; in the limited areas with sewer service, the provider is Alligator Rural Water & Sewer Co., which sets its own connection charges.
- Municipal Impact Fee (Chesterfield County - Unincorporated) — not applicable$0.00None — unincorporated area
- County Impact Fee (Chesterfield County) — none levied$0.00Chesterfield CountyChesterfield County has not adopted a development impact fee; building permits are priced from a valuation schedule effective July 1, 2021. The county has adopted a series of 60-day moratoria on new subdivisions, manufactured home parks and RV parks in the unincorporated area since 2024; the one adopted September 14, 2026 covers new RV parks only.
Where in Chesterfield County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Chesterfield County: Multifamily Impact Fees
A new multifamily unit in unincorporated Chesterfield County pays $2,200.00 per unit in impact fees (rates sourced November 4, 2026). All of it is levied by Chesterfield County.
The largest line items are Water Tap Fee (MF) — Chesterfield County Rural Water Co., 3/4" meter per unit ($2,200.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Chesterfield County Impact Fee Schedule
- Water Tap Fee (MF) — Chesterfield County Rural Water Co., 3/4" meter per unit$2,200.00CCRWC service area (most of the unincorporated county)Chesterfield County Rural Water Co., Inc. (CCRWC)Chesterfield County Rural Water Co. prohibits master meters and allows only one residence per meter, with no discount for multiple meters, so each apartment unit pays the full tap fee: $2,200 for a 3/4 inch meter or $3,000 for a 1 inch meter.
- Sewer Tap Fee (Chesterfield County - Unincorporated, MF) — no county sewer utility$0.00None — no county sewer utilityChesterfield County does not operate a sewer utility, so no county sewer tap fee applies in unincorporated areas. Multifamily projects there would need on-site wastewater arrangements or service from Alligator Rural Water & Sewer Co., which sets its own connection charges.
- Municipal Impact Fee (Chesterfield County - Unincorporated, MF) — not applicable$0.00None — unincorporated area
- County Impact Fee (Chesterfield County, MF) — none levied$0.00Chesterfield CountyChesterfield County has not adopted a development impact fee for any housing type; building permits are priced from a valuation schedule effective July 1, 2021. The county has adopted a series of 60-day moratoria on new subdivisions, manufactured home parks and RV parks in the unincorporated area since 2024; the one adopted September 14, 2026 covers new RV parks only.
Where in Chesterfield County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Chesterfield County: Commercial Impact Fees
Commercial development in unincorporated Chesterfield County pays no per-square-foot impact fees, but owes $5,000.00 in one-time water and sewer connection fees (rates sourced November 4, 2026).
For a 50,000 sq ft building, that comes to about $5,000.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (Chesterfield County Rural Water Co.) — 1" meter ($3,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Tap Fee (Alligator Rural Water & Sewer Co.) — New Tap is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Chesterfield County Impact Fee Schedule
- Water Tap Fee (Chesterfield County Rural Water Co.) — 1" meter$3,000.00 one-timeChesterfield County Rural Water Co., Inc. (CCRWC)Most of the unincorporated county is served by Chesterfield County Rural Water Co. (CCRWC), a private nonprofit; the southwest county around McBee and Patrick is served by Alligator Rural Water & Sewer Co. instead. CCRWC's tap fee is system-wide: $2,200 for a 3/4" meter and $3,000 for a 1" meter; meters 2" and over are charged materials and labor plus 15%. Each business needs its own meter (master meters are prohibited) and there is no discount for multiple meters.
- Water Tap Fee (Alligator Rural Water & Sewer Co.) — New Tap$2,000.00 one-timeRequires confirmationAlligator Rural Water & Sewer Co., Inc.Alternate provider serving the southwest county. Flat posted tap fee; no published commercial meter-size schedule.
- Sewer Tap Fee (Chesterfield County - Unincorporated) — no county sewer utility$0.00None — no county sewer utilityThe county operates no sewer utility; unincorporated development is generally on septic.
- City Development Impact Fee (unincorporated — not applicable, Commercial)$0.00None — unincorporated areaNot applicable: there is no municipal government in the unincorporated county.
- County Development Impact Fee (Chesterfield County, Commercial)$0.00Chesterfield CountyChesterfield County does not levy a nonresidential development impact fee.
Where in Chesterfield County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Chesterfield County: Industrial Impact Fees
Industrial development in unincorporated Chesterfield County pays no per-square-foot impact fees, but owes $5,000.00 in one-time water and sewer connection fees (rates sourced November 4, 2026).
For a 50,000 sq ft building, that comes to about $5,000.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (Chesterfield County Rural Water Co.) — 1" meter ($3,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Tap Fee (Alligator Rural Water & Sewer Co.) — New Tap is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Chesterfield County Impact Fee Schedule
- Water Tap Fee (Chesterfield County Rural Water Co.) — 1" meter$3,000.00 one-timeChesterfield County Rural Water Co., Inc. (CCRWC)Most of the unincorporated county is served by Chesterfield County Rural Water Co. (CCRWC), a private nonprofit; the southwest county around McBee and Patrick is served by Alligator Rural Water & Sewer Co. instead. CCRWC's tap fee is system-wide: $2,200 for a 3/4" meter and $3,000 for a 1" meter; meters 2" and over are charged materials and labor plus 15%. Each business needs its own meter (master meters are prohibited) and there is no discount for multiple meters.
- Water Tap Fee (Alligator Rural Water & Sewer Co.) — New Tap$2,000.00 one-timeRequires confirmationAlligator Rural Water & Sewer Co., Inc.Alternate provider serving the southwest county. Flat posted tap fee; no published commercial meter-size schedule.
- Sewer Tap Fee (Chesterfield County - Unincorporated) — no county sewer utility$0.00None — no county sewer utilityThe county operates no sewer utility; unincorporated development is generally on septic.
- City Development Impact Fee (unincorporated — not applicable, Industrial)$0.00None — unincorporated areaNot applicable: there is no municipal government in the unincorporated county.
- County Development Impact Fee (Chesterfield County, Industrial)$0.00Chesterfield CountyChesterfield County does not levy a nonresidential development impact fee.
Where in Chesterfield County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Chesterfield County: Office Impact Fees
Office development in unincorporated Chesterfield County pays no per-square-foot impact fees, but owes $5,000.00 in one-time water and sewer connection fees (rates sourced November 4, 2026).
For a 25,000 sq ft building, that comes to about $5,000.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (Chesterfield County Rural Water Co.) — 1" meter ($3,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Tap Fee (Alligator Rural Water & Sewer Co.) — New Tap is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Chesterfield County Impact Fee Schedule
- Water Tap Fee (Chesterfield County Rural Water Co.) — 1" meter$3,000.00 one-timeChesterfield County Rural Water Co., Inc. (CCRWC)Most of the unincorporated county is served by Chesterfield County Rural Water Co. (CCRWC), a private nonprofit; the southwest county around McBee and Patrick is served by Alligator Rural Water & Sewer Co. instead. CCRWC's tap fee is system-wide: $2,200 for a 3/4" meter and $3,000 for a 1" meter; meters 2" and over are charged materials and labor plus 15%. Each business needs its own meter (master meters are prohibited) and there is no discount for multiple meters.
- Water Tap Fee (Alligator Rural Water & Sewer Co.) — New Tap$2,000.00 one-timeRequires confirmationAlligator Rural Water & Sewer Co., Inc.Alternate provider serving the southwest county. Flat posted tap fee; no published commercial meter-size schedule.
- Sewer Tap Fee (Chesterfield County - Unincorporated) — no county sewer utility$0.00None — no county sewer utilityThe county operates no sewer utility; unincorporated development is generally on septic.
- City Development Impact Fee (unincorporated — not applicable, Office)$0.00None — unincorporated areaNot applicable: there is no municipal government in the unincorporated county.
- County Development Impact Fee (Chesterfield County, Office)$0.00Chesterfield CountyChesterfield County does not levy a nonresidential development impact fee.
Chesterfield County Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
Brush up on impact fee basics before you budget your next project.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Chesterfield County Impact Fee FAQs
What are single-family impact fees in Chesterfield County, South Carolina?
A new single-family home in unincorporated Chesterfield County pays $2,200.00 per unit in impact fees (rates sourced November 4, 2026). Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.
How much are multifamily impact fees in Chesterfield County?
Multifamily development in unincorporated Chesterfield County pays $2,200.00 per unit in impact fees (rates sourced November 4, 2026). Rates inside city limits depend on the municipality. Pick your city on this page.
How much are commercial impact fees in Chesterfield County?
Commercial development in unincorporated Chesterfield County pays no per-square-foot impact fees, but owes $5,000.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Do cities in Chesterfield County charge their own impact fees?
Yes. Every incorporated city applies its own fee schedule. 3 of 8 cities in Chesterfield County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.