Pageland Impact Fees by Project Type
Pageland: Single-Family Impact Fees
Pageland has no published impact fee amounts for a new single-family home (rates sourced November 4, 2026). The schedule below documents the status of each fee.
Water Impact Fee (Town of Pageland), Water Service Connection Fee (Town of Pageland) — 3/4" tap, Wastewater Impact Fee (Town of Pageland), and Sewer Service Connection Fee (Town of Pageland) — 4" tap are set by the utility and not published online. Municipal Impact Fee (Town of Pageland) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Pageland Impact Fee Schedule
- Water Impact Fee (Town of Pageland)Requires confirmationTown of PagelandIn addition to its water tap fee, Pageland collects a separate water impact fee on new connections, based on the town's 2023 impact fee study. The adopted amount is not published online.
- Water Service Connection Fee (Town of Pageland) — 3/4" tapRequires confirmationTown of PagelandPageland runs its own water distribution system and charges a connection fee for each new water tap, separate from its water impact fee. The town's 2026 rate schedule does not list the tap amount.
- Wastewater Impact Fee (Town of Pageland)Requires confirmationTown of PagelandIn addition to its sewer tap fee, Pageland collects a separate wastewater impact fee on new connections, based on the town's 2023 impact fee study. The adopted amount is not published online.
- Sewer Service Connection Fee (Town of Pageland) — 4" tapRequires confirmationTown of PagelandPageland operates its own sewer system and charges a connection fee for each new sewer tap, separate from its wastewater impact fee. The town's 2026 rate schedule does not list the tap amount.
- Municipal Impact Fee (Town of Pageland)Requires confirmationTown of PagelandThe Town of Pageland collects development impact fees on new homes for fire, police and recreation facilities, following a 2023 capital improvement plan and impact fee study. The adopted per-unit amounts are not published online, so no amount is shown.
- County Impact Fee (Chesterfield County) — none levied$0.00Chesterfield CountyChesterfield County has not adopted a development impact fee, so no county impact fee applies inside the Town of Pageland. Pageland's own town impact fees are listed separately.
Where in Chesterfield County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Pageland: Multifamily Impact Fees
Pageland has no published impact fee amounts for a new multifamily unit (rates sourced November 4, 2026). The schedule below documents the status of each fee.
Wastewater Impact Fee (Town of Pageland, MF), Sewer Service Connection Fee (Town of Pageland, MF), Water Service Connection Fee (Town of Pageland, MF) — per unit, and Water Impact Fee (Town of Pageland, MF) are set by the utility and not published online. Municipal Impact Fee (Town of Pageland, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Pageland Impact Fee Schedule
- Water Service Connection Fee (Town of Pageland, MF) — per unitRequires confirmationTown of PagelandPageland runs its own water distribution system and charges a connection fee for new water taps, separate from its water impact fee. The tap amount is not listed in the town's 2026 rate schedule.
- Water Impact Fee (Town of Pageland, MF)Requires confirmationTown of PagelandIn addition to its water tap fee, Pageland collects a separate water impact fee on new connections, based on the town's 2023 impact fee study. The adopted amount is not published online.
- Wastewater Impact Fee (Town of Pageland, MF)Requires confirmationTown of PagelandIn addition to its sewer tap fee, Pageland collects a separate wastewater impact fee on new connections, based on the town's 2023 impact fee study. The adopted amount is not published online.
- Sewer Service Connection Fee (Town of Pageland, MF)Requires confirmationTown of PagelandPageland operates its own sewer system and charges a connection fee for each new sewer tap, separate from its wastewater impact fee. The tap amount is not listed in the town's 2026 rate schedule.
- Municipal Impact Fee (Town of Pageland, MF)Requires confirmationTown of PagelandThe Town of Pageland collects development impact fees on new dwelling units for fire, police and recreation facilities, following a 2023 capital improvement plan and impact fee study. The adopted per-unit amounts are not published online, so no amount is shown.
- County Impact Fee (Chesterfield County, MF) — none levied$0.00Chesterfield CountyChesterfield County has not adopted a development impact fee, so no county impact fee applies inside the Town of Pageland. Pageland's own town impact fees are listed separately.
Where in Chesterfield County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Pageland: Commercial Impact Fees
Commercial development in Pageland pays no per-square-foot impact fees (rates sourced November 4, 2026).
Water Connection Fee (Town of Pageland), Wastewater Impact Fee (Town of Pageland), Water Impact Fee (Town of Pageland), and Sewer Connection Fee (Town of Pageland) are set by the utility and not published online. Municipal Impact Fee (Town of Pageland, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Pageland Impact Fee Schedule
- Water Connection Fee (Town of Pageland)Requires confirmationTown of PagelandPageland runs its own water distribution system and charges a connection fee for each new water tap, separate from its water impact fee. The town's 2026 rate schedule does not list the tap amount.
- Water Impact Fee (Town of Pageland)Requires confirmationTown of PagelandIn addition to its water connection fee, Pageland collects a separate water impact fee on new connections, based on the town's 2023 impact fee study. The adopted amount is not published online.
- Wastewater Impact Fee (Town of Pageland)Requires confirmationTown of PagelandIn addition to its sewer connection fee, Pageland collects a separate wastewater impact fee on new connections, based on the town's 2023 impact fee study. The adopted amount is not published online.
- Sewer Connection Fee (Town of Pageland)Requires confirmationTown of PagelandPageland operates its own sewer system and charges a connection fee for each new sewer tap, separate from its wastewater impact fee. The town's 2026 rate schedule does not list the tap amount.
- Municipal Impact Fee (Town of Pageland, Commercial)Requires confirmationTown of PagelandThe Town of Pageland collects development impact fees (its budget carries fire, police and recreation impact fee accounts) following a 2023 capital improvement plan and impact fee study. The amounts charged to nonresidential development are not published online, so no amount is shown.
- County Development Impact Fee (Chesterfield County, Commercial)$0.00Chesterfield CountyChesterfield County does not levy a nonresidential development impact fee.
Where in Chesterfield County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Pageland: Industrial Impact Fees
Industrial development in Pageland pays no per-square-foot impact fees (rates sourced November 4, 2026).
Water Connection Fee (Town of Pageland), Wastewater Impact Fee (Town of Pageland), Water Impact Fee (Town of Pageland), and Sewer Connection Fee (Town of Pageland) are set by the utility and not published online. Municipal Impact Fee (Town of Pageland, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Pageland Impact Fee Schedule
- Water Connection Fee (Town of Pageland)Requires confirmationTown of PagelandPageland runs its own water distribution system and charges a connection fee for each new water tap, separate from its water impact fee. The town's 2026 rate schedule does not list the tap amount.
- Water Impact Fee (Town of Pageland)Requires confirmationTown of PagelandIn addition to its water connection fee, Pageland collects a separate water impact fee on new connections, based on the town's 2023 impact fee study. The adopted amount is not published online.
- Wastewater Impact Fee (Town of Pageland)Requires confirmationTown of PagelandIn addition to its sewer connection fee, Pageland collects a separate wastewater impact fee on new connections, based on the town's 2023 impact fee study. The adopted amount is not published online.
- Sewer Connection Fee (Town of Pageland)Requires confirmationTown of PagelandPageland operates its own sewer system and charges a connection fee for each new sewer tap, separate from its wastewater impact fee. The town's 2026 rate schedule does not list the tap amount.
- Municipal Impact Fee (Town of Pageland, Industrial)Requires confirmationTown of PagelandThe Town of Pageland collects development impact fees (its budget carries fire, police and recreation impact fee accounts) following a 2023 capital improvement plan and impact fee study. The amounts charged to nonresidential development are not published online, so no amount is shown.
- County Development Impact Fee (Chesterfield County, Industrial)$0.00Chesterfield CountyChesterfield County does not levy a nonresidential development impact fee.
Where in Chesterfield County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Pageland: Office Impact Fees
Office development in Pageland pays no per-square-foot impact fees (rates sourced November 4, 2026).
Water Connection Fee (Town of Pageland), Wastewater Impact Fee (Town of Pageland), Water Impact Fee (Town of Pageland), and Sewer Connection Fee (Town of Pageland) are set by the utility and not published online. Municipal Impact Fee (Town of Pageland, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Pageland Impact Fee Schedule
- Water Connection Fee (Town of Pageland)Requires confirmationTown of PagelandPageland runs its own water distribution system and charges a connection fee for each new water tap, separate from its water impact fee. The town's 2026 rate schedule does not list the tap amount.
- Water Impact Fee (Town of Pageland)Requires confirmationTown of PagelandIn addition to its water connection fee, Pageland collects a separate water impact fee on new connections, based on the town's 2023 impact fee study. The adopted amount is not published online.
- Wastewater Impact Fee (Town of Pageland)Requires confirmationTown of PagelandIn addition to its sewer connection fee, Pageland collects a separate wastewater impact fee on new connections, based on the town's 2023 impact fee study. The adopted amount is not published online.
- Sewer Connection Fee (Town of Pageland)Requires confirmationTown of PagelandPageland operates its own sewer system and charges a connection fee for each new sewer tap, separate from its wastewater impact fee. The town's 2026 rate schedule does not list the tap amount.
- Municipal Impact Fee (Town of Pageland, Office)Requires confirmationTown of PagelandThe Town of Pageland collects development impact fees (its budget carries fire, police and recreation impact fee accounts) following a 2023 capital improvement plan and impact fee study. The amounts charged to nonresidential development are not published online, so no amount is shown.
- County Development Impact Fee (Chesterfield County, Office)$0.00Chesterfield CountyChesterfield County does not levy a nonresidential development impact fee.
Where in Chesterfield County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Pageland Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Pageland Impact Fee FAQs
How much are commercial impact fees in Pageland?
Pageland does not currently levy impact fees on commercial development.
Does Pageland charge its own impact fees?
Yes. Pageland levies its own municipal impact or utility fees. Chesterfield County does not currently add county-level impact fees inside Pageland. The schedule on this page shows every fee that applies to development in Pageland.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Chesterfield County impact fees page.