Skip to content
IMPACTFEES.ORG

Edisto Beach, South Carolina Impact Fees

Edisto Beach applies its own fee schedule. Colleton County does not currently add county-level impact fees inside city limits. A new single-family home pays $4,000.00 per unit (rates sourced ). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Edisto Beach Impact Fees by Project Type

Edisto Beach: Single-Family Impact Fees

A new single-family home in Edisto Beach pays $4,000.00 per unit in impact fees (rates sourced November 5, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Tap Fee (Town of Edisto Beach) — 0-300 gpd ($2,500.00).

Water Tap-In Fee (Town of Edisto Beach) — 3/4-inch line, inside town is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Edisto Beach Impact Fee Schedule
Water$1,500.00
  • Water Tap-In Fee (Town of Edisto Beach) — 3/4-inch line, inside town
    Town of Edisto Beach Utilities Department
    Water tap-in fee for an in-town 3/4-inch line. Larger in-town lines cost $1,750 (1-inch), $2,000 (1 1/2-inch) and $2,250 (2-inch). Taps outside town limits are priced higher ($2,000 to $3,500 by line size), and the town does not reserve water taps outside town.
    $1,500.00Requires confirmation
Sewer$2,500.00
  • Sewer Tap Fee (Town of Edisto Beach) — 0-300 gpd
    Town of Edisto Beach Utilities Department
    Sewer tap fee per dwelling unit for flows up to 300 gallons per day, plus $15 per gallon for each permitted gallon over 300. Future sewer capacity is allocated from a first-come priority list, with a non-refundable advance of one quarter of the estimated tap fee, so a tap fee does not guarantee capacity.
    $2,500.00
City$0.00
  • City Impact Fee (Town of Edisto Beach)
    Town of Edisto Beach
    The Town of Edisto Beach does not charge a development impact fee. New homes pay the town's water tap-in and sewer tap fees instead.
    $0.00
County$0.00
Total (Edisto Beach): $4,000.00
Sources last checked Official fee schedules:Town of Edisto Beach Utilities Department Town of Edisto Beach Colleton County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Colleton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Edisto Beach: Multifamily Impact Fees

A new multifamily unit in Edisto Beach pays $4,000.00 per unit in impact fees (rates sourced November 5, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Tap Fee (Town of Edisto Beach, MF) — per dwelling unit, 0-300 gpd ($2,500.00).

Water Tap-In Fee (Town of Edisto Beach, MF) — 3/4-inch line, inside town is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Edisto Beach Impact Fee Schedule
Water$1,500.00
  • Water Tap-In Fee (Town of Edisto Beach, MF) — 3/4-inch line, inside town
    Town of Edisto Beach Utilities Department
    Water tap-in fee for an in-town 3/4-inch line. The fee is charged per tap by line size, not per dwelling unit, so a building served by one connection pays once. In-town lines up to 2 inches are listed; taps outside town limits are priced higher.
    $1,500.00Requires confirmation
Sewer$2,500.00
  • Sewer Tap Fee (Town of Edisto Beach, MF) — per dwelling unit, 0-300 gpd
    Town of Edisto Beach Utilities Department
    Sewer tap fee charged for each dwelling unit, for flows up to 300 gallons per day, plus $15 per gallon for each permitted gallon over 300. Future sewer capacity is allocated from a first-come priority list with a non-refundable advance of one quarter of the estimated tap fee, so a multi-unit project may not obtain all its taps at once.
    $2,500.00
City$0.00
County$0.00
Total (Edisto Beach): $4,000.00
Sources last checked Official fee schedules:Town of Edisto Beach Utilities Department Town of Edisto Beach Colleton County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Colleton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Edisto Beach: Commercial Impact Fees

Commercial development in Edisto Beach pays no per-square-foot impact fees, but owes $4,250.00 in one-time water and sewer connection fees (rates sourced November 5, 2026).

For a 50,000 sq ft building, that comes to about $4,250.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Tap Fee (Town of Edisto Beach) and Water Tap-In Fee (Town of Edisto Beach) — 1" line, inside town are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Edisto Beach Impact Fee Schedule
Water$1,750.00 one-time
  • Water Tap-In Fee (Town of Edisto Beach) — 1" line, inside town
    Town of Edisto Beach
    Water tap-in fee for an in-town 1-inch line. Other in-town line sizes cost $1,500 (3/4-inch), $2,000 (1 1/2-inch) and $2,250 (2-inch). Taps outside town limits are priced higher ($2,000 to $3,500 by line size), and the town does not reserve water taps outside town.
    $1,750.00 one-timeRequires confirmation
Sewer$2,500.00 one-time
  • Sewer Tap Fee (Town of Edisto Beach)
    Town of Edisto Beach
    Sewer tap fee per business location for permitted flows up to 300 gallons per day, plus $15 per gallon for each permitted gallon over 300 (flows up to 1,500 gallons per day). Future sewer capacity is allocated from a first-come priority list, with a non-refundable advance of one quarter of the estimated tap fee, so a tap fee does not guarantee capacity. Only part of the town has sewer service.
    $2,500.00 one-timeRequires confirmation
City$0.00
County$0.00
  • County Impact Fee (Colleton County, Commercial)
    Colleton County
    Colleton County does not charge a development impact fee. In April 2026 the county hired a consultant to prepare an impact fee study, but no impact fee ordinance had been introduced as of November 2026.
    $0.00
Total (Edisto Beach): $4,250.00 one-time (≈ $4,250.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Edisto Beach Colleton County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Colleton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Edisto Beach: Industrial Impact Fees

Industrial development in Edisto Beach pays no per-square-foot impact fees, but owes $4,250.00 in one-time water and sewer connection fees (rates sourced November 5, 2026).

For a 50,000 sq ft building, that comes to about $4,250.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Tap Fee (Town of Edisto Beach) and Water Tap-In Fee (Town of Edisto Beach) — 1" line, inside town are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Edisto Beach Impact Fee Schedule
Water$1,750.00 one-time
  • Water Tap-In Fee (Town of Edisto Beach) — 1" line, inside town
    Town of Edisto Beach
    Water tap-in fee for an in-town 1-inch line. Other in-town line sizes cost $1,500 (3/4-inch), $2,000 (1 1/2-inch) and $2,250 (2-inch). Taps outside town limits are priced higher ($2,000 to $3,500 by line size), and the town does not reserve water taps outside town.
    $1,750.00 one-timeRequires confirmation
Sewer$2,500.00 one-time
  • Sewer Tap Fee (Town of Edisto Beach)
    Town of Edisto Beach
    Sewer tap fee per business location for permitted flows up to 300 gallons per day, plus $15 per gallon for each permitted gallon over 300 (flows up to 1,500 gallons per day). Future sewer capacity is allocated from a first-come priority list, with a non-refundable advance of one quarter of the estimated tap fee, so a tap fee does not guarantee capacity. Only part of the town has sewer service.
    $2,500.00 one-timeRequires confirmation
City$0.00
County$0.00
  • County Impact Fee (Colleton County, Industrial)
    Colleton County
    Colleton County does not charge a development impact fee. In April 2026 the county hired a consultant to prepare an impact fee study, but no impact fee ordinance had been introduced as of November 2026.
    $0.00
Total (Edisto Beach): $4,250.00 one-time (≈ $4,250.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Edisto Beach Colleton County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Colleton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Edisto Beach: Office Impact Fees

Office development in Edisto Beach pays no per-square-foot impact fees, but owes $4,250.00 in one-time water and sewer connection fees (rates sourced November 5, 2026).

For a 25,000 sq ft building, that comes to about $4,250.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Tap Fee (Town of Edisto Beach) and Water Tap-In Fee (Town of Edisto Beach) — 1" line, inside town are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Edisto Beach Impact Fee Schedule
Water$1,750.00 one-time
  • Water Tap-In Fee (Town of Edisto Beach) — 1" line, inside town
    Town of Edisto Beach
    Water tap-in fee for an in-town 1-inch line. Other in-town line sizes cost $1,500 (3/4-inch), $2,000 (1 1/2-inch) and $2,250 (2-inch). Taps outside town limits are priced higher ($2,000 to $3,500 by line size), and the town does not reserve water taps outside town.
    $1,750.00 one-timeRequires confirmation
Sewer$2,500.00 one-time
  • Sewer Tap Fee (Town of Edisto Beach)
    Town of Edisto Beach
    Sewer tap fee per business location for permitted flows up to 300 gallons per day, plus $15 per gallon for each permitted gallon over 300 (flows up to 1,500 gallons per day). Future sewer capacity is allocated from a first-come priority list, with a non-refundable advance of one quarter of the estimated tap fee, so a tap fee does not guarantee capacity. Only part of the town has sewer service.
    $2,500.00 one-timeRequires confirmation
City$0.00
County$0.00
  • County Impact Fee (Colleton County, Office)
    Colleton County
    Colleton County does not charge a development impact fee. In April 2026 the county hired a consultant to prepare an impact fee study, but no impact fee ordinance had been introduced as of November 2026.
    $0.00
Total (Edisto Beach): $4,250.00 one-time (≈ $4,250.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Town of Edisto Beach Colleton County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Colleton County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Edisto Beach Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Edisto Beach Impact Fee FAQs

What are the total impact fees for a single-family home in Edisto Beach, South Carolina?

A new single-family home in Edisto Beach pays $4,000.00 per unit in combined impact fees (rates sourced November 5, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Edisto Beach?

Commercial development in Edisto Beach pays no per-square-foot impact fees, but owes $4,250.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Edisto Beach charge its own impact fees?

Yes. Edisto Beach levies its own municipal impact or utility fees. Colleton County does not currently add county-level impact fees inside Edisto Beach. The schedule on this page shows every fee that applies to development in Edisto Beach.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Colleton County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000