Walterboro Impact Fees by Project Type
Walterboro: Single-Family Impact Fees
A new single-family home in Walterboro pays $10,636.00 per unit in impact fees (rates sourced November 4, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Connection Fee (City of Walterboro) — Residential ($3,306.00), Water Capacity Fee (City of Walterboro) — 3/4-inch service ($2,560.00) and Sewer Capacity Fee (City of Walterboro) — 3/4-inch service ($2,450.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Walterboro Impact Fee Schedule
- Water Capacity Fee (City of Walterboro) — 3/4-inch service$2,560.00City of WalterboroEffective July 1, 2025. Water capacity fee for a standard 3/4-inch meter, paid in addition to the water connection fee. The city reissues its rate schedule each July 1.
- Water Connection Fee (City of Walterboro) — 3/4-inch service$2,320.00City of WalterboroEffective July 1, 2025. Water connection fee for a standard 3/4-inch service, paid in addition to the water capacity fee. A $3,000 road bore fee applies where a road bore is required. The city reissues its rate schedule each July 1.
- Sewer Connection Fee (City of Walterboro) — Residential$3,306.00City of WalterboroEffective July 1, 2025. Flat sewer connection fee for a residential customer, paid in addition to the sewer capacity fee, which is set by service size. A flowable fill fee of up to $1,500 may also apply. The city reissues its rate schedule each July 1.
- Sewer Capacity Fee (City of Walterboro) — 3/4-inch service$2,450.00City of WalterboroEffective July 1, 2025. Sewer capacity fee for a standard 3/4-inch service, paid in addition to the sewer connection fee. The city reissues its rate schedule each July 1.
- City Impact Fee (City of Walterboro)$0.00City of WalterboroThe City of Walterboro does not charge a development impact fee. New homes pay the city's water and sewer connection and capacity fees.
- County Impact Fee (Colleton County — City of Walterboro)$0.00Colleton CountyColleton County does not charge a development impact fee. In April 2026 the county hired a consultant to prepare an impact fee study, but no impact fee ordinance had been introduced as of November 2026.
Where in Colleton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Walterboro: Multifamily Impact Fees
A new multifamily unit in Walterboro pays $7,548.00 per unit in impact fees (rates sourced November 4, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Capacity Fee (City of Walterboro, MF) — 3/4-inch service ($2,560.00), Sewer Capacity Fee (City of Walterboro, MF) — 3/4-inch service ($2,450.00) and Water Connection Fee (City of Walterboro, MF) — 3/4-inch service ($2,320.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Walterboro Impact Fee Schedule
- Water Capacity Fee (City of Walterboro, MF) — 3/4-inch service$2,560.00City of WalterboroEffective July 1, 2025. The city sets its water capacity fee by meter size and prints no per-unit rate; the amount shown is the full fee for the smallest (3/4-inch) meter. A building served by one meter pays the fee once for that meter size, not once per unit. Paid in addition to the water connection fee.
- Water Connection Fee (City of Walterboro, MF) — 3/4-inch service$2,320.00City of WalterboroEffective July 1, 2025. The city sets its water connection fee by meter size and prints no per-unit rate; the amount shown is the full fee for the smallest (3/4-inch) service. A building served by one connection pays the fee once for that meter, not once per unit. Paid in addition to the water capacity fee; services 3 inches and larger are billed at cost plus 20 percent.
- Sewer Capacity Fee (City of Walterboro, MF) — 3/4-inch service$2,450.00City of WalterboroEffective July 1, 2025. The city sets its sewer capacity fee by service size and prints no per-unit rate; the amount shown is the full fee for the smallest (3/4-inch) service. A building on one service pays the fee once for that size, not once per unit. Paid in addition to the sewer connection fee, which has its own Motel/Apartments per-unit class.
- Sewer Connection Fee (City of Walterboro, MF) — Motel/Apartments, each additional unit$218.00City of WalterboroEffective July 1, 2025. The city's Motel/Apartments sewer connection class pays $5,262 for the first unit and $218 for each additional unit; the per-unit figure shown is the additional-unit rate. Paid in addition to the sewer capacity fee, which is set by service size. The city reissues its rate schedule each July 1.
- City Impact Fee (City of Walterboro, MF)$0.00City of WalterboroThe City of Walterboro does not charge a development impact fee. New units pay the city's water and sewer connection and capacity fees.
- County Impact Fee (Colleton County — City of Walterboro, MF)$0.00Colleton CountyColleton County does not charge a development impact fee. In April 2026 the county hired a consultant to prepare an impact fee study, but no impact fee ordinance had been introduced as of November 2026.
Where in Colleton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Walterboro: Commercial Impact Fees
Commercial development in Walterboro pays no per-square-foot impact fees, but owes $20,381.00 in one-time water and sewer connection fees (rates sourced November 4, 2026).
For a 50,000 sq ft building, that comes to about $20,381.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Capacity Fee (City of Walterboro) — 1" meter ($6,400.00 one-time), Sewer Capacity Fee (City of Walterboro) — 1" meter ($6,125.00 one-time) and Sewer Connection Fee (City of Walterboro, Business) ($5,262.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Walterboro Impact Fee Schedule
- Water Capacity Fee (City of Walterboro) — 1" meter$6,400.00 one-timeCity of WalterboroWater capacity fee, effective July 1, 2025. Charged in addition to the water connection fee. Set by meter size, from 3/4" ($2,560) to 8" ($204,800).
- Water Connection Fee (City of Walterboro) — 1" meter$2,594.00 one-timeCity of WalterboroWater connection fee, effective July 1, 2025. Charged in addition to the water capacity fee. Meter-size ladder: 3/4" $2,320; 1" $2,594; 1.5" $4,942; 2" $5,958; sizes 3"-8" billed at cost plus 20%.
- Sewer Capacity Fee (City of Walterboro) — 1" meter$6,125.00 one-timeCity of WalterboroSewer capacity fee, effective July 1, 2025. Charged in addition to the sewer connection fee. Set by meter size, from 3/4" ($2,450) to 8" ($196,000).
- Sewer Connection Fee (City of Walterboro, Business)$5,262.00 one-timeCity of WalterboroSewer connection fee (business class), effective July 1, 2025. Charged in addition to the sewer capacity fee. Restaurants and lodging uses pay different connection rates.
- Municipal Impact Fee (City of Walterboro, Commercial)$0.00City of WalterboroThe City of Walterboro does not charge a development impact fee. New connections pay the city's water and sewer connection and capacity fees instead.
- County Impact Fee (Colleton County, Commercial)$0.00Colleton CountyColleton County does not charge a development impact fee. In April 2026 the county hired a consultant to prepare an impact fee study, but no impact fee ordinance had been introduced as of November 2026.
Where in Colleton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Walterboro: Industrial Impact Fees
Industrial development in Walterboro pays no per-square-foot impact fees, but owes $20,381.00 in one-time water and sewer connection fees (rates sourced November 4, 2026).
For a 50,000 sq ft building, that comes to about $20,381.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Capacity Fee (City of Walterboro) — 1" meter ($6,400.00 one-time), Sewer Capacity Fee (City of Walterboro) — 1" meter ($6,125.00 one-time) and Sewer Connection Fee (City of Walterboro, Business) ($5,262.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Walterboro Impact Fee Schedule
- Water Capacity Fee (City of Walterboro) — 1" meter$6,400.00 one-timeCity of WalterboroWater capacity fee, effective July 1, 2025. Charged in addition to the water connection fee. Set by meter size, from 3/4" ($2,560) to 8" ($204,800).
- Water Connection Fee (City of Walterboro) — 1" meter$2,594.00 one-timeCity of WalterboroWater connection fee, effective July 1, 2025. Charged in addition to the water capacity fee. Meter-size ladder: 3/4" $2,320; 1" $2,594; 1.5" $4,942; 2" $5,958; sizes 3"-8" billed at cost plus 20%.
- Sewer Capacity Fee (City of Walterboro) — 1" meter$6,125.00 one-timeCity of WalterboroSewer capacity fee, effective July 1, 2025. Charged in addition to the sewer connection fee. Set by meter size, from 3/4" ($2,450) to 8" ($196,000).
- Sewer Connection Fee (City of Walterboro, Business)$5,262.00 one-timeCity of WalterboroSewer connection fee (business class), effective July 1, 2025. Charged in addition to the sewer capacity fee. Restaurants and lodging uses pay different connection rates.
- Municipal Impact Fee (City of Walterboro, Industrial)$0.00City of WalterboroThe City of Walterboro does not charge a development impact fee. New connections pay the city's water and sewer connection and capacity fees instead.
- County Impact Fee (Colleton County, Industrial)$0.00Colleton CountyColleton County does not charge a development impact fee. In April 2026 the county hired a consultant to prepare an impact fee study, but no impact fee ordinance had been introduced as of November 2026.
Where in Colleton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Walterboro: Office Impact Fees
Office development in Walterboro pays no per-square-foot impact fees, but owes $20,381.00 in one-time water and sewer connection fees (rates sourced November 4, 2026).
For a 25,000 sq ft building, that comes to about $20,381.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Capacity Fee (City of Walterboro) — 1" meter ($6,400.00 one-time), Sewer Capacity Fee (City of Walterboro) — 1" meter ($6,125.00 one-time) and Sewer Connection Fee (City of Walterboro, Business) ($5,262.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Walterboro Impact Fee Schedule
- Water Capacity Fee (City of Walterboro) — 1" meter$6,400.00 one-timeCity of WalterboroWater capacity fee, effective July 1, 2025. Charged in addition to the water connection fee. Set by meter size, from 3/4" ($2,560) to 8" ($204,800).
- Water Connection Fee (City of Walterboro) — 1" meter$2,594.00 one-timeCity of WalterboroWater connection fee, effective July 1, 2025. Charged in addition to the water capacity fee. Meter-size ladder: 3/4" $2,320; 1" $2,594; 1.5" $4,942; 2" $5,958; sizes 3"-8" billed at cost plus 20%.
- Sewer Capacity Fee (City of Walterboro) — 1" meter$6,125.00 one-timeCity of WalterboroSewer capacity fee, effective July 1, 2025. Charged in addition to the sewer connection fee. Set by meter size, from 3/4" ($2,450) to 8" ($196,000).
- Sewer Connection Fee (City of Walterboro, Business)$5,262.00 one-timeCity of WalterboroSewer connection fee (business class), effective July 1, 2025. Charged in addition to the sewer capacity fee. Restaurants and lodging uses pay different connection rates.
- Municipal Impact Fee (City of Walterboro, Office)$0.00City of WalterboroThe City of Walterboro does not charge a development impact fee. New connections pay the city's water and sewer connection and capacity fees instead.
- County Impact Fee (Colleton County, Office)$0.00Colleton CountyColleton County does not charge a development impact fee. In April 2026 the county hired a consultant to prepare an impact fee study, but no impact fee ordinance had been introduced as of November 2026.
Where in Colleton County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Walterboro Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Walterboro Impact Fee FAQs
What are the total impact fees for a single-family home in Walterboro, South Carolina?
A new single-family home in Walterboro pays $10,636.00 per unit in combined impact fees (rates sourced November 4, 2026).
How much are commercial impact fees in Walterboro?
Commercial development in Walterboro pays no per-square-foot impact fees, but owes $20,381.00 in one-time water and sewer connection fees (assuming a 1-inch meter).
Does Walterboro charge its own impact fees?
Yes. Walterboro levies its own municipal impact or utility fees. Colleton County does not currently add county-level impact fees inside Walterboro. The schedule on this page shows every fee that applies to development in Walterboro.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Colleton County impact fees page.