Skip to content
IMPACTFEES.ORG

Edgefield County, South Carolina Impact Fees

Impact fees in Edgefield County depend on where you build. This page details the rates for unincorporated Edgefield County: at least $8,313.00 per single-family unit as of . This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. Inside city limits, each city applies its own schedule and fees may be completely different. Pick your city below.

Edgefield County Impact Fees by Project Type

Where in Edgefield County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Edgefield County$8,313.00this pageIncludes unconfirmed fees
Edgefield$6,946.00Johnston$6,946.00Trenton$6,946.00Includes unconfirmed fees

Unincorporated Edgefield County: Single-Family Impact Fees

A new single-family home in unincorporated Edgefield County pays at least $8,313.00 per unit in impact fees (rates sourced November 11, 2026). All of it is levied by Edgefield County.

The largest line items are Water Impact Fee (ECWSA) ($1,746.00), Water Tap Fee (ECWSA) ($1,700.00) and County Impact Fee (Edgefield County) — Merriwether and County Line Districts ($1,600.00).

Sewer Capacity Fee (ECWSA) — 300 gpd × $10.89/gal is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Connection Fee (ECWSA Regional Sewer System) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Edgefield County Impact Fee Schedule
Water$3,446.00
  • Water Impact Fee (ECWSA)
    3/4" meter
    Edgefield County Water & Sewer Authority (ECWSA)
    Water system impact fee of the Edgefield County Water and Sewer Authority, effective July 1, 2026, charged on every new water connection by meter size: $1,746 for a 3/4-inch meter, $3,104 for 1-inch, $6,984 for 1-1/2-inch, $12,416 for 2-inch, rising to $310,400 for 10-inch. It is collected with the tap fee, and service is not connected until both are paid. Dedicated fire lines and temporary connections are exempt.
    $1,746.00
  • Water Tap Fee (ECWSA)
    3/4" meter
    Edgefield County Water & Sewer Authority (ECWSA)
    Charged by the Edgefield County Water and Sewer Authority for a new water service, with the Authority installing the tap and meter. Residential tap fees are $1,700 for a 3/4-inch meter, $2,000 for 1-inch and $5,000 for 2-inch; where only a meter is set the charge is $500, $600 or $1,200. Taps that need pavement or sidewalk removal are billed at actual cost, and a customer who pays for a water main extension pays no tap or meter-set fee. The Authority's water impact fee is charged in addition.
    $1,700.00
Sewer$3,267.00
  • Sewer Capacity Fee (ECWSA) — 300 gpd × $10.89/gal
    Edgefield County Water & Sewer Authority (ECWSA)
    For new connections to the Edgefield County Water and Sewer Authority's regional sewer system, whose wastewater is treated at the Aiken County Horse Creek plant, the Authority passes through a capacity fee of $10.89 per gallon of reserved daily capacity, adopted June 22, 2026. At the state standard of 300 gallons per day for a house that is $3,267. A City of North Augusta capacity charge may be added once the city sets it. The fee is non-refundable and does not apply to homes on septic systems.
    $3,267.00Requires confirmation
  • Sewer Connection Fee (ECWSA Regional Sewer System)
    Edgefield County Water & Sewer Authority (ECWSA)
    New connections to the Edgefield County Water and Sewer Authority's regional sewer system in unincorporated Edgefield County are charged at the Authority's actual cost of installing the service connection, with no fixed dollar amount published. A separate regional capacity fee applies as well.
    Requires confirmation
County$1,600.00
  • County Impact Fee (Edgefield County) — Merriwether and County Line Districts
    Edgefield County
    Edgefield County impact fee of $1,600 per new single-family home (Ordinance 26-27-003, effective October 1, 2026), collected at building permit. It applies only inside the county's two impact fee districts, the Merriwether and County Line fire districts in the southern part of the county; new homes elsewhere in the unincorporated county pay no county impact fee. No net new dwelling unit means no fee.
    $1,600.00
Total (unincorporated Edgefield County): $8,313.00
Sources last checked Official fee schedules:Edgefield County Water & Sewer Authority (ECWSA) N/A — unincorporated Edgefield County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Edgefield County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Edgefield County$7,496.25this pageIncludes unconfirmed fees
Edgefield$6,946.00Johnston$6,946.00Trenton$6,946.00Includes unconfirmed fees

Unincorporated Edgefield County: Multifamily Impact Fees

A new multifamily unit in unincorporated Edgefield County pays at least $7,496.25 per unit in impact fees (rates sourced November 11, 2026). All of it is levied by Edgefield County.

The largest line items are Water Impact Fee (ECWSA, MF) ($1,746.00), Water Tap Fee (ECWSA, MF) ($1,700.00) and County Impact Fee (Edgefield County, MF) — Merriwether and County Line Districts ($1,600.00).

Sewer Capacity Fee (ECWSA, MF) — 225 gpd × $10.89/gal is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Connection Fee (ECWSA Regional Sewer System, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Edgefield County Impact Fee Schedule
Water$3,446.00
  • Water Impact Fee (ECWSA, MF)
    3/4" meter
    Edgefield County Water & Sewer Authority (ECWSA)
    Water system impact fee of the Edgefield County Water and Sewer Authority, effective July 1, 2026, charged per new water connection by meter size ($1,746 for a 3/4-inch meter up to $12,416 for 2-inch, and up to $310,400 for a 10-inch master meter), not per dwelling unit. Each unit with its own meter pays the amount for its meter; a building on one master meter pays once at that meter's size. It is collected with the tap fee.
    $1,746.00
  • Water Tap Fee (ECWSA, MF)
    3/4" meter
    Edgefield County Water & Sewer Authority (ECWSA)
    The Edgefield County Water and Sewer Authority charges water taps per connection by meter size, not per dwelling unit: $1,700 for a 3/4-inch tap, $2,000 for 1-inch and $5,000 for 2-inch, or $500 to $1,200 where only a meter is set. Each separately metered unit pays its own tap; a building on one master meter pays once at that meter's size. The water impact fee is charged in addition.
    $1,700.00
Sewer$2,450.25
  • Sewer Capacity Fee (ECWSA, MF) — 225 gpd × $10.89/gal
    Edgefield County Water & Sewer Authority (ECWSA)
    For new connections to the Edgefield County Water and Sewer Authority's regional sewer system (treated at the Aiken County Horse Creek plant), capacity is sold at $10.89 per gallon of reserved daily capacity under a policy adopted June 22, 2026. At the state standard of 225 gallons per day for a two-bedroom apartment that is $2,450.25 per unit. A City of North Augusta capacity charge may be added once the city sets it. The fee is non-refundable.
    $2,450.25Requires confirmation
  • Sewer Connection Fee (ECWSA Regional Sewer System, MF)
    Edgefield County Water & Sewer Authority (ECWSA)
    New connections to the Edgefield County Water and Sewer Authority's regional sewer system in unincorporated Edgefield County are charged at the Authority's actual cost of installing the service connection, with no fixed dollar amount and no per-unit multifamily rate published. A separate regional capacity fee applies as well.
    Requires confirmation
County$1,600.00
  • County Impact Fee (Edgefield County, MF) — Merriwether and County Line Districts
    Edgefield County
    Edgefield County impact fee of $1,600 per new multifamily unit (Ordinance 26-27-003, effective October 1, 2026), collected at building permit. It applies only inside the Merriwether and County Line impact fee districts in the southern part of the county; elsewhere in the unincorporated county no county impact fee is charged.
    $1,600.00
Total (unincorporated Edgefield County): $7,496.25
Sources last checked Official fee schedules:Edgefield County Water & Sewer Authority (ECWSA) N/A — unincorporated Edgefield County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Edgefield County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Edgefield County: Commercial Impact Fees

Commercial development in unincorporated Edgefield County pays no per-square-foot impact fees, but owes $6,704.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 50,000 sq ft building, that comes to at least $6,704.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (ECWSA) ($3,104.00 one-time), Water Tap Fee (ECWSA) ($2,000.00 one-time) and County Impact Fee (Edgefield County, Commercial) — Merriwether and County Line Districts ($1,600.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (ECWSA Regional Sewer System) and Sewer Capacity Fee (ECWSA Regional System) — per gallon of reserved daily capacity are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Edgefield County Impact Fee Schedule
Water$5,104.00 one-time
  • Water Impact Fee (ECWSA)
    1"
    Effective 7/1/2026. One-time water impact fee on every new water connection, charged by meter size (shown), applying to commercial and industrial as well as residential connections. Dedicated fire lines and temporary connections are exempt. In addition to the water tap fee.
    $3,104.00 one-time
  • Water Tap Fee (ECWSA)
    1"
    One-time water tap fee where ECWSA installs the tap, meter and appurtenances (rules effective July 1, 2026). Where the customer installs the tap and meter there is no tap fee; where the customer installs the tap and buys the meter from ECWSA, the charge is the meter cost plus a $100 processing fee. Paid in addition to the water impact fee.
    $2,000.00 one-time
Sewer$0.00
  • Sewer Connection Fee (ECWSA Regional Sewer System)
    Connections to ECWSA's regional sewer system (unincorporated areas) are charged at the Authority's actual cost of installing the service connection; no fixed amount is published.
    Requires confirmation
  • Sewer Capacity Fee (ECWSA Regional System) — per gallon of reserved daily capacity
    Connections to ECWSA's regional sewer system (flow conveyed through North Augusta to the Aiken County Horse Creek treatment facility) must buy reserved daily capacity under ECWSA Resolution 01-2026 (June 22, 2026): $10.89 per gallon of reserved daily capacity (the Aiken County Public Service Authority charge), plus any City of North Augusta capacity fee once North Augusta sets it in writing. The total depends on the capacity reserved. The fee is non-refundable, due within 30 days of the capacity purchase agreement, and unused capacity reverts after three years.
    Requires confirmation
County$1,600.00 one-time
  • County Impact Fee (Edgefield County, Commercial) — Merriwether and County Line Districts
    Edgefield County impact fee (Ordinance 26-27-003, effective October 1, 2026): $1,600 per address point for commercial development, charged only inside the Merriwether and County Line impact fee districts in southern Edgefield County (Ordinance 26-27-002, Exhibit A). Paid before the building permit is issued. No county impact fee applies outside these districts.
    $1,600.00 one-time
Total (unincorporated Edgefield County): $6,704.00 one-time (≈ $6,704.00 at 50,000 sq ft)
Sources last checked
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Edgefield County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Edgefield County: Industrial Impact Fees

Industrial development in unincorporated Edgefield County pays no per-square-foot impact fees, but owes $6,704.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 50,000 sq ft building, that comes to at least $6,704.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (ECWSA) ($3,104.00 one-time), Water Tap Fee (ECWSA) ($2,000.00 one-time) and County Impact Fee (Edgefield County, Industrial) — Merriwether and County Line Districts ($1,600.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (ECWSA Regional Sewer System) and Sewer Capacity Fee (ECWSA Regional System) — per gallon of reserved daily capacity are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Edgefield County Impact Fee Schedule
Water$5,104.00 one-time
  • Water Impact Fee (ECWSA)
    1"
    Effective 7/1/2026. One-time water impact fee on every new water connection, charged by meter size (shown), applying to commercial and industrial as well as residential connections. Dedicated fire lines and temporary connections are exempt. In addition to the water tap fee.
    $3,104.00 one-time
  • Water Tap Fee (ECWSA)
    1"
    One-time water tap fee where ECWSA installs the tap, meter and appurtenances (rules effective July 1, 2026). Where the customer installs the tap and meter there is no tap fee; where the customer installs the tap and buys the meter from ECWSA, the charge is the meter cost plus a $100 processing fee. Paid in addition to the water impact fee.
    $2,000.00 one-time
Sewer$0.00
  • Sewer Connection Fee (ECWSA Regional Sewer System)
    Connections to ECWSA's regional sewer system (unincorporated areas) are charged at the Authority's actual cost of installing the service connection; no fixed amount is published.
    Requires confirmation
  • Sewer Capacity Fee (ECWSA Regional System) — per gallon of reserved daily capacity
    Connections to ECWSA's regional sewer system (flow conveyed through North Augusta to the Aiken County Horse Creek treatment facility) must buy reserved daily capacity under ECWSA Resolution 01-2026 (June 22, 2026): $10.89 per gallon of reserved daily capacity (the Aiken County Public Service Authority charge), plus any City of North Augusta capacity fee once North Augusta sets it in writing. The total depends on the capacity reserved. The fee is non-refundable, due within 30 days of the capacity purchase agreement, and unused capacity reverts after three years.
    Requires confirmation
County$1,600.00 one-time
  • County Impact Fee (Edgefield County, Industrial) — Merriwether and County Line Districts
    Edgefield County impact fee (Ordinance 26-27-003, effective October 1, 2026): $1,600 per address point, charged only inside the Merriwether and County Line impact fee districts in southern Edgefield County. The ordinance lists a commercial rate only; uses not listed are charged at the most similar listed use. Paid before the building permit is issued. No county impact fee applies outside these districts.
    $1,600.00 one-time
Total (unincorporated Edgefield County): $6,704.00 one-time (≈ $6,704.00 at 50,000 sq ft)
Sources last checked
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Edgefield County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Edgefield County: Office Impact Fees

Office development in unincorporated Edgefield County pays no per-square-foot impact fees, but owes $6,704.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 25,000 sq ft building, that comes to at least $6,704.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (ECWSA) ($3,104.00 one-time), Water Tap Fee (ECWSA) ($2,000.00 one-time) and County Impact Fee (Edgefield County, Office) — Merriwether and County Line Districts ($1,600.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (ECWSA Regional Sewer System) and Sewer Capacity Fee (ECWSA Regional System) — per gallon of reserved daily capacity are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Edgefield County Impact Fee Schedule
Water$5,104.00 one-time
  • Water Impact Fee (ECWSA)
    1"
    Effective 7/1/2026. One-time water impact fee on every new water connection, charged by meter size (shown), applying to commercial and industrial as well as residential connections. Dedicated fire lines and temporary connections are exempt. In addition to the water tap fee.
    $3,104.00 one-time
  • Water Tap Fee (ECWSA)
    1"
    One-time water tap fee where ECWSA installs the tap, meter and appurtenances (rules effective July 1, 2026). Where the customer installs the tap and meter there is no tap fee; where the customer installs the tap and buys the meter from ECWSA, the charge is the meter cost plus a $100 processing fee. Paid in addition to the water impact fee.
    $2,000.00 one-time
Sewer$0.00
  • Sewer Connection Fee (ECWSA Regional Sewer System)
    Connections to ECWSA's regional sewer system (unincorporated areas) are charged at the Authority's actual cost of installing the service connection; no fixed amount is published.
    Requires confirmation
  • Sewer Capacity Fee (ECWSA Regional System) — per gallon of reserved daily capacity
    Connections to ECWSA's regional sewer system (flow conveyed through North Augusta to the Aiken County Horse Creek treatment facility) must buy reserved daily capacity under ECWSA Resolution 01-2026 (June 22, 2026): $10.89 per gallon of reserved daily capacity (the Aiken County Public Service Authority charge), plus any City of North Augusta capacity fee once North Augusta sets it in writing. The total depends on the capacity reserved. The fee is non-refundable, due within 30 days of the capacity purchase agreement, and unused capacity reverts after three years.
    Requires confirmation
County$1,600.00 one-time
  • County Impact Fee (Edgefield County, Office) — Merriwether and County Line Districts
    Edgefield County impact fee (Ordinance 26-27-003, effective October 1, 2026): $1,600 per address point, charged only inside the Merriwether and County Line impact fee districts in southern Edgefield County. The ordinance lists a commercial rate only; uses not listed are charged at the most similar listed use. Paid before the building permit is issued. No county impact fee applies outside these districts.
    $1,600.00 one-time
Total (unincorporated Edgefield County): $6,704.00 one-time (≈ $6,704.00 at 25,000 sq ft)
Sources last checked
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Edgefield County Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Edgefield County Impact Fee FAQs

What are single-family impact fees in Edgefield County, South Carolina?

A new single-family home in unincorporated Edgefield County pays at least $8,313.00 per unit in impact fees (rates sourced November 11, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.

How much are multifamily impact fees in Edgefield County?

Multifamily development in unincorporated Edgefield County pays at least $7,496.25 per unit in impact fees (rates sourced November 11, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. Rates inside city limits depend on the municipality. Pick your city on this page.

How much are commercial impact fees in Edgefield County?

Commercial development in unincorporated Edgefield County pays no per-square-foot impact fees, but owes $6,704.00 in one-time water and sewer connection fees (assuming a 1-inch meter). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Do cities in Edgefield County charge their own impact fees?

Yes. Every incorporated city applies its own fee schedule. 0 of 3 cities in Edgefield County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000