Skip to content
IMPACTFEES.ORG

Trenton, South Carolina Impact Fees

Trenton applies its own fee schedule: municipal fees plus the Edgefield County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $6,946.00 per unit (rates sourced ). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Trenton Impact Fees by Project Type

Trenton: Single-Family Impact Fees

A new single-family home in Trenton pays at least $6,946.00 per unit in impact fees (rates sourced November 11, 2026). All of it is levied by Edgefield County.

The largest line items are Sewer Connection Fee (ECWSA) ($3,500.00), Water Impact Fee (ECWSA) ($1,746.00) and Water Tap Fee (ECWSA) ($1,700.00).

Municipal Development Impact Fee (Town of Trenton) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Trenton Impact Fee Schedule
Water$3,446.00
  • Water Impact Fee (ECWSA)
    3/4" meter
    Edgefield County Water & Sewer Authority (ECWSA)
    Water system impact fee of the Edgefield County Water and Sewer Authority, effective July 1, 2026, charged on every new water connection by meter size: $1,746 for a 3/4-inch meter, $3,104 for 1-inch, $6,984 for 1-1/2-inch, $12,416 for 2-inch, rising to $310,400 for 10-inch. It is collected with the tap fee, and service is not connected until both are paid.
    $1,746.00
  • Water Tap Fee (ECWSA)
    3/4" meter
    Edgefield County Water & Sewer Authority (ECWSA)
    Water in the Town of Trenton is provided by the Edgefield County Water and Sewer Authority, which installs the tap and meter. Residential tap fees are $1,700 for a 3/4-inch meter, $2,000 for 1-inch and $5,000 for 2-inch; where only a meter is set the charge is $500, $600 or $1,200. Taps needing pavement or sidewalk removal are billed at actual cost. The Authority's water impact fee is charged in addition.
    $1,700.00
Sewer$3,500.00
  • Sewer Connection Fee (ECWSA)
    4" tap
    Edgefield County Water & Sewer Authority (ECWSA)
    Sewer in the Town of Trenton is provided by the Edgefield County Water and Sewer Authority. A 4-inch sewer connection is charged at the Authority's actual cost, with a minimum of $3,500; 6-inch and 8-inch connections have minimums of $4,000 and $5,000. Connections that need pavement or sidewalk removal cost more.
    $3,500.00
  • Sewer Capacity Fee (ECWSA)
    Edgefield County Water & Sewer Authority (ECWSA)
    Sewer service in the Town of Trenton is provided by the Edgefield County Water and Sewer Authority and is treated at the Authority's own plants. The Authority's published fee schedule charges a sewer connection fee for the Edgefield, Johnston and Trenton systems but no capacity fee; the Authority's capacity charge applies only to new connections whose wastewater is sent to the regional system treated in Aiken County.
    $0.00
City$0.00
  • Municipal Development Impact Fee (Town of Trenton)
    Town of Trenton
    The Town of Trenton publishes no development impact fee schedule. Building permits and inspections in Trenton are handled by the Edgefield County Building and Planning Department, whose adopted fee schedule contains building, electrical, plumbing, mechanical, planning and re-inspection fees only, with no impact fee. Water and sewer connection charges in Trenton are billed separately by the Edgefield County Water and Sewer Authority.
    Requires confirmation
County$0.00
  • County Development Impact Fee (Edgefield County)
    Edgefield County
    Edgefield County adopted a $1,600 impact fee on new homes effective October 1, 2026, but it applies only in the Merriwether and County Line impact fee districts in the southern part of the county. The Town of Trenton is outside those districts, so no county impact fee is charged here.
    $0.00
Total (Trenton): $6,946.00
Sources last checked Official fee schedules:Edgefield County Water & Sewer Authority (ECWSA) Town of Trenton Edgefield County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Edgefield County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Trenton: Multifamily Impact Fees

A new multifamily unit in Trenton pays at least $6,946.00 per unit in impact fees (rates sourced November 11, 2026). All of it is levied by Edgefield County.

The largest line items are Sewer Connection Fee (ECWSA, MF) ($3,500.00), Water Impact Fee (ECWSA, MF) ($1,746.00) and Water Tap Fee (ECWSA, MF) ($1,700.00).

Municipal Development Impact Fee (Town of Trenton, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Trenton Impact Fee Schedule
Water$3,446.00
  • Water Impact Fee (ECWSA, MF)
    3/4" meter
    Edgefield County Water & Sewer Authority (ECWSA)
    Water system impact fee of the Edgefield County Water and Sewer Authority, effective July 1, 2026, charged per new water connection by meter size ($1,746 for a 3/4-inch meter up to $12,416 for 2-inch, and up to $310,400 for a 10-inch master meter), not per dwelling unit. Each unit with its own meter pays the amount for its meter; a building on one master meter pays once at that meter's size.
    $1,746.00
  • Water Tap Fee (ECWSA, MF)
    3/4" meter
    Edgefield County Water & Sewer Authority (ECWSA)
    Water in the Town of Trenton is provided by the Edgefield County Water and Sewer Authority, which charges taps per connection by meter size, not per dwelling unit: $1,700 for a 3/4-inch tap, $2,000 for 1-inch and $5,000 for 2-inch, or $500 to $1,200 where only a meter is set. Each separately metered unit pays its own tap; a building on one master meter pays once at that meter's size. The water impact fee is charged in addition.
    $1,700.00
Sewer$3,500.00
  • Sewer Connection Fee (ECWSA, MF)
    Edgefield County Water & Sewer Authority (ECWSA)
    The Edgefield County Water and Sewer Authority charges sewer connections per connection by tap size, not per dwelling unit: a 4-inch connection costs actual cost with a minimum of $3,500, and 6-inch and 8-inch connections have minimums of $4,000 and $5,000. A building on one sewer connection pays once.
    $3,500.00
  • Sewer Capacity Fee (ECWSA, MF)
    Edgefield County Water & Sewer Authority (ECWSA)
    Sewer service in the Town of Trenton is provided by the Edgefield County Water and Sewer Authority and is treated at the Authority's own plants, which carry a sewer connection fee but no capacity fee for any customer class. The Authority's capacity charge applies only to new connections whose wastewater is sent to the regional system treated in Aiken County.
    $0.00
City$0.00
  • Municipal Development Impact Fee (Town of Trenton, MF)
    Town of Trenton
    The Town of Trenton publishes no development impact fee schedule for any type of housing. Building permits and inspections in Trenton are handled by the Edgefield County Building and Planning Department, whose adopted fee schedule contains building, electrical, plumbing, mechanical, planning and re-inspection fees only, with no impact fee.
    Requires confirmation
County$0.00
  • County Development Impact Fee (Edgefield County, MF)
    Edgefield County
    Edgefield County adopted a $1,600 per-unit impact fee effective October 1, 2026, but it applies only in the Merriwether and County Line impact fee districts in the southern part of the county. The Town of Trenton is outside those districts, so no county impact fee is charged here.
    $0.00
Total (Trenton): $6,946.00
Sources last checked Official fee schedules:Edgefield County Water & Sewer Authority (ECWSA) Town of Trenton Edgefield County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Edgefield County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Trenton: Commercial Impact Fees

Commercial development in Trenton pays no per-square-foot impact fees, but owes $8,604.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 50,000 sq ft building, that comes to at least $8,604.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection Fee (ECWSA) ($3,500.00 one-time), Water Impact Fee (ECWSA) ($3,104.00 one-time) and Water Tap Fee (ECWSA) ($2,000.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Capacity Fee (ECWSA) is set by the utility and not published online. Municipal Development Impact Fee (Town of Trenton, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Trenton Impact Fee Schedule
Water$5,104.00 one-time
  • Water Impact Fee (ECWSA)
    1"
    Effective 7/1/2026. One-time water impact fee on every new water connection, charged by meter size (shown), applying to commercial and industrial as well as residential connections. Dedicated fire lines and temporary connections are exempt. In addition to the water tap fee.
    $3,104.00 one-time
  • Water Tap Fee (ECWSA)
    1"
    One-time water tap fee where ECWSA installs the tap, meter and appurtenances (rules effective July 1, 2026). Where the customer installs the tap and meter there is no tap fee; where the customer installs the tap and buys the meter from ECWSA, the charge is the meter cost plus a $100 processing fee. Paid in addition to the water impact fee.
    $2,000.00 one-time
Sewer$3,500.00 one-time
  • Sewer Connection Fee (ECWSA)
    4"
    Sewer connection to ECWSA's Edgefield, Johnston and Trenton system (rules effective July 1, 2026): actual cost, with a minimum of $3,500 for a 4" tap. Special installation conditions such as pavement or sidewalk removal are billed at actual cost.
    $3,500.00 one-time
  • Sewer Capacity Fee (ECWSA)
    ECWSA publishes no sewer capacity fee for the Edgefield, Johnston and Trenton sewer system. Its per-gallon regional capacity charge applies to connections to the regional system serving unincorporated areas.
    Requires confirmation
County$0.00
Total (Trenton): $8,604.00 one-time (≈ $8,604.00 at 50,000 sq ft)
Sources last checked
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Edgefield County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Trenton: Industrial Impact Fees

Industrial development in Trenton pays no per-square-foot impact fees, but owes $8,604.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 50,000 sq ft building, that comes to at least $8,604.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection Fee (ECWSA) ($3,500.00 one-time), Water Impact Fee (ECWSA) ($3,104.00 one-time) and Water Tap Fee (ECWSA) ($2,000.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Capacity Fee (ECWSA) is set by the utility and not published online. Municipal Development Impact Fee (Town of Trenton, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Trenton Impact Fee Schedule
Water$5,104.00 one-time
  • Water Impact Fee (ECWSA)
    1"
    Effective 7/1/2026. One-time water impact fee on every new water connection, charged by meter size (shown), applying to commercial and industrial as well as residential connections. Dedicated fire lines and temporary connections are exempt. In addition to the water tap fee.
    $3,104.00 one-time
  • Water Tap Fee (ECWSA)
    1"
    One-time water tap fee where ECWSA installs the tap, meter and appurtenances (rules effective July 1, 2026). Where the customer installs the tap and meter there is no tap fee; where the customer installs the tap and buys the meter from ECWSA, the charge is the meter cost plus a $100 processing fee. Paid in addition to the water impact fee.
    $2,000.00 one-time
Sewer$3,500.00 one-time
  • Sewer Connection Fee (ECWSA)
    4"
    Sewer connection to ECWSA's Edgefield, Johnston and Trenton system (rules effective July 1, 2026): actual cost, with a minimum of $3,500 for a 4" tap. Special installation conditions such as pavement or sidewalk removal are billed at actual cost.
    $3,500.00 one-time
  • Sewer Capacity Fee (ECWSA)
    ECWSA publishes no sewer capacity fee for the Edgefield, Johnston and Trenton sewer system. Its per-gallon regional capacity charge applies to connections to the regional system serving unincorporated areas.
    Requires confirmation
County$0.00
Total (Trenton): $8,604.00 one-time (≈ $8,604.00 at 50,000 sq ft)
Sources last checked
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Edgefield County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Trenton: Office Impact Fees

Office development in Trenton pays no per-square-foot impact fees, but owes $8,604.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 25,000 sq ft building, that comes to at least $8,604.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection Fee (ECWSA) ($3,500.00 one-time), Water Impact Fee (ECWSA) ($3,104.00 one-time) and Water Tap Fee (ECWSA) ($2,000.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Capacity Fee (ECWSA) is set by the utility and not published online. Municipal Development Impact Fee (Town of Trenton, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Trenton Impact Fee Schedule
Water$5,104.00 one-time
  • Water Impact Fee (ECWSA)
    1"
    Effective 7/1/2026. One-time water impact fee on every new water connection, charged by meter size (shown), applying to commercial and industrial as well as residential connections. Dedicated fire lines and temporary connections are exempt. In addition to the water tap fee.
    $3,104.00 one-time
  • Water Tap Fee (ECWSA)
    1"
    One-time water tap fee where ECWSA installs the tap, meter and appurtenances (rules effective July 1, 2026). Where the customer installs the tap and meter there is no tap fee; where the customer installs the tap and buys the meter from ECWSA, the charge is the meter cost plus a $100 processing fee. Paid in addition to the water impact fee.
    $2,000.00 one-time
Sewer$3,500.00 one-time
  • Sewer Connection Fee (ECWSA)
    4"
    Sewer connection to ECWSA's Edgefield, Johnston and Trenton system (rules effective July 1, 2026): actual cost, with a minimum of $3,500 for a 4" tap. Special installation conditions such as pavement or sidewalk removal are billed at actual cost.
    $3,500.00 one-time
  • Sewer Capacity Fee (ECWSA)
    ECWSA publishes no sewer capacity fee for the Edgefield, Johnston and Trenton sewer system. Its per-gallon regional capacity charge applies to connections to the regional system serving unincorporated areas.
    Requires confirmation
County$0.00
Total (Trenton): $8,604.00 one-time (≈ $8,604.00 at 25,000 sq ft)
Sources last checked
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Edgefield County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Trenton Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Trenton Impact Fee FAQs

What are the total impact fees for a single-family home in Trenton, South Carolina?

A new single-family home in Trenton pays at least $6,946.00 per unit in combined impact fees (rates sourced November 11, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Trenton?

Commercial development in Trenton pays no per-square-foot impact fees, but owes $8,604.00 in one-time water and sewer connection fees (assuming a 1-inch meter). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Trenton charge its own impact fees?

Yes. Trenton levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Trenton, with the combined total.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Edgefield County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000