Fairfield County Impact Fees by Project Type
Where in Fairfield County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Fairfield County: Single-Family Impact Fees
A new single-family home in unincorporated Fairfield County pays at least $3,000.00 per unit in impact fees (rates sourced November 13, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Tap Fee — Town of Winnsboro (out-of-town), 3/4" meter ($1,500 tap + $1,500 capacity) ($3,000.00).
Sewer Connection Fee — No public sewer (septic) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Fairfield County Impact Fee Schedule
- Water Tap Fee — Town of Winnsboro (out-of-town), 3/4" meter ($1,500 tap + $1,500 capacity)$3,000.00Town of WinnsboroUnincorporated Fairfield County has several water providers. Where the Town of Winnsboro serves the lot (it serves the most customers outside the towns), a 3/4-inch meter pays the out-of-town tap fee of $1,500 plus the water capacity fee of $1,500, under its fee schedule effective July 1, 2024. Other areas are served by Mitford Rural Water District, Mid County Water Company or Jenkinsville Water Company, or rely on private wells.
- Sewer Connection Fee — No public sewer (septic)Requires confirmationNone — no county sewer utility (septic)Fairfield County runs no sewer utility, and most of the unincorporated county relies on septic systems. Properties that connect to the Town of Winnsboro's sewer system outside town limits pay a wastewater capacity fee of $3,500 for a 3/4-inch service plus a tap fee of the actual cost plus $850.
- Municipal Impact Fees (unincorporated Fairfield County)$0.00N/A — unincorporated area
- County Impact Fee (Fairfield County)$0.00Fairfield County
Where in Fairfield County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Fairfield County: Multifamily Impact Fees
A new multifamily unit in unincorporated Fairfield County pays at least $3,000.00 per unit in impact fees (rates sourced November 13, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Tap Fee (MF) — Town of Winnsboro (out-of-town), 3/4" meter ($1,500 tap + $1,500 capacity) ($3,000.00).
Sewer Connection Fee (MF) — No public sewer (septic) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Fairfield County Impact Fee Schedule
- Water Tap Fee (MF) — Town of Winnsboro (out-of-town), 3/4" meter ($1,500 tap + $1,500 capacity)$3,000.00Town of WinnsboroUnincorporated Fairfield County has several water providers. Where the Town of Winnsboro serves the lot (it serves the most customers outside the towns), a 3/4-inch meter pays the out-of-town tap fee of $1,500 plus the water capacity fee of $1,500, under its fee schedule effective July 1, 2024. A building served by one tap pays it once. Other areas are served by Mitford Rural Water District, Mid County Water Company or Jenkinsville Water Company, or rely on private wells.
- Sewer Connection Fee (MF) — No public sewer (septic)Requires confirmationNone — no county sewer utility (septic)Fairfield County runs no sewer utility, and most of the unincorporated county relies on septic systems. Properties that connect to the Town of Winnsboro's sewer system outside town limits pay a wastewater capacity fee plus a tap fee of the actual cost plus $850.
- Municipal Impact Fees (unincorporated Fairfield County, MF)$0.00N/A — unincorporated area
- County Impact Fee (Fairfield County, MF)$0.00Fairfield County
Where in Fairfield County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Fairfield County: Commercial Impact Fees
Commercial development in unincorporated Fairfield County pays no per-square-foot impact fees, but owes $7,250.00 in one-time water and sewer connection fees (rates sourced November 13, 2026).
For a 50,000 sq ft building, that comes to at least $7,250.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee — Town of Winnsboro (out-of-town), 1" meter ($3,500 tap + $3,750 capacity) ($7,250.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee — No public sewer (septic) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Fairfield County Impact Fee Schedule
- Water Tap Fee — Town of Winnsboro (out-of-town), 1" meter ($3,500 tap + $3,750 capacity)$7,250.00 one-timeTown of WinnsboroUnincorporated Fairfield County has several water providers. Where the Town of Winnsboro serves the lot (it serves the most customers outside the towns), a 1-inch meter pays the out-of-town tap fee of $3,500 plus the water capacity fee of $3,750, under its fee schedule effective July 1, 2024. Other areas are served by Mitford Rural Water District, Mid County Water Company or Jenkinsville Water Company, or rely on private wells.
- Water Tap Fee — Mitford Rural Water District$0.00Mitford Rural Water DistrictMitford Rural Water District, which serves part of the unincorporated county, charges commercial services (1-inch meter or larger) the cost of installation; no fixed amount is published. A $150 deposit applies to new taps.
- Sewer Connection Fee — No public sewer (septic)Requires confirmationNone (no county sewer utility)Fairfield County runs no sewer utility, and most of the unincorporated county relies on septic systems. Commercial properties that connect to the Town of Winnsboro's sewer system outside town limits pay a wastewater capacity fee of $3,500 per residential equivalent unit plus a tap fee of the actual cost plus $850.
- City Development Impact Fee (unincorporated Fairfield County, Commercial)$0.00N/A (unincorporated area)No municipal development impact fee applies in the unincorporated county.
- County Development Impact Fee (Fairfield County, Commercial)$0.00Fairfield CountyFairfield County does not levy a development impact fee; only regulatory permit and zoning fees apply.
Where in Fairfield County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Fairfield County: Industrial Impact Fees
Industrial development in unincorporated Fairfield County pays no per-square-foot impact fees, but owes $7,250.00 in one-time water and sewer connection fees (rates sourced November 13, 2026).
For a 50,000 sq ft building, that comes to at least $7,250.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee — Town of Winnsboro (out-of-town), 1" meter ($3,500 tap + $3,750 capacity) ($7,250.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee — No public sewer (septic) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Fairfield County Impact Fee Schedule
- Water Tap Fee — Town of Winnsboro (out-of-town), 1" meter ($3,500 tap + $3,750 capacity)$7,250.00 one-timeTown of WinnsboroUnincorporated Fairfield County has several water providers. Where the Town of Winnsboro serves the lot (it serves the most customers outside the towns), a 1-inch meter pays the out-of-town tap fee of $3,500 plus the water capacity fee of $3,750, under its fee schedule effective July 1, 2024. Other areas are served by Mitford Rural Water District, Mid County Water Company or Jenkinsville Water Company, or rely on private wells.
- Water Tap Fee — Mitford Rural Water District$0.00Mitford Rural Water DistrictMitford Rural Water District, which serves part of the unincorporated county, charges commercial services (1-inch meter or larger) the cost of installation; no fixed amount is published. A $150 deposit applies to new taps.
- Sewer Connection Fee — No public sewer (septic)Requires confirmationNone (no county sewer utility)Fairfield County runs no sewer utility, and most of the unincorporated county relies on septic systems. Commercial properties that connect to the Town of Winnsboro's sewer system outside town limits pay a wastewater capacity fee of $3,500 per residential equivalent unit plus a tap fee of the actual cost plus $850.
- City Development Impact Fee (unincorporated Fairfield County, Industrial)$0.00N/A (unincorporated area)No municipal development impact fee applies in the unincorporated county.
- County Development Impact Fee (Fairfield County, Industrial)$0.00Fairfield CountyFairfield County does not levy a development impact fee; only regulatory permit and zoning fees apply.
Where in Fairfield County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Fairfield County: Office Impact Fees
Office development in unincorporated Fairfield County pays no per-square-foot impact fees, but owes $7,250.00 in one-time water and sewer connection fees (rates sourced November 13, 2026).
For a 25,000 sq ft building, that comes to at least $7,250.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee — Town of Winnsboro (out-of-town), 1" meter ($3,500 tap + $3,750 capacity) ($7,250.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee — No public sewer (septic) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Fairfield County Impact Fee Schedule
- Water Tap Fee — Town of Winnsboro (out-of-town), 1" meter ($3,500 tap + $3,750 capacity)$7,250.00 one-timeTown of WinnsboroUnincorporated Fairfield County has several water providers. Where the Town of Winnsboro serves the lot (it serves the most customers outside the towns), a 1-inch meter pays the out-of-town tap fee of $3,500 plus the water capacity fee of $3,750, under its fee schedule effective July 1, 2024. Other areas are served by Mitford Rural Water District, Mid County Water Company or Jenkinsville Water Company, or rely on private wells.
- Water Tap Fee — Mitford Rural Water District$0.00Mitford Rural Water DistrictMitford Rural Water District, which serves part of the unincorporated county, charges commercial services (1-inch meter or larger) the cost of installation; no fixed amount is published. A $150 deposit applies to new taps.
- Sewer Connection Fee — No public sewer (septic)Requires confirmationNone (no county sewer utility)Fairfield County runs no sewer utility, and most of the unincorporated county relies on septic systems. Commercial properties that connect to the Town of Winnsboro's sewer system outside town limits pay a wastewater capacity fee of $3,500 per residential equivalent unit plus a tap fee of the actual cost plus $850.
- City Development Impact Fee (unincorporated Fairfield County, Office)$0.00N/A (unincorporated area)No municipal development impact fee applies in the unincorporated county.
- County Development Impact Fee (Fairfield County, Office)$0.00Fairfield CountyFairfield County does not levy a development impact fee; only regulatory permit and zoning fees apply.
Fairfield County Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Fairfield County Impact Fee FAQs
What are single-family impact fees in Fairfield County, South Carolina?
A new single-family home in unincorporated Fairfield County pays at least $3,000.00 per unit in impact fees (rates sourced November 13, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.
How much are multifamily impact fees in Fairfield County?
Multifamily development in unincorporated Fairfield County pays at least $3,000.00 per unit in impact fees (rates sourced November 13, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. Rates inside city limits depend on the municipality. Pick your city on this page.
How much are commercial impact fees in Fairfield County?
Commercial development in unincorporated Fairfield County pays no per-square-foot impact fees, but owes $7,250.00 in one-time water and sewer connection fees (assuming a 1-inch meter). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
Do cities in Fairfield County charge their own impact fees?
Yes. Every incorporated city applies its own fee schedule. 2 of 3 cities in Fairfield County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.