Winnsboro, South Carolina Impact Fees

Winnsboro applies its own fee schedule. Fairfield County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $5,750.00 per unit (rates sourced ). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Winnsboro Impact Fees by Project Type

Winnsboro: Single-Family Impact Fees

A new single-family home in Winnsboro pays at least $5,750.00 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Capacity/Impact Fee (Town of Winnsboro) ($3,500.00), Water Capacity/Impact Fee (Town of Winnsboro) — 3/4" meter ($1,500.00) and Water Tap Fee (Town of Winnsboro) — 3/4" meter ($750.00).

Sewer Tap Fee (Town of Winnsboro) is set by the utility and not published online. Development Impact Fee (Town of Winnsboro) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Winnsboro Impact Fee Schedule
Water$2,250.00
  • Water Capacity/Impact Fee (Town of Winnsboro) — 3/4" meter
    Town of Winnsboro
    Water capacity fee for a 3/4-inch meter under the Town of Winnsboro fee schedule effective July 1, 2024. The fee is set by meter size, from $3,750 for a 1-inch meter up to $172,500 for a 10-inch meter, and is charged in addition to the water tap fee.
    $1,500.00
  • Water Tap Fee (Town of Winnsboro) — 3/4" meter
    Town of Winnsboro
    In-town water tap fee for a 3/4-inch meter under the Town of Winnsboro fee schedule effective July 1, 2024. Larger in-town taps are $900 (1-inch) and $1,500 (1 1/2-inch); 2-inch and 3-inch taps are the actual cost plus $800. A separate water capacity fee is charged in addition.
    $750.00
Sewer$3,500.00
  • Sewer Capacity/Impact Fee (Town of Winnsboro)
    Town of Winnsboro
    Wastewater capacity fee for a 3/4-inch service under the Town of Winnsboro fee schedule effective July 1, 2024. Larger services are charged $3,500 per residential equivalent unit based on state wastewater loading tables. A separate sewer tap fee (actual cost plus $750 in town) is charged in addition.
    $3,500.00
  • Sewer Tap Fee (Town of Winnsboro)
    Town of Winnsboro
    The Town of Winnsboro's sewer tap fee is cost-based: inside town it is the actual cost of the connection plus $750, and outside town the actual cost plus $850. Because it depends on the cost of each installation, no fixed dollar amount is published. A separate wastewater capacity/impact fee of $3,500 applies to a 3/4-inch service.
    Requires confirmation
City$0.00
  • Development Impact Fee (Town of Winnsboro)
    Town of Winnsboro
    The Town of Winnsboro adopted a development impact fee program by Ordinance No. 162 on September 16, 2025, and added the fees to its fee schedule for the fiscal year that began July 1, 2026. That schedule is not published online, so no town impact fee amount is included here yet.
    Requires confirmation
County$0.00
Total (Winnsboro): $5,750.00
Sources last checked Official fee schedules:Town of Winnsboro Fairfield County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Fairfield County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Winnsboro: Multifamily Impact Fees

A new multifamily unit in Winnsboro pays at least $5,750.00 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Capacity/Impact Fee (Town of Winnsboro, MF) — 3/4" meter ($1,500.00) and Water Tap Fee (Town of Winnsboro, MF) — 3/4" meter ($750.00).

Sewer Capacity/Impact Fee (Town of Winnsboro, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Tap Fee (Town of Winnsboro, MF) is set by the utility and not published online. Development Impact Fee (Town of Winnsboro, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Winnsboro Impact Fee Schedule
Water$2,250.00
  • Water Capacity/Impact Fee (Town of Winnsboro, MF) — 3/4" meter
    Town of Winnsboro
    Winnsboro sets its water capacity fee by meter size, not per dwelling unit. This is the 3/4-inch meter fee under the fee schedule effective July 1, 2024; a building served by one meter pays it once. Larger meters cost more: $3,750 (1-inch), $7,500 (1 1/2-inch) and $12,000 (2-inch).
    $1,500.00
  • Water Tap Fee (Town of Winnsboro, MF) — 3/4" meter
    Town of Winnsboro
    Winnsboro sets water tap fees by meter size, not per dwelling unit. This is the in-town 3/4-inch tap under the fee schedule effective July 1, 2024; a building served by one connection pays it once. Larger in-town taps are $900 (1-inch) and $1,500 (1 1/2-inch), and 2-inch and larger taps are actual cost plus $800.
    $750.00
Sewer$3,500.00
  • Sewer Capacity/Impact Fee (Town of Winnsboro, MF)
    Town of Winnsboro
    Winnsboro charges a wastewater capacity fee of $3,500 for a 3/4-inch service under the fee schedule effective July 1, 2024. Larger and commercial services are charged $3,500 per residential equivalent unit based on state wastewater loading tables, so a multifamily building may be assessed by its total loading rather than once per connection.
    $3,500.00Requires confirmation
  • Sewer Tap Fee (Town of Winnsboro, MF)
    Town of Winnsboro
    The Town of Winnsboro's sewer tap fee is cost-based rather than per dwelling unit: inside town it is the actual cost of the connection plus $750, and outside town the actual cost plus $850. No fixed per-unit amount is published.
    Requires confirmation
City$0.00
  • Development Impact Fee (Town of Winnsboro, MF)
    Town of Winnsboro
    The Town of Winnsboro adopted a development impact fee program by Ordinance No. 162 on September 16, 2025, and added the fees to its fee schedule for the fiscal year that began July 1, 2026. That schedule is not published online, so no town impact fee amount is included here yet.
    Requires confirmation
County$0.00
Total (Winnsboro): $5,750.00
Sources last checked Official fee schedules:Town of Winnsboro Fairfield County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Fairfield County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Winnsboro: Commercial Impact Fees

Commercial development in Winnsboro pays no per-square-foot impact fees, but owes $8,150.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 50,000 sq ft building, that comes to at least $8,150.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Capacity/Impact Fee (Town of Winnsboro) — 1" meter ($3,750.00 one-time) and Water Tap Fee (Town of Winnsboro) — 1" service ($900.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Capacity/Impact Fee (Town of Winnsboro) — 1 REU × $3,500/REU is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

City Development Impact Fee (Town of Winnsboro, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Winnsboro Impact Fee Schedule
Water$4,650.00 one-time
  • Water Capacity/Impact Fee (Town of Winnsboro) — 1" meter
    Town of Winnsboro
    Water capacity fee by meter size under the Town fee schedule effective July 1, 2024 (unchanged since 2023). Charged in addition to the water tap fee.
    $3,750.00 one-time
  • Water Tap Fee (Town of Winnsboro) — 1" service
    Town of Winnsboro
    In-town water tap fee by meter size under the Town fee schedule effective July 1, 2024 (unchanged since 2023). 2-inch and 3-inch in-town taps are the actual cost plus $800. Charged in addition to the water capacity fee.
    $900.00 one-time
Sewer$3,500.00 one-time
  • Sewer Capacity/Impact Fee (Town of Winnsboro) — 1 REU × $3,500/REU
    Town of Winnsboro
    Wastewater capacity fee for commercial connections: $3,500 per residential equivalent unit (REU), with the REU count set from state wastewater loading rates for the use, under the Town fee schedule effective July 1, 2024. Shown for one REU; most commercial uses count several. Charged in addition to the cost-based sewer tap fee.
    $3,500.00 one-timeRequires confirmation
  • Sewer Tap Fee (Town of Winnsboro)
    Town of Winnsboro
    Sewer tap fee is the actual connection cost plus $750 in town (plus $850 outside town limits); no fixed amount is published. A separate wastewater capacity fee of $3,500 per residential equivalent unit applies.
    $0.00
City$0.00
  • City Development Impact Fee (Town of Winnsboro, Commercial)
    Town of Winnsboro
    The Town of Winnsboro adopted a development impact fee program in September 2025 (Ord. 162), and its fee schedule for the fiscal year beginning July 1, 2026 adds the impact fees. The adopted nonresidential amounts are not yet published.
    Requires confirmation
County$0.00
Total (Winnsboro): $8,150.00 one-time (≈ $8,150.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Winnsboro Fairfield County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Fairfield County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Winnsboro: Industrial Impact Fees

Industrial development in Winnsboro pays no per-square-foot impact fees, but owes $8,150.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 50,000 sq ft building, that comes to at least $8,150.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Capacity/Impact Fee (Town of Winnsboro) — 1" meter ($3,750.00 one-time) and Water Tap Fee (Town of Winnsboro) — 1" service ($900.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Capacity/Impact Fee (Town of Winnsboro) — 1 REU × $3,500/REU is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

City Development Impact Fee (Town of Winnsboro, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Winnsboro Impact Fee Schedule
Water$4,650.00 one-time
  • Water Capacity/Impact Fee (Town of Winnsboro) — 1" meter
    Town of Winnsboro
    Water capacity fee by meter size under the Town fee schedule effective July 1, 2024 (unchanged since 2023). Charged in addition to the water tap fee.
    $3,750.00 one-time
  • Water Tap Fee (Town of Winnsboro) — 1" service
    Town of Winnsboro
    In-town water tap fee by meter size under the Town fee schedule effective July 1, 2024 (unchanged since 2023). 2-inch and 3-inch in-town taps are the actual cost plus $800. Charged in addition to the water capacity fee.
    $900.00 one-time
Sewer$3,500.00 one-time
  • Sewer Capacity/Impact Fee (Town of Winnsboro) — 1 REU × $3,500/REU
    Town of Winnsboro
    Wastewater capacity fee for commercial connections: $3,500 per residential equivalent unit (REU), with the REU count set from state wastewater loading rates for the use, under the Town fee schedule effective July 1, 2024. Shown for one REU; most commercial uses count several. Charged in addition to the cost-based sewer tap fee.
    $3,500.00 one-timeRequires confirmation
  • Sewer Tap Fee (Town of Winnsboro)
    Town of Winnsboro
    Sewer tap fee is the actual connection cost plus $750 in town (plus $850 outside town limits); no fixed amount is published. A separate wastewater capacity fee of $3,500 per residential equivalent unit applies.
    $0.00
City$0.00
  • City Development Impact Fee (Town of Winnsboro, Industrial)
    Town of Winnsboro
    The Town of Winnsboro adopted a development impact fee program in September 2025 (Ord. 162), and its fee schedule for the fiscal year beginning July 1, 2026 adds the impact fees. The adopted nonresidential amounts are not yet published.
    Requires confirmation
County$0.00
Total (Winnsboro): $8,150.00 one-time (≈ $8,150.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Winnsboro Fairfield County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Fairfield County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Winnsboro: Office Impact Fees

Office development in Winnsboro pays no per-square-foot impact fees, but owes $8,150.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 25,000 sq ft building, that comes to at least $8,150.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Capacity/Impact Fee (Town of Winnsboro) — 1" meter ($3,750.00 one-time) and Water Tap Fee (Town of Winnsboro) — 1" service ($900.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Capacity/Impact Fee (Town of Winnsboro) — 1 REU × $3,500/REU is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

City Development Impact Fee (Town of Winnsboro, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Winnsboro Impact Fee Schedule
Water$4,650.00 one-time
  • Water Capacity/Impact Fee (Town of Winnsboro) — 1" meter
    Town of Winnsboro
    Water capacity fee by meter size under the Town fee schedule effective July 1, 2024 (unchanged since 2023). Charged in addition to the water tap fee.
    $3,750.00 one-time
  • Water Tap Fee (Town of Winnsboro) — 1" service
    Town of Winnsboro
    In-town water tap fee by meter size under the Town fee schedule effective July 1, 2024 (unchanged since 2023). 2-inch and 3-inch in-town taps are the actual cost plus $800. Charged in addition to the water capacity fee.
    $900.00 one-time
Sewer$3,500.00 one-time
  • Sewer Capacity/Impact Fee (Town of Winnsboro) — 1 REU × $3,500/REU
    Town of Winnsboro
    Wastewater capacity fee for commercial connections: $3,500 per residential equivalent unit (REU), with the REU count set from state wastewater loading rates for the use, under the Town fee schedule effective July 1, 2024. Shown for one REU; most commercial uses count several. Charged in addition to the cost-based sewer tap fee.
    $3,500.00 one-timeRequires confirmation
  • Sewer Tap Fee (Town of Winnsboro)
    Town of Winnsboro
    Sewer tap fee is the actual connection cost plus $750 in town (plus $850 outside town limits); no fixed amount is published. A separate wastewater capacity fee of $3,500 per residential equivalent unit applies.
    $0.00
City$0.00
  • City Development Impact Fee (Town of Winnsboro, Office)
    Town of Winnsboro
    The Town of Winnsboro adopted a development impact fee program in September 2025 (Ord. 162), and its fee schedule for the fiscal year beginning July 1, 2026 adds the impact fees. The adopted nonresidential amounts are not yet published.
    Requires confirmation
County$0.00
Total (Winnsboro): $8,150.00 one-time (≈ $8,150.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Town of Winnsboro Fairfield County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Fairfield County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Winnsboro Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

Brush up on impact fee basics before you budget your next project.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Winnsboro Impact Fee FAQs

What are the total impact fees for a single-family home in Winnsboro, South Carolina?

A new single-family home in Winnsboro pays at least $5,750.00 per unit in combined impact fees (rates sourced November 11, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Winnsboro?

Commercial development in Winnsboro pays no per-square-foot impact fees, but owes $8,150.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

Does Winnsboro charge its own impact fees?

Yes. Winnsboro levies its own municipal impact or utility fees. Fairfield County does not currently add county-level impact fees inside Winnsboro. The schedule on this page shows every fee that applies to development in Winnsboro.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Fairfield County impact fees page.