Georgetown, South Carolina Impact Fees

Georgetown applies its own fee schedule. Georgetown County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $4,320.00 per unit (rates sourced ). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Georgetown Impact Fees by Project Type

Georgetown: Single-Family Impact Fees

A new single-family home in Georgetown pays at least $4,320.00 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Development (Impact) Fee (City of Georgetown) ($1,320.00), Water Tap Fee (City of Georgetown) ($1,000.00) and Water Development (Impact) Fee (City of Georgetown) ($950.00).

Fire Impact Fee (City of Georgetown) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Georgetown Impact Fee Schedule
Water$2,100.00
  • Water Tap Fee (City of Georgetown)
    3/4" meter
    City of Georgetown Water Utilities Department
    The City of Georgetown's water tap fee is $1,000 for a 3/4-inch tap or $1,100 for a 1-inch tap, plus a $150 meter installation charge and the separate water development fee. Larger taps and taps in the Belle Isle service area are priced by proposal.
    $1,000.00
  • Water Development (Impact) Fee (City of Georgetown)
    3/4" meter
    City of Georgetown Water Utilities Department
    The City of Georgetown charges a water development fee by meter size ($950 for a 3/4-inch meter, up to $15,870 for 4 inches) in addition to the tap fee, under its combined public utility system rate schedule.
    $950.00
  • Water Meter Installation Charge (City of Georgetown)
    City of Georgetown Water Utilities Department
    The City of Georgetown adds a $150 meter installation charge to each 3/4-inch or 1-inch water tap.
    $150.00
Sewer$2,220.00
  • Sewer Development (Impact) Fee (City of Georgetown)
    3/4" meter
    City of Georgetown Water Utilities Department
    The City of Georgetown charges a wastewater development fee by meter size ($1,320 for a 3/4-inch meter, up to $31,810 for 4 inches) in addition to the $900 sewer tap fee, under its combined public utility system rate schedule.
    $1,320.00
  • Sewer Tap Fee (City of Georgetown)
    City of Georgetown Water Utilities Department
    The City of Georgetown charges a $900 sewer tap fee (the same for 3/4-inch and 1-inch water services), plus the separate wastewater development fee. Sewer taps over 4 inches are priced by proposal.
    $900.00
City$0.00
  • Fire Impact Fee (City of Georgetown)
    City of Georgetown
    The City of Georgetown charges a fire impact fee of 0.4% of the construction cost of a new single-family detached home, paid before the building permit is issued, so it is not included in this estimate. The fee is halved for a building voluntarily equipped with sprinklers where they are not otherwise required.
    Requires confirmation
County$0.00
Total (Georgetown): $4,320.00
Sources last checked Official fee schedules:City of Georgetown Water Utilities Department City of Georgetown Georgetown County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Georgetown County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Georgetown: Multifamily Impact Fees

A new multifamily unit in Georgetown pays at least $4,320.00 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Development (Impact) Fee (City of Georgetown, MF) ($1,320.00), Water Tap Fee (City of Georgetown, MF) ($1,000.00) and Water Development (Impact) Fee (City of Georgetown, MF) ($950.00).

Fire Impact Fee (City of Georgetown, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Georgetown Impact Fee Schedule
Water$2,100.00
  • Water Tap Fee (City of Georgetown, MF)
    City of Georgetown Water Utilities Department
    The City of Georgetown charges a water tap fee per tap, not per dwelling unit: $1,000 for a 3/4-inch tap ($1,100 for 1 inch; larger taps by proposal). A building served by one tap pays it once.
    $1,000.00
  • Water Development (Impact) Fee (City of Georgetown, MF)
    3/4" meter
    City of Georgetown Water Utilities Department
    The City of Georgetown charges a water development fee by meter size, not per dwelling unit: $950 for a 3/4-inch meter, $1,620 for 1 inch, $3,140 for 1 1/2 inches and $5,040 for 2 inches (larger meters cost more). A building served by one meter pays it once.
    $950.00
  • Water Meter Installation Charge (City of Georgetown, MF)
    City of Georgetown Water Utilities Department
    The City of Georgetown adds a $150 meter installation charge to each 3/4-inch or 1-inch water tap; a building served by one meter pays it once.
    $150.00
Sewer$2,220.00
  • Sewer Development (Impact) Fee (City of Georgetown, MF)
    3/4" meter
    City of Georgetown Water Utilities Department
    The City of Georgetown charges a wastewater development fee by meter size, not per dwelling unit: $1,320 for a 3/4-inch meter, $5,280 for 1 inch, $6,340 for 1 1/2 inches and $23,630 for 2 inches (larger meters cost more). A building served by one meter pays it once.
    $1,320.00
  • Sewer Tap Fee (City of Georgetown, MF)
    City of Georgetown Water Utilities Department
    The City of Georgetown charges a $900 sewer tap fee per tap, not per dwelling unit, plus the separate wastewater development fee. A building served by one tap pays it once.
    $900.00
City$0.00
  • Fire Impact Fee (City of Georgetown, MF)
    City of Georgetown
    The City of Georgetown charges a fire impact fee of 0.5% of the construction cost of any non-detached residential building (apartments, condominiums, townhouses, duplexes), paid before the building permit is issued, so it is not included in this estimate. The fee is halved for a building voluntarily equipped with sprinklers where they are not otherwise required.
    Requires confirmation
County$0.00
Total (Georgetown): $4,320.00
Sources last checked Official fee schedules:City of Georgetown Water Utilities Department City of Georgetown Georgetown County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Georgetown County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Georgetown: Commercial Impact Fees

Commercial development in Georgetown pays no per-square-foot impact fees, but owes $9,050.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 50,000 sq ft building, that comes to at least $9,050.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Development (Impact) Fee (City of Georgetown) — 1" meter ($5,280.00 one-time), Water Development (Impact) Fee (City of Georgetown) — 1" meter ($1,620.00 one-time) and Water Tap Fee (City of Georgetown) — 1" meter ($1,100.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Fire Impact Fee (City of Georgetown, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Georgetown Impact Fee Schedule
Water$2,870.00 one-time
  • Water Development (Impact) Fee (City of Georgetown) — 1" meter
    City of Georgetown Water Utilities
    City of Georgetown water development (impact) fee by meter size, from $950 for a 3/4-inch meter to $15,870 for a 4-inch meter, charged in addition to the water tap fee under the city's Combined Public Utility System Rates Schedule (FY2025 issue).
    $1,620.00 one-time
  • Water Tap Fee (City of Georgetown) — 1" meter
    City of Georgetown Water Utilities
    City of Georgetown water tap fee: $1,000 for a 3/4-inch tap or $1,100 for a 1-inch tap, plus a $150 meter installation charge and the separate water development fee (City Tap Application, revised 7-1-2023). Taps larger than 1 inch and taps in the Belle Isle service area are priced by proposal.
    $1,100.00 one-time
  • Water Meter Installation Charge (City of Georgetown)
    City of Georgetown Water Utilities
    The City of Georgetown adds a $150 meter installation charge to each 3/4-inch or 1-inch water tap; larger taps are priced by proposal.
    $150.00 one-time
Sewer$6,180.00 one-time
  • Sewer Development (Impact) Fee (City of Georgetown) — 1" meter
    City of Georgetown Water Utilities
    City of Georgetown sewer (wastewater) development fee by meter size, from $1,320 for a 3/4-inch meter to $31,810 for a 4-inch meter, charged in addition to the sewer tap fee under the city's Combined Public Utility System Rates Schedule (FY2025 issue).
    $5,280.00 one-time
  • Sewer Tap Fee (City of Georgetown)
    City of Georgetown Water Utilities
    City of Georgetown sewer tap fee: $900 with a 3/4-inch or 1-inch water service, plus the separate sewer development fee (City Tap Application, revised 7-1-2023). Sewer taps larger than 4 inches and Belle Isle-area taps are priced by proposal.
    $900.00 one-time
City$0.00
  • Fire Impact Fee (City of Georgetown, Commercial)
    City of Georgetown
    Fire impact fee assessed at 0.8% of total construction cost for commercial/industrial buildings; a 50% reduction applies to buildings voluntarily sprinklered where sprinklers are not otherwise required. Not expressible as a flat or per-square-foot amount.
    Requires confirmation
County$0.00
Total (Georgetown): $9,050.00 one-time (≈ $9,050.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Georgetown Water Utilities City of Georgetown Georgetown County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Georgetown County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Georgetown: Industrial Impact Fees

Industrial development in Georgetown pays no per-square-foot impact fees, but owes $9,050.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 50,000 sq ft building, that comes to at least $9,050.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Development (Impact) Fee (City of Georgetown) — 1" meter ($5,280.00 one-time), Water Development (Impact) Fee (City of Georgetown) — 1" meter ($1,620.00 one-time) and Water Tap Fee (City of Georgetown) — 1" meter ($1,100.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Fire Impact Fee (City of Georgetown, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Georgetown Impact Fee Schedule
Water$2,870.00 one-time
  • Water Development (Impact) Fee (City of Georgetown) — 1" meter
    City of Georgetown Water Utilities
    City of Georgetown water development (impact) fee by meter size, from $950 for a 3/4-inch meter to $15,870 for a 4-inch meter, charged in addition to the water tap fee under the city's Combined Public Utility System Rates Schedule (FY2025 issue).
    $1,620.00 one-time
  • Water Tap Fee (City of Georgetown) — 1" meter
    City of Georgetown Water Utilities
    City of Georgetown water tap fee: $1,000 for a 3/4-inch tap or $1,100 for a 1-inch tap, plus a $150 meter installation charge and the separate water development fee (City Tap Application, revised 7-1-2023). Taps larger than 1 inch and taps in the Belle Isle service area are priced by proposal.
    $1,100.00 one-time
  • Water Meter Installation Charge (City of Georgetown)
    City of Georgetown Water Utilities
    The City of Georgetown adds a $150 meter installation charge to each 3/4-inch or 1-inch water tap; larger taps are priced by proposal.
    $150.00 one-time
Sewer$6,180.00 one-time
  • Sewer Development (Impact) Fee (City of Georgetown) — 1" meter
    City of Georgetown Water Utilities
    City of Georgetown sewer (wastewater) development fee by meter size, from $1,320 for a 3/4-inch meter to $31,810 for a 4-inch meter, charged in addition to the sewer tap fee under the city's Combined Public Utility System Rates Schedule (FY2025 issue).
    $5,280.00 one-time
  • Sewer Tap Fee (City of Georgetown)
    City of Georgetown Water Utilities
    City of Georgetown sewer tap fee: $900 with a 3/4-inch or 1-inch water service, plus the separate sewer development fee (City Tap Application, revised 7-1-2023). Sewer taps larger than 4 inches and Belle Isle-area taps are priced by proposal.
    $900.00 one-time
City$0.00
  • Fire Impact Fee (City of Georgetown, Industrial)
    City of Georgetown
    Fire impact fee assessed at 0.8% of total construction cost for industrial buildings; a 50% reduction applies to voluntary sprinklering not otherwise required. Not expressible as a flat or per-square-foot amount.
    Requires confirmation
County$0.00
Total (Georgetown): $9,050.00 one-time (≈ $9,050.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Georgetown Water Utilities City of Georgetown Georgetown County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Georgetown County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Georgetown: Office Impact Fees

Office development in Georgetown pays no per-square-foot impact fees, but owes $9,050.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 25,000 sq ft building, that comes to at least $9,050.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Development (Impact) Fee (City of Georgetown) — 1" meter ($5,280.00 one-time), Water Development (Impact) Fee (City of Georgetown) — 1" meter ($1,620.00 one-time) and Water Tap Fee (City of Georgetown) — 1" meter ($1,100.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Fire Impact Fee (City of Georgetown, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Georgetown Impact Fee Schedule
Water$2,870.00 one-time
  • Water Development (Impact) Fee (City of Georgetown) — 1" meter
    City of Georgetown Water Utilities
    City of Georgetown water development (impact) fee by meter size, from $950 for a 3/4-inch meter to $15,870 for a 4-inch meter, charged in addition to the water tap fee under the city's Combined Public Utility System Rates Schedule (FY2025 issue).
    $1,620.00 one-time
  • Water Tap Fee (City of Georgetown) — 1" meter
    City of Georgetown Water Utilities
    City of Georgetown water tap fee: $1,000 for a 3/4-inch tap or $1,100 for a 1-inch tap, plus a $150 meter installation charge and the separate water development fee (City Tap Application, revised 7-1-2023). Taps larger than 1 inch and taps in the Belle Isle service area are priced by proposal.
    $1,100.00 one-time
  • Water Meter Installation Charge (City of Georgetown)
    City of Georgetown Water Utilities
    The City of Georgetown adds a $150 meter installation charge to each 3/4-inch or 1-inch water tap; larger taps are priced by proposal.
    $150.00 one-time
Sewer$6,180.00 one-time
  • Sewer Development (Impact) Fee (City of Georgetown) — 1" meter
    City of Georgetown Water Utilities
    City of Georgetown sewer (wastewater) development fee by meter size, from $1,320 for a 3/4-inch meter to $31,810 for a 4-inch meter, charged in addition to the sewer tap fee under the city's Combined Public Utility System Rates Schedule (FY2025 issue).
    $5,280.00 one-time
  • Sewer Tap Fee (City of Georgetown)
    City of Georgetown Water Utilities
    City of Georgetown sewer tap fee: $900 with a 3/4-inch or 1-inch water service, plus the separate sewer development fee (City Tap Application, revised 7-1-2023). Sewer taps larger than 4 inches and Belle Isle-area taps are priced by proposal.
    $900.00 one-time
City$0.00
  • Fire Impact Fee (City of Georgetown, Office)
    City of Georgetown
    Fire impact fee assessed at 0.8% of total construction cost for office/commercial buildings; a 50% reduction applies to voluntary sprinklering not otherwise required. Not expressible as a flat or per-square-foot amount.
    Requires confirmation
County$0.00
Total (Georgetown): $9,050.00 one-time (≈ $9,050.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Georgetown Water Utilities City of Georgetown Georgetown County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Georgetown County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Georgetown Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Georgetown Impact Fee FAQs

What are the total impact fees for a single-family home in Georgetown, South Carolina?

A new single-family home in Georgetown pays at least $4,320.00 per unit in combined impact fees (rates sourced November 11, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Georgetown?

Commercial development in Georgetown pays no per-square-foot impact fees, but owes $9,050.00 in one-time water and sewer connection fees (assuming a 1-inch meter). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

Does Georgetown charge its own impact fees?

Yes. Georgetown levies its own municipal impact or utility fees. Georgetown County does not currently add county-level impact fees inside Georgetown. The schedule on this page shows every fee that applies to development in Georgetown.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Georgetown County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000