Pawleys Island applies its own fee schedule: municipal fees plus the Georgetown County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $4,743.00 per unit (rates sourced ). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Pawleys Island Impact Fees by Project Type

Pawleys Island: Single-Family Impact Fees

A new single-family home in Pawleys Island pays at least $4,743.00 per unit in impact fees (rates sourced November 11, 2026). All of it is levied by Georgetown County.

The largest line items are Sewer Impact Fee (GCWSD, Pawleys Island) ($1,893.00), Water Tap Fee (GCWSD, Pawleys Island) — 3/4" tap ($1,561.00) and Water Impact Fee (GCWSD, Pawleys Island) ($1,169.00).

Fire Impact Fee (Town of Pawleys Island) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Pawleys Island Impact Fee Schedule
Water$2,730.00
  • Water Tap Fee (GCWSD, Pawleys Island) — 3/4" tap
    3/4" without backflow
    Georgetown County Water & Sewer District (GCWSD)
    Georgetown County Water and Sewer District supplies water on Pawleys Island; its residential 3/4-inch water tap is $1,561 without a backflow preventer or $1,930 with one, effective July 1, 2026, charged in addition to the water impact fee.
    $1,561.00
  • Water Impact Fee (GCWSD, Pawleys Island)
    Georgetown County Water & Sewer District (GCWSD)
    Georgetown County Water and Sewer District supplies water on Pawleys Island (the town owns no utility) and charges a water impact fee of $1,169 per REU, effective July 1, 2026; a single-family home is 1 REU.
    $1,169.00
Sewer$2,013.00
  • Sewer Impact Fee (GCWSD, Pawleys Island)
    Georgetown County Water & Sewer District (GCWSD)
    Where Georgetown County Water and Sewer District sewer is available on Pawleys Island, its sewer impact fee is $1,893 per REU (effective July 1, 2026), plus a $120 sewer service administrative fee. Much of the island uses septic systems; a grinder pump, where required, costs $9,535 to $10,578 more.
    $1,893.00
  • Sewer Service Administrative Fee (GCWSD, Pawleys Island)
    Georgetown County Water & Sewer District (GCWSD)
    A one-time $120 sewer service administrative fee is charged by Georgetown County Water and Sewer District on a new sewer connection, in addition to the sewer impact fee.
    $120.00
City$0.00
  • Fire Impact Fee (Town of Pawleys Island)
    Town of Pawleys Island
    The Town of Pawleys Island charges a fire impact fee of 0.4% of the total construction cost of a new single-family detached home, so it is not included in this estimate.
    Requires confirmation
County$0.00
Total (Pawleys Island): $4,743.00
Sources last checked Official fee schedules:Georgetown County Water & Sewer District (GCWSD) Town of Pawleys Island Georgetown County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Georgetown County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Pawleys Island: Multifamily Impact Fees

A new multifamily unit in Pawleys Island pays at least $4,743.00 per unit in impact fees (rates sourced November 11, 2026). All of it is levied by Georgetown County.

The largest line items are Sewer Impact Fee (GCWSD, Pawleys Island, MF) ($1,893.00), Water Impact Fee (GCWSD, Pawleys Island, MF) ($1,169.00) and Sewer Service Administrative Fee (GCWSD, Pawleys Island, MF) ($120.00).

Water Tap Fee (GCWSD, Pawleys Island, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Fire Impact Fee (Town of Pawleys Island, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Pawleys Island Impact Fee Schedule
Water$2,730.00
  • Water Tap Fee (GCWSD, Pawleys Island, MF)
    Georgetown County Water & Sewer District (GCWSD)
    Georgetown County Water and Sewer District publishes a residential 3/4-inch water tap fee of $1,561 (effective July 1, 2026) and no per-unit multifamily tap rate. It is charged per tap, so a building served by one connection pays it once; larger and commercial taps are priced by the district's engineering department.
    $1,561.00Requires confirmation
  • Water Impact Fee (GCWSD, Pawleys Island, MF)
    Georgetown County Water & Sewer District (GCWSD)
    Georgetown County Water and Sewer District supplies water on Pawleys Island and charges a water impact fee of $1,169 per REU, effective July 1, 2026. The district assigns at least one REU to each apartment, condominium or townhouse unit.
    $1,169.00
Sewer$2,013.00
  • Sewer Impact Fee (GCWSD, Pawleys Island, MF)
    Georgetown County Water & Sewer District (GCWSD)
    Where Georgetown County Water and Sewer District sewer is available on Pawleys Island, its sewer impact fee is $1,893 per REU (effective July 1, 2026), plus a $120 sewer service administrative fee. The district assigns at least one REU to each apartment, condominium or townhouse unit.
    $1,893.00
  • Sewer Service Administrative Fee (GCWSD, Pawleys Island, MF)
    Georgetown County Water & Sewer District (GCWSD)
    A one-time $120 sewer service administrative fee is charged by Georgetown County Water and Sewer District on a new sewer account, in addition to the sewer impact fee.
    $120.00
City$0.00
  • Fire Impact Fee (Town of Pawleys Island, MF)
    Town of Pawleys Island
    The Town of Pawleys Island charges a fire impact fee of 0.5% of the total construction cost of any non-detached residential building (multifamily, duplexes and similar), so it is not included in this estimate.
    Requires confirmation
County$0.00
Total (Pawleys Island): $4,743.00
Sources last checked Official fee schedules:Georgetown County Water & Sewer District (GCWSD) Town of Pawleys Island Georgetown County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Georgetown County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Pawleys Island: Commercial Impact Fees

Commercial development in Pawleys Island pays no per-square-foot impact fees, but owes $4,743.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 50,000 sq ft building, that comes to about $4,743.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Service Administrative Fee (GCWSD, Pawleys Island) ($120.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Tap Fee (GCWSD, Pawleys Island) — 3/4" without backflow, Water Impact Fee (GCWSD, Pawleys Island) — per REU (1-REU minimum), and Sewer Impact Fee (GCWSD, Pawleys Island) — per REU (1-REU minimum) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Pawleys Island Impact Fee Schedule
Water$2,730.00 one-time
  • Water Tap Fee (GCWSD, Pawleys Island) — 3/4" without backflow
    Georgetown County Water & Sewer District (GCWSD)
    Water for Pawleys Island comes from GCWSD, which publishes a 3/4-inch tap at $1,561 without backflow or $1,930 with backflow, effective 7/1/2026; commercial taps are sized and priced by GCWSD Engineering. Separate from the water impact fee.
    $1,561.00 one-timeRequires confirmation
  • Water Impact Fee (GCWSD, Pawleys Island) — per REU (1-REU minimum)
    Georgetown County Water & Sewer District (GCWSD)
    Water for Pawleys Island is supplied by Georgetown County Water & Sewer District (GCWSD). Water impact fee is $1,169 per residential-equivalent unit (REU); GCWSD Engineering assigns the REU count for a commercial project (effective 7/1/2026). Charged separately from the tap fee.
    $1,169.00 one-timeRequires confirmation
Sewer$2,013.00 one-time
  • Sewer Impact Fee (GCWSD, Pawleys Island) — per REU (1-REU minimum)
    Georgetown County Water & Sewer District (GCWSD)
    Where GCWSD sewer is available (much of Pawleys Island remains on septic), the sewer impact fee is $1,893 per REU plus a $120 sewer service administrative fee (effective 7/1/2026). GCWSD Engineering assigns the REU count for a commercial project.
    $1,893.00 one-timeRequires confirmation
  • Sewer Service Administrative Fee (GCWSD, Pawleys Island)
    Georgetown County Water & Sewer District (GCWSD)
    One-time $120 sewer service administrative fee charged by GCWSD on a new sewer connection, in addition to the sewer impact fee (effective 7/1/2026).
    $120.00 one-time
City$0.00
County$0.00
Total (Pawleys Island): $4,743.00 one-time (≈ $4,743.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Georgetown County Water & Sewer District (GCWSD) Town of Pawleys Island Georgetown County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Georgetown County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Pawleys Island: Industrial Impact Fees

Industrial development in Pawleys Island pays no per-square-foot impact fees, but owes $4,743.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 50,000 sq ft building, that comes to about $4,743.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Service Administrative Fee (GCWSD, Pawleys Island) ($120.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Tap Fee (GCWSD, Pawleys Island) — 3/4" without backflow, Water Impact Fee (GCWSD, Pawleys Island) — per REU (1-REU minimum), and Sewer Impact Fee (GCWSD, Pawleys Island) — per REU (1-REU minimum) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Pawleys Island Impact Fee Schedule
Water$2,730.00 one-time
  • Water Tap Fee (GCWSD, Pawleys Island) — 3/4" without backflow
    Georgetown County Water & Sewer District (GCWSD)
    Water for Pawleys Island comes from GCWSD, which publishes a 3/4-inch tap at $1,561 without backflow or $1,930 with backflow, effective 7/1/2026; commercial taps are sized and priced by GCWSD Engineering. Separate from the water impact fee.
    $1,561.00 one-timeRequires confirmation
  • Water Impact Fee (GCWSD, Pawleys Island) — per REU (1-REU minimum)
    Georgetown County Water & Sewer District (GCWSD)
    Water for Pawleys Island is supplied by Georgetown County Water & Sewer District (GCWSD). Water impact fee is $1,169 per residential-equivalent unit (REU); GCWSD Engineering assigns the REU count for a commercial project (effective 7/1/2026). Charged separately from the tap fee.
    $1,169.00 one-timeRequires confirmation
Sewer$2,013.00 one-time
  • Sewer Impact Fee (GCWSD, Pawleys Island) — per REU (1-REU minimum)
    Georgetown County Water & Sewer District (GCWSD)
    Where GCWSD sewer is available (much of Pawleys Island remains on septic), the sewer impact fee is $1,893 per REU plus a $120 sewer service administrative fee (effective 7/1/2026). GCWSD Engineering assigns the REU count for a commercial project.
    $1,893.00 one-timeRequires confirmation
  • Sewer Service Administrative Fee (GCWSD, Pawleys Island)
    Georgetown County Water & Sewer District (GCWSD)
    One-time $120 sewer service administrative fee charged by GCWSD on a new sewer connection, in addition to the sewer impact fee (effective 7/1/2026).
    $120.00 one-time
City$0.00
County$0.00
Total (Pawleys Island): $4,743.00 one-time (≈ $4,743.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Georgetown County Water & Sewer District (GCWSD) Town of Pawleys Island Georgetown County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Georgetown County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Pawleys Island: Office Impact Fees

Office development in Pawleys Island pays no per-square-foot impact fees, but owes $4,743.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 25,000 sq ft building, that comes to about $4,743.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Service Administrative Fee (GCWSD, Pawleys Island) ($120.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Tap Fee (GCWSD, Pawleys Island) — 3/4" without backflow, Water Impact Fee (GCWSD, Pawleys Island) — per REU (1-REU minimum), and Sewer Impact Fee (GCWSD, Pawleys Island) — per REU (1-REU minimum) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Pawleys Island Impact Fee Schedule
Water$2,730.00 one-time
  • Water Tap Fee (GCWSD, Pawleys Island) — 3/4" without backflow
    Georgetown County Water & Sewer District (GCWSD)
    Water for Pawleys Island comes from GCWSD, which publishes a 3/4-inch tap at $1,561 without backflow or $1,930 with backflow, effective 7/1/2026; commercial taps are sized and priced by GCWSD Engineering. Separate from the water impact fee.
    $1,561.00 one-timeRequires confirmation
  • Water Impact Fee (GCWSD, Pawleys Island) — per REU (1-REU minimum)
    Georgetown County Water & Sewer District (GCWSD)
    Water for Pawleys Island is supplied by Georgetown County Water & Sewer District (GCWSD). Water impact fee is $1,169 per residential-equivalent unit (REU); GCWSD Engineering assigns the REU count for a commercial project (effective 7/1/2026). Charged separately from the tap fee.
    $1,169.00 one-timeRequires confirmation
Sewer$2,013.00 one-time
  • Sewer Impact Fee (GCWSD, Pawleys Island) — per REU (1-REU minimum)
    Georgetown County Water & Sewer District (GCWSD)
    Where GCWSD sewer is available (much of Pawleys Island remains on septic), the sewer impact fee is $1,893 per REU plus a $120 sewer service administrative fee (effective 7/1/2026). GCWSD Engineering assigns the REU count for a commercial project.
    $1,893.00 one-timeRequires confirmation
  • Sewer Service Administrative Fee (GCWSD, Pawleys Island)
    Georgetown County Water & Sewer District (GCWSD)
    One-time $120 sewer service administrative fee charged by GCWSD on a new sewer connection, in addition to the sewer impact fee (effective 7/1/2026).
    $120.00 one-time
City$0.00
County$0.00
Total (Pawleys Island): $4,743.00 one-time (≈ $4,743.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Georgetown County Water & Sewer District (GCWSD) Town of Pawleys Island Georgetown County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Georgetown County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Pawleys Island Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Pawleys Island Impact Fee FAQs

What are the total impact fees for a single-family home in Pawleys Island, South Carolina?

A new single-family home in Pawleys Island pays at least $4,743.00 per unit in combined impact fees (rates sourced November 11, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Pawleys Island?

Commercial development in Pawleys Island pays no per-square-foot impact fees, but owes $4,743.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Pawleys Island charge its own impact fees?

Yes. Pawleys Island levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Pawleys Island, with the combined total.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Georgetown County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000