Skip to content
IMPACTFEES.ORG

Ridge Spring, South Carolina Impact Fees

Ridge Spring applies its own fee schedule. Saluda County does not currently add county-level impact fees inside city limits. A new single-family home pays $2,100.00 per unit (rates sourced ). The full breakdown is below.

Ridge Spring Impact Fees by Project Type

Ridge Spring: Single-Family Impact Fees

A new single-family home in Ridge Spring pays $2,100.00 per unit in impact fees (rates sourced November 14, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Tap Fee (Town of Ridge Spring) ($1,050.00) and Sewer Tap Fee (Town of Ridge Spring) ($1,050.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Ridge Spring Impact Fee Schedule
Water$1,050.00
  • Water Tap Fee (Town of Ridge Spring)
    3/4"
    Town of Ridge Spring
    The Town of Ridge Spring operates its own water system. Its utility rate table, effective December 2, 2024, sets water taps inside the town limits at $1,050 for 3/4-inch and $1,350 for 1-inch, plus an extra charge for installation and materials; larger taps are $1,350 plus installation and materials. Outside the town limits the same taps are $1,450 and $1,900. New customers also pay a one-time $75 activation charge.
    $1,050.00
Sewer$1,050.00
  • Sewer Tap Fee (Town of Ridge Spring)
    Town of Ridge Spring
    The Town of Ridge Spring operates its own sewer system. Its utility rate table, effective December 2, 2024, sets a 4-inch sewer tap at $1,050 inside the town limits and $1,450 outside, plus an extra charge for installation and materials.
    $1,050.00
City$0.00
County$0.00
Total (Ridge Spring): $2,100.00
Sources last checked Official fee schedules:Town of Ridge Spring Saluda County

Where in Saluda County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ridge Spring: Multifamily Impact Fees

A new multifamily unit in Ridge Spring pays $2,100.00 per unit in impact fees (rates sourced November 14, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Tap Fee (Town of Ridge Spring, MF) ($1,050.00) and Water Tap Fee (Town of Ridge Spring, MF) ($1,050.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Ridge Spring Impact Fee Schedule
Water$1,050.00
  • Water Tap Fee (Town of Ridge Spring, MF)
    3/4"
    Town of Ridge Spring
    The Town of Ridge Spring prices water taps by meter size, not per dwelling unit, so a multifamily building on one tap pays once. Its rate table, effective December 2, 2024, sets taps inside the town at $1,050 for 3/4-inch and $1,350 for 1-inch, plus an extra charge for installation and materials.
    $1,050.00
Sewer$1,050.00
  • Sewer Tap Fee (Town of Ridge Spring, MF)
    Town of Ridge Spring
    The Town of Ridge Spring charges sewer taps per tap, not per dwelling unit, so a multifamily building on one tap pays once. Its rate table, effective December 2, 2024, sets a 4-inch sewer tap at $1,050 inside the town and $1,450 outside, plus an extra charge for installation and materials.
    $1,050.00
City$0.00
County$0.00
Total (Ridge Spring): $2,100.00
Sources last checked Official fee schedules:Town of Ridge Spring Saluda County

Where in Saluda County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ridge Spring: Commercial Impact Fees

Commercial development in Ridge Spring pays no per-square-foot impact fees, but owes $2,400.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).

For a 50,000 sq ft building, that comes to about $2,400.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Tap Fee (Town of Ridge Spring) — 1" meter ($1,350.00 one-time) and Sewer Tap Fee (Town of Ridge Spring) ($1,050.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Ridge Spring Impact Fee Schedule
Water$1,350.00 one-time
  • Water Tap Fee (Town of Ridge Spring) — 1" meter
    Inside-town water tap, Town of Ridge Spring rate table effective December 2, 2024; the out-of-town 1-inch tap is $1,900. Every tap carries an extra charge for installation and materials; taps larger than 1 inch are $1,350 inside plus installation and materials. New service also pays a $75 activation fee.
    $1,350.00 one-time
Sewer$1,050.00 one-time
  • Sewer Tap Fee (Town of Ridge Spring)
    Inside-town 4-inch sewer tap, Town of Ridge Spring rate table effective December 2, 2024; the out-of-town tap is $1,450. Every tap carries an extra charge for installation and materials. Two large industrial users are served under a separate Saluda County Water and Sewer Authority pass-through agreement.
    $1,050.00 one-time
Total (Ridge Spring): $2,400.00 one-time (≈ $2,400.00 at 50,000 sq ft)
Sources last checked
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Saluda County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ridge Spring: Industrial Impact Fees

Industrial development in Ridge Spring pays no per-square-foot impact fees, but owes $2,400.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).

For a 50,000 sq ft building, that comes to about $2,400.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Tap Fee (Town of Ridge Spring) — 1" meter ($1,350.00 one-time) and Sewer Tap Fee (Town of Ridge Spring) ($1,050.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Ridge Spring Impact Fee Schedule
Water$1,350.00 one-time
  • Water Tap Fee (Town of Ridge Spring) — 1" meter
    Inside-town water tap, Town of Ridge Spring rate table effective December 2, 2024; the out-of-town 1-inch tap is $1,900. Every tap carries an extra charge for installation and materials; taps larger than 1 inch are $1,350 inside plus installation and materials. New service also pays a $75 activation fee.
    $1,350.00 one-time
Sewer$1,050.00 one-time
  • Sewer Tap Fee (Town of Ridge Spring)
    Inside-town 4-inch sewer tap, Town of Ridge Spring rate table effective December 2, 2024; the out-of-town tap is $1,450. Every tap carries an extra charge for installation and materials. Two large industrial users are served under a separate Saluda County Water and Sewer Authority pass-through agreement.
    $1,050.00 one-time
Total (Ridge Spring): $2,400.00 one-time (≈ $2,400.00 at 50,000 sq ft)
Sources last checked
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Saluda County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ridge Spring: Office Impact Fees

Office development in Ridge Spring pays no per-square-foot impact fees, but owes $2,400.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).

For a 25,000 sq ft building, that comes to about $2,400.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Tap Fee (Town of Ridge Spring) — 1" meter ($1,350.00 one-time) and Sewer Tap Fee (Town of Ridge Spring) ($1,050.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Ridge Spring Impact Fee Schedule
Water$1,350.00 one-time
  • Water Tap Fee (Town of Ridge Spring) — 1" meter
    Inside-town water tap, Town of Ridge Spring rate table effective December 2, 2024; the out-of-town 1-inch tap is $1,900. Every tap carries an extra charge for installation and materials; taps larger than 1 inch are $1,350 inside plus installation and materials. New service also pays a $75 activation fee.
    $1,350.00 one-time
Sewer$1,050.00 one-time
  • Sewer Tap Fee (Town of Ridge Spring)
    Inside-town 4-inch sewer tap, Town of Ridge Spring rate table effective December 2, 2024; the out-of-town tap is $1,450. Every tap carries an extra charge for installation and materials. Two large industrial users are served under a separate Saluda County Water and Sewer Authority pass-through agreement.
    $1,050.00 one-time
Total (Ridge Spring): $2,400.00 one-time (≈ $2,400.00 at 25,000 sq ft)
Sources last checked
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Saluda County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ridge Spring Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Ridge Spring Impact Fee FAQs

What are the total impact fees for a single-family home in Ridge Spring, South Carolina?

A new single-family home in Ridge Spring pays $2,100.00 per unit in combined impact fees (rates sourced November 14, 2026).

How much are commercial impact fees in Ridge Spring?

Commercial development in Ridge Spring pays no per-square-foot impact fees, but owes $2,400.00 in one-time water and sewer connection fees (assuming a 1-inch meter).

Does Ridge Spring charge its own impact fees?

Yes. Ridge Spring levies its own municipal impact or utility fees. Saluda County does not currently add county-level impact fees inside Ridge Spring. The schedule on this page shows every fee that applies to development in Ridge Spring.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Saluda County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000