Skip to content
IMPACTFEES.ORG

Ward, South Carolina Impact Fees

Ward applies its own fee schedule: municipal fees plus the Saluda County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $2,720.00 per unit (rates sourced ). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Ward Impact Fees by Project Type

Ward: Single-Family Impact Fees

A new single-family home in Ward pays at least $2,720.00 per unit in impact fees (rates sourced November 14, 2026). All of it is levied by Saluda County.

Water Meter Tap Fee (Saluda County W&S Authority) — 3/4" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Tap Fee (Town of Ward - septic) is set by the utility and not published online. City Impact Fee (Town of Ward) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Ward Impact Fee Schedule
Water$2,720.00
  • Water Meter Tap Fee (Saluda County W&S Authority) — 3/4" meter
    Saluda County Water & Sewer Authority
    Saluda County Water and Sewer Authority tap schedule effective March 18, 2026, by meter size: 3/4-inch $2,720, 1-inch $3,320 and 1 1/2-inch $3,790, each including a $40 administrative fee; taps of 2 inches and larger are billed at cost plus 25 percent.
    $2,720.00Requires confirmation
Sewer$0.00
City$0.00
County$0.00
Total (Ward): $2,720.00
Sources last checked Official fee schedules:Saluda County Water & Sewer Authority Town of Ward Saluda County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Saluda County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ward: Multifamily Impact Fees

A new multifamily unit in Ward pays at least $2,720.00 per unit in impact fees (rates sourced November 14, 2026). All of it is levied by Saluda County.

Water Meter Tap Fee (Saluda County W&S Authority, MF) — 3/4" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Tap Fee (Town of Ward - septic, MF) is set by the utility and not published online. City Impact Fee (Town of Ward, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Ward Impact Fee Schedule
Water$2,720.00
  • Water Meter Tap Fee (Saluda County W&S Authority, MF) — 3/4" meter
    Saluda County Water & Sewer Authority
    Saluda County Water and Sewer Authority prices water taps by meter size, not per dwelling unit, so a multifamily building on one tap pays the tap fee once. Schedule effective March 18, 2026: 3/4-inch $2,720, 1-inch $3,320 and 1 1/2-inch $3,790, each including a $40 administrative fee; taps of 2 inches and larger are billed at cost plus 25 percent.
    $2,720.00Requires confirmation
Sewer$0.00
City$0.00
County$0.00
Total (Ward): $2,720.00
Sources last checked Official fee schedules:Saluda County Water & Sewer Authority Town of Ward Saluda County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Saluda County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ward: Commercial Impact Fees

Commercial development in Ward pays no per-square-foot impact fees, but owes $3,320.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).

For a 50,000 sq ft building, that comes to at least $3,320.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Meter Tap Fee (Saluda County W&S Authority) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Water Meter Tap Fee (Saluda County W&S Authority) — 2" and larger and Sewer Tap Fee (Town of Ward - septic) are set by the utility and not published online. City Impact Fee (Town of Ward, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Ward Impact Fee Schedule
Water$3,320.00 one-time
  • Water Meter Tap Fee (Saluda County W&S Authority) — 1" meter
    Saluda County Water and Sewer Authority tap schedule effective March 18, 2026, by meter size: 3/4-inch $2,720, 1-inch $3,320 and 1 1/2-inch $3,790, each including a $40 administrative fee; taps of 2 inches and larger are billed at cost plus 25 percent. Commercial connections may need a backflow-prevention device beyond the standard dual check valve.
    $3,320.00 one-timeRequires confirmation
  • Water Meter Tap Fee (Saluda County W&S Authority) — 2" and larger
    For water meters of 2 inches and larger, Saluda County Water and Sewer Authority bills the tap at cost plus 25 percent (schedule effective March 18, 2026).
    Requires confirmation
Sewer$0.00
City$0.00
Total (Ward): $3,320.00 one-time (≈ $3,320.00 at 50,000 sq ft)
Sources last checked
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Saluda County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ward: Industrial Impact Fees

Industrial development in Ward pays no per-square-foot impact fees, but owes $3,320.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).

For a 50,000 sq ft building, that comes to at least $3,320.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Meter Tap Fee (Saluda County W&S Authority) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Water Meter Tap Fee (Saluda County W&S Authority) — 2" and larger and Sewer Tap Fee (Town of Ward - septic) are set by the utility and not published online. City Impact Fee (Town of Ward, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Ward Impact Fee Schedule
Water$3,320.00 one-time
  • Water Meter Tap Fee (Saluda County W&S Authority) — 1" meter
    Saluda County Water and Sewer Authority tap schedule effective March 18, 2026, by meter size: 3/4-inch $2,720, 1-inch $3,320 and 1 1/2-inch $3,790, each including a $40 administrative fee; taps of 2 inches and larger are billed at cost plus 25 percent. Commercial connections may need a backflow-prevention device beyond the standard dual check valve.
    $3,320.00 one-timeRequires confirmation
  • Water Meter Tap Fee (Saluda County W&S Authority) — 2" and larger
    For water meters of 2 inches and larger, Saluda County Water and Sewer Authority bills the tap at cost plus 25 percent (schedule effective March 18, 2026).
    Requires confirmation
Sewer$0.00
City$0.00
Total (Ward): $3,320.00 one-time (≈ $3,320.00 at 50,000 sq ft)
Sources last checked
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Saluda County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ward: Office Impact Fees

Office development in Ward pays no per-square-foot impact fees, but owes $3,320.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).

For a 25,000 sq ft building, that comes to at least $3,320.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Meter Tap Fee (Saluda County W&S Authority) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Water Meter Tap Fee (Saluda County W&S Authority) — 2" and larger and Sewer Tap Fee (Town of Ward - septic) are set by the utility and not published online. City Impact Fee (Town of Ward, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Ward Impact Fee Schedule
Water$3,320.00 one-time
  • Water Meter Tap Fee (Saluda County W&S Authority) — 1" meter
    Saluda County Water and Sewer Authority tap schedule effective March 18, 2026, by meter size: 3/4-inch $2,720, 1-inch $3,320 and 1 1/2-inch $3,790, each including a $40 administrative fee; taps of 2 inches and larger are billed at cost plus 25 percent. Commercial connections may need a backflow-prevention device beyond the standard dual check valve.
    $3,320.00 one-timeRequires confirmation
  • Water Meter Tap Fee (Saluda County W&S Authority) — 2" and larger
    For water meters of 2 inches and larger, Saluda County Water and Sewer Authority bills the tap at cost plus 25 percent (schedule effective March 18, 2026).
    Requires confirmation
Sewer$0.00
City$0.00
Total (Ward): $3,320.00 one-time (≈ $3,320.00 at 25,000 sq ft)
Sources last checked
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Saluda County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ward Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Ward Impact Fee FAQs

What are the total impact fees for a single-family home in Ward, South Carolina?

A new single-family home in Ward pays at least $2,720.00 per unit in combined impact fees (rates sourced November 14, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Ward?

Commercial development in Ward pays no per-square-foot impact fees, but owes $3,320.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

Does Ward charge its own impact fees?

Yes. Ward levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Ward, with the combined total.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Saluda County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000