Mayesville Impact Fees by Project Type
Mayesville: Single-Family Impact Fees
A new single-family home in Mayesville pays at least $3,000.00 per unit in impact fees (rates sourced November 14, 2026). Every line item is levied at the municipal or utility level.
Water Connection Fee (City of Sumter, Mayesville system) — infill, 5/8" x 3/4" meter, Water Tap Fee (City of Sumter, Mayesville system) — 5/8" x 3/4" meter, Sewer Tap Fee (City of Sumter, Mayesville system), and Sewer Connection Fee (City of Sumter, Mayesville system) — infill, 4" lateral are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
City Impact Fee (Town of Mayesville) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Mayesville Impact Fee Schedule
- Water Connection Fee (City of Sumter, Mayesville system) — infill, 5/8" x 3/4" meter$750.00Requires confirmationCity of SumterThe City of Sumter owns and runs the Mayesville water system. Amount is the city's outside-city residential water connection fee for an infill lot from its October 2026 engineering fee schedule, due at building permit application and paid in addition to the water tap fee.
- Water Tap Fee (City of Sumter, Mayesville system) — 5/8" x 3/4" meter$450.00Requires confirmationCity of SumterThe City of Sumter owns and runs the Mayesville water system. Amount is the city's outside-city residential water tap fee for an infill lot from its October 2026 engineering fee schedule, paid in addition to the water connection fee.
- Sewer Tap Fee (City of Sumter, Mayesville system)$900.00Requires confirmationCity of SumterThe City of Sumter runs the Mayesville sewer system. Amount is the city's outside-city residential sewer tap fee for an infill lot from its October 2026 engineering fee schedule, paid in addition to the sewer connection fee.
- Sewer Connection Fee (City of Sumter, Mayesville system) — infill, 4" lateral$900.00Requires confirmationCity of SumterThe City of Sumter runs the Mayesville sewer system. Amount is the city's outside-city residential sewer connection fee for an infill lot, due at building permit application and paid in addition to the sewer tap fee.
- City Impact Fee (Town of Mayesville)Requires confirmationTown of Mayesville
- County Impact Fee (Sumter County)$0.00Sumter CountySumter County does not charge a development impact fee.
Where in Sumter County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Mayesville: Multifamily Impact Fees
A new multifamily unit in Mayesville pays at least $1,300.00 per unit in impact fees (rates sourced November 14, 2026). Every line item is levied at the municipal or utility level.
Water Connection Fee (City of Sumter, Mayesville system, MF) — infill, 5/8" x 3/4" meter, Sewer Connection Fee (City of Sumter, Mayesville system, MF) — apartment, each additional unit, and Water Tap Fee (City of Sumter, Mayesville system, MF) — 5/8" x 3/4" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
City Impact Fee (Town of Mayesville, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Mayesville Impact Fee Schedule
- Water Connection Fee (City of Sumter, Mayesville system, MF) — infill, 5/8" x 3/4" meter$750.00Requires confirmationCity of SumterThe City of Sumter owns and runs the Mayesville water system. Amount is the city's outside-city water connection fee for the smallest meter; the city prints no per-unit rate, and a building served by one meter pays once for that meter, not once per unit.
- Water Tap Fee (City of Sumter, Mayesville system, MF) — 5/8" x 3/4" meter$450.00Requires confirmationCity of SumterThe City of Sumter owns and runs the Mayesville water system. Amount is the city's outside-city water tap fee for the smallest meter; the city prints no per-unit rate, and a building served by one meter pays the fee once for that meter, not once per unit.
- Sewer Connection Fee (City of Sumter, Mayesville system, MF) — apartment, each additional unit$100.00Requires confirmationCity of SumterThe City of Sumter runs the Mayesville sewer system and charges apartment sewer service as a base fee for the first unit plus $100 for each additional unit; the per-unit figure shown is the additional-unit rate. The outside-city base is $1,800 for a 4-inch line, $2,400 for 6-inch and $2,600 for 8-inch.
- City Impact Fee (Town of Mayesville, MF)Requires confirmationTown of Mayesville
- County Impact Fee (Sumter County, MF)$0.00Sumter CountySumter County does not charge a development impact fee.
Where in Sumter County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Mayesville: Commercial Impact Fees
Commercial development in Mayesville pays no per-square-foot impact fees, but owes $3,400.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).
For a 50,000 sq ft building, that comes to at least $3,400.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (City of Sumter, Mayesville system) — 4" service and Water Connection Fee (City of Sumter, Mayesville system) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
City Impact Fee (Town of Mayesville, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Mayesville Impact Fee Schedule
- Water Connection Fee (City of Sumter, Mayesville system) — 1" meter$1,600.00 one-timeRequires confirmationCity of SumterWater in Mayesville is provided by the City of Sumter. City commercial water connection fee at the outside-city rate, due at engineering plan approval; meters larger than 2 in. are priced by quote. Connections that need a third-party contractor are billed at cost plus 20%.
- Sewer Connection Fee (City of Sumter, Mayesville system) — 4" service$1,800.00 one-timeRequires confirmationCity of SumterSewer in Mayesville is provided by the City of Sumter. City commercial sewer connection fee for a 4 in. service at the outside-city rate, due at engineering plan approval.
- Requires confirmation
- $0.00
Where in Sumter County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Mayesville: Industrial Impact Fees
Industrial development in Mayesville pays no per-square-foot impact fees, but owes $3,400.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).
For a 50,000 sq ft building, that comes to at least $3,400.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (City of Sumter, Mayesville system) — 4" service and Water Connection Fee (City of Sumter, Mayesville system) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
City Impact Fee (Town of Mayesville, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Mayesville Impact Fee Schedule
- Water Connection Fee (City of Sumter, Mayesville system) — 1" meter$1,600.00 one-timeRequires confirmationCity of SumterWater in Mayesville is provided by the City of Sumter. City commercial water connection fee at the outside-city rate, due at engineering plan approval; meters larger than 2 in. are priced by quote. Connections that need a third-party contractor are billed at cost plus 20%.
- Sewer Connection Fee (City of Sumter, Mayesville system) — 4" service$1,800.00 one-timeRequires confirmationCity of SumterSewer in Mayesville is provided by the City of Sumter. City commercial sewer connection fee for a 4 in. service at the outside-city rate, due at engineering plan approval.
- Requires confirmation
- $0.00
Where in Sumter County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Mayesville: Office Impact Fees
Office development in Mayesville pays no per-square-foot impact fees, but owes $3,400.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).
For a 25,000 sq ft building, that comes to at least $3,400.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (City of Sumter, Mayesville system) — 4" service and Water Connection Fee (City of Sumter, Mayesville system) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
City Impact Fee (Town of Mayesville, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Mayesville Impact Fee Schedule
- Water Connection Fee (City of Sumter, Mayesville system) — 1" meter$1,600.00 one-timeRequires confirmationCity of SumterWater in Mayesville is provided by the City of Sumter. City commercial water connection fee at the outside-city rate, due at engineering plan approval; meters larger than 2 in. are priced by quote. Connections that need a third-party contractor are billed at cost plus 20%.
- Sewer Connection Fee (City of Sumter, Mayesville system) — 4" service$1,800.00 one-timeRequires confirmationCity of SumterSewer in Mayesville is provided by the City of Sumter. City commercial sewer connection fee for a 4 in. service at the outside-city rate, due at engineering plan approval.
- Requires confirmation
- $0.00
Where in Sumter County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Mayesville Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
Brush up on impact fee basics before you budget your next project.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Mayesville Impact Fee FAQs
What are the total impact fees for a single-family home in Mayesville, South Carolina?
A new single-family home in Mayesville pays at least $3,000.00 per unit in combined impact fees (rates sourced November 14, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Mayesville?
Commercial development in Mayesville pays no per-square-foot impact fees, but owes $3,400.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Mayesville charge its own impact fees?
Yes. Mayesville levies its own municipal impact or utility fees. Sumter County does not currently add county-level impact fees inside Mayesville. The schedule on this page shows every fee that applies to development in Mayesville.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Sumter County impact fees page.