Sumter Impact Fees by Project Type
Sumter: Single-Family Impact Fees
A new single-family home in Sumter pays $2,100.00 per unit in impact fees (rates sourced November 14, 2026). Every line item is levied at the municipal or utility level.
Sewer Tap Fee (City of Sumter), Sewer Connection Fee (City of Sumter) — infill, 4" lateral, Water Tap Fee (City of Sumter) — 5/8" x 3/4" meter, and Water Connection Fee (City of Sumter) — infill, 5/8" x 3/4" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Sumter Impact Fee Schedule
- Water Connection Fee (City of Sumter) — infill, 5/8" x 3/4" meter$500.00Requires confirmationCity of SumterCity of Sumter residential water connection fee for an infill lot inside the city, due at building permit application, from the city's October 2026 engineering fee schedule. It is paid in addition to the water tap fee. Lots in a new subdivision pay the subdivision connection fee instead, half at plan approval and half at final plat.
- Water Tap Fee (City of Sumter) — 5/8" x 3/4" meter$400.00Requires confirmationCity of SumterCity of Sumter residential water tap fee for an infill lot inside the city, due at building permit application, from the city's October 2026 engineering fee schedule. It is paid in addition to the water connection fee. Larger meters cost more.
- Sewer Tap Fee (City of Sumter)$600.00Requires confirmationCity of SumterCity of Sumter residential sewer tap fee for an infill lot inside the city (4-inch lateral), due at building permit application, from the city's October 2026 engineering fee schedule. It is paid in addition to the sewer connection fee, and the owner also pays to install the building sewer.
- Sewer Connection Fee (City of Sumter) — infill, 4" lateral$600.00Requires confirmationCity of SumterCity of Sumter residential sewer connection fee for an infill lot inside the city, due at building permit application, from the city's October 2026 engineering fee schedule. It is paid in addition to the sewer tap fee. Lots in a new subdivision pay the subdivision sewer connection fee instead.
- City Impact Fee (City of Sumter)$0.00City of SumterThe City of Sumter does not charge a development impact fee. New homes pay the city's water and sewer connection and tap fees.
- County Impact Fee (Sumter County)$0.00Sumter CountySumter County does not charge a development impact fee.
Where in Sumter County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Sumter: Multifamily Impact Fees
A new multifamily unit in Sumter pays $1,000.00 per unit in impact fees (rates sourced November 14, 2026). Every line item is levied at the municipal or utility level.
Water Connection Fee (City of Sumter, MF) — infill, 5/8" x 3/4" meter, Water Tap Fee (City of Sumter, MF) — 5/8" x 3/4" meter, and Sewer Connection Fee (City of Sumter, MF) — apartment, each additional unit are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Sumter Impact Fee Schedule
- Water Connection Fee (City of Sumter, MF) — infill, 5/8" x 3/4" meter$500.00Requires confirmationCity of SumterCity of Sumter water connection fee by meter size from the city's October 2026 engineering fee schedule; the city prints no per-unit rate, so the amount shown is the fee for the smallest meter. A building served by one meter pays once for that meter, not once per unit. It is paid in addition to the water tap fee.
- Water Tap Fee (City of Sumter, MF) — 5/8" x 3/4" meter$400.00Requires confirmationCity of SumterCity of Sumter water tap fee by meter size from the city's October 2026 engineering fee schedule; the city prints no per-unit rate, so the amount shown is the fee for the smallest meter. A building served by one meter pays the fee once for that meter, not once per unit. It is paid in addition to the water connection fee.
- Sewer Connection Fee (City of Sumter, MF) — apartment, each additional unit$100.00Requires confirmationCity of SumterThe City of Sumter charges apartment sewer service as a base fee for the first unit plus $100 for each additional unit; the per-unit figure shown is the additional-unit rate. Inside the city the base is $1,200 for a 4-inch line, $1,600 for 6-inch and $1,800 for 8-inch, due at engineering plan approval. From the city's October 2026 engineering fee schedule.
- City Impact Fee (City of Sumter, MF)$0.00City of SumterThe City of Sumter does not charge a development impact fee. New units pay the city's water and sewer connection and tap fees.
- County Impact Fee (Sumter County, MF)$0.00Sumter CountySumter County does not charge a development impact fee.
Where in Sumter County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Sumter: Commercial Impact Fees
Commercial development in Sumter pays no per-square-foot impact fees, but owes $2,600.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).
For a 50,000 sq ft building, that comes to about $2,600.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Connection Fee (City of Sumter) — 1" meter and Sewer Connection Fee (City of Sumter) — 4" service are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Sumter Impact Fee Schedule
- Water Connection Fee (City of Sumter) — 1" meter$1,400.00 one-timeRequires confirmationCity of SumterCity of Sumter commercial water connection fee for a 1 in. meter, from the city's Engineering Fee Schedule (October 2026), due at engineering plan approval. Meters larger than 2 in. are priced by quote; connections that need a third-party contractor are billed at cost plus 20%.
- Sewer Connection Fee (City of Sumter) — 4" service$1,200.00 one-timeRequires confirmationCity of SumterCity of Sumter commercial sewer connection fee for a 4 in. service, from the city's Engineering Fee Schedule (October 2026), due at engineering plan approval. Hotels pay the same base plus $100 for each unit after the first.
- $0.00
- $0.00
Where in Sumter County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Sumter: Industrial Impact Fees
Industrial development in Sumter pays no per-square-foot impact fees, but owes $2,600.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).
For a 50,000 sq ft building, that comes to about $2,600.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Connection Fee (City of Sumter) — 1" meter and Sewer Connection Fee (City of Sumter) — 4" service are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Sumter Impact Fee Schedule
- Water Connection Fee (City of Sumter) — 1" meter$1,400.00 one-timeRequires confirmationCity of SumterCity of Sumter commercial water connection fee for a 1 in. meter, from the city's Engineering Fee Schedule (October 2026), due at engineering plan approval. Meters larger than 2 in. are priced by quote; connections that need a third-party contractor are billed at cost plus 20%.
- Sewer Connection Fee (City of Sumter) — 4" service$1,200.00 one-timeRequires confirmationCity of SumterCity of Sumter commercial sewer connection fee for a 4 in. service, from the city's Engineering Fee Schedule (October 2026), due at engineering plan approval. Hotels pay the same base plus $100 for each unit after the first.
- $0.00
- $0.00
Where in Sumter County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Sumter: Office Impact Fees
Office development in Sumter pays no per-square-foot impact fees, but owes $2,600.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).
For a 25,000 sq ft building, that comes to about $2,600.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Connection Fee (City of Sumter) — 1" meter and Sewer Connection Fee (City of Sumter) — 4" service are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Sumter Impact Fee Schedule
- Water Connection Fee (City of Sumter) — 1" meter$1,400.00 one-timeRequires confirmationCity of SumterCity of Sumter commercial water connection fee for a 1 in. meter, from the city's Engineering Fee Schedule (October 2026), due at engineering plan approval. Meters larger than 2 in. are priced by quote; connections that need a third-party contractor are billed at cost plus 20%.
- Sewer Connection Fee (City of Sumter) — 4" service$1,200.00 one-timeRequires confirmationCity of SumterCity of Sumter commercial sewer connection fee for a 4 in. service, from the city's Engineering Fee Schedule (October 2026), due at engineering plan approval. Hotels pay the same base plus $100 for each unit after the first.
- $0.00
- $0.00
Where in Sumter County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Sumter Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Sumter Impact Fee FAQs
What are the total impact fees for a single-family home in Sumter, South Carolina?
A new single-family home in Sumter pays $2,100.00 per unit in combined impact fees (rates sourced November 14, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
How much are commercial impact fees in Sumter?
Commercial development in Sumter pays no per-square-foot impact fees, but owes $2,600.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Sumter charge its own impact fees?
Yes. Sumter levies its own municipal impact or utility fees. Sumter County does not currently add county-level impact fees inside Sumter. The schedule on this page shows every fee that applies to development in Sumter.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Sumter County impact fees page.