Skip to content
IMPACTFEES.ORG

Brazos County, Texas Impact Fees

Impact fees in Brazos County depend on where you build. This page details the rates for unincorporated Brazos County: $5,923.00 per single-family unit as of . In Texas the city whose extraterritorial jurisdiction covers a site can charge water, wastewater and drainage impact fees there, and a utility district can charge its own fees, so new construction outside city limits may still owe them. Inside city limits, each city applies its own schedule and fees may be completely different. Pick your city below.

Brazos County Impact Fees by Project Type

Where in Brazos County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Brazos County: Single-Family Impact Fees

A new single-family home in unincorporated Brazos County pays $5,923.00 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Connection Fee — Wellborn SUD, 3/4" ($5,923.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Brazos County Impact Fee Schedule
Water$5,923.00
  • Water Connection Fee — Wellborn SUD, 3/4"
    Wellborn SUD
    Wellborn Special Utility District serves the southwest county and charges a water impact fee of $5,923 per 3/4-inch meter on property platted after 2017 ($2,100 per connection if platted before 2017). A meter installation charge set by the water line size at the site is added. The district is preparing an impact fee update.
    $5,923.00
Sewer$0.00
  • Sewer (Brazos County - Unincorporated)
    Brazos County
    Unincorporated Brazos County has no public sewer utility; homes use an on-site septic system permitted by the county, which is not an impact fee.
    $0.00
City$0.00
County$0.00
  • County Impact Fee (Brazos County)
    Brazos County
    Brazos County does not levy impact fees (Texas counties lack impact-fee authority except limited drainage fees in populous counties).
    $0.00
Total (unincorporated Brazos County): $5,923.00
Sources last checked Official fee schedules:Wellborn SUD Brazos County

Where in Brazos County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Brazos County: Multifamily Impact Fees

A new multifamily unit in unincorporated Brazos County pays $5,923.00 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Connection Fee (MF) — Wellborn SUD, 3/4" ($5,923.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Brazos County Impact Fee Schedule
Water$5,923.00
  • Water Connection Fee (MF) — Wellborn SUD, 3/4"
    Wellborn SUD
    Wellborn Special Utility District (southwest county) charges a water impact fee of $5,923 per 3/4-inch meter on property platted after 2017 ($2,100 per connection if platted before 2017); a building on one meter pays once, and the district has not published its fee for larger meters. A meter installation charge is added. A fee update is in preparation.
    $5,923.00
Sewer$0.00
  • Sewer (Brazos County - Unincorporated, MF)
    Brazos County
    Unincorporated Brazos County has no public sewer utility; development uses on-site septic systems permitted by the county, which is not an impact fee.
    $0.00
City$0.00
County$0.00
  • County Impact Fee (Brazos County, MF)
    Brazos County
    Brazos County does not levy impact fees (Texas counties lack impact-fee authority except limited drainage fees in populous counties).
    $0.00
Total (unincorporated Brazos County): $5,923.00
Sources last checked Official fee schedules:Wellborn SUD Brazos County

Where in Brazos County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Brazos County$5,923.00*this pageIncludes unconfirmed fees
Bryan$850.00*College Station$31,717.20Kurten$5,450.00*Wixon Valley$5,450.00*Includes unconfirmed fees

Unincorporated Brazos County: Commercial Impact Fees

Commercial development in unincorporated Brazos County pays no per-square-foot impact fees, but owes $5,923.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 50,000 sq ft building, that comes to about $5,923.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Connection Fee — Wellborn SUD, 3/4" is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Brazos County Impact Fee Schedule
Water$5,923.00 one-time
  • Water Connection Fee — Wellborn SUD, 3/4"
    Wellborn Special Utility District
    Wellborn Special Utility District serves the southwest county and charges a water impact fee of $5,923 per 3/4-inch meter on property platted after 2017 ($2,100 per connection if platted before 2017). The district has not published its impact fee for larger meters, and a meter installation charge based on the water line size is added. The district is preparing an impact fee update under the 2025 Chapter 395 procedure; the current fee stays in effect until the board adopts a new order. Wickson Creek SUD serves the northeast county.
    $5,923.00 one-timeRequires confirmation
Sewer$0.00
  • Sewer Connection Fee (Brazos County - Unincorporated)
    None identified (on-site septic)
    Unincorporated Brazos County has no public sewer utility; commercial development generally uses an on-site septic system permitted by the county, which is not an impact fee.
    $0.00
City$0.00
County$0.00
  • County Impact Fee (Brazos County, Commercial)
    Brazos County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Brazos County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (unincorporated Brazos County): $5,923.00 one-time (≈ $5,923.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Wellborn Special Utility District None (unincorporated area) Brazos County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Brazos County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Brazos County$5,923.00*this pageIncludes unconfirmed fees
Bryan$850.00*College Station$17,197.20Kurten$5,450.00*Wixon Valley$5,450.00*Includes unconfirmed fees

Unincorporated Brazos County: Industrial Impact Fees

Industrial development in unincorporated Brazos County pays no per-square-foot impact fees, but owes $5,923.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 50,000 sq ft building, that comes to about $5,923.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Connection Fee — Wellborn SUD, 3/4" is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Brazos County Impact Fee Schedule
Water$5,923.00 one-time
  • Water Connection Fee — Wellborn SUD, 3/4"
    Wellborn Special Utility District
    Wellborn Special Utility District serves the southwest county and charges a water impact fee of $5,923 per 3/4-inch meter on property platted after 2017 ($2,100 per connection if platted before 2017). The district has not published its impact fee for larger meters, and a meter installation charge based on the water line size is added. The district is preparing an impact fee update under the 2025 Chapter 395 procedure; the current fee stays in effect until the board adopts a new order. Wickson Creek SUD serves the northeast county.
    $5,923.00 one-timeRequires confirmation
Sewer$0.00
  • Sewer Connection Fee (Brazos County - Unincorporated)
    None identified (on-site septic)
    Unincorporated Brazos County has no public sewer utility; commercial development generally uses an on-site septic system permitted by the county, which is not an impact fee.
    $0.00
City$0.00
County$0.00
  • County Impact Fee (Brazos County, Industrial)
    Brazos County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Brazos County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (unincorporated Brazos County): $5,923.00 one-time (≈ $5,923.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Wellborn Special Utility District None (unincorporated area) Brazos County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Brazos County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Brazos County$5,923.00*this pageIncludes unconfirmed fees
Bryan$850.00*College Station$18,317.20Kurten$5,450.00*Wixon Valley$5,450.00*Includes unconfirmed fees

Unincorporated Brazos County: Office Impact Fees

Office development in unincorporated Brazos County pays no per-square-foot impact fees, but owes $5,923.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 25,000 sq ft building, that comes to about $5,923.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Connection Fee — Wellborn SUD, 3/4" is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Brazos County Impact Fee Schedule
Water$5,923.00 one-time
  • Water Connection Fee — Wellborn SUD, 3/4"
    Wellborn Special Utility District
    Wellborn Special Utility District serves the southwest county and charges a water impact fee of $5,923 per 3/4-inch meter on property platted after 2017 ($2,100 per connection if platted before 2017). The district has not published its impact fee for larger meters, and a meter installation charge based on the water line size is added. The district is preparing an impact fee update under the 2025 Chapter 395 procedure; the current fee stays in effect until the board adopts a new order. Wickson Creek SUD serves the northeast county.
    $5,923.00 one-timeRequires confirmation
Sewer$0.00
  • Sewer Connection Fee (Brazos County - Unincorporated)
    None identified (on-site septic)
    Unincorporated Brazos County has no public sewer utility; commercial development generally uses an on-site septic system permitted by the county, which is not an impact fee.
    $0.00
City$0.00
County$0.00
  • County Impact Fee (Brazos County, Office)
    Brazos County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Brazos County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (unincorporated Brazos County): $5,923.00 one-time (≈ $5,923.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Wellborn Special Utility District None (unincorporated area) Brazos County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Brazos County Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Brazos County Impact Fee FAQs

What are single-family impact fees in Brazos County, Texas?

A new single-family home in unincorporated Brazos County pays $5,923.00 per unit in impact fees (rates sourced November 11, 2026). Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.

How much are multifamily impact fees in Brazos County?

Multifamily development in unincorporated Brazos County pays $5,923.00 per unit in impact fees (rates sourced November 11, 2026). Rates inside city limits depend on the municipality. Pick your city on this page.

How much are commercial impact fees in Brazos County?

Commercial development in unincorporated Brazos County pays no per-square-foot impact fees, but owes $5,923.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Do cities in Brazos County charge their own impact fees?

Yes. Every incorporated city applies its own fee schedule. 4 of 4 cities in Brazos County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.