College Station applies its own fee schedule. Brazos County does not currently add county-level impact fees inside city limits. A new single-family home pays $17,640.79 per unit (rates sourced ). The full breakdown is below.

College Station Impact Fees by Project Type

College Station: Single-Family Impact Fees

A new single-family home in College Station pays $17,640.79 per unit in impact fees (rates sourced November 17, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Roadway Impact Fee (City of College Station) ($5,692.64), Parkland Dedication Fee-in-Lieu (City of College Station) ($5,256.00) and Wastewater Impact Fee (City of College Station) — 5/8" x 3/4" ($3,300.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full College Station Impact Fee Schedule
Water$3,020.85
Sewer$3,671.30
City$10,948.64
  • Roadway Impact Fee (City of College Station)
    Service Area D
    City of College Station
    Roadway impact fee for a single-family home (ITE 210), shown for the highest of College Station's 4 roadway service areas: Areas C and D both pay $5,692.64. Area A pays $1,876.24 and Area B $4,741.36 ($4,030.72 for property platted before January 1, 2022). Rates for building permits from January 1, 2026; due at building permit.
    $5,692.64
  • Parkland Dedication Fee-in-Lieu (City of College Station)
    City of College Station
    Single-family parkland dedication fee, effective October 1, 2024: $1,106 fee in lieu of land plus $4,150 park development fee, $5,256 per dwelling unit. Collected before the final plat is filed, where land is not dedicated.
    $5,256.00
County$0.00
  • County Impact Fee (Brazos County)
    Brazos County
    Brazos County does not levy impact fees (Texas counties lack impact-fee authority except limited drainage fees in populous counties).
    $0.00
Total (College Station): $17,640.79
Sources last checked Official fee schedules:City of College Station Brazos County

Where in Brazos County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

College Station: Multifamily Impact Fees

A new multifamily unit in College Station pays $12,815.99 per unit in impact fees (rates sourced November 17, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Parkland Dedication Fee-in-Lieu (City of College Station, MF) — 2 BR × $1,881/BR ($3,762.00), Wastewater Impact Fee (City of College Station, MF) — 5/8" x 3/4" ($3,300.00) and Water Impact and Connection Fee (MF) — City of College Station, 5/8" x 3/4" ($2,325 impact + $695.85 connection) ($3,020.85).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full College Station Impact Fee Schedule
Water$3,020.85
Sewer$3,671.30
  • Wastewater Impact Fee (City of College Station, MF) — 5/8" x 3/4"
    City of College Station
    College Station wastewater impact fee for the smallest meter, unchanged since March 1, 2022. The fee is set by meter size, so a building on one master meter pays once, by that meter's size. The bio-corridor and east side sewer areas are outside the impact fee service area.
    $3,300.00
  • Sewer Service Connection Fee (City of College Station, MF)
    City of College Station
    College Station's city-installed 4-inch residential sewer service connection fee (FY2027); a building on one connection pays once. Larger sewer services are installed by the developer's contractor for a $106.10 inspection fee.
    $371.30
City$6,123.84
  • Parkland Dedication Fee-in-Lieu (City of College Station, MF) — 2 BR × $1,881/BR
    City of College Station
    Multifamily parkland dedication fee, effective October 1, 2024, charged per bedroom: $395 fee in lieu of land plus $1,486 park development fee, $1,881 per bedroom ($3,762 for a 2-bedroom unit). Collected before the multifamily building permit is issued.
    $3,762.00
  • Roadway Impact Fee (City of College Station, MF)
    Service Area D
    City of College Station
    Roadway impact fee for a mid-rise apartment unit (ITE 221), shown for the highest of College Station's 4 roadway service areas: Areas C and D both pay $2,361.84. Area A pays $778.44 and Area B $1,967.16 ($1,672.32 for property platted before January 1, 2022). Rates for building permits from January 1, 2026.
    $2,361.84
County$0.00
Total (College Station): $12,815.99
Sources last checked Official fee schedules:City of College Station Brazos County

Where in Brazos County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

College Station: Commercial Impact Fees

Commercial development in College Station pays $0.50 per square foot in impact fees, plus $6,797.20 in one-time water and sewer connection fees (rates sourced November 17, 2026).

For a 50,000 sq ft building, that comes to about $31,717.20. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of College Station) — 1" ($5,100.00 one-time), Water Impact Fee — City of College Station, 1" ($850.00 one-time) and Water Service Connection Fee (City of College Station) — 1" ($847.20 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full College Station Impact Fee Schedule
Water$1,697.20 one-time
  • Water Impact Fee — City of College Station, 1"
    City of College Station
    College Station water impact fee for a 1-inch meter on non-residential development, unchanged since December 1, 2017. It applies to domestic and irrigation meters, is assessed at final plat and is collected with the building permit. A separate water service connection fee is also due. Areas of the city served by Wellborn SUD pay Wellborn's fee instead.
    $850.00 one-time
  • Water Service Connection Fee (City of College Station) — 1"
    City of College Station
    College Station water service connection fee for a 1-inch service, in addition to the water impact fee (FY2027 fee schedule, September 30, 2026). The city installs 5/8 to 2-inch services and provides the meter, box and lid; services 3 inches and larger are installed by the developer's contractor for an inspection fee.
    $847.20 one-time
Sewer$5,100.00 one-time
  • Wastewater Impact Fee (City of College Station) — 1"
    City of College Station
    College Station wastewater impact fee for a building on a 1-inch water meter, non-residential rate unchanged since December 1, 2017. Assessed at final plat and collected with the building permit. The bio-corridor and east side sewer areas are outside the impact fee service area.
    $5,100.00 one-time
  • Sewer Service Connection Fee (City of College Station, Nonresidential)
    City of College Station
    Non-residential sewer services (6-inch) are installed by the developer's registered contractor, so College Station charges no sewer service connection fee; a $106.10 inspection fee applies (FY2027 fee schedule). The wastewater impact fee is still due.
    $0.00
City$0.50/sq ft
  • Roadway Impact Fee (City of College Station, Commercial)
    City of College Station
    Assessed at final plat approval and collected with the building permit, at $498.40 per 1,000 sq ft of gross floor area for a shopping plaza of 40,000 to 150,000 sq ft. The rate is the same in all four roadway service areas and has been unchanged since March 1, 2022. Strip retail under 40,000 sq ft pays $632.80 and shopping centers over 150,000 sq ft pay $359.20 per 1,000 sq ft of leasable area.
    $0.50/sq ft
County$0.00
  • County Impact Fee (Brazos County, Commercial)
    Brazos County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Brazos County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (College Station): $0.50/sq ft + $6,797.20 one-time (≈ $31,717.20 at 50,000 sq ft)
Sources last checked Official fee schedules:City of College Station Brazos County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Brazos County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

College Station: Industrial Impact Fees

Industrial development in College Station pays $0.21 per square foot in impact fees, plus $6,797.20 in one-time water and sewer connection fees (rates sourced November 17, 2026).

For a 50,000 sq ft building, that comes to about $17,197.20. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of College Station) — 1" ($5,100.00 one-time), Water Impact Fee — City of College Station, 1" ($850.00 one-time) and Water Service Connection Fee (City of College Station) — 1" ($847.20 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full College Station Impact Fee Schedule
Water$1,697.20 one-time
  • Water Impact Fee — City of College Station, 1"
    City of College Station
    College Station water impact fee for a 1-inch meter on non-residential development, unchanged since December 1, 2017. It applies to domestic and irrigation meters, is assessed at final plat and is collected with the building permit. A separate water service connection fee is also due. Areas of the city served by Wellborn SUD pay Wellborn's fee instead.
    $850.00 one-time
  • Water Service Connection Fee (City of College Station) — 1"
    City of College Station
    College Station water service connection fee for a 1-inch service, in addition to the water impact fee (FY2027 fee schedule, September 30, 2026). The city installs 5/8 to 2-inch services and provides the meter, box and lid; services 3 inches and larger are installed by the developer's contractor for an inspection fee.
    $847.20 one-time
Sewer$5,100.00 one-time
  • Wastewater Impact Fee (City of College Station) — 1"
    City of College Station
    College Station wastewater impact fee for a building on a 1-inch water meter, non-residential rate unchanged since December 1, 2017. Assessed at final plat and collected with the building permit. The bio-corridor and east side sewer areas are outside the impact fee service area.
    $5,100.00 one-time
  • Sewer Service Connection Fee (City of College Station, Nonresidential)
    City of College Station
    Non-residential sewer services (6-inch) are installed by the developer's registered contractor, so College Station charges no sewer service connection fee; a $106.10 inspection fee applies (FY2027 fee schedule). The wastewater impact fee is still due.
    $0.00
City$0.21/sq ft
  • Roadway Impact Fee (City of College Station, Industrial)
    City of College Station
    Assessed at final plat approval and collected with the building permit, at $208.00 per 1,000 sq ft of gross floor area for general light industrial use. The rate is the same in all four roadway service areas and has been unchanged since March 1, 2022. Warehousing pays $57.60 and industrial park space $108.80 per 1,000 sq ft.
    $0.21/sq ft
County$0.00
  • County Impact Fee (Brazos County, Industrial)
    Brazos County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Brazos County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (College Station): $0.21/sq ft + $6,797.20 one-time (≈ $17,197.20 at 50,000 sq ft)
Sources last checked Official fee schedules:City of College Station Brazos County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Brazos County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

College Station: Office Impact Fees

Office development in College Station pays $0.46 per square foot in impact fees, plus $6,797.20 in one-time water and sewer connection fees (rates sourced November 17, 2026).

For a 25,000 sq ft building, that comes to about $18,317.20. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of College Station) — 1" ($5,100.00 one-time), Water Impact Fee — City of College Station, 1" ($850.00 one-time) and Water Service Connection Fee (City of College Station) — 1" ($847.20 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full College Station Impact Fee Schedule
Water$1,697.20 one-time
  • Water Impact Fee — City of College Station, 1"
    City of College Station
    College Station water impact fee for a 1-inch meter on non-residential development, unchanged since December 1, 2017. It applies to domestic and irrigation meters, is assessed at final plat and is collected with the building permit. A separate water service connection fee is also due. Areas of the city served by Wellborn SUD pay Wellborn's fee instead.
    $850.00 one-time
  • Water Service Connection Fee (City of College Station) — 1"
    City of College Station
    College Station water service connection fee for a 1-inch service, in addition to the water impact fee (FY2027 fee schedule, September 30, 2026). The city installs 5/8 to 2-inch services and provides the meter, box and lid; services 3 inches and larger are installed by the developer's contractor for an inspection fee.
    $847.20 one-time
Sewer$5,100.00 one-time
  • Wastewater Impact Fee (City of College Station) — 1"
    City of College Station
    College Station wastewater impact fee for a building on a 1-inch water meter, non-residential rate unchanged since December 1, 2017. Assessed at final plat and collected with the building permit. The bio-corridor and east side sewer areas are outside the impact fee service area.
    $5,100.00 one-time
  • Sewer Service Connection Fee (City of College Station, Nonresidential)
    City of College Station
    Non-residential sewer services (6-inch) are installed by the developer's registered contractor, so College Station charges no sewer service connection fee; a $106.10 inspection fee applies (FY2027 fee schedule). The wastewater impact fee is still due.
    $0.00
City$0.46/sq ft
  • Roadway Impact Fee (City of College Station, Office)
    City of College Station
    Assessed at final plat approval and collected with the building permit, at $460.80 per 1,000 sq ft of gross floor area for a general office building. The rate is the same in all four roadway service areas and has been unchanged since March 1, 2022. Medical-dental office pays $1,257.60 per 1,000 sq ft.
    $0.46/sq ft
County$0.00
  • County Impact Fee (Brazos County, Office)
    Brazos County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Brazos County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (College Station): $0.46/sq ft + $6,797.20 one-time (≈ $18,317.20 at 25,000 sq ft)
Sources last checked Official fee schedules:City of College Station Brazos County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Brazos County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

College Station Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

Brush up on impact fee basics before you budget your next project.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

College Station Impact Fee FAQs

What are the total impact fees for a single-family home in College Station, Texas?

A new single-family home in College Station pays $17,640.79 per unit in combined impact fees (rates sourced November 17, 2026).

How much are commercial impact fees in College Station?

Commercial development in College Station pays $0.50 per square foot in impact fees, plus $6,797.20 in one-time water and sewer connection fees (assuming a 1-inch meter), about $31,717.20 for a 50,000 sq ft building.

Does College Station charge its own impact fees?

Yes. College Station levies its own municipal impact or utility fees. Brazos County does not currently add county-level impact fees inside College Station. The schedule on this page shows every fee that applies to development in College Station.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Brazos County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.