Globe applies its own fee schedule. Gila County does not currently add county-level impact fees inside city limits. A new single-family home pays $8,128.62 per unit (rates sourced ). The full breakdown is below.

Globe Impact Fees by Project Type

Globe: Single-Family Impact Fees

A new single-family home in Globe pays $8,128.62 per unit in impact fees (rates sourced October 16, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Capacity Fee (City of Globe) — 3/4" meter ($3,640.00), Sewer Capacity Fee (City of Globe) — 3/4" meter ($2,683.00) and Water Tap Fee (City of Globe) — 3/4" meter ($903.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Globe Impact Fee Schedule
Water$4,543.00
  • Water Capacity Fee (City of Globe) — 3/4" meter
    City of Globe
    A new home connecting to City of Globe water pays a one-time water capacity fee by meter size, in addition to the tap fee, under rates effective March 1, 2025. A standard 3/4-inch meter pays $3,640.
    $3,640.00
  • Water Tap Fee (City of Globe) — 3/4" meter
    City of Globe
    A new home connecting to City of Globe water on an existing main pays a one-time tap fee by meter size, under rates effective March 1, 2025; meters over 1 inch pay $1,134 or actual cost, whichever is greater. A separate water capacity fee also applies. Part of west Globe receives water from Arizona Water Company instead of the city.
    $903.00
Sewer$3,585.62
  • Sewer Capacity Fee (City of Globe) — 3/4" meter
    City of Globe
    A new home connecting to City of Globe sewer pays a one-time sewer capacity fee by meter size, in addition to the sewer hook-up fee, under rates effective March 1, 2025. A standard 3/4-inch meter pays $2,683.
    $2,683.00
  • Sewer Hook-Up Fee (City of Globe)
    City of Globe
    A new residential connection to City of Globe sewer pays a one-time hook-up fee of $902.62, under rates effective March 1, 2025. A separate sewer capacity fee also applies.
    $902.62
City$0.00
  • City Development Impact Fee (City of Globe)
    City of Globe
    The City of Globe does not currently collect a general development impact fee. Water and sewer connection and capacity fees are charged separately and listed on their own.
    $0.00
County$0.00
Total (Globe): $8,128.62
Sources last checked Official fee schedules:City of Globe Gila County

Where in Gila County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Globe: Multifamily Impact Fees

A new multifamily unit in Globe pays $8,128.62 per unit in impact fees (rates sourced October 16, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Capacity Fee (City of Globe, MF) — 3/4" meter ($3,640.00), Sewer Capacity Fee (City of Globe, MF) — 3/4" meter ($2,683.00) and Water Tap Fee (City of Globe, MF) — 3/4" meter ($903.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Globe Impact Fee Schedule
Water$4,543.00
  • Water Capacity Fee (City of Globe, MF) — 3/4" meter
    City of Globe
    A new connection to City of Globe water pays a one-time water capacity fee by meter size, in addition to the tap fee, under rates effective March 1, 2025. The amount shown assumes each unit has its own 3/4-inch meter; a building served by one meter pays that meter's fee once.
    $3,640.00
  • Water Tap Fee (City of Globe, MF) — 3/4" meter
    City of Globe
    A new connection to City of Globe water on an existing main pays a one-time tap fee by meter size, under rates effective March 1, 2025. The amount shown assumes each unit has its own 3/4-inch meter; a building served by one meter pays that meter's fee once. A separate water capacity fee also applies, and part of west Globe receives water from Arizona Water Company instead of the city.
    $903.00
Sewer$3,585.62
  • Sewer Capacity Fee (City of Globe, MF) — 3/4" meter
    City of Globe
    A new connection to City of Globe sewer pays a one-time sewer capacity fee by meter size, in addition to the hook-up fee, under rates effective March 1, 2025. The amount shown assumes each unit has its own 3/4-inch meter; a building served by one meter pays that meter's fee once.
    $2,683.00
  • Sewer Hook-Up Fee (City of Globe, MF)
    City of Globe
    A new residential connection to City of Globe sewer pays a one-time hook-up fee of $902.62, under rates effective March 1, 2025; apartments are billed in the residential class. The amount shown assumes one connection per unit; a building on one connection pays once. A separate sewer capacity fee also applies.
    $902.62
City$0.00
County$0.00
Total (Globe): $8,128.62
Sources last checked Official fee schedules:City of Globe Gila County

Where in Gila County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Globe: Commercial Impact Fees

Commercial development in Globe pays no per-square-foot impact fees, but owes $13,720.68 in one-time water and sewer connection fees (rates sourced October 16, 2026).

For a 50,000 sq ft building, that comes to about $13,720.68. The calculator below adjusts to your exact square footage.

The largest line items are Water Capacity Fee (City of Globe) — 1" meter ($6,079.00 one-time), Sewer Capacity Fee (City of Globe) — 1" meter ($4,481.00 one-time) and Sewer Hook-Up Fee (City of Globe, Commercial) ($2,142.18 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Globe Impact Fee Schedule
Water$7,097.50 one-time
  • Water Capacity Fee (City of Globe) — 1" meter
    City of Globe
    A new connection to City of Globe water pays a one-time water capacity fee by meter size, in addition to the tap fee, under rates effective March 1, 2025.
    $6,079.00 one-time
  • Water Tap Fee (City of Globe) — 1" meter
    City of Globe
    A new connection to City of Globe water on an existing main pays a one-time tap fee by meter size, under rates effective March 1, 2025; meters over 1 inch pay $1,134 or actual cost, whichever is greater. A separate water capacity fee also applies. Part of west Globe receives water from Arizona Water Company instead of the city.
    $1,018.50 one-time
Sewer$6,623.18 one-time
  • Sewer Capacity Fee (City of Globe) — 1" meter
    City of Globe
    A new connection to City of Globe sewer pays a one-time sewer capacity fee by water meter size, in addition to the commercial sewer hook-up fee, under rates effective March 1, 2025.
    $4,481.00 one-time
  • Sewer Hook-Up Fee (City of Globe, Commercial)
    City of Globe
    A new commercial connection to City of Globe sewer pays a one-time hook-up fee of $2,142.18 under rates effective March 1, 2025, in addition to the sewer capacity fee. Properties outside city limits pay a higher non-city rate.
    $2,142.18 one-time
City$0.00
County$0.00
Total (Globe): $13,720.68 one-time (≈ $13,720.68 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Globe Gila County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Gila County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Globe: Industrial Impact Fees

Industrial development in Globe pays no per-square-foot impact fees, but owes $13,720.68 in one-time water and sewer connection fees (rates sourced October 16, 2026).

For a 50,000 sq ft building, that comes to about $13,720.68. The calculator below adjusts to your exact square footage.

The largest line items are Water Capacity Fee (City of Globe) — 1" meter ($6,079.00 one-time), Sewer Capacity Fee (City of Globe) — 1" meter ($4,481.00 one-time) and Sewer Hook-Up Fee (City of Globe, Commercial) ($2,142.18 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Globe Impact Fee Schedule
Water$7,097.50 one-time
  • Water Capacity Fee (City of Globe) — 1" meter
    City of Globe
    A new connection to City of Globe water pays a one-time water capacity fee by meter size, in addition to the tap fee, under rates effective March 1, 2025.
    $6,079.00 one-time
  • Water Tap Fee (City of Globe) — 1" meter
    City of Globe
    A new connection to City of Globe water on an existing main pays a one-time tap fee by meter size, under rates effective March 1, 2025; meters over 1 inch pay $1,134 or actual cost, whichever is greater. A separate water capacity fee also applies. Part of west Globe receives water from Arizona Water Company instead of the city.
    $1,018.50 one-time
Sewer$6,623.18 one-time
  • Sewer Capacity Fee (City of Globe) — 1" meter
    City of Globe
    A new connection to City of Globe sewer pays a one-time sewer capacity fee by water meter size, in addition to the commercial sewer hook-up fee, under rates effective March 1, 2025.
    $4,481.00 one-time
  • Sewer Hook-Up Fee (City of Globe, Commercial)
    City of Globe
    A new commercial connection to City of Globe sewer pays a one-time hook-up fee of $2,142.18 under rates effective March 1, 2025, in addition to the sewer capacity fee. Properties outside city limits pay a higher non-city rate.
    $2,142.18 one-time
City$0.00
County$0.00
Total (Globe): $13,720.68 one-time (≈ $13,720.68 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Globe Gila County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Gila County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Globe: Office Impact Fees

Office development in Globe pays no per-square-foot impact fees, but owes $13,720.68 in one-time water and sewer connection fees (rates sourced October 16, 2026).

For a 25,000 sq ft building, that comes to about $13,720.68. The calculator below adjusts to your exact square footage.

The largest line items are Water Capacity Fee (City of Globe) — 1" meter ($6,079.00 one-time), Sewer Capacity Fee (City of Globe) — 1" meter ($4,481.00 one-time) and Sewer Hook-Up Fee (City of Globe, Commercial) ($2,142.18 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Globe Impact Fee Schedule
Water$7,097.50 one-time
  • Water Capacity Fee (City of Globe) — 1" meter
    City of Globe
    A new connection to City of Globe water pays a one-time water capacity fee by meter size, in addition to the tap fee, under rates effective March 1, 2025.
    $6,079.00 one-time
  • Water Tap Fee (City of Globe) — 1" meter
    City of Globe
    A new connection to City of Globe water on an existing main pays a one-time tap fee by meter size, under rates effective March 1, 2025; meters over 1 inch pay $1,134 or actual cost, whichever is greater. A separate water capacity fee also applies. Part of west Globe receives water from Arizona Water Company instead of the city.
    $1,018.50 one-time
Sewer$6,623.18 one-time
  • Sewer Capacity Fee (City of Globe) — 1" meter
    City of Globe
    A new connection to City of Globe sewer pays a one-time sewer capacity fee by water meter size, in addition to the commercial sewer hook-up fee, under rates effective March 1, 2025.
    $4,481.00 one-time
  • Sewer Hook-Up Fee (City of Globe, Commercial)
    City of Globe
    A new commercial connection to City of Globe sewer pays a one-time hook-up fee of $2,142.18 under rates effective March 1, 2025, in addition to the sewer capacity fee. Properties outside city limits pay a higher non-city rate.
    $2,142.18 one-time
City$0.00
  • City Development Impact Fee (City of Globe, Office)
    City of Globe
    The City of Globe has not adopted development impact fees, so there is no city fee for streets, parks, police, fire or other facilities. Water and sewer connection charges are listed separately.
    $0.00
County$0.00
Total (Globe): $13,720.68 one-time (≈ $13,720.68 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Globe Gila County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Gila County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Globe Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in Arizona

Arizona cities and towns assess development impact fees (the statute calls them development fees) under A.R.S. 9-463.05 and counties under A.R.S. 11-1102. A fee can only be adopted after the governing body adopts land use assumptions and an infrastructure improvements plan for the service area, with public notice and hearings, and the plan projects demand for no more than ten years.

Fees are limited to necessary public services the statute lists: water, wastewater, stormwater and drainage, streets, fire and police facilities, neighborhood parks of up to 30 acres and, for cities, small libraries. Each fee must be proportionate to the new development's share of the cost, kept in a separate account for that service category and service area, and never used for operations, maintenance or a higher level of service for existing development.

Developers earn credits for facilities they build or dedicate, and a fee that goes unspent for ten years (fifteen for water or wastewater) is refundable with interest on request. For a residential unit the fee is due when the building permit issues unless a development agreement defers it, and a new or increased fee cannot be applied to an approved plat or site plan for 24 months.

Counties and cities each adopt their own schedules. County development fees apply in the county's service areas; inside city limits, development pays the city's fees plus any utility connection charges, which is why totals differ between a city and the unincorporated county around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of October 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Globe Impact Fee FAQs

What are the total impact fees for a single-family home in Globe, Arizona?

A new single-family home in Globe pays $8,128.62 per unit in combined impact fees (rates sourced October 16, 2026).

How much are commercial impact fees in Globe?

Commercial development in Globe pays no per-square-foot impact fees, but owes $13,720.68 in one-time water and sewer connection fees (assuming a 1-inch meter).

Does Globe charge its own impact fees?

Yes. Globe levies its own municipal impact or utility fees. Gila County does not currently add county-level impact fees inside Globe. The schedule on this page shows every fee that applies to development in Globe.

Can Arizona development impact fees increase at any time?

No. Under A.R.S. 9-463.05 and 11-1102 a new or increased fee cannot be adopted on an emergency basis, takes effect only after public notice and hearings (75 days after adoption for a city, 90 for a county), and cannot be applied to a development with an approved final plat or site plan for 24 months unless the plan changes to add service units.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Gila County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000