A new single-family home in Star Valley pays at least $1,200.00 per unit in impact fees (rates sourced July 23, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Connection Fee (Town of Star Valley) — 3/4" meter ($1,200.00).
Sewer Connection Fee (Town of Star Valley) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Star Valley Impact Fee Schedule
- Water Connection Fee (Town of Star Valley) — 3/4" meter$1,200.00Town of Star ValleyThe Town of Star Valley charges a one-time new water meter connection fee by meter size where water service is already available at the lot, under its rate schedule effective September 1, 2024. Where no service line exists, the new line is billed at time and materials. Meters of 3 inches and larger are charged at actual cost.
- Sewer Connection Fee (Town of Star Valley)Requires confirmationTown of Star ValleyThe Town of Star Valley does not operate a sewer system and charges no sewer connection fee. Most homes use private septic systems permitted by Gila County; a lot served by the Northern Gila County Sanitary District pays that district's capacity fees instead.
- City Development Impact Fee (Town of Star Valley)$0.00Town of Star ValleyThe Town of Star Valley has not adopted development impact fees, so there is no town fee for streets, parks, police, fire or other facilities.
- County Development Fee (Gila County)$0.00Gila CountyGila County has not adopted county development impact fees, so no county fee applies here.
Where in Gila County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Star Valley: Multifamily Impact Fees
A new multifamily unit in Star Valley pays at least $1,200.00 per unit in impact fees (rates sourced July 23, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Connection Fee (Town of Star Valley, MF) — 3/4" meter ($1,200.00).
Sewer Connection Fee (Town of Star Valley, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Star Valley Impact Fee Schedule
- Water Connection Fee (Town of Star Valley, MF) — 3/4" meter$1,200.00Town of Star ValleyThe Town of Star Valley charges a one-time new water meter connection fee by meter size where water service is already available, under its rate schedule effective September 1, 2024. The amount shown assumes each unit has its own meter; a building served by one meter pays that meter's fee once. Meters of 3 inches and larger are charged at actual cost.
- Sewer Connection Fee (Town of Star Valley, MF)Requires confirmationTown of Star ValleyThe Town of Star Valley does not operate a sewer system and charges no sewer connection fee. Most homes use private septic systems permitted by Gila County; a lot served by the Northern Gila County Sanitary District pays that district's capacity fees instead.
- City Development Impact Fee (Town of Star Valley, MF)$0.00Town of Star ValleyThe Town of Star Valley has not adopted development impact fees, so there is no town fee for streets, parks, police, fire or other facilities.
- County Development Fee (Gila County, MF)$0.00Gila CountyGila County has not adopted county development impact fees, so no county fee applies here.
Where in Gila County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Star Valley: Commercial Impact Fees
Commercial development in Star Valley pays no per-square-foot impact fees, but owes $1,300.00 in one-time water and sewer connection fees (rates sourced July 23, 2026).
For a 50,000 sq ft building, that comes to at least $1,300.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (Town of Star Valley) — 1" meter ($1,300.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (Town of Star Valley) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Star Valley Impact Fee Schedule
- Water Connection Fee (Town of Star Valley) — 1" meter$1,300.00 one-timeTown of Star ValleyThe Town of Star Valley charges a one-time water meter connection fee by meter size where service is available, under rates effective September 1, 2024: 3/4 inch $1,200, 1 inch $1,300 and 2 inch $2,500; 3 and 4 inch meters pay actual cost. Where no service exists, the new service line is billed at time and materials.
- Sewer Connection Fee (Town of Star Valley)Requires confirmationTown of Star ValleyThe Town of Star Valley does not operate a sewer system and charges no sewer connection fee. Most properties use private septic systems permitted by Gila County; a property served by the Northern Gila County Sanitary District pays that district's capacity fees instead.
- City Development Impact Fee (Town of Star Valley, Commercial)$0.00Town of Star ValleyThe Town of Star Valley has not adopted development impact fees, so there is no town fee for streets, parks, police, fire or other facilities. The water meter connection fee is listed separately.
- County Development Fee (Gila County, Commercial)$0.00Gila CountyGila County does not levy county development impact fees.
Where in Gila County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Star Valley: Industrial Impact Fees
Industrial development in Star Valley pays no per-square-foot impact fees, but owes $1,300.00 in one-time water and sewer connection fees (rates sourced July 23, 2026).
For a 50,000 sq ft building, that comes to at least $1,300.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (Town of Star Valley) — 1" meter ($1,300.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (Town of Star Valley) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Star Valley Impact Fee Schedule
- Water Connection Fee (Town of Star Valley) — 1" meter$1,300.00 one-timeTown of Star ValleyThe Town of Star Valley charges a one-time water meter connection fee by meter size where service is available, under rates effective September 1, 2024: 3/4 inch $1,200, 1 inch $1,300 and 2 inch $2,500; 3 and 4 inch meters pay actual cost. Where no service exists, the new service line is billed at time and materials.
- Sewer Connection Fee (Town of Star Valley)Requires confirmationTown of Star ValleyThe Town of Star Valley does not operate a sewer system and charges no sewer connection fee. Most properties use private septic systems permitted by Gila County; a property served by the Northern Gila County Sanitary District pays that district's capacity fees instead.
- City Development Impact Fee (Town of Star Valley, Industrial)$0.00Town of Star ValleyThe Town of Star Valley has not adopted development impact fees, so there is no town fee for streets, parks, police, fire or other facilities. The water meter connection fee is listed separately.
- County Development Fee (Gila County, Industrial)$0.00Gila CountyGila County does not levy county development impact fees.
Where in Gila County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Star Valley: Office Impact Fees
Office development in Star Valley pays no per-square-foot impact fees, but owes $1,300.00 in one-time water and sewer connection fees (rates sourced July 23, 2026).
For a 25,000 sq ft building, that comes to at least $1,300.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (Town of Star Valley) — 1" meter ($1,300.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (Town of Star Valley) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Star Valley Impact Fee Schedule
- Water Connection Fee (Town of Star Valley) — 1" meter$1,300.00 one-timeTown of Star ValleyThe Town of Star Valley charges a one-time water meter connection fee by meter size where service is available, under rates effective September 1, 2024: 3/4 inch $1,200, 1 inch $1,300 and 2 inch $2,500; 3 and 4 inch meters pay actual cost. Where no service exists, the new service line is billed at time and materials.
- Sewer Connection Fee (Town of Star Valley)Requires confirmationTown of Star ValleyThe Town of Star Valley does not operate a sewer system and charges no sewer connection fee. Most properties use private septic systems permitted by Gila County; a property served by the Northern Gila County Sanitary District pays that district's capacity fees instead.
- City Development Impact Fee (Town of Star Valley, Office)$0.00Town of Star ValleyThe Town of Star Valley has not adopted development impact fees, so there is no town fee for streets, parks, police, fire or other facilities. The water meter connection fee is listed separately.
- County Development Fee (Gila County, Office)$0.00Gila CountyGila County does not levy county development impact fees.
Where in Gila County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Star Valley Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in Arizona
Arizona cities and towns assess development impact fees (the statute calls them development fees) under A.R.S. 9-463.05 and counties under A.R.S. 11-1102. A fee can only be adopted after the governing body adopts land use assumptions and an infrastructure improvements plan for the service area, with public notice and hearings, and the plan projects demand for no more than ten years.
Fees are limited to necessary public services the statute lists: water, wastewater, stormwater and drainage, streets, fire and police facilities, neighborhood parks of up to 30 acres and, for cities, small libraries. Each fee must be proportionate to the new development's share of the cost, kept in a separate account for that service category and service area, and never used for operations, maintenance or a higher level of service for existing development.
Developers earn credits for facilities they build or dedicate, and a fee that goes unspent for ten years (fifteen for water or wastewater) is refundable with interest on request. For a residential unit the fee is due when the building permit issues unless a development agreement defers it, and a new or increased fee cannot be applied to an approved plat or site plan for 24 months.
Counties and cities each adopt their own schedules. County development fees apply in the county's service areas; inside city limits, development pays the city's fees plus any utility connection charges, which is why totals differ between a city and the unincorporated county around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of October 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Star Valley Impact Fee FAQs
What are the total impact fees for a single-family home in Star Valley, Arizona?
A new single-family home in Star Valley pays at least $1,200.00 per unit in combined impact fees (rates sourced July 23, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Star Valley?
Commercial development in Star Valley pays no per-square-foot impact fees, but owes $1,300.00 in one-time water and sewer connection fees (assuming a 1-inch meter). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
Does Star Valley charge its own impact fees?
Yes. Star Valley levies its own municipal impact or utility fees. Gila County does not currently add county-level impact fees inside Star Valley. The schedule on this page shows every fee that applies to development in Star Valley.
Can Arizona development impact fees increase at any time?
No. Under A.R.S. 9-463.05 and 11-1102 a new or increased fee cannot be adopted on an emergency basis, takes effect only after public notice and hearings (75 days after adoption for a city, 90 for a county), and cannot be applied to a development with an approved final plat or site plan for 24 months unless the plan changes to add service units.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Gila County impact fees page.