Skip to content
IMPACTFEES.ORG

Hayden, Arizona Impact Fees

Hayden applies its own fee schedule. Gila County does not currently add county-level impact fees inside city limits. A new single-family home pays $907.50 per unit (rates sourced ). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Hayden Impact Fees by Project Type

Hayden: Single-Family Impact Fees

A new single-family home in Hayden pays $907.50 per unit in impact fees (rates sourced October 16, 2026). Every line item is levied at the municipal or utility level.

Water Tap Fee (Town of Hayden) — standard tap and Sewer Tap Fee (Town of Hayden) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Hayden Impact Fee Schedule
Water$453.75
  • Water Tap Fee (Town of Hayden) — standard tap
    Town of Hayden
    The Town of Hayden charges a one-time water tap fee for a new connection. Taps over 2 inches pay a higher fee. The town proposed raising the standard tap fee to $544.50 for 2026.
    $453.75Requires confirmation
Sewer$453.75
  • Sewer Tap Fee (Town of Hayden)
    Town of Hayden
    The Town of Hayden charges a one-time residential sewer tap fee for a new connection. The town proposed raising it to $500 for 2026.
    $453.75Requires confirmation
City$0.00
County$0.00
Total (Hayden): $907.50
Sources last checked Official fee schedules:Town of Hayden Gila County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Gila County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Hayden: Multifamily Impact Fees

A new multifamily unit in Hayden pays $907.50 per unit in impact fees (rates sourced October 16, 2026). Every line item is levied at the municipal or utility level.

Sewer Tap Fee (Town of Hayden, MF) and Water Tap Fee (Town of Hayden, MF) — standard tap are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Hayden Impact Fee Schedule
Water$453.75
  • Water Tap Fee (Town of Hayden, MF) — standard tap
    Town of Hayden
    The Town of Hayden charges a one-time water tap fee for a new connection. The amount shown assumes one tap per unit; a building on one tap pays once. The town proposed raising the standard tap fee to $544.50 for 2026.
    $453.75Requires confirmation
Sewer$453.75
  • Sewer Tap Fee (Town of Hayden, MF)
    Town of Hayden
    The Town of Hayden charges a one-time residential sewer tap fee for a new connection. The amount shown assumes one tap per unit; a building on one tap pays once. The town proposed raising it to $500 for 2026.
    $453.75Requires confirmation
City$0.00
County$0.00
Total (Hayden): $907.50
Sources last checked Official fee schedules:Town of Hayden Gila County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Gila County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Hayden: Commercial Impact Fees

Commercial development in Hayden pays no per-square-foot impact fees, but owes $1,653.75 in one-time water and sewer connection fees (rates sourced October 16, 2026).

For a 50,000 sq ft building, that comes to about $1,653.75. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Tap Fee (Town of Hayden) — standard tap and Sewer Tap Fee (Town of Hayden, Commercial) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Hayden Impact Fee Schedule
Water$453.75 one-time
  • Water Tap Fee (Town of Hayden) — standard tap
    Town of Hayden
    The Town of Hayden charges a one-time water tap fee for a new connection; taps over 2 inches pay a higher fee. The town proposed raising the standard tap fee to $544.50 for 2026.
    $453.75 one-timeRequires confirmation
Sewer$1,200.00 one-time
  • Sewer Tap Fee (Town of Hayden, Commercial)
    Town of Hayden
    The Town of Hayden charges a one-time commercial sewer tap fee for a new connection. The town proposed raising it to $1,320 for 2026.
    $1,200.00 one-timeRequires confirmation
City$0.00
County$0.00
Total (Hayden): $1,653.75 one-time (≈ $1,653.75 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Hayden Gila County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Gila County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Hayden: Industrial Impact Fees

Industrial development in Hayden pays no per-square-foot impact fees, but owes $1,653.75 in one-time water and sewer connection fees (rates sourced October 16, 2026).

For a 50,000 sq ft building, that comes to about $1,653.75. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Tap Fee (Town of Hayden) — standard tap and Sewer Tap Fee (Town of Hayden, Commercial) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Hayden Impact Fee Schedule
Water$453.75 one-time
  • Water Tap Fee (Town of Hayden) — standard tap
    Town of Hayden
    The Town of Hayden charges a one-time water tap fee for a new connection; taps over 2 inches pay a higher fee. The town proposed raising the standard tap fee to $544.50 for 2026.
    $453.75 one-timeRequires confirmation
Sewer$1,200.00 one-time
  • Sewer Tap Fee (Town of Hayden, Commercial)
    Town of Hayden
    The Town of Hayden charges a one-time commercial sewer tap fee for a new connection. The town proposed raising it to $1,320 for 2026.
    $1,200.00 one-timeRequires confirmation
City$0.00
County$0.00
Total (Hayden): $1,653.75 one-time (≈ $1,653.75 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Hayden Gila County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Gila County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Hayden: Office Impact Fees

Office development in Hayden pays no per-square-foot impact fees, but owes $1,653.75 in one-time water and sewer connection fees (rates sourced October 16, 2026).

For a 25,000 sq ft building, that comes to about $1,653.75. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Tap Fee (Town of Hayden) — standard tap and Sewer Tap Fee (Town of Hayden, Commercial) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Hayden Impact Fee Schedule
Water$453.75 one-time
  • Water Tap Fee (Town of Hayden) — standard tap
    Town of Hayden
    The Town of Hayden charges a one-time water tap fee for a new connection; taps over 2 inches pay a higher fee. The town proposed raising the standard tap fee to $544.50 for 2026.
    $453.75 one-timeRequires confirmation
Sewer$1,200.00 one-time
  • Sewer Tap Fee (Town of Hayden, Commercial)
    Town of Hayden
    The Town of Hayden charges a one-time commercial sewer tap fee for a new connection. The town proposed raising it to $1,320 for 2026.
    $1,200.00 one-timeRequires confirmation
City$0.00
County$0.00
Total (Hayden): $1,653.75 one-time (≈ $1,653.75 at 25,000 sq ft)
Sources last checked Official fee schedules:Town of Hayden Gila County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Gila County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Hayden Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in Arizona

Arizona cities and towns assess development impact fees (the statute calls them development fees) under A.R.S. 9-463.05 and counties under A.R.S. 11-1102. A fee can only be adopted after the governing body adopts land use assumptions and an infrastructure improvements plan for the service area, with public notice and hearings, and the plan projects demand for no more than ten years.

Fees are limited to necessary public services the statute lists: water, wastewater, stormwater and drainage, streets, fire and police facilities, neighborhood parks of up to 30 acres and, for cities, small libraries. Each fee must be proportionate to the new development's share of the cost, kept in a separate account for that service category and service area, and never used for operations, maintenance or a higher level of service for existing development.

Developers earn credits for facilities they build or dedicate, and a fee that goes unspent for ten years (fifteen for water or wastewater) is refundable with interest on request. For a residential unit the fee is due when the building permit issues unless a development agreement defers it, and a new or increased fee cannot be applied to an approved plat or site plan for 24 months.

Counties and cities each adopt their own schedules. County development fees apply in the county's service areas; inside city limits, development pays the city's fees plus any utility connection charges, which is why totals differ between a city and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of October 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Hayden Impact Fee FAQs

What are the total impact fees for a single-family home in Hayden, Arizona?

A new single-family home in Hayden pays $907.50 per unit in combined impact fees (rates sourced October 16, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Hayden?

Commercial development in Hayden pays no per-square-foot impact fees, but owes $1,653.75 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Hayden charge its own impact fees?

Yes. Hayden levies its own municipal impact or utility fees. Gila County does not currently add county-level impact fees inside Hayden. The schedule on this page shows every fee that applies to development in Hayden.

Can Arizona development impact fees increase at any time?

No. Under A.R.S. 9-463.05 and 11-1102 a new or increased fee cannot be adopted on an emergency basis, takes effect only after public notice and hearings (75 days after adoption for a city, 90 for a county), and cannot be applied to a development with an approved final plat or site plan for 24 months unless the plan changes to add service units.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Gila County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000