Taylor Impact Fees by Project Type
Taylor: Single-Family Impact Fees
A new single-family home in Taylor pays $5,715.00 per unit in impact fees (rates sourced October 16, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Connection Fee (Town of Taylor) ($4,000.00) and Water Line Tap Fee (Town of Taylor) — 5/8" meter ($1,715.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Taylor Impact Fee Schedule
- Water Line Tap Fee (Town of Taylor) — 5/8" meter$1,715.00Town of TaylorOne-time water line tap fee charged by the Town of Taylor, including meter installation, priced by meter size (effective September 1, 2024). A standard home uses the 5/8-inch tap; meters over 2 inches are charged at actual cost.
- Sewer Connection Fee (Town of Taylor)$4,000.00Town of TaylorOne-time sewer connection fee charged by the Town of Taylor for a standard 4-inch connection, effective September 1, 2024.
- City Development Impact Fee (Town of Taylor)$0.00Town of TaylorTaylor does not charge a town development impact fee. Its fee schedule (effective April 5, 2025) and budget show no impact or development fee.
- County Overlay Impact Fee (Navajo County)$0.00Navajo CountyNavajo County does not charge a county development impact fee. Its planning and development fee schedule (updated July 15, 2025) lists building, septic, plan review and zoning fees only.
Where in Navajo County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Taylor: Multifamily Impact Fees
A new multifamily unit in Taylor pays $3,715.00 per unit in impact fees (rates sourced October 16, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Connection Fee (Town of Taylor, MF) ($2,000.00) and Water Line Tap Fee (Town of Taylor, MF) — 5/8" meter ($1,715.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Taylor Impact Fee Schedule
- Water Line Tap Fee (Town of Taylor, MF) — 5/8" meter$1,715.00Town of TaylorTaylor's water line tap fee includes meter installation and is priced by meter size (effective September 1, 2024). The schedule has no separate multifamily rate, so each unit is shown at the 5/8-inch tap fee; a building on one larger meter pays once at that meter's rate.
- Sewer Connection Fee (Town of Taylor, MF)$2,000.00Town of TaylorOne-time sewer connection fee charged by the Town of Taylor for multifamily units: $2,000 per dwelling unit (effective September 1, 2024).
- City Development Impact Fee (Town of Taylor, MF)$0.00Town of TaylorTaylor does not charge a town development impact fee. Its fee schedule (effective April 5, 2025) and budget show no impact or development fee.
- County Overlay Impact Fee (Navajo County, MF)$0.00Navajo CountyNavajo County does not charge a county development impact fee. Its planning and development fee schedule (updated July 15, 2025) lists building, septic, plan review and zoning fees only.
Where in Navajo County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Taylor: Commercial Impact Fees
Commercial development in Taylor pays no per-square-foot impact fees, but owes $6,138.00 in one-time water and sewer connection fees (rates sourced October 16, 2026).
For a 50,000 sq ft building, that comes to about $6,138.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Line Tap/Connection Fee (Town of Taylor) — 1" meter ($2,138.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (Town of Taylor) — 4" connection is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Taylor Impact Fee Schedule
- Water Line Tap/Connection Fee (Town of Taylor) — 1" meter$2,138.00 one-timeTown of TaylorWater line tap fee for a 1-inch meter, including meter installation, effective September 1, 2024. Ladder: 5/8-inch $1,715, 1-inch $2,138, 1 1/2-inch $4,730, 2-inch $5,470; larger than 2-inch at actual cost.
- Sewer Connection Fee (Town of Taylor) — 4" connection$4,000.00 one-timeRequires confirmationTown of TaylorThe published sewer connection fee for a standard 4-inch connection is $4,000 (effective September 1, 2024). The Town determines commercial sewer hookup charges from fixture units and anticipated flows, so a commercial project's charge may differ.
- City Development Impact Fee (Town of Taylor, Commercial)$0.00Town of TaylorThe Town of Taylor levies no development impact fees; its adopted fee schedule (effective April 5, 2025) contains no development fee.
- County Overlay Impact Fee (Town of Taylor, Commercial)$0.00Navajo CountyNavajo County levies no county development (impact) fees.
Where in Navajo County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Taylor: Industrial Impact Fees
Industrial development in Taylor pays no per-square-foot impact fees, but owes $6,138.00 in one-time water and sewer connection fees (rates sourced October 16, 2026).
For a 50,000 sq ft building, that comes to about $6,138.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Line Tap/Connection Fee (Town of Taylor) — 1" meter ($2,138.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (Town of Taylor) — 4" connection is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Taylor Impact Fee Schedule
- Water Line Tap/Connection Fee (Town of Taylor) — 1" meter$2,138.00 one-timeTown of TaylorWater line tap fee for a 1-inch meter, including meter installation, effective September 1, 2024. Ladder: 5/8-inch $1,715, 1-inch $2,138, 1 1/2-inch $4,730, 2-inch $5,470; larger than 2-inch at actual cost.
- Sewer Connection Fee (Town of Taylor) — 4" connection$4,000.00 one-timeRequires confirmationTown of TaylorThe published sewer connection fee for a standard 4-inch connection is $4,000 (effective September 1, 2024). The Town determines commercial sewer hookup charges from fixture units and anticipated flows, so a commercial project's charge may differ.
- City Development Impact Fee (Town of Taylor, Industrial)$0.00Town of TaylorThe Town of Taylor levies no development impact fees; its adopted fee schedule (effective April 5, 2025) contains no development fee.
- County Overlay Impact Fee (Town of Taylor, Industrial)$0.00Navajo CountyNavajo County levies no county development (impact) fees.
Where in Navajo County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Taylor: Office Impact Fees
Office development in Taylor pays no per-square-foot impact fees, but owes $6,138.00 in one-time water and sewer connection fees (rates sourced October 16, 2026).
For a 25,000 sq ft building, that comes to about $6,138.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Line Tap/Connection Fee (Town of Taylor) — 1" meter ($2,138.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (Town of Taylor) — 4" connection is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Taylor Impact Fee Schedule
- Water Line Tap/Connection Fee (Town of Taylor) — 1" meter$2,138.00 one-timeTown of TaylorWater line tap fee for a 1-inch meter, including meter installation, effective September 1, 2024. Ladder: 5/8-inch $1,715, 1-inch $2,138, 1 1/2-inch $4,730, 2-inch $5,470; larger than 2-inch at actual cost.
- Sewer Connection Fee (Town of Taylor) — 4" connection$4,000.00 one-timeRequires confirmationTown of TaylorThe published sewer connection fee for a standard 4-inch connection is $4,000 (effective September 1, 2024). The Town determines commercial sewer hookup charges from fixture units and anticipated flows, so a commercial project's charge may differ.
- City Development Impact Fee (Town of Taylor, Office)$0.00Town of TaylorThe Town of Taylor levies no development impact fees; its adopted fee schedule (effective April 5, 2025) contains no development fee.
- County Overlay Impact Fee (Town of Taylor, Office)$0.00Navajo CountyNavajo County levies no county development (impact) fees.
Where in Navajo County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Taylor Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in Arizona
Arizona cities and towns assess development impact fees (the statute calls them development fees) under A.R.S. 9-463.05 and counties under A.R.S. 11-1102. A fee can only be adopted after the governing body adopts land use assumptions and an infrastructure improvements plan for the service area, with public notice and hearings, and the plan projects demand for no more than ten years.
Fees are limited to necessary public services the statute lists: water, wastewater, stormwater and drainage, streets, fire and police facilities, neighborhood parks of up to 30 acres and, for cities, small libraries. Each fee must be proportionate to the new development's share of the cost, kept in a separate account for that service category and service area, and never used for operations, maintenance or a higher level of service for existing development.
Developers earn credits for facilities they build or dedicate, and a fee that goes unspent for ten years (fifteen for water or wastewater) is refundable with interest on request. For a residential unit the fee is due when the building permit issues unless a development agreement defers it, and a new or increased fee cannot be applied to an approved plat or site plan for 24 months.
Counties and cities each adopt their own schedules. County development fees apply in the county's service areas; inside city limits, development pays the city's fees plus any utility connection charges, which is why totals differ between a city and the unincorporated county around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of October 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Taylor Impact Fee FAQs
What are the total impact fees for a single-family home in Taylor, Arizona?
A new single-family home in Taylor pays $5,715.00 per unit in combined impact fees (rates sourced October 16, 2026).
How much are commercial impact fees in Taylor?
Commercial development in Taylor pays no per-square-foot impact fees, but owes $6,138.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Taylor charge its own impact fees?
Yes. Taylor levies its own municipal impact or utility fees. Navajo County does not currently add county-level impact fees inside Taylor. The schedule on this page shows every fee that applies to development in Taylor.
Can Arizona development impact fees increase at any time?
No. Under A.R.S. 9-463.05 and 11-1102 a new or increased fee cannot be adopted on an emergency basis, takes effect only after public notice and hearings (75 days after adoption for a city, 90 for a county), and cannot be applied to a development with an approved final plat or site plan for 24 months unless the plan changes to add service units.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Navajo County impact fees page.