Winslow Impact Fees by Project Type
Winslow: Single-Family Impact Fees
A new single-family home in Winslow pays $1,400.00 per unit in impact fees (rates sourced October 16, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Tap Fee (City of Winslow) — 5/8" to 1" meter, under 10 ft ($770.00), Water Plant Investment Fee (City of Winslow) — 1.0 EQR × $330/EQR ($330.00) and Sewer Tap-In Fee (City of Winslow) ($300.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Winslow Impact Fee Schedule
- Water Tap Fee (City of Winslow) — 5/8" to 1" meter, under 10 ft$770.00City of WinslowOne-time water tap fee charged by the City of Winslow for a 5/8-inch to 1-inch meter with a service line under 10 feet (Ordinance 637 fee schedule, July 2026). Lines of 10 to 20 feet cost $870, each foot beyond 20 feet adds $43.50, and service lines larger than 1 inch are billed at actual cost plus 10 percent. Paid in addition to the plant investment fee.
- Water Plant Investment Fee (City of Winslow) — 1.0 EQR × $330/EQR$330.00City of WinslowOne-time water plant investment fee charged by the City of Winslow on every new water connection: $330 per equivalent residential unit, and a single-family home is one unit (Ordinance 637 fee schedule, July 2026). Connections outside city limits pay double. A separate tap fee also applies.
- Sewer Tap-In Fee (City of Winslow)$300.00City of WinslowOne-time sewer tap-in fee charged by the City of Winslow: $300 per residential unit (Ordinance 637 fee schedule, July 2026).
- City Development Impact Fee (City of Winslow)$0.00City of WinslowWinslow does not charge a city development impact fee. Its fee schedule (Ordinance 637, July 2026) has no impact or development fee; new construction pays standard permit fees and the water and sewer connection charges listed separately.
- County Overlay Impact Fee (Navajo County)$0.00Navajo CountyNavajo County does not charge a county development impact fee. Its planning and development fee schedule (updated July 15, 2025) lists building, septic, plan review and zoning fees only.
Where in Navajo County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Winslow: Multifamily Impact Fees
A new multifamily unit in Winslow pays $1,334.00 per unit in impact fees (rates sourced October 16, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Tap Fee (City of Winslow, MF) — 5/8" to 1" meter, under 10 ft ($770.00), Sewer Tap-In Fee (City of Winslow, MF) ($300.00) and Water Plant Investment Fee (City of Winslow, MF) — 0.8 EQR × $330/EQR ($264.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Winslow Impact Fee Schedule
- Water Tap Fee (City of Winslow, MF) — 5/8" to 1" meter, under 10 ft$770.00City of WinslowOne-time water tap fee charged by the City of Winslow per connection, shown for a 5/8-inch to 1-inch meter with a service line under 10 feet (Ordinance 637 fee schedule, July 2026). A building on one connection pays once, and service lines larger than 1 inch are billed at actual cost plus 10 percent. Paid in addition to the plant investment fee.
- Water Plant Investment Fee (City of Winslow, MF) — 0.8 EQR × $330/EQR$264.00Up to 2 BRCity of WinslowOne-time water plant investment fee charged by the City of Winslow per apartment or condominium unit billed collectively in one building: 0.8 equivalent residential unit at $330, or $264, for units of up to two bedrooms (Ordinance 637 fee schedule, July 2026). Studios pay $198 and units of three or more bedrooms pay $330. Connections outside city limits pay double.
- Sewer Tap-In Fee (City of Winslow, MF)$300.00City of WinslowOne-time sewer tap-in fee charged by the City of Winslow: $300 per residential unit (Ordinance 637 fee schedule, July 2026).
- City Development Impact Fee (City of Winslow, MF)$0.00City of WinslowWinslow does not charge a city development impact fee. Its fee schedule (Ordinance 637, July 2026) has no impact or development fee; new construction pays standard permit fees and the water and sewer connection charges listed separately.
- County Overlay Impact Fee (Navajo County, MF)$0.00Navajo CountyNavajo County does not charge a county development impact fee. Its planning and development fee schedule (updated July 15, 2025) lists building, septic, plan review and zoning fees only.
Where in Navajo County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Winslow: Commercial Impact Fees
Commercial development in Winslow pays no per-square-foot impact fees, but owes $1,880.00 in one-time water and sewer connection fees (rates sourced October 16, 2026).
For a 50,000 sq ft building, that comes to about $1,880.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Tap-In Fee (City of Winslow) — 1" meter ($780.00 one-time), Water Tap Fee (City of Winslow) — 5/8" to 1" meter, under 10 ft ($770.00 one-time) and Water Plant Investment Fee (City of Winslow) — 1.0 EQR × $330/EQR ($330.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Winslow Impact Fee Schedule
- Water Tap Fee (City of Winslow) — 5/8" to 1" meter, under 10 ft$770.00 one-timeCity of WinslowWater tap fee for a 5/8-inch to 1-inch meter with a service line under 10 feet (City of Winslow schedule revised July 2026). A 10 to 20 foot line costs $870, plus $43.50 per foot beyond 20 feet; service lines larger than 1 inch are charged at actual cost plus a 10% administrative charge.
- Water Plant Investment Fee (City of Winslow) — 1.0 EQR × $330/EQR$330.00 one-timeCity of WinslowThe City of Winslow charges a water plant investment fee of $330 per equivalent residential unit (EQR); the amount shown is the one-EQR minimum. Stores and offices count as 1.0 EQR for the first 2,800 sq ft plus 0.04 per additional 100 sq ft; warehouses and light industrial count as 1.0 EQR for the first 8,400 sq ft plus 0.04 per additional 300 sq ft, with added factors for certain fixtures and process water. Service outside city limits pays twice the in-city fee.
- Sewer Tap-In Fee (City of Winslow) — 1" meter$780.00 one-timeCity of WinslowCommercial sewer tap-in fee for a 1-inch water meter (City of Winslow schedule revised July 2026). Commercial and nonresidential tap-in fees are set by water meter size, from $300 for a 5/8-inch meter to $28,800 for a 6-inch meter.
- City Development Impact Fee (City of Winslow, Commercial)$0.00City of WinslowThe City of Winslow levies no development impact fees; its schedule of rates, fees and charges (revised July 2026) contains no development fee.
- County Overlay Impact Fee (City of Winslow, Commercial)$0.00Navajo CountyNavajo County levies no county development (impact) fees.
Where in Navajo County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Winslow: Industrial Impact Fees
Industrial development in Winslow pays no per-square-foot impact fees, but owes $1,880.00 in one-time water and sewer connection fees (rates sourced October 16, 2026).
For a 50,000 sq ft building, that comes to about $1,880.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Tap-In Fee (City of Winslow) — 1" meter ($780.00 one-time), Water Tap Fee (City of Winslow) — 5/8" to 1" meter, under 10 ft ($770.00 one-time) and Water Plant Investment Fee (City of Winslow) — 1.0 EQR × $330/EQR ($330.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Winslow Impact Fee Schedule
- Water Tap Fee (City of Winslow) — 5/8" to 1" meter, under 10 ft$770.00 one-timeCity of WinslowWater tap fee for a 5/8-inch to 1-inch meter with a service line under 10 feet (City of Winslow schedule revised July 2026). A 10 to 20 foot line costs $870, plus $43.50 per foot beyond 20 feet; service lines larger than 1 inch are charged at actual cost plus a 10% administrative charge.
- Water Plant Investment Fee (City of Winslow) — 1.0 EQR × $330/EQR$330.00 one-timeCity of WinslowThe City of Winslow charges a water plant investment fee of $330 per equivalent residential unit (EQR); the amount shown is the one-EQR minimum. Stores and offices count as 1.0 EQR for the first 2,800 sq ft plus 0.04 per additional 100 sq ft; warehouses and light industrial count as 1.0 EQR for the first 8,400 sq ft plus 0.04 per additional 300 sq ft, with added factors for certain fixtures and process water. Service outside city limits pays twice the in-city fee.
- Sewer Tap-In Fee (City of Winslow) — 1" meter$780.00 one-timeCity of WinslowCommercial sewer tap-in fee for a 1-inch water meter (City of Winslow schedule revised July 2026). Commercial and nonresidential tap-in fees are set by water meter size, from $300 for a 5/8-inch meter to $28,800 for a 6-inch meter.
- City Development Impact Fee (City of Winslow, Industrial)$0.00City of WinslowThe City of Winslow levies no development impact fees; its schedule of rates, fees and charges (revised July 2026) contains no development fee.
- County Overlay Impact Fee (City of Winslow, Industrial)$0.00Navajo CountyNavajo County levies no county development (impact) fees.
Where in Navajo County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Winslow: Office Impact Fees
Office development in Winslow pays no per-square-foot impact fees, but owes $1,880.00 in one-time water and sewer connection fees (rates sourced October 16, 2026).
For a 25,000 sq ft building, that comes to about $1,880.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Tap-In Fee (City of Winslow) — 1" meter ($780.00 one-time), Water Tap Fee (City of Winslow) — 5/8" to 1" meter, under 10 ft ($770.00 one-time) and Water Plant Investment Fee (City of Winslow) — 1.0 EQR × $330/EQR ($330.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Winslow Impact Fee Schedule
- Water Tap Fee (City of Winslow) — 5/8" to 1" meter, under 10 ft$770.00 one-timeCity of WinslowWater tap fee for a 5/8-inch to 1-inch meter with a service line under 10 feet (City of Winslow schedule revised July 2026). A 10 to 20 foot line costs $870, plus $43.50 per foot beyond 20 feet; service lines larger than 1 inch are charged at actual cost plus a 10% administrative charge.
- Water Plant Investment Fee (City of Winslow) — 1.0 EQR × $330/EQR$330.00 one-timeCity of WinslowThe City of Winslow charges a water plant investment fee of $330 per equivalent residential unit (EQR); the amount shown is the one-EQR minimum. Stores and offices count as 1.0 EQR for the first 2,800 sq ft plus 0.04 per additional 100 sq ft; warehouses and light industrial count as 1.0 EQR for the first 8,400 sq ft plus 0.04 per additional 300 sq ft, with added factors for certain fixtures and process water. Service outside city limits pays twice the in-city fee.
- Sewer Tap-In Fee (City of Winslow) — 1" meter$780.00 one-timeCity of WinslowCommercial sewer tap-in fee for a 1-inch water meter (City of Winslow schedule revised July 2026). Commercial and nonresidential tap-in fees are set by water meter size, from $300 for a 5/8-inch meter to $28,800 for a 6-inch meter.
- City Development Impact Fee (City of Winslow, Office)$0.00City of WinslowThe City of Winslow levies no development impact fees; its schedule of rates, fees and charges (revised July 2026) contains no development fee.
- County Overlay Impact Fee (City of Winslow, Office)$0.00Navajo CountyNavajo County levies no county development (impact) fees.
Where in Navajo County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Winslow Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in Arizona
Arizona cities and towns assess development impact fees (the statute calls them development fees) under A.R.S. 9-463.05 and counties under A.R.S. 11-1102. A fee can only be adopted after the governing body adopts land use assumptions and an infrastructure improvements plan for the service area, with public notice and hearings, and the plan projects demand for no more than ten years.
Fees are limited to necessary public services the statute lists: water, wastewater, stormwater and drainage, streets, fire and police facilities, neighborhood parks of up to 30 acres and, for cities, small libraries. Each fee must be proportionate to the new development's share of the cost, kept in a separate account for that service category and service area, and never used for operations, maintenance or a higher level of service for existing development.
Developers earn credits for facilities they build or dedicate, and a fee that goes unspent for ten years (fifteen for water or wastewater) is refundable with interest on request. For a residential unit the fee is due when the building permit issues unless a development agreement defers it, and a new or increased fee cannot be applied to an approved plat or site plan for 24 months.
Counties and cities each adopt their own schedules. County development fees apply in the county's service areas; inside city limits, development pays the city's fees plus any utility connection charges, which is why totals differ between a city and the unincorporated county around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of October 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Winslow Impact Fee FAQs
What are the total impact fees for a single-family home in Winslow, Arizona?
A new single-family home in Winslow pays $1,400.00 per unit in combined impact fees (rates sourced October 16, 2026).
How much are commercial impact fees in Winslow?
Commercial development in Winslow pays no per-square-foot impact fees, but owes $1,880.00 in one-time water and sewer connection fees (assuming a 1-inch meter).
Does Winslow charge its own impact fees?
Yes. Winslow levies its own municipal impact or utility fees. Navajo County does not currently add county-level impact fees inside Winslow. The schedule on this page shows every fee that applies to development in Winslow.
Can Arizona development impact fees increase at any time?
No. Under A.R.S. 9-463.05 and 11-1102 a new or increased fee cannot be adopted on an emergency basis, takes effect only after public notice and hearings (75 days after adoption for a city, 90 for a county), and cannot be applied to a development with an approved final plat or site plan for 24 months unless the plan changes to add service units.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Navajo County impact fees page.