Starke, Florida Impact Fees

Starke applies its own fee schedule: municipal fees plus the Bradford County-levied fees that apply inside city limits. There are currently no published impact fee amounts for a new single-family home (rates sourced July 11, 2026). The full breakdown is below.

Starke impact fees by project type

Starke: Single-Family Impact Fees

Starke has no published impact fee amounts for a new single-family home (rates sourced July 11, 2026). The schedule below documents the status of each fee.

County Impact Fees (City of Starke) and Water Capacity Availability Charge (City of Starke) and Sewer Tap Charge (City of Starke) are set by the utility and not published online. Contact the utility to verify before budgeting; they are not included as dollar figures here.

Official fee schedule

View the full fee schedule
Water$0.00
  • Water Capacity Availability Charge (City of Starke)
    City of Starke
    Starke Code Sec. 102-36 imposes a water capacity availability charge per equivalent residential connection (1 ERC = 350 gpd for an SFR), with the amount "as provided by the city commission by resolution." Sec. 102-34 likewise sets the meter/new-service-connection charge by resolution. Re-checked 7/11/2026: the code carries no dollar figure, and Res. 2025-14 (the city's only posted fee schedule) covers building/zoning fees only — the utility rate resolution is not posted online. The $15 "water connection fee" in the Customer Service Guide is an account-setup charge, not a capacity fee. Utility Services (904) 964-5027 / cityutilities@cityofstarke.org.
    Contact jurisdiction/utility to verifyRequires confirmation
Sewer$0.00
  • Sewer Tap Charge (City of Starke)
    Starke Code Sec. 102-35 (sewer tap charge) and Sec. 102-37 (water pollution control charge) both set amounts by city commission resolution. Re-checked 7/11/2026: no dollar figure in the code; Res. 2025-14 (only posted fee schedule) covers building/zoning fees only. Utility rate resolution not posted online. Utility Services (904) 964-5027 / cityutilities@cityofstarke.org.
    Contact jurisdiction/utility to verifyRequires confirmation
City$0.00
  • City Impact Fees (City of Starke)
    City of Starke
    CONFIRMED $0. City of Starke Building & Zoning FAQ: "The City of Starke has no impact fees for the development of any kind." Re-verified 7/11/2026 — the city's current adopted fee schedule (Res. 2025-14, adopted 5/20/2025, Exhibit A) contains ONLY planning/zoning/building permit fees; no impact fees and no utility capacity fees. Building & Zoning (904) 930-3243.
    $0.00
County$0.00
  • County Impact Fees (City of Starke)
    Bradford County Board of County Commissioners
    Bradford County Ord. 2025-01 (eff. 10/1/2025) levies Fire ($498/DU), Law Enforcement ($304/DU) and EMS ($258/DU) impact fees +2% admin. The adopted notice states the fees apply in unincorporated areas and in municipalities that agree to collect and remit to the County, EXPRESSLY EXCEPTING the City of Starke, which provides its own fire protection. Entered $0 pending confirmation of whether the law-enforcement/EMS components are collected inside Starke. County Manager (904) 966-6327.
    Contact jurisdiction/utility to verifyRequires confirmation
Total (Starke): $0.00
Sources last checked July 11, 2026Official fee schedule
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Bradford County are you building?

Each jurisdiction applies its own fee schedule. Pick yours.

Starke: Multifamily Impact Fees

Starke has no published impact fee amounts for a new multifamily unit (rates sourced July 11, 2026). The schedule below documents the status of each fee.

Sewer Tap Charge (City of Starke, MF) and County Impact Fees (City of Starke, MF) and Water Capacity Availability Charge (City of Starke, MF) are set by the utility and not published online. Contact the utility to verify before budgeting; they are not included as dollar figures here.

Official fee schedule

View the full fee schedule
Water$0.00
  • Water Capacity Availability Charge (City of Starke, MF)
    City of Starke
    Starke Code Sec. 102-36: water capacity availability charge per equivalent residential connection (1 ERC = 350 gpd for an SFR), amount set by city commission resolution. Re-checked 7/11/2026: no dollar figure in the code, and Res. 2025-14 (only posted fee schedule) covers building/zoning fees only. MF per-unit ERC factor also unpublished. Utility Services (904) 964-5027 / cityutilities@cityofstarke.org.
    Contact jurisdiction/utility to verifyRequires confirmation
Sewer$0.00
  • Sewer Tap Charge (City of Starke, MF)
    City of Starke
    Starke Code Sec. 102-35 (sewer tap charge) and Sec. 102-37 (water pollution control charge) set amounts by city commission resolution. Re-checked 7/11/2026: no dollar figure in the code; Res. 2025-14 covers building/zoning fees only. MF per-unit basis also unpublished. Utility Services (904) 964-5027.
    Contact jurisdiction/utility to verifyRequires confirmation
City$0.00
  • City Impact Fees (City of Starke, MF)
    City of Starke
    CONFIRMED $0. City of Starke Building & Zoning FAQ: "The City of Starke has no impact fees for the development of any kind." Re-verified 7/11/2026 — the city's current adopted fee schedule (Res. 2025-14, adopted 5/20/2025, Exhibit A) contains ONLY planning/zoning/building permit fees. Building & Zoning (904) 930-3243.
    $0.00
County$0.00
  • County Impact Fees (City of Starke, MF)
    Bradford County Board of County Commissioners
    Bradford County Ord. 2025-01 (eff. 10/1/2025) levies Fire ($498/DU), Law Enforcement ($304/DU) and EMS ($258/DU) impact fees +2% admin, per dwelling unit. The adopted notice applies them in unincorporated areas and in municipalities that agree to collect and remit to the County, EXPRESSLY EXCEPTING the City of Starke, which provides its own fire protection. Entered $0 pending confirmation of the law-enforcement/EMS components inside Starke. County Manager (904) 966-6327.
    Contact jurisdiction/utility to verifyRequires confirmation
Total (Starke): $0.00
Sources last checked July 11, 2026Official fee schedule
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Bradford County are you building?

Each jurisdiction applies its own fee schedule. Pick yours.

Starke: Commercial Impact Fees

Commercial development in Starke pays no per-square-foot impact fees (rates sourced July 11, 2026).

County Impact Fees (City of Starke, Commercial) and Sewer Tap Charge & Water Pollution Control Charge (City of Starke) and Water Capacity Availability Charge (City of Starke) are not published as a standard rate. Contact the jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Official fee schedule

View the full fee schedule
Water$0.00
  • Water Capacity Availability Charge (City of Starke)
    City of Starke
    AMOUNT UNPUBLISHED — Starke runs its own water utility. Basis is ERC, NOT meter size: Code Sec. 102-36 imposes a water capacity availability charge based on the number of equivalent residential connections, amount 'as provided by the city commission by resolution.' Sec. 102-33(l) sets the nonres ERC formula: estimated commercial/industrial daily flow divided by 350 gpd = number of ERCs, multiplied by the water capacity charge then in effect (for business/industrial/institutional uses the city engineers estimate the ERC count). Sec. 102-34: the meter charge schedule is also set by resolution, and new service connections larger than 2 inches are charged at 200% of material cost (meter, valves, enclosure) — so there is no published nonres meter-size table. Checked 2026-07-11: Municode Ch. 102 carries no dollar figure; Res. 2025-14 (the city's only posted fee schedule) covers building/zoning fees only; the utility rate resolution is not posted online; cityofstarke.ishopserver.com/utilityrates.html returns no content. The $15 'water connection fee' in the Customer Service Guide is an account-setup charge, not a capacity fee. VERIFY the per-ERC water capacity charge and the meter charge schedule → Utility Services (904) 964-5027 / cityutilities@cityofstarke.org.
    Contact jurisdiction/utility to verifyRequires confirmation
Sewer$0.00
  • Sewer Tap Charge & Water Pollution Control Charge (City of Starke)
    City of Starke
    AMOUNT UNPUBLISHED — Starke runs its own sewerage system. Two one-time sewer charges apply to new nonres connections, both set by resolution: (1) Sec. 102-35 sewer tap charge (plus an added charge where the connection run exceeds 50 ft); and (2) Sec. 102-37 water pollution control charge, computed on the number of ERCs (nonres ERCs = estimated daily flow / 350 gpd per Sec. 102-33(l)). Sec. 102-37(c) adds a strength-based formula for industrial/process waste exceeding 300 ppm BOD / 600 ppm COD / 300 ppm SS: WPC = (BOD or COD/2 x Qmgd x 8.34 x $370/lb) + (SS x Qmgd x 8.34 x $370/lb) — relevant to Industrial users. Checked 2026-07-11: no dollar figures in Municode Ch. 102; Res. 2025-14 covers building/zoning fees only; the utility rate resolution is not posted online. VERIFY the sewer tap charge and the per-ERC water pollution control charge → Utility Services (904) 964-5027 / cityutilities@cityofstarke.org.
    Contact jurisdiction/utility to verifyRequires confirmation
City$0.00
  • City Impact Fees (City of Starke, Commercial)
    City of Starke
    CONFIRMED $0. City of Starke Building & Zoning FAQ: 'The City of Starke has no impact fees for the development of any kind' — which expressly covers nonresidential. Cross-checked 2026-07-11 against the city's current adopted fee schedule (Res. 2025-14, adopted 5/20/2025, Exhibit A), which contains ONLY planning/zoning/building permit fees — no impact fees of any category and no transportation/park/police/fire development fee. Municode Ch. 82 (Planning) carries no impact-fee article. Building & Zoning (904) 930-3243.
    $0.00
County$0.00
  • County Impact Fees (City of Starke, Commercial)
    Bradford County Board of County Commissioners
    $0 — not enforceable absent an interlocal agreement. Bradford County Ord. 2025-01 is codified as Code Ch. 43 (adopted 7/17/2025, eff. 10/1/2025): nonres Fire $194.00 / Law Enforcement $119.00 / EMS $101.00 per 1,000 sq ft (+ admin fee up to 2%, Sec. 43-10(i)). CONTROLLING PROVISION — Sec. 43-18 (Municipal participation): the ordinance 'shall not be enforced within a municipality unless the county and municipality enter into an interlocal agreement setting forth the terms and conditions under which the provisions of the ordinance shall be implemented within the municipality.' No Starke–County interlocal is published (county site, Municode, BOCC agendas checked 2026-07-11), so the ordinance's own default — non-enforcement inside the city — governs. SCOPE OF THE STARKE EXCEPTION NOW RESOLVED (was flagged unclear): it is FIRE-ONLY. Sec. 43-31(b) excludes Starke from the fire fee ('except for the City of Starke which provides its own fire facilities'); Art. III (Law Enforcement) and Art. IV (EMS) contain NO Starke carve-out and would apply if an interlocal were executed. Starke also issues its own building permits (the County directs all in-city-limits permitting to Starke B&Z), and Starke's B&Z FAQ states the city charges no impact fees on development. REMAINING VERIFY: whether a Sec. 43-18 interlocal has been executed for Law Enforcement/EMS → County Manager's Office (904) 966-6327 / Starke Building & Zoning (904) 930-3243.
    Contact jurisdiction/utility to verifyRequires confirmation
Total (Starke): $0.00
Sources last checked July 11, 2026Official fee schedule
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Bradford County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Starke: Industrial Impact Fees

Industrial development in Starke pays no per-square-foot impact fees (rates sourced July 11, 2026).

County Impact Fees (City of Starke, Industrial) and Sewer Tap Charge & Water Pollution Control Charge (City of Starke) and Water Capacity Availability Charge (City of Starke) are not published as a standard rate. Contact the jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Official fee schedule

View the full fee schedule
Water$0.00
  • Water Capacity Availability Charge (City of Starke)
    City of Starke
    AMOUNT UNPUBLISHED — Starke runs its own water utility. Basis is ERC, NOT meter size: Code Sec. 102-36 imposes a water capacity availability charge based on the number of equivalent residential connections, amount 'as provided by the city commission by resolution.' Sec. 102-33(l) sets the nonres ERC formula: estimated commercial/industrial daily flow divided by 350 gpd = number of ERCs, multiplied by the water capacity charge then in effect (for business/industrial/institutional uses the city engineers estimate the ERC count). Sec. 102-34: the meter charge schedule is also set by resolution, and new service connections larger than 2 inches are charged at 200% of material cost (meter, valves, enclosure) — so there is no published nonres meter-size table. Checked 2026-07-11: Municode Ch. 102 carries no dollar figure; Res. 2025-14 (the city's only posted fee schedule) covers building/zoning fees only; the utility rate resolution is not posted online; cityofstarke.ishopserver.com/utilityrates.html returns no content. The $15 'water connection fee' in the Customer Service Guide is an account-setup charge, not a capacity fee. VERIFY the per-ERC water capacity charge and the meter charge schedule → Utility Services (904) 964-5027 / cityutilities@cityofstarke.org.
    Contact jurisdiction/utility to verifyRequires confirmation
Sewer$0.00
  • Sewer Tap Charge & Water Pollution Control Charge (City of Starke)
    City of Starke
    AMOUNT UNPUBLISHED — Starke runs its own sewerage system. Two one-time sewer charges apply to new nonres connections, both set by resolution: (1) Sec. 102-35 sewer tap charge (plus an added charge where the connection run exceeds 50 ft); and (2) Sec. 102-37 water pollution control charge, computed on the number of ERCs (nonres ERCs = estimated daily flow / 350 gpd per Sec. 102-33(l)). Sec. 102-37(c) adds a strength-based formula for industrial/process waste exceeding 300 ppm BOD / 600 ppm COD / 300 ppm SS: WPC = (BOD or COD/2 x Qmgd x 8.34 x $370/lb) + (SS x Qmgd x 8.34 x $370/lb) — relevant to Industrial users. Checked 2026-07-11: no dollar figures in Municode Ch. 102; Res. 2025-14 covers building/zoning fees only; the utility rate resolution is not posted online. VERIFY the sewer tap charge and the per-ERC water pollution control charge → Utility Services (904) 964-5027 / cityutilities@cityofstarke.org.
    Contact jurisdiction/utility to verifyRequires confirmation
City$0.00
  • City Impact Fees (City of Starke, Industrial)
    City of Starke
    CONFIRMED $0. City of Starke Building & Zoning FAQ: 'The City of Starke has no impact fees for the development of any kind.' Cross-checked 2026-07-11 against Res. 2025-14 (adopted 5/20/2025, Exhibit A) — planning/zoning/building permit fees only, no impact fees. Building & Zoning (904) 930-3243.
    $0.00
County$0.00
  • County Impact Fees (City of Starke, Industrial)
    Bradford County Board of County Commissioners
    $0 — not enforceable absent an interlocal agreement. Bradford County Ord. 2025-01 is codified as Code Ch. 43 (adopted 7/17/2025, eff. 10/1/2025): nonres Fire $194.00 / Law Enforcement $119.00 / EMS $101.00 per 1,000 sq ft (+ admin fee up to 2%, Sec. 43-10(i)). CONTROLLING PROVISION — Sec. 43-18 (Municipal participation): the ordinance 'shall not be enforced within a municipality unless the county and municipality enter into an interlocal agreement.' No Starke–County interlocal is published (checked 2026-07-11), so the ordinance's default of non-enforcement inside the city governs. SCOPE OF THE STARKE EXCEPTION NOW RESOLVED (was flagged unclear): it is FIRE-ONLY — Sec. 43-31(b) excludes Starke from the fire fee; Art. III (Law Enforcement) and Art. IV (EMS) carry no Starke carve-out and would apply if an interlocal were executed. Starke issues its own building permits and its B&Z FAQ states the city charges no impact fees on development. REMAINING VERIFY: whether a Sec. 43-18 interlocal exists for Law Enforcement/EMS → County Manager's Office (904) 966-6327 / Starke Building & Zoning (904) 930-3243.
    Contact jurisdiction/utility to verifyRequires confirmation
Total (Starke): $0.00
Sources last checked July 11, 2026Official fee schedule
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Bradford County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Starke: Office Impact Fees

Office development in Starke pays no per-square-foot impact fees (rates sourced July 11, 2026).

County Impact Fees (City of Starke, Office) and Sewer Tap Charge & Water Pollution Control Charge (City of Starke) and Water Capacity Availability Charge (City of Starke) are not published as a standard rate. Contact the jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Official fee schedule

View the full fee schedule
Water$0.00
  • Water Capacity Availability Charge (City of Starke)
    City of Starke
    AMOUNT UNPUBLISHED — Starke runs its own water utility. Basis is ERC, NOT meter size: Code Sec. 102-36 imposes a water capacity availability charge based on the number of equivalent residential connections, amount 'as provided by the city commission by resolution.' Sec. 102-33(l) sets the nonres ERC formula: estimated commercial/industrial daily flow divided by 350 gpd = number of ERCs, multiplied by the water capacity charge then in effect (for business/industrial/institutional uses the city engineers estimate the ERC count). Sec. 102-34: the meter charge schedule is also set by resolution, and new service connections larger than 2 inches are charged at 200% of material cost (meter, valves, enclosure) — so there is no published nonres meter-size table. Checked 2026-07-11: Municode Ch. 102 carries no dollar figure; Res. 2025-14 (the city's only posted fee schedule) covers building/zoning fees only; the utility rate resolution is not posted online; cityofstarke.ishopserver.com/utilityrates.html returns no content. The $15 'water connection fee' in the Customer Service Guide is an account-setup charge, not a capacity fee. VERIFY the per-ERC water capacity charge and the meter charge schedule → Utility Services (904) 964-5027 / cityutilities@cityofstarke.org.
    Contact jurisdiction/utility to verifyRequires confirmation
Sewer$0.00
  • Sewer Tap Charge & Water Pollution Control Charge (City of Starke)
    City of Starke
    AMOUNT UNPUBLISHED — Starke runs its own sewerage system. Two one-time sewer charges apply to new nonres connections, both set by resolution: (1) Sec. 102-35 sewer tap charge (plus an added charge where the connection run exceeds 50 ft); and (2) Sec. 102-37 water pollution control charge, computed on the number of ERCs (nonres ERCs = estimated daily flow / 350 gpd per Sec. 102-33(l)). Sec. 102-37(c) adds a strength-based formula for industrial/process waste exceeding 300 ppm BOD / 600 ppm COD / 300 ppm SS: WPC = (BOD or COD/2 x Qmgd x 8.34 x $370/lb) + (SS x Qmgd x 8.34 x $370/lb) — relevant to Industrial users. Checked 2026-07-11: no dollar figures in Municode Ch. 102; Res. 2025-14 covers building/zoning fees only; the utility rate resolution is not posted online. VERIFY the sewer tap charge and the per-ERC water pollution control charge → Utility Services (904) 964-5027 / cityutilities@cityofstarke.org.
    Contact jurisdiction/utility to verifyRequires confirmation
City$0.00
  • City Impact Fees (City of Starke, Office)
    City of Starke
    CONFIRMED $0. City of Starke Building & Zoning FAQ: 'The City of Starke has no impact fees for the development of any kind.' Cross-checked 2026-07-11 against Res. 2025-14 (adopted 5/20/2025, Exhibit A) — planning/zoning/building permit fees only, no impact fees. Building & Zoning (904) 930-3243.
    $0.00
County$0.00
  • County Impact Fees (City of Starke, Office)
    Bradford County Board of County Commissioners
    $0 — not enforceable absent an interlocal agreement. Bradford County Ord. 2025-01 is codified as Code Ch. 43 (adopted 7/17/2025, eff. 10/1/2025): nonres Fire $194.00 / Law Enforcement $119.00 / EMS $101.00 per 1,000 sq ft (+ admin fee up to 2%, Sec. 43-10(i)). CONTROLLING PROVISION — Sec. 43-18 (Municipal participation): the ordinance 'shall not be enforced within a municipality unless the county and municipality enter into an interlocal agreement.' No Starke–County interlocal is published (checked 2026-07-11), so the ordinance's default of non-enforcement inside the city governs. SCOPE OF THE STARKE EXCEPTION NOW RESOLVED (was flagged unclear): it is FIRE-ONLY — Sec. 43-31(b) excludes Starke from the fire fee; Art. III (Law Enforcement) and Art. IV (EMS) carry no Starke carve-out and would apply if an interlocal were executed. Starke issues its own building permits and its B&Z FAQ states the city charges no impact fees on development. REMAINING VERIFY: whether a Sec. 43-18 interlocal exists for Law Enforcement/EMS → County Manager's Office (904) 966-6327 / Starke Building & Zoning (904) 930-3243.
    Contact jurisdiction/utility to verifyRequires confirmation
Total (Starke): $0.00
Sources last checked July 11, 2026Official fee schedule
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Bradford County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Estimate your project in Starke

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

How much are commercial impact fees in Starke?

Starke does not currently levy impact fees on commercial development.

Does Starke charge its own impact fees?

Yes. Starke levies its own municipal impact fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Starke, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Bradford County impact fees page.