Starke impact fees by project type
Starke: Single-Family Impact Fees
Starke has no published impact fee amounts for a new single-family home (rates sourced July 13, 2026). The schedule below documents the status of each fee.
Water Capacity Availability Charge (City of Starke) and Sewer Tap Charge (City of Starke) are set by the utility and not published online. County Impact Fees (City of Starke) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Capacity Availability Charge (City of Starke)Requires confirmationCity of StarkeCity of Starke Code Sec. 102-36 imposes a water capacity availability charge per equivalent residential connection (1 ERC = 350 gpd for a single-family residence), with the amount 'as provided by the city commission by resolution.' Sec. 102-34 likewise sets the meter / new-service-connection charge by resolution. Re-checked 2026-07-22: the codified chapter carries no dollar figure; Res. 2025-14 (the only fee schedule the city posts) covers building and zoning fees only; the Utility Services department page posts notification forms, a drinking-water report and a payment portal but no rate sheet. The $15 water charge in the city's Customer Service Guide is an account-setup connection charge (alongside $25 electric and $20 gas, plus a $200 refundable meter deposit), not a capacity fee. The utility rate resolution is not published online.
- Sewer Tap Charge (City of Starke)Requires confirmationCity of Starke Code Sec. 102-35 (sewer tap charge) and Sec. 102-37 (water pollution control charge) both set their amounts by city commission resolution. Re-checked 2026-07-22: no dollar figure in the codified chapter; Res. 2025-14 (the only posted fee schedule) covers building and zoning fees only; the Utility Services department page posts no rate sheet. The utility rate resolution is not published online. Starke is Florida's oldest municipal utility and provides electric, water, sewer, gas and garbage.
- City Impact Fees (City of Starke)$0.00City of StarkeCONFIRMED $0. City of Starke Building, Zoning & Floodplain Management FAQ: 'The City of Starke has no impact fees for the development of any kind.' Re-verified 2026-07-22 (the FAQ now serves from /m/faq?cat=16). The city's current adopted fee schedule, Res. 2025-14 adopted 5/20/2025 Exhibit A, contains only planning, zoning and building-permit fees — no impact fees. Starke issues its own building permits (the county Building Department refers anyone inside the city limits, or on City of Starke utilities, to the City).
- County Impact Fees (City of Starke)Requires confirmationBradford County Board of County CommissionersBradford County Code Sec. 43-18 (Ord. 2025-01) provides that Ch. 43 will NOT be enforced within a municipality unless the county and that municipality enter an interlocal agreement setting out implementation and the municipality's retention of collection administrative fees. Separately, Sec. 43-31(b) expressly excepts the City of Starke from the FIRE fee because Starke provides its own fire facilities; the law enforcement (Sec. 43-41) and EMS (Sec. 43-51) articles carry no Starke exception, so those two could reach Starke under a Sec. 43-18 interlocal. No such interlocal is published by either government, and Starke issues its own building permits. Entered $0 until an interlocal is located. Codifier re-read 2026-07-22.
Where in Bradford County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Starke: Multifamily Impact Fees
Starke has no published impact fee amounts for a new multifamily unit (rates sourced July 13, 2026). The schedule below documents the status of each fee.
Sewer Tap Charge (City of Starke, MF) and Water Capacity Availability Charge (City of Starke, MF) are set by the utility and not published online. County Impact Fees (City of Starke, MF) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Capacity Availability Charge (City of Starke, MF)Requires confirmationCity of StarkeCity of Starke Code Sec. 102-36 imposes a water capacity availability charge per equivalent residential connection (1 ERC = 350 gpd for a single-family residence), amount set 'as provided by the city commission by resolution.' Re-checked 2026-07-22: no dollar figure in the codified chapter; Res. 2025-14 (the only posted fee schedule) covers building and zoning fees only; the Utility Services department page posts no rate sheet. TWO unknowns for MF: the per-ERC dollar amount, and the ERC factor the city assigns a multifamily unit — the code defines the ERC in gallons per day, so a per-unit factor exists somewhere, but no ERC schedule is published.
- Sewer Tap Charge (City of Starke, MF)Requires confirmationCity of StarkeCity of Starke Code Sec. 102-35 (sewer tap charge) and Sec. 102-37 (water pollution control charge) both set their amounts by city commission resolution. Re-checked 2026-07-22: no dollar figure in the codified chapter; Res. 2025-14 (the only posted fee schedule) covers building and zoning fees only; the Utility Services department page posts no rate sheet. The multifamily per-unit basis is likewise unpublished.
- City Impact Fees (City of Starke, MF)$0.00City of StarkeCONFIRMED $0. City of Starke Building, Zoning & Floodplain Management FAQ: 'The City of Starke has no impact fees for the development of any kind.' Re-verified 2026-07-22. The city's adopted fee schedule (Res. 2025-14, adopted 5/20/2025, Exhibit A) contains only planning, zoning and building-permit fees. Starke issues its own building permits.
- County Impact Fees (City of Starke, MF)Requires confirmationBradford County Board of County CommissionersBradford County Code Sec. 43-18 (Ord. 2025-01) provides that Ch. 43 will NOT be enforced within a municipality unless the county and that municipality enter an interlocal agreement. Sec. 43-31(b) separately and expressly excepts the City of Starke from the FIRE fee (Starke provides its own fire facilities); the law enforcement (Sec. 43-41) and EMS (Sec. 43-51) articles carry no Starke exception and could reach Starke under a Sec. 43-18 interlocal at $304 and $258 per dwelling unit. No interlocal is published by either government, and Starke issues its own building permits. Entered $0 until one is located. Codifier re-read 2026-07-22.
Where in Bradford County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Starke: Commercial Impact Fees
Commercial development in Starke pays no per-square-foot impact fees, but owes $5,550.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).
For a 50,000 sq ft building, that comes to about $5,550.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Pollution Control Charge (City of Starke), Sewer Connection Charge (City of Starke) — 1" meter, Water Capacity Availability Charge (City of Starke), and Water Main Tap Charge (City of Starke) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the full fee schedule
- Water Main Tap Charge (City of Starke) — 1" meter$500.00 one-timeRequires confirmationCity of Starke Utility ServicesOne-time water main tapping charge, charged IN ADDITION TO the ERC-based water capacity availability charge (see that record). Ord. No. 2015-0721 (adopted 3-3-2015), Exhibit A, p.2, 'Water main tapping': 5/8"x3/4" $350.00 · 3/4" $350.00 · 1" $500.00 · 1.5" $550.00 · 2" $600.00 · 'Fees for taps larger than 2" shall be determined by the actual cost x 200%.' Code Sec. 102-34: meter charge schedule set by resolution; new service connections larger than 2 inches charged at 200% of material cost. Canonical nonres default = 1" meter. Meter-size + capacity-charge stacking follows the Charlotte County precedent in the Process Guide. ⚠️ LIKELY SUPERSEDED: Res. No. 2026-01 (passed 10-7-2025, 'Updating the Fee Schedule for New Installation Services… Electrical, Gas, Water, Sewer') — text/exhibit not published anywhere. VERIFY → Utility Services (904) 964-5027 / cityutilities@cityofstarke.org.
- Water Capacity Availability Charge (City of Starke)$350.00 one-timeRequires confirmationCity of StarkeAMOUNT NOW SOURCED (audit 2026-07-13) — was $0 unpublished. City of Starke Ord. No. 2015-0721 (adopted 3-3-2015), Exhibit A utility fee schedule, p.2: water 'Capacity charge' 5/8"x3/4" = $350.00; all larger meters (3/4", 1", 1.5", 2", 4", 6", 8", 12") = 'Calculation based on E.R.U. X $350.00.' So the charge is ERC/ERU-BASED, NOT a meter ladder: $350.00 per ERC. Code Sec. 102-36 imposes the water capacity availability charge on the number of ERCs; Sec. 102-36(b): 1 ERC = a single-family household using 350 gpd. Sec. 102-33(l): nonresidential ERC count = estimated commercial/industrial daily flow / 350 gpd (city engineers estimate for business/industrial/institutional uses). Entered here as the published 1-ERC MINIMUM ($350.00), Subtype blank, Is Default true — a nonres project multiplies by its engineered ERC count. Separate WATER MAIN TAPPING charges also apply by meter size (see the Water Main Tap Charge records for this jurisdiction). ⚠️ LIKELY SUPERSEDED: Starke Res. No. 2026-01, 'Updating the Fee Schedule for New Installation Services Charged by the City of Starke for Providing Electrical, Gas, Water, Sewer, and Related Services,' passed 4-0 on the consent agenda 10-7-2025 (Commission agenda + minutes on Starke MuniDocs); the resolution's text/exhibit is NOT published on cityofstarke.org, in MuniDocs, or in the Agenda Center (Starke posts agendas only, no packets). The $350.00 above is the last PUBLISHED adopted figure. VERIFY the current per-ERC water capacity charge → Utility Services (904) 964-5027 / cityutilities@cityofstarke.org.
- Sewer Connection Charge (City of Starke) — 1" meter$3,500.00 one-timeRequires confirmationCity of StarkeAMOUNT NOW SOURCED (audit 2026-07-13) — was $0 unpublished. City of Starke Ord. No. 2015-0721 (adopted 3-3-2015), Exhibit A, p.4: 'Sewer service connection charges, by water meter size' — 3/4" $1,000.00 · 1" $3,500.00 · 1.5" $8,000.00 · 2" $15,500.00 · above 2" = actual cost x 200%. Canonical nonres default = 1" meter ($3,500.00) per project rule; other meter sizes are separate Subtype records. Code Sec. 102-35 authorizes the connection charge ('as provided by the city commission by resolution'), plus an added charge where the connection run exceeds 50 ft. The separate WATER POLLUTION CONTROL CHARGE (Sec. 102-37, $1,200.00 per ERC) is carried on its own record. Sec. 102-37(c) adds a strength surcharge for industrial/process waste exceeding 300 ppm BOD / 600 ppm COD / 300 ppm SS. ⚠️ LIKELY SUPERSEDED: Starke Res. No. 2026-01 ('Updating the Fee Schedule for New Installation Services… Electrical, Gas, Water, Sewer'), passed 4-0 on 10-7-2025 (Commission agenda + minutes on Starke MuniDocs); its text/exhibit is not published anywhere. Amounts above are the last PUBLISHED adopted figures. VERIFY current amounts → Utility Services (904) 964-5027 / cityutilities@cityofstarke.org.
- Water Pollution Control Charge (City of Starke)$1,200.00 one-timeRequires confirmationCity of Starke Utility ServicesSeparate one-time sewer charge, distinct from the sewer connection charge. Code Sec. 102-37(b): the water pollution control charge is based on the number of ERCs, amount set by commission resolution. Ord. No. 2015-0721 (adopted 3-3-2015), Exhibit A, p.4: 'Pollution control charge' = $1,200.00. Entered as the published 1-ERC MINIMUM (Subtype blank, Is Default true); nonres ERC count = estimated daily flow / 350 gpd (Sec. 102-33(l)). Sec. 102-37(c) adds a strength-based surcharge for industrial/process waste exceeding 300 ppm BOD / 600 ppm COD / 300 ppm SS: WPC = (BOD or COD/2 x Qmgd x 8.34 x $370/lb) + (SS x Qmgd x 8.34 x $370/lb) — relevant to Industrial users. ⚠️ LIKELY SUPERSEDED by Res. No. 2026-01 (10-7-2025, fee schedule for new installation services — text/exhibit unpublished). VERIFY → Utility Services (904) 964-5027 / cityutilities@cityofstarke.org.
- City Impact Fees (City of Starke, Commercial)$0.00City of StarkeCONFIRMED $0. City of Starke Building & Zoning FAQ (reconfirmed live on audit 2026-07-13, page updated 11-20-2025): 'The City of Starke has no impact fees for the development of any kind' — which expressly covers nonresidential. Cross-checked against the city's current adopted fee schedule (Res. 2025-14, adopted 5-20-2025, Exhibit A), which contains ONLY planning/zoning/building permit fees — no impact fees of any category. Municode Ch. 82 (Planning) carries no impact-fee article; 2022 Commission minutes record that 'impact fees were done away with.' ⚠️ RECHECK EACH CYCLE — Starke is running its own impact-fee study (Infrastructure Consulting & Engineering; public hearing 12-17-2024, ICE presentation to Commission 11-18-2025). 'Impact Fees' has remained a standing Old Business item on every Commission agenda through 2026-04-21 with NO adopting ordinance or resolution passed as of this audit. Building & Zoning (904) 930-3243.
- County Impact Fees (City of Starke, Commercial)$0.00Bradford County Board of County CommissionersCONFIRMED $0 (audit 2026-07-13 — Unconfirmed resolved). Bradford County Ord. 2025-01, codified as Code Ch. 43 (adopted 7-17-2025): nonres Fire $194.00 / Law Enforcement $119.00 / EMS $101.00 per 1,000 sq ft (+ admin fee up to 2%, Sec. 43-10(i)). CONTROLLING PROVISION — Sec. 43-18 (Municipal participation): the ordinance 'shall not be enforced within a municipality unless the county and municipality enter into an interlocal agreement setting forth the terms and conditions under which the provisions of the ordinance shall be implemented within the municipality.' AUDIT PROOF (2026-07-13): all 560 documents in Starke's Municode MuniDocs library — the city's complete agenda + minutes record through April 2026 — were searched for 'interlocal': 15 hits, ALL unrelated (automatic aid/fire, fuel tax split, school board facilities, Supervisor of Elections, Rural Infrastructure Fund grant, Sheriff law enforcement, SRWMD). NO impact-fee interlocal exists. Starke also issues its own building permits (the County directs all in-city permitting to Starke B&Z), so the county has no collection point in the city, and Starke's own B&Z FAQ (updated 11-20-2025) states 'The City of Starke has no impact fees for the development of any kind.' Sec. 43-31(b) separately carves Starke out of the FIRE fee entirely ('except for the City of Starke which provides it own fire facilities'); Art. III (Law Enf.) and Art. IV (EMS) carry no Starke carve-out and would apply only if an interlocal were executed. ⚠️ RECHECK: an executed Sec. 43-18 interlocal would turn this on at $220.00 per 1,000 sq ft (Law Enf. + EMS only, fire excluded). County Manager's Office (904) 966-6327 / Starke B&Z (904) 930-3243.
Where in Bradford County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Starke: Industrial Impact Fees
Industrial development in Starke pays no per-square-foot impact fees, but owes $5,550.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).
For a 50,000 sq ft building, that comes to about $5,550.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Pollution Control Charge (City of Starke), Sewer Connection Charge (City of Starke) — 1" meter, Water Capacity Availability Charge (City of Starke), and Water Main Tap Charge (City of Starke) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the full fee schedule
- Water Main Tap Charge (City of Starke) — 1" meter$500.00 one-timeRequires confirmationCity of Starke Utility ServicesOne-time water main tapping charge, charged IN ADDITION TO the ERC-based water capacity availability charge (see that record). Ord. No. 2015-0721 (adopted 3-3-2015), Exhibit A, p.2, 'Water main tapping': 5/8"x3/4" $350.00 · 3/4" $350.00 · 1" $500.00 · 1.5" $550.00 · 2" $600.00 · 'Fees for taps larger than 2" shall be determined by the actual cost x 200%.' Code Sec. 102-34: meter charge schedule set by resolution; new service connections larger than 2 inches charged at 200% of material cost. Canonical nonres default = 1" meter. Meter-size + capacity-charge stacking follows the Charlotte County precedent in the Process Guide. ⚠️ LIKELY SUPERSEDED: Res. No. 2026-01 (passed 10-7-2025, 'Updating the Fee Schedule for New Installation Services… Electrical, Gas, Water, Sewer') — text/exhibit not published anywhere. VERIFY → Utility Services (904) 964-5027 / cityutilities@cityofstarke.org.
- Water Capacity Availability Charge (City of Starke)$350.00 one-timeRequires confirmationCity of StarkeAMOUNT NOW SOURCED (audit 2026-07-13) — was $0 unpublished. City of Starke Ord. No. 2015-0721 (adopted 3-3-2015), Exhibit A utility fee schedule, p.2: water 'Capacity charge' 5/8"x3/4" = $350.00; all larger meters (3/4", 1", 1.5", 2", 4", 6", 8", 12") = 'Calculation based on E.R.U. X $350.00.' So the charge is ERC/ERU-BASED, NOT a meter ladder: $350.00 per ERC. Code Sec. 102-36 imposes the water capacity availability charge on the number of ERCs; Sec. 102-36(b): 1 ERC = a single-family household using 350 gpd. Sec. 102-33(l): nonresidential ERC count = estimated commercial/industrial daily flow / 350 gpd (city engineers estimate for business/industrial/institutional uses). Entered here as the published 1-ERC MINIMUM ($350.00), Subtype blank, Is Default true — a nonres project multiplies by its engineered ERC count. Separate WATER MAIN TAPPING charges also apply by meter size (see the Water Main Tap Charge records for this jurisdiction). ⚠️ LIKELY SUPERSEDED: Starke Res. No. 2026-01, 'Updating the Fee Schedule for New Installation Services Charged by the City of Starke for Providing Electrical, Gas, Water, Sewer, and Related Services,' passed 4-0 on the consent agenda 10-7-2025 (Commission agenda + minutes on Starke MuniDocs); the resolution's text/exhibit is NOT published on cityofstarke.org, in MuniDocs, or in the Agenda Center (Starke posts agendas only, no packets). The $350.00 above is the last PUBLISHED adopted figure. VERIFY the current per-ERC water capacity charge → Utility Services (904) 964-5027 / cityutilities@cityofstarke.org.
- Sewer Connection Charge (City of Starke) — 1" meter$3,500.00 one-timeRequires confirmationCity of StarkeAMOUNT NOW SOURCED (audit 2026-07-13) — was $0 unpublished. City of Starke Ord. No. 2015-0721 (adopted 3-3-2015), Exhibit A, p.4: 'Sewer service connection charges, by water meter size' — 3/4" $1,000.00 · 1" $3,500.00 · 1.5" $8,000.00 · 2" $15,500.00 · above 2" = actual cost x 200%. Canonical nonres default = 1" meter ($3,500.00) per project rule; other meter sizes are separate Subtype records. Code Sec. 102-35 authorizes the connection charge ('as provided by the city commission by resolution'), plus an added charge where the connection run exceeds 50 ft. The separate WATER POLLUTION CONTROL CHARGE (Sec. 102-37, $1,200.00 per ERC) is carried on its own record. Sec. 102-37(c) adds a strength surcharge for industrial/process waste exceeding 300 ppm BOD / 600 ppm COD / 300 ppm SS. ⚠️ LIKELY SUPERSEDED: Starke Res. No. 2026-01 ('Updating the Fee Schedule for New Installation Services… Electrical, Gas, Water, Sewer'), passed 4-0 on 10-7-2025 (Commission agenda + minutes on Starke MuniDocs); its text/exhibit is not published anywhere. Amounts above are the last PUBLISHED adopted figures. VERIFY current amounts → Utility Services (904) 964-5027 / cityutilities@cityofstarke.org.
- Water Pollution Control Charge (City of Starke)$1,200.00 one-timeRequires confirmationCity of Starke Utility ServicesSeparate one-time sewer charge, distinct from the sewer connection charge. Code Sec. 102-37(b): the water pollution control charge is based on the number of ERCs, amount set by commission resolution. Ord. No. 2015-0721 (adopted 3-3-2015), Exhibit A, p.4: 'Pollution control charge' = $1,200.00. Entered as the published 1-ERC MINIMUM (Subtype blank, Is Default true); nonres ERC count = estimated daily flow / 350 gpd (Sec. 102-33(l)). Sec. 102-37(c) adds a strength-based surcharge for industrial/process waste exceeding 300 ppm BOD / 600 ppm COD / 300 ppm SS: WPC = (BOD or COD/2 x Qmgd x 8.34 x $370/lb) + (SS x Qmgd x 8.34 x $370/lb) — relevant to Industrial users. ⚠️ LIKELY SUPERSEDED by Res. No. 2026-01 (10-7-2025, fee schedule for new installation services — text/exhibit unpublished). VERIFY → Utility Services (904) 964-5027 / cityutilities@cityofstarke.org.
- City Impact Fees (City of Starke, Industrial)$0.00City of StarkeCONFIRMED $0. City of Starke Building & Zoning FAQ (reconfirmed live on audit 2026-07-13): 'The City of Starke has no impact fees for the development of any kind.' Cross-checked against Res. 2025-14 (adopted 5-20-2025, Exhibit A) — planning/zoning/building permit fees only, no impact fees. ⚠️ RECHECK EACH CYCLE — Starke is running its own impact-fee study (Infrastructure Consulting & Engineering; ICE presentation to Commission 11-18-2025); 'Impact Fees' remains a standing Old Business item through 2026-04-21 with nothing adopted. Building & Zoning (904) 930-3243.
- County Impact Fees (City of Starke, Industrial)$0.00Bradford County Board of County CommissionersCONFIRMED $0 (audit 2026-07-13 — Unconfirmed resolved). Bradford County Ord. 2025-01 / Code Ch. 43 (adopted 7-17-2025): nonres Fire $194 / Law Enf $119 / EMS $101 per 1,000 sq ft. Sec. 43-18 (Municipal participation) bars enforcement inside a municipality absent a county–city interlocal agreement. AUDIT PROOF (2026-07-13): all 560 documents in Starke's Municode MuniDocs library (the city's complete agenda + minutes record through April 2026) were searched for 'interlocal' — 15 hits, none concerning impact fees. No impact-fee interlocal exists. Starke issues its own building permits, and its B&Z FAQ (updated 11-20-2025) states the city has no impact fees of any kind. Sec. 43-31(b) also carves Starke out of the FIRE fee entirely; Law Enforcement and EMS carry no carve-out and would apply only under an interlocal ($220.00 per 1,000 sq ft combined). ⚠️ RECHECK each cycle for an executed Sec. 43-18 interlocal. County Manager's Office (904) 966-6327 / Starke B&Z (904) 930-3243.
Where in Bradford County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Starke: Office Impact Fees
Office development in Starke pays no per-square-foot impact fees, but owes $5,550.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).
For a 25,000 sq ft building, that comes to about $5,550.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Pollution Control Charge (City of Starke), Sewer Connection Charge (City of Starke) — 1" meter, Water Capacity Availability Charge (City of Starke), and Water Main Tap Charge (City of Starke) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the full fee schedule
- Water Main Tap Charge (City of Starke) — 1" meter$500.00 one-timeRequires confirmationCity of Starke Utility ServicesOne-time water main tapping charge, charged IN ADDITION TO the ERC-based water capacity availability charge (see that record). Ord. No. 2015-0721 (adopted 3-3-2015), Exhibit A, p.2, 'Water main tapping': 5/8"x3/4" $350.00 · 3/4" $350.00 · 1" $500.00 · 1.5" $550.00 · 2" $600.00 · 'Fees for taps larger than 2" shall be determined by the actual cost x 200%.' Code Sec. 102-34: meter charge schedule set by resolution; new service connections larger than 2 inches charged at 200% of material cost. Canonical nonres default = 1" meter. Meter-size + capacity-charge stacking follows the Charlotte County precedent in the Process Guide. ⚠️ LIKELY SUPERSEDED: Res. No. 2026-01 (passed 10-7-2025, 'Updating the Fee Schedule for New Installation Services… Electrical, Gas, Water, Sewer') — text/exhibit not published anywhere. VERIFY → Utility Services (904) 964-5027 / cityutilities@cityofstarke.org.
- Water Capacity Availability Charge (City of Starke)$350.00 one-timeRequires confirmationCity of StarkeAMOUNT NOW SOURCED (audit 2026-07-13) — was $0 unpublished. City of Starke Ord. No. 2015-0721 (adopted 3-3-2015), Exhibit A utility fee schedule, p.2: water 'Capacity charge' 5/8"x3/4" = $350.00; all larger meters (3/4", 1", 1.5", 2", 4", 6", 8", 12") = 'Calculation based on E.R.U. X $350.00.' So the charge is ERC/ERU-BASED, NOT a meter ladder: $350.00 per ERC. Code Sec. 102-36 imposes the water capacity availability charge on the number of ERCs; Sec. 102-36(b): 1 ERC = a single-family household using 350 gpd. Sec. 102-33(l): nonresidential ERC count = estimated commercial/industrial daily flow / 350 gpd (city engineers estimate for business/industrial/institutional uses). Entered here as the published 1-ERC MINIMUM ($350.00), Subtype blank, Is Default true — a nonres project multiplies by its engineered ERC count. Separate WATER MAIN TAPPING charges also apply by meter size (see the Water Main Tap Charge records for this jurisdiction). ⚠️ LIKELY SUPERSEDED: Starke Res. No. 2026-01, 'Updating the Fee Schedule for New Installation Services Charged by the City of Starke for Providing Electrical, Gas, Water, Sewer, and Related Services,' passed 4-0 on the consent agenda 10-7-2025 (Commission agenda + minutes on Starke MuniDocs); the resolution's text/exhibit is NOT published on cityofstarke.org, in MuniDocs, or in the Agenda Center (Starke posts agendas only, no packets). The $350.00 above is the last PUBLISHED adopted figure. VERIFY the current per-ERC water capacity charge → Utility Services (904) 964-5027 / cityutilities@cityofstarke.org.
- Sewer Connection Charge (City of Starke) — 1" meter$3,500.00 one-timeRequires confirmationCity of StarkeAMOUNT NOW SOURCED (audit 2026-07-13) — was $0 unpublished. City of Starke Ord. No. 2015-0721 (adopted 3-3-2015), Exhibit A, p.4: 'Sewer service connection charges, by water meter size' — 3/4" $1,000.00 · 1" $3,500.00 · 1.5" $8,000.00 · 2" $15,500.00 · above 2" = actual cost x 200%. Canonical nonres default = 1" meter ($3,500.00) per project rule; other meter sizes are separate Subtype records. Code Sec. 102-35 authorizes the connection charge ('as provided by the city commission by resolution'), plus an added charge where the connection run exceeds 50 ft. The separate WATER POLLUTION CONTROL CHARGE (Sec. 102-37, $1,200.00 per ERC) is carried on its own record. Sec. 102-37(c) adds a strength surcharge for industrial/process waste exceeding 300 ppm BOD / 600 ppm COD / 300 ppm SS. ⚠️ LIKELY SUPERSEDED: Starke Res. No. 2026-01 ('Updating the Fee Schedule for New Installation Services… Electrical, Gas, Water, Sewer'), passed 4-0 on 10-7-2025 (Commission agenda + minutes on Starke MuniDocs); its text/exhibit is not published anywhere. Amounts above are the last PUBLISHED adopted figures. VERIFY current amounts → Utility Services (904) 964-5027 / cityutilities@cityofstarke.org.
- Water Pollution Control Charge (City of Starke)$1,200.00 one-timeRequires confirmationCity of Starke Utility ServicesSeparate one-time sewer charge, distinct from the sewer connection charge. Code Sec. 102-37(b): the water pollution control charge is based on the number of ERCs, amount set by commission resolution. Ord. No. 2015-0721 (adopted 3-3-2015), Exhibit A, p.4: 'Pollution control charge' = $1,200.00. Entered as the published 1-ERC MINIMUM (Subtype blank, Is Default true); nonres ERC count = estimated daily flow / 350 gpd (Sec. 102-33(l)). Sec. 102-37(c) adds a strength-based surcharge for industrial/process waste exceeding 300 ppm BOD / 600 ppm COD / 300 ppm SS: WPC = (BOD or COD/2 x Qmgd x 8.34 x $370/lb) + (SS x Qmgd x 8.34 x $370/lb) — relevant to Industrial users. ⚠️ LIKELY SUPERSEDED by Res. No. 2026-01 (10-7-2025, fee schedule for new installation services — text/exhibit unpublished). VERIFY → Utility Services (904) 964-5027 / cityutilities@cityofstarke.org.
- City Impact Fees (City of Starke, Office)$0.00City of StarkeCONFIRMED $0. City of Starke Building & Zoning FAQ (reconfirmed live on audit 2026-07-13): 'The City of Starke has no impact fees for the development of any kind.' Cross-checked against Res. 2025-14 (adopted 5-20-2025, Exhibit A) — planning/zoning/building permit fees only, no impact fees. ⚠️ RECHECK EACH CYCLE — Starke is running its own impact-fee study (Infrastructure Consulting & Engineering; ICE presentation to Commission 11-18-2025); 'Impact Fees' remains a standing Old Business item through 2026-04-21 with nothing adopted. Building & Zoning (904) 930-3243.
- County Impact Fees (City of Starke, Office)$0.00Bradford County Board of County CommissionersCONFIRMED $0 (audit 2026-07-13 — Unconfirmed resolved). Bradford County Ord. 2025-01 / Code Ch. 43 (adopted 7-17-2025): nonres Fire $194 / Law Enf $119 / EMS $101 per 1,000 sq ft. Sec. 43-18 (Municipal participation) bars enforcement inside a municipality absent a county–city interlocal agreement. AUDIT PROOF (2026-07-13): all 560 documents in Starke's Municode MuniDocs library (the city's complete agenda + minutes record through April 2026) were searched for 'interlocal' — 15 hits, none concerning impact fees. No impact-fee interlocal exists. Starke issues its own building permits, and its B&Z FAQ (updated 11-20-2025) states the city has no impact fees of any kind. Sec. 43-31(b) also carves Starke out of the FIRE fee entirely; Law Enforcement and EMS carry no carve-out and would apply only under an interlocal ($220.00 per 1,000 sq ft combined). ⚠️ RECHECK each cycle for an executed Sec. 43-18 interlocal. County Manager's Office (904) 966-6327 / Starke B&Z (904) 930-3243.
Where in Bradford County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Starke
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
How much are commercial impact fees in Starke?
Commercial development in Starke pays no per-square-foot impact fees, but owes $5,550.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Starke charge its own impact fees?
Yes. Starke levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Starke, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Bradford County impact fees page.