IMPACTFEES.ORG

Citrus County, Florida Impact Fees

Impact fees in Citrus County depend on where you build. This page details the rates for unincorporated Citrus County: $17,467.89 per single-family unit as of July 12, 2026. Inside city limits, each city applies its own schedule and fees may be completely different. Pick your city below.

Citrus County impact fees by project type

Where in Citrus County are you building?

Each jurisdiction applies its own fee schedule. Pick yours.

Unincorporated Citrus County$17,467.89this page
Crystal River$18,019.00Inverness$19,765.43

Unincorporated Citrus County: Single-Family Impact Fees

A new single-family home in unincorporated Citrus County pays $17,467.89 per unit in impact fees (rates sourced July 12, 2026). All of it is levied by Citrus County.

The largest line items are County Impact Fee (Citrus County) ($13,109.00), Sewer Connection Fee (Citrus County Utilities) ($2,897.13) and Water Connection Fee (Citrus County Utilities) ($1,461.76).

View the full fee schedule
Water$1,461.76
  • Water Connection Fee (Citrus County Utilities)
    Citrus County Water Resources
    CONFIRMED 7/11/2026 (closes a long-standing VERIFY). Citrus County Water Resources 'Miscellaneous Service Charges' schedule, WATER AND WASTEWATER CONNECTIONS FEES section, FY26 column: Water Plant Capacity $538.27/ERU + Water Off-Site Facilities $923.49/ERU = $1,461.76 per ERU. SFR = 1.0 ERU. FY26 = Oct 2025-Sep 2026, the currently effective year. Fee document is the 'Miscellaneous Fees [pdf]' linked from the About Your Bill page (cited here because the hashed CMS file URL is unstable).
    $1,461.76
Sewer$2,897.13
  • Sewer Connection Fee (Citrus County Utilities)
    Citrus County Water Resources
    CONFIRMED 7/11/2026 - UPDATED off a stale figure. Citrus County Water Resources 'Miscellaneous Service Charges' schedule, WATER AND WASTEWATER CONNECTIONS FEES section, FY26 column: Wastewater Plant Capacity $1,715.06/ERU + Wastewater Off-Site Facilities $1,182.07/ERU = $2,897.13 per ERU. SFR = 1.0 ERU. Supersedes the prior $2,833.94 ($1,156.29 + $1,677.65), which was an Oct 1 2024 figure sourced from the Cambridge Greens grant-program portal (a septic-to-sewer assistance program, not the adopted fee schedule) - re-sourced to the county's official fee document.
    $2,897.13
City$0.00
  • City Impact Fee (Citrus County - Unincorporated)
    N/A - unincorporated area
    CONFIRMED $0 - N/A by definition. There is no municipal government in the unincorporated area, so no city-level impact fee can apply. Development in unincorporated Citrus County pays the countywide Citrus County impact fee (Ord. 2025-A15, eff. 10/28/2025) plus Citrus County Utilities water/sewer connection fees - see the separate County/Water/Sewer records. Mandatory City placeholder added 7/11/2026 audit.
    $0.00
County$13,109.00
  • County Impact Fee (Citrus County)
    Citrus County
    CONFIRMED 7/11/2026 from the adopted schedule (previously sourced to news articles). Ordinance No. 2025-A15, Impact Fee Schedule effective 10/28/2025. Single-Family Detached Dwelling, 8 categories: Transportation $5,193 + Schools $5,298 + Parks $710 + Library $405 + Fire $406 + EMS $77 + Law Enforcement $581 + Public Buildings $439 = $13,109. Applies COUNTYWIDE, including inside Crystal River and Inverness, per County Code Sec. 54-1(c). Prior rate was $7,949. Other residential tiers on the same schedule: SF Low-Income $9,310; SF Age-Restricted $3,515; Multi-Family $7,161; MF Age-Restricted $2,139; Mobile Home Pad $8,798.
    $13,109.00
Total (unincorporated Citrus County): $17,467.89
Sources last checked July 12, 2026Official fee schedules:Citrus County Water Resources N/A - unincorporated area Citrus County

Where in Citrus County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Citrus County$11,519.89this pageIncludes unconfirmed fees
Crystal River$12,071.00Inverness$12,421.50

Unincorporated Citrus County: Multifamily Impact Fees

A new multifamily unit in unincorporated Citrus County pays $11,519.89 per unit in impact fees (rates sourced July 12, 2026). All of it is levied by Citrus County.

The largest line items are County Impact Fee (Citrus County, MF) ($7,161.00).

Sewer Connection Fee (Citrus County Utilities, MF) and Water Connection Fee (Citrus County Utilities, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$1,461.76
  • Water Connection Fee (Citrus County Utilities, MF)
    Citrus County Water Resources
    Amount now sourced (was $0). Citrus County Water Resources 'Miscellaneous Service Charges' schedule, WATER AND WASTEWATER CONNECTIONS FEES, FY26 column: Water Plant Capacity $538.27/ERU + Water Off-Site Facilities $923.49/ERU = $1,461.76 PER ERU. Entered at 1.0 ERU per MF unit. STILL UNCONFIRMED: the county charges per ERU, and the per-unit ERU factor for multifamily is not published (the schedule prices a 'Multi-Family Building Permit, PER ERU' inspection fee but publishes no MF ERU-equivalency table) - confirm the MF ERU factor with Utility Business Services, 352-527-7650.
    $1,461.76Requires confirmation
Sewer$2,897.13
  • Sewer Connection Fee (Citrus County Utilities, MF)
    Citrus County Water Resources
    UPDATED off a stale figure. Citrus County Water Resources 'Miscellaneous Service Charges' schedule, FY26 column: Wastewater Plant Capacity $1,715.06/ERU + Wastewater Off-Site Facilities $1,182.07/ERU = $2,897.13 PER ERU. Supersedes the prior $2,833.94 (Oct 2024 figure taken from the Cambridge Greens septic-to-sewer grant portal, not an adopted fee schedule). Entered at 1.0 ERU per MF unit. STILL UNCONFIRMED: per-unit ERU factor for multifamily is not published - confirm with Utility Business Services, 352-527-7650.
    $2,897.13Requires confirmation
City$0.00
  • City Impact Fee (Citrus County - Unincorporated, MF)
    N/A - unincorporated area
    CONFIRMED $0 - N/A by definition. No municipal government exists in the unincorporated area, so no city-level impact fee can apply. Multifamily development in unincorporated Citrus County pays the countywide Citrus County MF impact fee ($7,161/unit, Ord. 2025-A15) plus Citrus County Utilities water/sewer connection fees. Mandatory City placeholder added 7/11/2026 audit.
    $0.00
County$7,161.00
  • County Impact Fee (Citrus County, MF)
    Citrus County
    CONFIRMED 7/11/2026 from the adopted schedule (previously sourced to news articles). Ord. No. 2025-A15, Impact Fee Schedule effective 10/28/2025. Multi-Family Dwelling, 8 categories: Transportation $2,030 + Schools $3,128 + Parks $543 + Library $310 + Fire $311 + EMS $59 + Law Enforcement $444 + Public Buildings $336 = $7,161 per unit. Correctly differs from the SFR rate ($13,109). Applies countywide per County Code Sec. 54-1(c). Canonical (non-age-restricted) tier = default.
    $7,161.00
Total (unincorporated Citrus County): $11,519.89
Sources last checked July 12, 2026Official fee schedules:Citrus County Water Resources N/A - unincorporated area Citrus County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Citrus County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Unincorporated Citrus County$377,597.23this page
Crystal River$376,520.00Inverness$452,843.00

Unincorporated Citrus County: Commercial Impact Fees

Commercial development in unincorporated Citrus County pays $7.33 per square foot in impact fees, plus $10,897.23 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to about $377,597.23. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection Fee (Citrus County Utilities) — 1" meter — 2.5 ERU × $2,897.13/ERU ($7,242.83 one-time), Water Connection Fee (Citrus County Utilities) — 1" meter — 2.5 ERU × $1,461.76/ERU ($3,654.40 one-time) and County Impact Fee (Citrus County, Commercial) ($7.33/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full fee schedule
Water$3,654.40 one-time
  • Water Connection Fee (Citrus County Utilities) — 1" meter — 2.5 ERU × $1,461.76/ERU
    Citrus County Water Resources
    Citrus County Utilities (unincorporated county). RATE: 'Miscellaneous Service Charges' schedule eff. 10/01/2024, WATER AND WASTEWATER CONNECTIONS FEES section, FY26 column (Oct 2025–Sep 2026, currently effective): Water Plant Capacity $538.27/ERU + Water Off-Site Facilities $923.49/ERU = $1,461.76 per ERU. BASIS: Citrus County Code Sec. 102-85 (Ord. No. 2018-A05, 4-10-18) — nonresidential connection fees are METER-SIZE based via the code's ERU chart: 5/8x3/4"=1.0, 1"=2.5, 1.5"=5.0, 2"=8.0, 3"=16.0, 4"=25.0, 6"=50.0, 8"=80.0, 10"=150.0, 12"=215.0. Sec. 102-81 defines 1 ERU = a dwelling served by a 5/8x3/4" meter. Applicant must submit an AWWA Manual M22 meter-sizing calculation by a FL Registered PE. This record = 1" meter: 2.5 ERU × $1,461.76 = $3,654.40 (canonical default per Guide). Meter installation charges are billed separately on the Misc Fees schedule and are not part of the connection fee. RESOLVED at 2026-07-12 audit: record previously held only the 1.0-ERU floor with the ERU basis flagged Unconfirmed; the basis is published in the CODE, not the fee schedule (Charlotte County precedent) — entering it as a flat 1-ERU fee understated every tier above 5/8x3/4".
    $3,654.40 one-time
Sewer$7,242.83 one-time
  • Sewer Connection Fee (Citrus County Utilities) — 1" meter — 2.5 ERU × $2,897.13/ERU
    Citrus County Water Resources
    Citrus County Utilities (unincorporated county). RATE: 'Miscellaneous Service Charges' schedule eff. 10/01/2024, WATER AND WASTEWATER CONNECTIONS FEES section, FY26 column (Oct 2025–Sep 2026, currently effective): Wastewater Plant Capacity $1,715.06/ERU + Wastewater Off-Site Facilities $1,182.07/ERU = $2,897.13 per ERU. BASIS: Citrus County Code Sec. 102-85 (Ord. No. 2018-A05, 4-10-18) — nonresidential connection fees are METER-SIZE based via the code's ERU chart: 5/8x3/4"=1.0, 1"=2.5, 1.5"=5.0, 2"=8.0, 3"=16.0, 4"=25.0, 6"=50.0, 8"=80.0, 10"=150.0, 12"=215.0. Sec. 102-81 defines 1 ERU = a dwelling served by a 5/8x3/4" meter. Applicant must submit an AWWA Manual M22 meter-sizing calculation by a FL Registered PE. This record = 1" meter: 2.5 ERU × $2,897.13 = $7,242.83 (canonical default per Guide). RESOLVED at 2026-07-12 audit: record previously held only the 1.0-ERU floor with the ERU basis flagged Unconfirmed; the basis is published in the CODE, not the fee schedule (Charlotte County precedent) — entering it as a flat 1-ERU fee understated every tier above 5/8x3/4".
    $7,242.83 one-time
City$0.00
  • City Impact Fee (Citrus County - Unincorporated, Commercial)
    N/A - unincorporated area
    CONFIRMED $0 — N/A by definition. There is no municipal government in the unincorporated area, so no city-level impact fee can apply. Nonresidential development in unincorporated Citrus County pays the countywide Citrus County impact fee (Ord. 2025-A15, eff. 10/28/2025) plus Citrus County Utilities water/sewer connection fees — see the separate County and Water/Sewer records. Mandatory City placeholder.
    $0.00
County$7.33/sq ft
  • County Impact Fee (Citrus County, Commercial)
    Citrus County
    Citrus County Impact Fee, Ord. No. 2025-A15, effective 10/28/2025. Schedule row: 'Retail/Commercial', unit = 1,000 sq. ft. (GFA). Combined total of the 5 nonres-applicable components: Transportation $5,257 + Fire $561 + EMS $107 + Law Enforcement $802 + Public Buildings $607 = $7,334 per 1,000 sq ft. Schools, Parks and Library are shown 'n/a' for every nonresidential row on the adopted schedule. Fee applies COUNTYWIDE, including inside Crystal River and Inverness, per County Code Sec. 54-1(c).
    $7.33/sq ft
Total (unincorporated Citrus County): $7.33/sq ft + $10,897.23 one-time (≈ $377,597.23 at 50,000 sq ft)
Sources last checked July 12, 2026Official fee schedules:Citrus County Water Resources N/A - unincorporated area Citrus County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Citrus County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Unincorporated Citrus County$98,047.23this page
Crystal River$96,970.00Inverness$117,215.50

Unincorporated Citrus County: Industrial Impact Fees

Industrial development in unincorporated Citrus County pays $1.74 per square foot in impact fees, plus $10,897.23 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to about $98,047.23. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection Fee (Citrus County Utilities) — 1" meter — 2.5 ERU × $2,897.13/ERU ($7,242.83 one-time), Water Connection Fee (Citrus County Utilities) — 1" meter — 2.5 ERU × $1,461.76/ERU ($3,654.40 one-time) and County Impact Fee (Citrus County, Industrial) ($1.74/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full fee schedule
Water$3,654.40 one-time
  • Water Connection Fee (Citrus County Utilities) — 1" meter — 2.5 ERU × $1,461.76/ERU
    Citrus County Water Resources
    Citrus County Utilities (unincorporated county). RATE: 'Miscellaneous Service Charges' schedule eff. 10/01/2024, WATER AND WASTEWATER CONNECTIONS FEES section, FY26 column (Oct 2025–Sep 2026, currently effective): Water Plant Capacity $538.27/ERU + Water Off-Site Facilities $923.49/ERU = $1,461.76 per ERU. BASIS: Citrus County Code Sec. 102-85 (Ord. No. 2018-A05, 4-10-18) — nonresidential connection fees are METER-SIZE based via the code's ERU chart: 5/8x3/4"=1.0, 1"=2.5, 1.5"=5.0, 2"=8.0, 3"=16.0, 4"=25.0, 6"=50.0, 8"=80.0, 10"=150.0, 12"=215.0. Sec. 102-81 defines 1 ERU = a dwelling served by a 5/8x3/4" meter. Applicant must submit an AWWA Manual M22 meter-sizing calculation by a FL Registered PE. This record = 1" meter: 2.5 ERU × $1,461.76 = $3,654.40 (canonical default per Guide). Meter installation charges are billed separately on the Misc Fees schedule and are not part of the connection fee. RESOLVED at 2026-07-12 audit: record previously held only the 1.0-ERU floor with the ERU basis flagged Unconfirmed; the basis is published in the CODE, not the fee schedule (Charlotte County precedent) — entering it as a flat 1-ERU fee understated every tier above 5/8x3/4".
    $3,654.40 one-time
Sewer$7,242.83 one-time
  • Sewer Connection Fee (Citrus County Utilities) — 1" meter — 2.5 ERU × $2,897.13/ERU
    Citrus County Water Resources
    Citrus County Utilities (unincorporated county). RATE: 'Miscellaneous Service Charges' schedule eff. 10/01/2024, WATER AND WASTEWATER CONNECTIONS FEES section, FY26 column (Oct 2025–Sep 2026, currently effective): Wastewater Plant Capacity $1,715.06/ERU + Wastewater Off-Site Facilities $1,182.07/ERU = $2,897.13 per ERU. BASIS: Citrus County Code Sec. 102-85 (Ord. No. 2018-A05, 4-10-18) — nonresidential connection fees are METER-SIZE based via the code's ERU chart: 5/8x3/4"=1.0, 1"=2.5, 1.5"=5.0, 2"=8.0, 3"=16.0, 4"=25.0, 6"=50.0, 8"=80.0, 10"=150.0, 12"=215.0. Sec. 102-81 defines 1 ERU = a dwelling served by a 5/8x3/4" meter. Applicant must submit an AWWA Manual M22 meter-sizing calculation by a FL Registered PE. This record = 1" meter: 2.5 ERU × $2,897.13 = $7,242.83 (canonical default per Guide). RESOLVED at 2026-07-12 audit: record previously held only the 1.0-ERU floor with the ERU basis flagged Unconfirmed; the basis is published in the CODE, not the fee schedule (Charlotte County precedent) — entering it as a flat 1-ERU fee understated every tier above 5/8x3/4".
    $7,242.83 one-time
City$0.00
  • City Impact Fee (Citrus County - Unincorporated, Industrial)
    N/A - unincorporated area
    CONFIRMED $0 — N/A by definition; no municipal government exists in the unincorporated area. Development pays the countywide Citrus County impact fee (Ord. 2025-A15) plus Citrus County Utilities W/S connection fees. Mandatory City placeholder.
    $0.00
County$1.74/sq ft
  • County Impact Fee (Citrus County, Industrial)
    Citrus County
    Citrus County Impact Fee, Ord. No. 2025-A15, effective 10/28/2025. Schedule row: 'Industrial' (general light industrial), unit = 1,000 sq. ft. (GFA). Combined total: Transportation $1,455 + Fire $78 + EMS $15 + Law Enforcement $111 + Public Buildings $84 = $1,743 per 1,000 sq ft. Separate Warehousing ($922) and Mini Warehouse ($666) rows exist on the schedule but are not entered per the default-row-only rule. Applies COUNTYWIDE per County Code Sec. 54-1(c).
    $1.74/sq ft
Total (unincorporated Citrus County): $1.74/sq ft + $10,897.23 one-time (≈ $98,047.23 at 50,000 sq ft)
Sources last checked July 12, 2026Official fee schedules:Citrus County Water Resources N/A - unincorporated area Citrus County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Citrus County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Unincorporated Citrus County$131,422.23this page
Crystal River$130,345.00Inverness$160,119.50

Unincorporated Citrus County: Office Impact Fees

Office development in unincorporated Citrus County pays $4.82 per square foot in impact fees, plus $10,897.23 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 25,000 sq ft building, that comes to about $131,422.23. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection Fee (Citrus County Utilities) — 1" meter — 2.5 ERU × $2,897.13/ERU ($7,242.83 one-time), Water Connection Fee (Citrus County Utilities) — 1" meter — 2.5 ERU × $1,461.76/ERU ($3,654.40 one-time) and County Impact Fee (Citrus County, Office) ($4.82/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full fee schedule
Water$3,654.40 one-time
  • Water Connection Fee (Citrus County Utilities) — 1" meter — 2.5 ERU × $1,461.76/ERU
    Citrus County Water Resources
    Citrus County Utilities (unincorporated county). RATE: 'Miscellaneous Service Charges' schedule eff. 10/01/2024, WATER AND WASTEWATER CONNECTIONS FEES section, FY26 column (Oct 2025–Sep 2026, currently effective): Water Plant Capacity $538.27/ERU + Water Off-Site Facilities $923.49/ERU = $1,461.76 per ERU. BASIS: Citrus County Code Sec. 102-85 (Ord. No. 2018-A05, 4-10-18) — nonresidential connection fees are METER-SIZE based via the code's ERU chart: 5/8x3/4"=1.0, 1"=2.5, 1.5"=5.0, 2"=8.0, 3"=16.0, 4"=25.0, 6"=50.0, 8"=80.0, 10"=150.0, 12"=215.0. Sec. 102-81 defines 1 ERU = a dwelling served by a 5/8x3/4" meter. Applicant must submit an AWWA Manual M22 meter-sizing calculation by a FL Registered PE. This record = 1" meter: 2.5 ERU × $1,461.76 = $3,654.40 (canonical default per Guide). Meter installation charges are billed separately on the Misc Fees schedule and are not part of the connection fee. RESOLVED at 2026-07-12 audit: record previously held only the 1.0-ERU floor with the ERU basis flagged Unconfirmed; the basis is published in the CODE, not the fee schedule (Charlotte County precedent) — entering it as a flat 1-ERU fee understated every tier above 5/8x3/4".
    $3,654.40 one-time
Sewer$7,242.83 one-time
  • Sewer Connection Fee (Citrus County Utilities) — 1" meter — 2.5 ERU × $2,897.13/ERU
    Citrus County Water Resources
    Citrus County Utilities (unincorporated county). RATE: 'Miscellaneous Service Charges' schedule eff. 10/01/2024, WATER AND WASTEWATER CONNECTIONS FEES section, FY26 column (Oct 2025–Sep 2026, currently effective): Wastewater Plant Capacity $1,715.06/ERU + Wastewater Off-Site Facilities $1,182.07/ERU = $2,897.13 per ERU. BASIS: Citrus County Code Sec. 102-85 (Ord. No. 2018-A05, 4-10-18) — nonresidential connection fees are METER-SIZE based via the code's ERU chart: 5/8x3/4"=1.0, 1"=2.5, 1.5"=5.0, 2"=8.0, 3"=16.0, 4"=25.0, 6"=50.0, 8"=80.0, 10"=150.0, 12"=215.0. Sec. 102-81 defines 1 ERU = a dwelling served by a 5/8x3/4" meter. Applicant must submit an AWWA Manual M22 meter-sizing calculation by a FL Registered PE. This record = 1" meter: 2.5 ERU × $2,897.13 = $7,242.83 (canonical default per Guide). RESOLVED at 2026-07-12 audit: record previously held only the 1.0-ERU floor with the ERU basis flagged Unconfirmed; the basis is published in the CODE, not the fee schedule (Charlotte County precedent) — entering it as a flat 1-ERU fee understated every tier above 5/8x3/4".
    $7,242.83 one-time
City$0.00
  • City Impact Fee (Citrus County - Unincorporated, Office)
    N/A - unincorporated area
    CONFIRMED $0 — N/A by definition; no municipal government exists in the unincorporated area. Development pays the countywide Citrus County impact fee (Ord. 2025-A15) plus Citrus County Utilities W/S connection fees. Mandatory City placeholder.
    $0.00
County$4.82/sq ft
  • County Impact Fee (Citrus County, Office)
    Citrus County
    Citrus County Impact Fee, Ord. No. 2025-A15, effective 10/28/2025. Schedule row: 'Office', unit = 1,000 sq. ft. (GFA). Combined total: Transportation $3,835 + Fire $266 + EMS $51 + Law Enforcement $381 + Public Buildings $288 = $4,821 per 1,000 sq ft. Schools, Parks and Library are 'n/a' for all nonresidential rows. Applies COUNTYWIDE per County Code Sec. 54-1(c).
    $4.82/sq ft
Total (unincorporated Citrus County): $4.82/sq ft + $10,897.23 one-time (≈ $131,422.23 at 25,000 sq ft)
Sources last checked July 12, 2026Official fee schedules:Citrus County Water Resources N/A - unincorporated area Citrus County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Estimate your project in Citrus County

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are single-family impact fees in Citrus County, Florida?

A new single-family home in unincorporated Citrus County pays $17,467.89 per unit in impact fees (rates sourced July 12, 2026). Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.

How much are multifamily impact fees in Citrus County?

Multifamily development in unincorporated Citrus County pays $11,519.89 per unit in impact fees (rates sourced July 12, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. Rates inside city limits depend on the municipality. Pick your city on this page.

How much are commercial impact fees in Citrus County?

Commercial development in unincorporated Citrus County pays $7.33 per square foot in impact fees, plus $10,897.23 in one-time water and sewer connection fees (assuming a 1-inch meter), about $377,597.23 for a 50,000 sq ft building.

Do cities in Citrus County charge their own impact fees?

Yes. Every incorporated city applies its own fee schedule. 2 of 2 cities in Citrus County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000