Skip to content
IMPACTFEES.ORG

Crystal River, Florida Impact Fees

Crystal River applies its own fee schedule: municipal fees plus the Citrus County-levied fees that apply inside city limits. Combined, a new single-family home pays $17,003.00 per unit (rates sourced ). The full breakdown is below.

Crystal River Impact Fees by Project Type

Crystal River: Single-Family Impact Fees

A new single-family home in Crystal River pays $17,003.00 per unit in impact fees (rates sourced October 16, 2026). Of that, Citrus County-levied fees account for $11,993.00 and municipal or utility fees for $5,010.00.

The largest line items are County Impact Fee (Citrus County) ($11,993.00), Sewer Expansion Fee (City of Crystal River) ($2,740.00) and Water Expansion Fee (City of Crystal River) ($2,170.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Crystal River Impact Fee Schedule
Water$2,170.00
  • Water Expansion Fee (City of Crystal River)
    City of Crystal River
    City of Crystal River water system expansion fee (Code Sec. 16-3(a)(2)): $2,170.00 per ERU. Each residential, apartment, or condominium unit is one ERU (Sec. 16-2), so the per-unit charge is the same for single-family and multifamily.
    $2,170.00
Sewer$2,840.00
  • Sewer Expansion Fee (City of Crystal River)
    City of Crystal River
    City of Crystal River sewer system expansion fee (Code Sec. 16-3(a)(1)): $2,740.00 per ERU. Each residential, apartment, or condominium unit is one ERU (Sec. 16-2), so the per-unit charge is the same for single-family and multifamily.
    $2,740.00
  • Sewer Connection Fee (City of Crystal River)
    City of Crystal River
    City of Crystal River sewer connection fee (Code Sec. 16-16(a)): $100 for each residential unit, charged in addition to the sewer system expansion fee. 125% outside city limits.
    $100.00
City$0.00
  • City Impact Fee (City of Crystal River)
    City of Crystal River
    Crystal River levies no municipal impact fee of its own; its transportation impact fee was repealed in 2021. New development pays the Citrus County impact fee and the city water and sewer charges.
    $0.00
County$11,993.00
  • County Impact Fee (Citrus County)
    Single-Family Detached
    Citrus County
    Citrus County impact fee inside Crystal River (Ord. 2025-A15, effective Oct 28, 2025), standard single-family detached dwelling: transportation $5,193 (Crystal River transportation benefit district), schools $5,298, library $405, EMS $77, law enforcement $581 and public buildings $439. The county parks and fire components do not apply inside Crystal River (County Code Sec. 54-7); the city provides its own fire service. Crystal River's own water and sewer system expansion fees are separate records. Other adopted residential tiers have their own records.
    $11,993.00
Total (Crystal River): $17,003.00
Sources last checked Official fee schedules:City of Crystal River Citrus County

Where in Citrus County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours.

Crystal River: Multifamily Impact Fees

A new multifamily unit in Crystal River pays $11,317.00 per unit in impact fees (rates sourced October 16, 2026). Of that, Citrus County-levied fees account for $6,307.00 and municipal or utility fees for $5,010.00.

The largest line items are County Impact Fee (Citrus County, MF) ($6,307.00), Sewer Expansion Fee (City of Crystal River, MF) ($2,740.00) and Water Expansion Fee (City of Crystal River, MF) ($2,170.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Crystal River Impact Fee Schedule
Water$2,170.00
  • Water Expansion Fee (City of Crystal River, MF)
    City of Crystal River
    City of Crystal River water system expansion fee (Code Sec. 16-3(a)(2)): $2,170.00 per ERU. Each apartment or condominium unit is one ERU (Sec. 16-2), so the multifamily per-unit charge equals the single-family rate.
    $2,170.00
Sewer$2,840.00
  • Sewer Expansion Fee (City of Crystal River, MF)
    City of Crystal River
    City of Crystal River sewer system expansion fee (Code Sec. 16-3(a)(1)): $2,740.00 per ERU. Each apartment or condominium unit is one ERU (Sec. 16-2), so the multifamily per-unit charge equals the single-family rate.
    $2,740.00
  • Sewer Connection Fee (City of Crystal River, MF)
    City of Crystal River
    City of Crystal River sewer connection fee (Code Sec. 16-16(a)): $100 for each residential unit; each apartment or condominium unit is one ERU (Sec. 16-2). Charged in addition to the sewer system expansion fee. 125% outside city limits.
    $100.00
City$0.00
  • City Impact Fee (City of Crystal River, MF)
    City of Crystal River
    Crystal River levies no municipal impact fee of its own; its transportation impact fee was repealed in 2021. Multifamily development pays the Citrus County impact fee and the city water and sewer charges.
    $0.00
County$6,307.00
  • County Impact Fee (Citrus County, MF)
    Standard
    Citrus County
    Citrus County impact fee inside Crystal River (Ord. 2025-A15, effective Oct 28, 2025), standard multifamily unit: transportation $2,030, schools $3,128, library $310, EMS $59, law enforcement $444 and public buildings $336. The county parks and fire components do not apply inside Crystal River (County Code Sec. 54-7). Crystal River's own water and sewer system expansion fees are separate records. An age-restricted multifamily tier has its own record.
    $6,307.00
Total (Crystal River): $11,317.00
Sources last checked Official fee schedules:City of Crystal River Citrus County

Where in Citrus County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours.

Crystal River: Commercial Impact Fees

Commercial development in Crystal River pays $6.77 per square foot in impact fees, plus $10,020.00 in one-time water and sewer connection fees (rates sourced October 16, 2026).

For a 50,000 sq ft building, that comes to about $348,670.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Expansion Fee (City of Crystal River) — 2 ERU × $2,740/ERU nonres minimum ($5,480.00 one-time), Water Expansion Fee (City of Crystal River) — 2 ERU × $2,170/ERU nonres minimum ($4,340.00 one-time) and Sewer Connection Fee (City of Crystal River) — 2 ERU × $100/ERU nonres minimum ($200.00 one-time).

View the Full Crystal River Impact Fee Schedule
Water$4,340.00 one-time
  • Water Expansion Fee (City of Crystal River) — 2 ERU × $2,170/ERU nonres minimum
    City of Crystal River
    City of Crystal River water system expansion fee, effective January 10, 2022 (Ord. 22-O-02), charged per ERU. The amount shown is the nonresidential minimum (2 ERUs, for a commercial building up to 2,300 sq ft); larger buildings add 1 ERU per additional 2,300 sq ft, and use-specific rules apply to hotels, restaurants, schools, hospitals, laundries and car washes. Connections outside the city limits pay 125%.
    $4,340.00 one-time
Sewer$5,680.00 one-time
  • Sewer Expansion Fee (City of Crystal River) — 2 ERU × $2,740/ERU nonres minimum
    City of Crystal River
    City of Crystal River sewer system expansion fee, effective January 10, 2022 (Ord. 22-O-02), charged per ERU. The amount shown is the nonresidential minimum (2 ERUs, for a commercial building up to 2,300 sq ft); larger buildings add 1 ERU per additional 2,300 sq ft, with use-specific rules for certain uses. A separate $100-per-ERU sewer connection fee also applies. Connections outside the city limits pay 125%.
    $5,480.00 one-time
  • Sewer Connection Fee (City of Crystal River) — 2 ERU × $100/ERU nonres minimum
    City of Crystal River
    City of Crystal River sewer connection fee (Code Sec. 16-16(a)): $100 per equivalent residential unit (ERU), charged in addition to the sewer system expansion fee. The amount shown is the nonresidential minimum of 2 ERUs (a commercial building up to 2,300 sq ft); larger buildings add 1 ERU per additional 2,300 sq ft, with use-specific ERU rules for certain uses. Connections outside the city limits pay 125%.
    $200.00 one-time
City$0.00
  • City Impact Fee (City of Crystal River, Commercial)
    City of Crystal River
    The City of Crystal River levies no municipal impact fee; its transportation impact fee was repealed in 2021. Nonresidential development pays the Citrus County impact fee (the county fire component does not apply inside the city, which provides its own fire service) and the City's water and sewer expansion and connection fees.
    $0.00
County$6.77/sq ft
  • County Impact Fee (Citrus County, Commercial)
    Citrus County
    Citrus County impact fee inside Crystal River (Ord. 2025-A15, effective October 28, 2025), per 1,000 sq ft of gross floor area for retail/commercial use: transportation $5,257 (Crystal River transportation benefit district), EMS $107, law enforcement $802 and public buildings $607. The county fire component does not apply inside Crystal River, which provides its own fire service (County Code Sec. 54-7). School, park and library components do not apply to nonresidential development. Crystal River's own water and sewer system expansion fees are separate records.
    $6.77/sq ft
Total (Crystal River): $6.77/sq ft + $10,020.00 one-time (≈ $348,670.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Crystal River Citrus County

Where in Citrus County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Crystal River: Industrial Impact Fees

Industrial development in Crystal River pays $1.67 per square foot in impact fees, plus $10,020.00 in one-time water and sewer connection fees (rates sourced October 16, 2026).

For a 50,000 sq ft building, that comes to about $93,270.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Expansion Fee (City of Crystal River) — 2 ERU × $2,740/ERU nonres minimum ($5,480.00 one-time), Water Expansion Fee (City of Crystal River) — 2 ERU × $2,170/ERU nonres minimum ($4,340.00 one-time) and Sewer Connection Fee (City of Crystal River) — 2 ERU × $100/ERU nonres minimum ($200.00 one-time).

View the Full Crystal River Impact Fee Schedule
Water$4,340.00 one-time
  • Water Expansion Fee (City of Crystal River) — 2 ERU × $2,170/ERU nonres minimum
    City of Crystal River
    City of Crystal River water system expansion fee, effective January 10, 2022 (Ord. 22-O-02), charged per ERU. The amount shown is the nonresidential minimum (2 ERUs, for a commercial building up to 2,300 sq ft); larger buildings add 1 ERU per additional 2,300 sq ft, and use-specific rules apply to hotels, restaurants, schools, hospitals, laundries and car washes. Connections outside the city limits pay 125%.
    $4,340.00 one-time
Sewer$5,680.00 one-time
  • Sewer Expansion Fee (City of Crystal River) — 2 ERU × $2,740/ERU nonres minimum
    City of Crystal River
    City of Crystal River sewer system expansion fee, effective January 10, 2022 (Ord. 22-O-02), charged per ERU. The amount shown is the nonresidential minimum (2 ERUs, for a commercial building up to 2,300 sq ft); larger buildings add 1 ERU per additional 2,300 sq ft, with use-specific rules for certain uses. A separate $100-per-ERU sewer connection fee also applies. Connections outside the city limits pay 125%.
    $5,480.00 one-time
  • Sewer Connection Fee (City of Crystal River) — 2 ERU × $100/ERU nonres minimum
    City of Crystal River
    City of Crystal River sewer connection fee (Code Sec. 16-16(a)): $100 per equivalent residential unit (ERU), charged in addition to the sewer system expansion fee. The amount shown is the nonresidential minimum of 2 ERUs (a commercial building up to 2,300 sq ft); larger buildings add 1 ERU per additional 2,300 sq ft, with use-specific ERU rules for certain uses. Connections outside the city limits pay 125%.
    $200.00 one-time
City$0.00
  • City Impact Fee (City of Crystal River, Industrial)
    City of Crystal River
    The City of Crystal River levies no municipal impact fee; its transportation impact fee was repealed in 2021. Nonresidential development pays the Citrus County impact fee (the county fire component does not apply inside the city, which provides its own fire service) and the City's water and sewer expansion and connection fees.
    $0.00
County$1.67/sq ft
  • County Impact Fee (Citrus County, Industrial)
    Citrus County
    Citrus County impact fee inside Crystal River (Ord. 2025-A15, effective October 28, 2025), per 1,000 sq ft of gross floor area for general light industrial use: transportation $1,455 (Crystal River transportation benefit district), EMS $15, law enforcement $111 and public buildings $84. The county fire component does not apply inside Crystal River, which provides its own fire service (County Code Sec. 54-7). School, park and library components do not apply to nonresidential development.
    $1.67/sq ft
Total (Crystal River): $1.67/sq ft + $10,020.00 one-time (≈ $93,270.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Crystal River Citrus County

Where in Citrus County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Crystal River: Office Impact Fees

Office development in Crystal River pays $4.55 per square foot in impact fees, plus $10,020.00 in one-time water and sewer connection fees (rates sourced October 16, 2026).

For a 25,000 sq ft building, that comes to about $123,895.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Expansion Fee (City of Crystal River) — 2 ERU × $2,740/ERU nonres minimum ($5,480.00 one-time), Water Expansion Fee (City of Crystal River) — 2 ERU × $2,170/ERU nonres minimum ($4,340.00 one-time) and Sewer Connection Fee (City of Crystal River) — 2 ERU × $100/ERU nonres minimum ($200.00 one-time).

View the Full Crystal River Impact Fee Schedule
Water$4,340.00 one-time
  • Water Expansion Fee (City of Crystal River) — 2 ERU × $2,170/ERU nonres minimum
    City of Crystal River
    City of Crystal River water system expansion fee, effective January 10, 2022 (Ord. 22-O-02), charged per ERU. The amount shown is the nonresidential minimum (2 ERUs, for a commercial building up to 2,300 sq ft); larger buildings add 1 ERU per additional 2,300 sq ft, and use-specific rules apply to hotels, restaurants, schools, hospitals, laundries and car washes. Connections outside the city limits pay 125%.
    $4,340.00 one-time
Sewer$5,680.00 one-time
  • Sewer Expansion Fee (City of Crystal River) — 2 ERU × $2,740/ERU nonres minimum
    City of Crystal River
    City of Crystal River sewer system expansion fee, effective January 10, 2022 (Ord. 22-O-02), charged per ERU. The amount shown is the nonresidential minimum (2 ERUs, for a commercial building up to 2,300 sq ft); larger buildings add 1 ERU per additional 2,300 sq ft, with use-specific rules for certain uses. A separate $100-per-ERU sewer connection fee also applies. Connections outside the city limits pay 125%.
    $5,480.00 one-time
  • Sewer Connection Fee (City of Crystal River) — 2 ERU × $100/ERU nonres minimum
    City of Crystal River
    City of Crystal River sewer connection fee (Code Sec. 16-16(a)): $100 per equivalent residential unit (ERU), charged in addition to the sewer system expansion fee. The amount shown is the nonresidential minimum of 2 ERUs (a commercial building up to 2,300 sq ft); larger buildings add 1 ERU per additional 2,300 sq ft, with use-specific ERU rules for certain uses. Connections outside the city limits pay 125%.
    $200.00 one-time
City$0.00
  • City Impact Fee (City of Crystal River, Office)
    City of Crystal River
    The City of Crystal River levies no municipal impact fee; its transportation impact fee was repealed in 2021. Nonresidential development pays the Citrus County impact fee (the county fire component does not apply inside the city, which provides its own fire service) and the City's water and sewer expansion and connection fees.
    $0.00
County$4.55/sq ft
  • County Impact Fee (Citrus County, Office)
    Citrus County
    Citrus County impact fee inside Crystal River (Ord. 2025-A15, effective October 28, 2025), per 1,000 sq ft of gross floor area for office use: transportation $3,835 (Crystal River transportation benefit district), EMS $51, law enforcement $381 and public buildings $288. The county fire component does not apply inside Crystal River, which provides its own fire service (County Code Sec. 54-7). School, park and library components do not apply to nonresidential development.
    $4.55/sq ft
Total (Crystal River): $4.55/sq ft + $10,020.00 one-time (≈ $123,895.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Crystal River Citrus County

Where in Citrus County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Crystal River Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Crystal River Impact Fee FAQs

What are the total impact fees for a single-family home in Crystal River, Florida?

A new single-family home in Crystal River pays $17,003.00 per unit in combined impact fees (rates sourced October 16, 2026).

How much are commercial impact fees in Crystal River?

Commercial development in Crystal River pays $6.77 per square foot in impact fees, plus $10,020.00 in one-time water and sewer connection fees, about $348,670.00 for a 50,000 sq ft building.

Does Crystal River charge its own impact fees?

Yes. Crystal River levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Crystal River, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Citrus County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000