Skip to content
IMPACTFEES.ORG

Collier County, Florida Impact Fees

Impact fees in Collier County depend on where you build. This page details the rates for unincorporated Collier County: $37,770.97 per single-family unit as of . Unincorporated communities such as Golden Gate, Immokalee and Ave Maria pay these county rates rather than a city schedule. Inside city limits, each city applies its own schedule and fees may be completely different. Pick your city below.

Collier County Impact Fees by Project Type

Where in Collier County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Collier County: Single-Family Impact Fees

A new single-family home in unincorporated Collier County pays $37,770.97 per unit in impact fees (rates sourced October 17, 2026). All of it is levied by Collier County.

The largest line items are County Impact Fees (Collier County, SFR — Total excl. Fire & Water/Sewer) ($23,763.97), Water Impact Fee (Collier County Water-Sewer District, SFR) ($5,441.00) and Wastewater (Sewer) Impact Fee (Collier County Water-Sewer District, SFR) ($4,847.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Collier County Impact Fee Schedule
Water$7,280.00
  • Water Impact Fee (Collier County Water-Sewer District, SFR)
    Collier County Water-Sewer District
    Collier County Water-Sewer District water impact fee for a single-family home, individually metered, up to 4,999 sq ft of living space and five toilets: 1.0 ERU = $5,441, the rate on the county schedules since December 1, 2025. It rises to $6,470 on December 1, 2026 (Phase 3 of the water and sewer update). The district serves most of unincorporated Collier County; Immokalee is served by the Immokalee Water & Sewer District instead. A separate meter installation charge also applies.
    $5,441.00
  • Water Meter Installation Charge (Collier County Water-Sewer District) — 3/4" meter, with service line
    Collier County Water-Sewer District
    Collier County Water-Sewer District charges a one-time meter and cross-connection control device installation charge on each new water connection, in addition to the water and sewer impact fees. For a 3/4 inch meter with a new service line the charge is $1,839; where the service line is already in place (drop-in or hang) it is $778. Larger meters cost more (up to $3,344 for a 2 inch meter with service line). Rates as printed on the county schedules since December 2025 and unchanged on the December 1, 2026 schedule.
    $1,839.00
Sewer$4,847.00
  • Wastewater (Sewer) Impact Fee (Collier County Water-Sewer District, SFR)
    Collier County Water-Sewer District
    Collier County Water-Sewer District wastewater (sewer) impact fee for a single-family home, individually metered, up to 4,999 sq ft of living space and five toilets: 1.0 ERU = $4,847, the rate on the county schedules since December 1, 2025. It rises to $5,614 on December 1, 2026 (Phase 3 of the water and sewer update). The district serves most of unincorporated Collier County; Immokalee is served by the Immokalee Water & Sewer District instead.
    $4,847.00
City$0.00
County$25,643.97
  • County Impact Fees (Collier County, SFR — Total excl. Fire & Water/Sewer)
    Outside Ave Maria, <4,000 sf
    Collier County
    Collier County impact fees for a single-family detached home under 4,000 sq ft of living area in unincorporated Collier County, effective May 1, 2026 (Phase 2 of the current update): $23,763.97 total, combining EMS, jail, libraries, roads, schools, government buildings, law enforcement, community parks and regional parks. This is the highest of the county's two residential rate schedules; Ave Maria has its own lower schedule (lower park fees). Homes of 4,000 sq ft or more pay $26,535.95. Fire impact fees (by fire district) and Collier County Water-Sewer District water and sewer impact fees are separate.
    $23,763.97
  • Fire Impact Fee (Collier County, SFR) — $0.94/sf × 2,000 sf
    Immokalee Fire District
    Collier County Fire Districts
    Collier County fire impact fee, charged at a rate set by the fire district serving the property and collected at building permit issuance. This is the highest of four rate districts: Immokalee Fire at $0.94 per square foot under roof (capped at 4,000 sq ft), so a 2,000 sq ft home pays $1,880. Ochopee Fire charges $0.60 per sq ft (capped at 4,000 sq ft), Greater Naples Fire $0.433 per sq ft, and North Collier Fire a flat $476 per home under 4,000 sq ft of living area ($833 at 4,000 sq ft or more). Area under roof includes garages and covered lanais. Ave Maria is in the Immokalee district. The Immokalee rate has applied since January 1, 2024.
    $1,880.00
Total (unincorporated Collier County): $37,770.97
Sources last checked Official fee schedules:Collier County Water-Sewer District N/A Collier County Collier County Fire Districts

Where in Collier County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Collier County: Multifamily Impact Fees

A new multifamily unit in unincorporated Collier County pays $20,386.95 per unit in impact fees (rates sourced October 17, 2026). All of it is levied by Collier County.

The largest line items are Impact Fees - Multifamily Mid-Rise (4-10 floors) - Total excl. Fire ($10,716.95), Water Impact Fee - Multifamily (0.67 ERU, 751-1,500 sf) ($3,644.00) and Wastewater Impact Fee - Multifamily (0.67 ERU, 751-1,500 sf) ($3,247.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Collier County Impact Fee Schedule
Water$5,483.00
  • Water Impact Fee - Multifamily (0.67 ERU, 751-1,500 sf)
    Collier County Water-Sewer District, master metered 751-1,500 sf
    Collier County Water-Sewer District
    Collier County Water-Sewer District water impact fee for a unit in a master-metered multifamily building, set by unit living area: 751 to 1,500 sq ft = 0.67 ERC, $3,644 (shown). Units of 0 to 750 sq ft pay $1,795 and 1,501 sq ft or more $5,441. Individually metered units pay the full per-unit rate ($5,441). Rates rise on December 1, 2026 (Phase 3): this tier to $4,334.
    $3,644.00
  • Water Meter Installation Charge (Collier County Water-Sewer District, MF) — 3/4" meter, with service line
    Collier County Water-Sewer District
    Collier County Water-Sewer District charges a one-time meter and cross-connection control device installation charge per new water meter, in addition to the water and sewer impact fees. For a 3/4 inch meter with a new service line the charge is $1,839 ($778 where the service line is already in place). The charge is per meter, so a building served by one master meter pays it once, at the rate for that meter size (up to $3,344 for a 2 inch meter with service line).
    $1,839.00
Sewer$3,247.00
  • Wastewater Impact Fee - Multifamily (0.67 ERU, 751-1,500 sf)
    Collier County Water-Sewer District, master metered 751-1,500 sf
    Collier County Water-Sewer District
    Collier County Water-Sewer District wastewater (sewer) impact fee for a unit in a master-metered multifamily building, set by unit living area: 751 to 1,500 sq ft = 0.67 ERC, $3,247 (shown). Units of 0 to 750 sq ft pay $1,599 and 1,501 sq ft or more $4,847. Individually metered units pay the full per-unit rate ($4,847). Rates rise on December 1, 2026 (Phase 3): this tier to $3,761.
    $3,247.00
City$0.00
County$11,656.95
  • Impact Fees - Multifamily Mid-Rise (4-10 floors) - Total excl. Fire
    Outside Ave Maria, Mid-Rise (4-10 floors)
    Collier County
    Collier County impact fees for a mid-rise (4 to 10 floor) multifamily unit in unincorporated Collier County, effective May 1, 2026 (Phase 2 of the current update): $10,716.95 per unit, combining EMS, jail, libraries, roads, schools, government buildings, law enforcement, community parks and regional parks. This is the highest of the county's two residential rate schedules for this building type; Ave Maria has its own lower schedule. Low-rise (1 to 3 floor) units pay $12,547.95 and high-rise (over 10 floors) $10,189.95. Fire impact fees (by fire district) and water and sewer impact fees are separate.
    $10,716.95
  • Fire Impact Fee (Collier County, MF) — $0.94/sf × 1,000 sf
    Immokalee Fire District
    Collier County Fire Districts
    Collier County fire impact fee for multifamily, charged at a rate set by the fire district serving the property and collected at building permit issuance. This is the highest of four rate districts: Immokalee Fire at $0.94 per square foot under roof (capped at 4,000 sq ft), so a 1,000 sq ft unit pays $940. Ochopee Fire charges $0.60 per sq ft, Greater Naples Fire $0.433 per sq ft, and North Collier Fire a flat $357 per multifamily unit. Ave Maria is in the Immokalee district. The Immokalee rate has applied since January 1, 2024.
    $940.00
Total (unincorporated Collier County): $20,386.95
Sources last checked Official fee schedules:Collier County Water-Sewer District N/A Collier County Collier County Fire Districts

Where in Collier County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Collier County: Commercial Impact Fees

Commercial development in unincorporated Collier County pays $17.93 per square foot in impact fees, plus $19,328.00 in one-time water and sewer connection fees (rates sourced October 17, 2026).

For a 50,000 sq ft building, that comes to about $915,828.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (Collier County Water-Sewer District) — 1" meter ($9,085.00 one-time), Wastewater (Sewer) Impact Fee (Collier County Water-Sewer District) — 1" meter ($8,095.00 one-time) and Water Meter Installation Charge (Collier County Water-Sewer District) — 1" meter, with service line ($2,148.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Collier County Impact Fee Schedule
Water$11,233.00 one-time
  • Water Impact Fee (Collier County Water-Sewer District) — 1" meter
    Collier County Water-Sewer District
    Collier County Water-Sewer District water impact fee by meter size, Phase 2 rates effective December 1, 2025; Phase 3 takes effect December 1, 2026 (1 inch meter $10,804). Meter size is determined by total fixture value per the Florida Plumbing Code; the County installs meters 2 inches or smaller. Meter and cross-connection control device installation charges are separate. For a change of use, charged only if the meter is upsized. The Immokalee area is served by the Immokalee Water & Sewer District instead.
    $9,085.00 one-time
  • Water Meter Installation Charge (Collier County Water-Sewer District) — 1" meter, with service line
    Collier County Water-Sewer District
    Collier County Water-Sewer District charges a one-time meter and cross-connection control device installation charge on each new water connection, in addition to the water and wastewater impact fees. For a 1 inch meter with a new service line the charge is $2,148; where the service line is already in place it is $1,007. The County installs meters 2 inches or smaller; larger meters are installed by the developer.
    $2,148.00 one-time
Sewer$8,095.00 one-time
  • Wastewater (Sewer) Impact Fee (Collier County Water-Sewer District) — 1" meter
    Collier County Water-Sewer District
    Collier County Water-Sewer District wastewater impact fee by meter size, Phase 2 rates effective December 1, 2025; Phase 3 takes effect December 1, 2026 (1 inch meter $9,375). Meter size is determined by total fixture value per the Florida Plumbing Code; the County installs meters 2 inches or smaller. For a change of use, charged only if the meter is upsized. The Immokalee area is served by the Immokalee Water & Sewer District instead.
    $8,095.00 one-time
City$0.00
County$17.93/sq ft
  • County Impact Fees (Collier County, Commercial)
    Retail 40,001-150,000 sq ft
    Collier County
    Effective May 1, 2026 (Phase 2 rates), per square foot of building area. Collier County impact fee covering EMS, Government Buildings, Jail, Law Enforcement and Road; Library, Parks and School are not assessed on nonresidential. Applies to retail 40,001 to 150,000 sq ft. Ave Maria has its own county schedule with a lower road fee; this countywide rate is the higher of the two. Water, wastewater and fire impact fees are billed separately.
    $16.87/sq ft
  • Fire Impact Fee (Collier County Fire Districts, Commercial)
    North Collier Fire District
    Collier County Fire Districts
    Fire impact fee per square foot under roof, effective May 1, 2026. The rate depends on the fire district; North Collier's $1.06 is the highest of 4 rate districts. The others are Greater Naples $0.433, Immokalee $0.60 (which includes Ave Maria) and Ochopee $0.68. Not assessed inside Naples or Marco Island, which levy their own fire impact fees.
    $1.06/sq ft
Total (unincorporated Collier County): $17.93/sq ft + $19,328.00 one-time (≈ $915,828.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Collier County Water-Sewer District N/A Collier County Collier County Fire Districts
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Collier County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Collier County: Industrial Impact Fees

Industrial development in unincorporated Collier County pays $5.03 per square foot in impact fees, plus $19,328.00 in one-time water and sewer connection fees (rates sourced October 17, 2026).

For a 50,000 sq ft building, that comes to about $270,828.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (Collier County Water-Sewer District) — 1" meter ($9,085.00 one-time), Wastewater (Sewer) Impact Fee (Collier County Water-Sewer District) — 1" meter ($8,095.00 one-time) and Water Meter Installation Charge (Collier County Water-Sewer District) — 1" meter, with service line ($2,148.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Collier County Impact Fee Schedule
Water$11,233.00 one-time
  • Water Impact Fee (Collier County Water-Sewer District) — 1" meter
    Collier County Water-Sewer District
    Collier County Water-Sewer District water impact fee by meter size, Phase 2 rates effective December 1, 2025; Phase 3 takes effect December 1, 2026 (1 inch meter $10,804). Meter size is determined by total fixture value per the Florida Plumbing Code; the County installs meters 2 inches or smaller. Meter and cross-connection control device installation charges are separate. For a change of use, charged only if the meter is upsized. The Immokalee area is served by the Immokalee Water & Sewer District instead.
    $9,085.00 one-time
  • Water Meter Installation Charge (Collier County Water-Sewer District) — 1" meter, with service line
    Collier County Water-Sewer District
    Collier County Water-Sewer District charges a one-time meter and cross-connection control device installation charge on each new water connection, in addition to the water and wastewater impact fees. For a 1 inch meter with a new service line the charge is $2,148; where the service line is already in place it is $1,007. The County installs meters 2 inches or smaller; larger meters are installed by the developer.
    $2,148.00 one-time
Sewer$8,095.00 one-time
  • Wastewater (Sewer) Impact Fee (Collier County Water-Sewer District) — 1" meter
    Collier County Water-Sewer District
    Collier County Water-Sewer District wastewater impact fee by meter size, Phase 2 rates effective December 1, 2025; Phase 3 takes effect December 1, 2026 (1 inch meter $9,375). Meter size is determined by total fixture value per the Florida Plumbing Code; the County installs meters 2 inches or smaller. For a change of use, charged only if the meter is upsized. The Immokalee area is served by the Immokalee Water & Sewer District instead.
    $8,095.00 one-time
City$0.00
County$5.03/sq ft
  • County Impact Fees (Collier County, Industrial)
    Collier County
    Effective May 1, 2026 (Phase 2 rates), per square foot of building area. Collier County general light industrial impact fee covering EMS, Government Buildings, Jail, Law Enforcement and Road; Library, Parks and School are not assessed on nonresidential. The Ave Maria schedule prints the same industrial rate. Water, wastewater and fire impact fees are billed separately.
    $3.97/sq ft
  • Fire Impact Fee (Collier County Fire Districts, Industrial)
    North Collier Fire District
    Collier County Fire Districts
    Fire impact fee per square foot under roof, effective May 1, 2026. The rate depends on the fire district; North Collier's $1.06 is the highest of 4 rate districts. The others are Greater Naples $0.433, Immokalee $0.60 (which includes Ave Maria) and Ochopee $0.68. Not assessed inside Naples or Marco Island, which levy their own fire impact fees.
    $1.06/sq ft
Total (unincorporated Collier County): $5.03/sq ft + $19,328.00 one-time (≈ $270,828.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Collier County Water-Sewer District N/A Collier County Collier County Fire Districts
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Collier County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Collier County: Office Impact Fees

Office development in unincorporated Collier County pays $9.36 per square foot in impact fees, plus $19,328.00 in one-time water and sewer connection fees (rates sourced October 17, 2026).

For a 25,000 sq ft building, that comes to about $253,328.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (Collier County Water-Sewer District) — 1" meter ($9,085.00 one-time), Wastewater (Sewer) Impact Fee (Collier County Water-Sewer District) — 1" meter ($8,095.00 one-time) and Water Meter Installation Charge (Collier County Water-Sewer District) — 1" meter, with service line ($2,148.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Collier County Impact Fee Schedule
Water$11,233.00 one-time
  • Water Impact Fee (Collier County Water-Sewer District) — 1" meter
    Collier County Water-Sewer District
    Collier County Water-Sewer District water impact fee by meter size, Phase 2 rates effective December 1, 2025; Phase 3 takes effect December 1, 2026 (1 inch meter $10,804). Meter size is determined by total fixture value per the Florida Plumbing Code; the County installs meters 2 inches or smaller. Meter and cross-connection control device installation charges are separate. For a change of use, charged only if the meter is upsized. The Immokalee area is served by the Immokalee Water & Sewer District instead.
    $9,085.00 one-time
  • Water Meter Installation Charge (Collier County Water-Sewer District) — 1" meter, with service line
    Collier County Water-Sewer District
    Collier County Water-Sewer District charges a one-time meter and cross-connection control device installation charge on each new water connection, in addition to the water and wastewater impact fees. For a 1 inch meter with a new service line the charge is $2,148; where the service line is already in place it is $1,007. The County installs meters 2 inches or smaller; larger meters are installed by the developer.
    $2,148.00 one-time
Sewer$8,095.00 one-time
  • Wastewater (Sewer) Impact Fee (Collier County Water-Sewer District) — 1" meter
    Collier County Water-Sewer District
    Collier County Water-Sewer District wastewater impact fee by meter size, Phase 2 rates effective December 1, 2025; Phase 3 takes effect December 1, 2026 (1 inch meter $9,375). Meter size is determined by total fixture value per the Florida Plumbing Code; the County installs meters 2 inches or smaller. For a change of use, charged only if the meter is upsized. The Immokalee area is served by the Immokalee Water & Sewer District instead.
    $8,095.00 one-time
City$0.00
County$9.36/sq ft
  • County Impact Fees (Collier County, Office)
    Countywide
    Collier County
    Effective May 1, 2026 (Phase 2 rates), per square foot of building area. Collier County general office impact fee covering EMS, Government Buildings, Jail, Law Enforcement and Road; Library, Parks and School are not assessed on nonresidential. Ave Maria has its own county schedule with a lower road fee; this countywide rate is the higher of the two. Water, wastewater and fire impact fees are billed separately.
    $8.30/sq ft
  • Fire Impact Fee (Collier County Fire Districts, Office)
    North Collier Fire District
    Collier County Fire Districts
    Fire impact fee per square foot under roof, effective May 1, 2026. The rate depends on the fire district; North Collier's $1.06 is the highest of 4 rate districts. The others are Greater Naples $0.433, Immokalee $0.60 (which includes Ave Maria) and Ochopee $0.68. Not assessed inside Naples or Marco Island, which levy their own fire impact fees.
    $1.06/sq ft
Total (unincorporated Collier County): $9.36/sq ft + $19,328.00 one-time (≈ $253,328.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Collier County Water-Sewer District N/A Collier County Collier County Fire Districts
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Collier County Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Collier County Impact Fee FAQs

What are single-family impact fees in Collier County, Florida?

A new single-family home in unincorporated Collier County pays $37,770.97 per unit in impact fees (rates sourced October 17, 2026). Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.

How much are multifamily impact fees in Collier County?

Multifamily development in unincorporated Collier County pays $20,386.95 per unit in impact fees (rates sourced October 17, 2026). Rates inside city limits depend on the municipality. Pick your city on this page.

How much are commercial impact fees in Collier County?

Commercial development in unincorporated Collier County pays $17.93 per square foot in impact fees, plus $19,328.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $915,828.00 for a 50,000 sq ft building.

Do Golden Gate and Immokalee pay Collier County impact fees?

Yes. Golden Gate, Immokalee and Ave Maria are unincorporated, so new construction there pays the unincorporated Collier County schedule on this page, not a city schedule. Search a specific address in the calculator below to confirm it sits outside every city limit.

Do cities in Collier County charge their own impact fees?

Yes. Every incorporated city applies its own fee schedule. 3 of 3 cities in Collier County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000