Cross City applies its own fee schedule: municipal fees plus the Dixie County-levied fees that apply inside city limits. Combined, a new single-family home pays $2,900.00 per unit (rates sourced July 12, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Cross City impact fees by project type

Cross City: Single-Family Impact Fees

A new single-family home in Cross City pays $2,900.00 per unit in impact fees (rates sourced July 12, 2026). Of that, Dixie County-levied fees account for $2,000.00 and municipal or utility fees for $900.00.

The largest line items are Sewer Impact Fee (Town of Cross City) ($550.00) and Water Impact Fee (Town of Cross City) ($350.00).

County Impact Fee (Dixie County) — 2,000 sq ft × $1.00/sq ft is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full fee schedule
Water$350.00
  • Water Impact Fee (Town of Cross City)
    Town of Cross City Utilities
    CONFIRMED from the operative code: Cross City Code Ch. 34 Art. III, Sec. 34-55(1)a (Ord. No. 289, § 5, 2-12-2001) — water impact fee for an individually metered single-family dwelling, inside or outside the town: $350.00. This is the town's adopted water impact fee (deposited to the Sec. 34-59 impact fee trust fund). NOTE: Sec. 34-53 also requires a separate TAP FEE + deposit at connection; those are 'on file in the town clerk's office' per Sec. 34-20 and are not posted online — call Cross City Utilities (352) 498-1205 for the tap-fee schedule. Sec. 34-57(b)(3) waives water/sewer impact fees for development inside the Community Redevelopment Area (CRA) requiring a meter no larger than 2 inches. Audited 7/12/2026 — corrected from $0/unverified; the June pass searched only Ch. 8 and missed Ch. 34.
    $350.00
Sewer$550.00
  • Sewer Impact Fee (Town of Cross City)
    Town of Cross City Utilities
    CONFIRMED from the operative code: Cross City Code Ch. 34 Art. III, Sec. 34-55(1)a (Ord. No. 289, § 5, 2-12-2001) — sewer impact fee for an individually metered single-family dwelling, inside or outside the town: $550.00. Adopted fee, deposited to the Sec. 34-59 impact fee trust fund. NOTE: Sec. 34-53 also requires a separate TAP FEE + deposit at connection, 'on file in the town clerk's office' (Sec. 34-20), not posted online — call Cross City Utilities (352) 498-1205. Sec. 34-57(b)(3) waives water/sewer impact fees inside the CRA for services needing a meter no larger than 2 inches. Audited 7/12/2026 — corrected from $0/unverified.
    $550.00
City$0.00
  • City Impact Fee (Town of Cross City)
    Town of Cross City
    CONFIRMED $0 — no NON-UTILITY city impact fee (transportation, parks, fire, police, etc.). Re-proved 7/12/2026 against the full Cross City code TOC: the town's ONLY impact fee article is Ch. 34 Art. III (Sec. 34-52 to 34-60, Ord. 289), and it levies water & sewer utility impact fees exclusively — those are carried on this jurisdiction's Water and Sewer records. There is no separate municipal impact/development fee chapter. Dixie County's countywide impact fee (Ord. 2009-01A) still applies inside Cross City and is carried on the County record. CORRECTION: the prior note claimed 'only Chapter 8 Buildings identified' — the June pass missed Chapter 34 entirely.
    $0.00
County$2,000.00
  • County Impact Fee (Dixie County) — 2,000 sq ft × $1.00/sq ft
    Dixie County
    Dixie County impact fees apply COUNTYWIDE per Sec. 20-26(k), including within Cross City. CONFIRMED adopted rate (Ord. 2009-01A, eff. 3-19-2009; Code Sec. 20-24): $1.00 per sq ft, min $1,000, max $3,500. Fee Amount shown = representative 2,000 sq ft single-family home. UNCONFIRMED: Sec. 20-29 CPI auto-adjustment — no adjusted schedule published by the county; confirm current rate with Dixie County Building Dept 352-498-1235. Audited 7/12/2026 (was $0).
    $2,000.00Requires confirmation
Total (Cross City): $2,900.00
Sources last checked July 12, 2026Official fee schedules:Town of Cross City Utilities Town of Cross City Dixie County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Dixie County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Cross City: Multifamily Impact Fees

A new multifamily unit in Cross City pays $2,560.00 per unit in impact fees (rates sourced July 12, 2026). Of that, Dixie County-levied fees account for $1,180.00 and municipal or utility fees for $1,380.00.

The largest line items are Sewer Impact Fee (Town of Cross City, MF) ($940.00) and Water Impact Fee (Town of Cross City, MF) ($440.00).

County Impact Fee (Dixie County, MF) — 1,000 sq ft × $1.18/sq ft is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full fee schedule
Water$440.00
  • Water Impact Fee (Town of Cross City, MF)
    Town of Cross City Utilities
    CONFIRMED from the operative code: Cross City Code Ch. 34 Art. III, Sec. 34-55(1)b (Ord. No. 289, § 5, 2-12-2001) — water impact fee for MASTER-METERED MULTIFAMILY dwelling units, inside or outside the town: $440.00 PER DWELLING UNIT (the code states the rate is 'multiplied by the number of dwelling units'). MF rate legitimately exceeds the SFR rate ($350) — the code sets a separate, higher per-unit figure for master-metered multifamily. NOTE: Sec. 34-53 also requires a separate tap fee + deposit, 'on file in the town clerk's office' (Sec. 34-20), not posted — call Cross City Utilities (352) 498-1205. Sec. 34-57(b)(3) waives water/sewer impact fees inside the CRA where the service needs a meter no larger than 2 inches. Audited 7/12/2026 — corrected from $0/unverified; the June pass missed Ch. 34 entirely.
    $440.00
Sewer$940.00
  • Sewer Impact Fee (Town of Cross City, MF)
    Town of Cross City Utilities
    CONFIRMED from the operative code: Cross City Code Ch. 34 Art. III, Sec. 34-55(1)b (Ord. No. 289, § 5, 2-12-2001) — sewer impact fee for MASTER-METERED MULTIFAMILY dwelling units, inside or outside the town: $940.00 PER DWELLING UNIT ('multiplied by the number of dwelling units'). MF rate legitimately exceeds the SFR rate ($550) per the code's separate multifamily line. NOTE: Sec. 34-53 also requires a separate tap fee + deposit, 'on file in the town clerk's office' (Sec. 34-20), not posted — call Cross City Utilities (352) 498-1205. Sec. 34-57(b)(3) CRA waiver applies where the service needs a meter no larger than 2 inches. Audited 7/12/2026 — corrected from $0/unverified.
    $940.00
City$0.00
  • City Impact Fee (Town of Cross City, MF)
    Town of Cross City
    CONFIRMED $0 — no NON-UTILITY city impact fee (transportation, parks, fire, police, etc.). Re-proved 7/12/2026 against the full Cross City code TOC: the town's ONLY impact fee article is Ch. 34 Art. III (Ord. 289), which levies water & sewer utility impact fees exclusively — carried on this jurisdiction's Water and Sewer MF records ($440 / $940 per unit). No separate municipal impact/development fee chapter exists. Dixie County's countywide impact fee (Ord. 2006-01 for multiunit) applies inside Cross City and is carried on the County record. CORRECTION: the prior note claimed only Chapter 8 was identified — the June pass missed Chapter 34.
    $0.00
County$1,180.00
  • County Impact Fee (Dixie County, MF) — 1,000 sq ft × $1.18/sq ft
    Dixie County
    Dixie County impact fees apply COUNTYWIDE per Sec. 20-58(k), including within Cross City. CONFIRMED adopted MF/multiunit rates (Ord. 2006-01, eff. 1-19-2006; Code Sec. 20-55): $588.20/room, $735.25/bed, or $1.18/sq ft. Fee Amount = canonical MF unit (2BR/2BA, 1,000 sq ft) × $1.18/sq ft = $1,180 per unit. UNCONFIRMED: Sec. 20-61 CPI auto-adjustment — no adjusted schedule published; confirm with Dixie County Building Dept 352-498-1235. Audited 7/12/2026 (was $0).
    $1,180.00Requires confirmation
Total (Cross City): $2,560.00
Sources last checked July 12, 2026Official fee schedules:Town of Cross City Utilities Town of Cross City Dixie County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Dixie County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Cross City: Commercial Impact Fees

Commercial development in Cross City pays $1.18 per square foot in impact fees, plus $4,485.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to about $63,485.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee (Town of Cross City) — 1" line ($3,055.00 one-time) and Water Impact Fee (Town of Cross City) — 1" line ($1,430.00 one-time).

County Impact Fee (Dixie County, Commercial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full fee schedule
Water$1,430.00 one-time
  • Water Impact Fee (Town of Cross City) — 1" line
    Town of Cross City Utilities
    CONFIRMED from the operative code: Cross City Code Ch. 34 Art. III, Sec. 34-55(2) (Ord. No. 289, §5(2), 2-12-2001) — NON-RESIDENTIAL water impact fee, inside or outside the town, set by SERVICE LINE SIZE: 3/4" $550 | 1" $1,430 | 1.5" $2,530 | 2" $3,905 | 3" and greater = $550 × Q, where Q = applicant's estimated water use in GPD ÷ 400 GPD per ERU (Sec. 34-52), Q always ≥ 1.0. CANONICAL DEFAULT = 1" line ($1,430). Applies to new connections only (Sec. 34-56); on an upgrade of an existing service the fee is the difference between the new and old line-size fees (code's own example: 3/4" → 1" = $1,430 − $550 = $880). WAIVER: Sec. 34-57(b)(3) waives water and sewer impact fees for development inside the Community Redevelopment Area (CRA) requiring a service no larger than 2 inches. Deferred payment available where impact fees exceed $7,500 (Sec. 34-53(e)) and for 501(c)(3) entities where they exceed $5,000 (Sec. 34-57(b)(4)). SEPARATE from this: Sec. 34-53(a) requires a TAP FEE + deposit at connection, which Sec. 34-20 keeps 'on file in the town clerk's office' and is not posted online — call Cross City Utilities (352) 498-1205 for the tap-fee schedule. Out-of-town commercial applications also pay a $250 non-refundable application fee (Sec. 34-53(b)).
    $1,430.00 one-time
Sewer$3,055.00 one-time
  • Sewer Impact Fee (Town of Cross City) — 1" line
    Town of Cross City Utilities
    CONFIRMED from the operative code: Cross City Code Ch. 34 Art. III, Sec. 34-55(2) (Ord. No. 289, §5(2), 2-12-2001) — NON-RESIDENTIAL sewer impact fee, inside or outside the town, set by SERVICE LINE SIZE: 3/4" $1,175 | 1" $3,055 | 1.5" $5,405 | 2" $8,342.50 | 3" and greater = $1,175 × Q, where Q = applicant's estimated water use in GPD ÷ 400 GPD per ERU (Sec. 34-52), Q always ≥ 1.0. CANONICAL DEFAULT = 1" line ($3,055). Applies to new connections only (Sec. 34-56); upgrades pay the difference between new and old line-size fees. WAIVER: Sec. 34-57(b)(3) waives water and sewer impact fees inside the Community Redevelopment Area (CRA) for services no larger than 2 inches. Deferred payment available where impact fees exceed $7,500 (Sec. 34-53(e)). SEPARATE from this: Sec. 34-53(a) requires a TAP FEE + deposit at connection, kept 'on file in the town clerk's office' (Sec. 34-20) and not posted online — call Cross City Utilities (352) 498-1205.
    $3,055.00 one-time
City$0.00
  • City Impact Fee (Town of Cross City, Commercial)
    Town of Cross City
    CONFIRMED $0 — the Town of Cross City levies NO non-utility municipal impact or development fee on nonresidential development (no transportation, parks, fire, police, or general development fee). Proved against the full code TOC 7/12/2026: the town's ONLY impact-fee article is Ch. 34 Art. III (Secs. 34-52—34-60, Ord. No. 289, 2-12-2001), which levies water and sewer UTILITY impact fees exclusively — those are carried in the Water Sewer Fees - Nonresidential table. There is no separate municipal impact/development-fee chapter and no posted development fee schedule. Dixie County's countywide impact fee (Ord. 2006-01, $1.18/sq ft nonres) DOES apply inside town limits (Code Sec. 20-58(k)) and is carried on this jurisdiction's County record. Documented $0 for a fee that does not exist — not an unverified gap. Contact: Cross City Town Hall / Utilities (352) 498-1205.
    $0.00
County$1.18/sq ft
  • County Impact Fee (Dixie County, Commercial)
    Dixie County
    Dixie County Impact Fee Ordinance, Art. III 'Other Development' (Ord. No. 2006-01, §8, eff. 1-19-2006; Code Sec. 20-55(a)(1)). Adopted schedule for 'multiunit and commercial building permits': per room $588.20 / per bed $735.25 / PER SQUARE FOOT $1.18. Nonresidential development pays the $1.18/sq ft square-foot fee; Sec. 20-55(a)(3) directs the county manager to apply the square-foot fee to any land use not otherwise specified. SINGLE NONRES RATE — no Commercial/Office/Industrial split in the schedule. Applies COUNTYWIDE incl. inside Cross City and Horseshoe Beach (Sec. 20-58(k): 'All funds and accounts have countywide service areas'). Art. II ($1.00/sq ft) is single-family ONLY and expressly excludes commercial buildings (Sec. 20-20(d)), so nonres is governed solely by Art. III. Basis: gross sq ft of the building permit. Exemptions (Sec. 20-60(a)): churches, schools, remodels with no added sq ft/parking. Change-of-use: charged on net increase in impact (Sec. 20-54(b)). Distribution: transportation, law enforcement, fire/public safety, recreation. UNCONFIRMED: Sec. 20-61 auto-adjusts the fee annually to CPI but the county publishes no adjusted schedule, so the current rate may exceed $1.18/sq ft — confirm with Dixie County Building Dept, 387 SE 22 Ave, Cross City, 352-498-1235.
    $1.18/sq ftRequires confirmation
Total (Cross City): $1.18/sq ft + $4,485.00 one-time (≈ $63,485.00 at 50,000 sq ft)
Sources last checked July 12, 2026Official fee schedules:Town of Cross City Utilities Town of Cross City Dixie County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Dixie County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Cross City: Industrial Impact Fees

Industrial development in Cross City pays $1.18 per square foot in impact fees, plus $4,485.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to about $63,485.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee (Town of Cross City) — 1" line ($3,055.00 one-time) and Water Impact Fee (Town of Cross City) — 1" line ($1,430.00 one-time).

County Impact Fee (Dixie County, Industrial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full fee schedule
Water$1,430.00 one-time
  • Water Impact Fee (Town of Cross City) — 1" line
    Town of Cross City Utilities
    CONFIRMED from the operative code: Cross City Code Ch. 34 Art. III, Sec. 34-55(2) (Ord. No. 289, §5(2), 2-12-2001) — NON-RESIDENTIAL water impact fee, inside or outside the town, set by SERVICE LINE SIZE: 3/4" $550 | 1" $1,430 | 1.5" $2,530 | 2" $3,905 | 3" and greater = $550 × Q, where Q = applicant's estimated water use in GPD ÷ 400 GPD per ERU (Sec. 34-52), Q always ≥ 1.0. CANONICAL DEFAULT = 1" line ($1,430). Applies to new connections only (Sec. 34-56); on an upgrade of an existing service the fee is the difference between the new and old line-size fees (code's own example: 3/4" → 1" = $1,430 − $550 = $880). WAIVER: Sec. 34-57(b)(3) waives water and sewer impact fees for development inside the Community Redevelopment Area (CRA) requiring a service no larger than 2 inches. Deferred payment available where impact fees exceed $7,500 (Sec. 34-53(e)) and for 501(c)(3) entities where they exceed $5,000 (Sec. 34-57(b)(4)). SEPARATE from this: Sec. 34-53(a) requires a TAP FEE + deposit at connection, which Sec. 34-20 keeps 'on file in the town clerk's office' and is not posted online — call Cross City Utilities (352) 498-1205 for the tap-fee schedule. Out-of-town commercial applications also pay a $250 non-refundable application fee (Sec. 34-53(b)).
    $1,430.00 one-time
Sewer$3,055.00 one-time
  • Sewer Impact Fee (Town of Cross City) — 1" line
    Town of Cross City Utilities
    CONFIRMED from the operative code: Cross City Code Ch. 34 Art. III, Sec. 34-55(2) (Ord. No. 289, §5(2), 2-12-2001) — NON-RESIDENTIAL sewer impact fee, inside or outside the town, set by SERVICE LINE SIZE: 3/4" $1,175 | 1" $3,055 | 1.5" $5,405 | 2" $8,342.50 | 3" and greater = $1,175 × Q, where Q = applicant's estimated water use in GPD ÷ 400 GPD per ERU (Sec. 34-52), Q always ≥ 1.0. CANONICAL DEFAULT = 1" line ($3,055). Applies to new connections only (Sec. 34-56); upgrades pay the difference between new and old line-size fees. WAIVER: Sec. 34-57(b)(3) waives water and sewer impact fees inside the Community Redevelopment Area (CRA) for services no larger than 2 inches. Deferred payment available where impact fees exceed $7,500 (Sec. 34-53(e)). SEPARATE from this: Sec. 34-53(a) requires a TAP FEE + deposit at connection, kept 'on file in the town clerk's office' (Sec. 34-20) and not posted online — call Cross City Utilities (352) 498-1205.
    $3,055.00 one-time
City$0.00
  • City Impact Fee (Town of Cross City, Industrial)
    Town of Cross City
    CONFIRMED $0 — no non-utility municipal impact/development fee on industrial development. Proved against the full Cross City code TOC 7/12/2026: the town's only impact-fee article is Ch. 34 Art. III (Ord. No. 289, 2-12-2001), which levies water and sewer utility impact fees exclusively (carried in the Water Sewer Fees - Nonresidential table). No municipal impact-fee chapter, no posted development fee schedule. Dixie County's countywide $1.18/sq ft nonres impact fee (Ord. 2006-01) applies inside town limits and is carried on the County record. Documented $0 for a fee that does not exist. Contact: Cross City Town Hall (352) 498-1205.
    $0.00
County$1.18/sq ft
  • County Impact Fee (Dixie County, Industrial)
    Dixie County
    Dixie County Impact Fee Ordinance, Art. III 'Other Development' (Ord. No. 2006-01, §8, eff. 1-19-2006; Code Sec. 20-55(a)(1)). Schedule publishes ONE nonres basis: per square foot $1.18. Sec. 20-55(a)(3): land uses not specified pay the square-foot fee — industrial therefore pays $1.18/sq ft. SINGLE NONRES RATE — no category split in the schedule. Applies COUNTYWIDE incl. inside Cross City and Horseshoe Beach (Sec. 20-58(k)). Art. II ($1.00/sq ft) is single-family only (Sec. 20-20(d)). Basis: gross sq ft. Exemptions (Sec. 20-60(a)): churches, schools, remodels with no added sq ft/parking. UNCONFIRMED: Sec. 20-61 annual CPI auto-adjustment, no adjusted schedule published — confirm with Dixie County Building Dept 352-498-1235.
    $1.18/sq ftRequires confirmation
Total (Cross City): $1.18/sq ft + $4,485.00 one-time (≈ $63,485.00 at 50,000 sq ft)
Sources last checked July 12, 2026Official fee schedules:Town of Cross City Utilities Town of Cross City Dixie County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Dixie County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Cross City: Office Impact Fees

Office development in Cross City pays $1.18 per square foot in impact fees, plus $4,485.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 25,000 sq ft building, that comes to about $33,985.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee (Town of Cross City) — 1" line ($3,055.00 one-time) and Water Impact Fee (Town of Cross City) — 1" line ($1,430.00 one-time).

County Impact Fee (Dixie County, Office) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full fee schedule
Water$1,430.00 one-time
  • Water Impact Fee (Town of Cross City) — 1" line
    Town of Cross City Utilities
    CONFIRMED from the operative code: Cross City Code Ch. 34 Art. III, Sec. 34-55(2) (Ord. No. 289, §5(2), 2-12-2001) — NON-RESIDENTIAL water impact fee, inside or outside the town, set by SERVICE LINE SIZE: 3/4" $550 | 1" $1,430 | 1.5" $2,530 | 2" $3,905 | 3" and greater = $550 × Q, where Q = applicant's estimated water use in GPD ÷ 400 GPD per ERU (Sec. 34-52), Q always ≥ 1.0. CANONICAL DEFAULT = 1" line ($1,430). Applies to new connections only (Sec. 34-56); on an upgrade of an existing service the fee is the difference between the new and old line-size fees (code's own example: 3/4" → 1" = $1,430 − $550 = $880). WAIVER: Sec. 34-57(b)(3) waives water and sewer impact fees for development inside the Community Redevelopment Area (CRA) requiring a service no larger than 2 inches. Deferred payment available where impact fees exceed $7,500 (Sec. 34-53(e)) and for 501(c)(3) entities where they exceed $5,000 (Sec. 34-57(b)(4)). SEPARATE from this: Sec. 34-53(a) requires a TAP FEE + deposit at connection, which Sec. 34-20 keeps 'on file in the town clerk's office' and is not posted online — call Cross City Utilities (352) 498-1205 for the tap-fee schedule. Out-of-town commercial applications also pay a $250 non-refundable application fee (Sec. 34-53(b)).
    $1,430.00 one-time
Sewer$3,055.00 one-time
  • Sewer Impact Fee (Town of Cross City) — 1" line
    Town of Cross City Utilities
    CONFIRMED from the operative code: Cross City Code Ch. 34 Art. III, Sec. 34-55(2) (Ord. No. 289, §5(2), 2-12-2001) — NON-RESIDENTIAL sewer impact fee, inside or outside the town, set by SERVICE LINE SIZE: 3/4" $1,175 | 1" $3,055 | 1.5" $5,405 | 2" $8,342.50 | 3" and greater = $1,175 × Q, where Q = applicant's estimated water use in GPD ÷ 400 GPD per ERU (Sec. 34-52), Q always ≥ 1.0. CANONICAL DEFAULT = 1" line ($3,055). Applies to new connections only (Sec. 34-56); upgrades pay the difference between new and old line-size fees. WAIVER: Sec. 34-57(b)(3) waives water and sewer impact fees inside the Community Redevelopment Area (CRA) for services no larger than 2 inches. Deferred payment available where impact fees exceed $7,500 (Sec. 34-53(e)). SEPARATE from this: Sec. 34-53(a) requires a TAP FEE + deposit at connection, kept 'on file in the town clerk's office' (Sec. 34-20) and not posted online — call Cross City Utilities (352) 498-1205.
    $3,055.00 one-time
City$0.00
  • City Impact Fee (Town of Cross City, Office)
    Town of Cross City
    CONFIRMED $0 — no non-utility municipal impact/development fee on office development. Proved against the full Cross City code TOC 7/12/2026: the town's only impact-fee article is Ch. 34 Art. III (Ord. No. 289, 2-12-2001), which levies water and sewer utility impact fees exclusively (carried in the Water Sewer Fees - Nonresidential table). No municipal impact-fee chapter, no posted development fee schedule. Dixie County's countywide $1.18/sq ft nonres impact fee (Ord. 2006-01) applies inside town limits and is carried on the County record. Documented $0 for a fee that does not exist. Contact: Cross City Town Hall (352) 498-1205.
    $0.00
County$1.18/sq ft
  • County Impact Fee (Dixie County, Office)
    Dixie County
    Dixie County Impact Fee Ordinance, Art. III 'Other Development' (Ord. No. 2006-01, §8, eff. 1-19-2006; Code Sec. 20-55(a)(1)). Schedule publishes ONE nonres basis: per square foot $1.18. Sec. 20-55(a)(3): land uses not specified on the schedule pay the square-foot fee — office therefore pays $1.18/sq ft. SINGLE NONRES RATE — no category split in the schedule. Applies COUNTYWIDE incl. inside Cross City and Horseshoe Beach (Sec. 20-58(k)). Art. II ($1.00/sq ft) is single-family only (Sec. 20-20(d) excludes commercial buildings). Basis: gross sq ft. Exemptions (Sec. 20-60(a)): churches, schools, remodels with no added sq ft/parking. UNCONFIRMED: Sec. 20-61 annual CPI auto-adjustment, no adjusted schedule published — confirm with Dixie County Building Dept 352-498-1235.
    $1.18/sq ftRequires confirmation
Total (Cross City): $1.18/sq ft + $4,485.00 one-time (≈ $33,985.00 at 25,000 sq ft)
Sources last checked July 12, 2026Official fee schedules:Town of Cross City Utilities Town of Cross City Dixie County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Dixie County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Cross City

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Cross City, Florida?

A new single-family home in Cross City pays $2,900.00 per unit in combined impact fees (rates sourced July 12, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Cross City?

Commercial development in Cross City pays $1.18 per square foot in impact fees, plus $4,485.00 in one-time water and sewer connection fees, about $63,485.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Cross City charge its own impact fees?

Yes. Cross City levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Cross City, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Dixie County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000