Cross City impact fees by project type
Cross City: Single-Family Impact Fees
A new single-family home in Cross City pays $2,900.00 per unit in impact fees (rates sourced July 12, 2026). Of that, Dixie County-levied fees account for $2,000.00 and municipal or utility fees for $900.00.
The largest line items are Sewer Impact Fee (Town of Cross City) ($550.00) and Water Impact Fee (Town of Cross City) ($350.00).
County Impact Fee (Dixie County) — 2,000 sq ft × $1.00/sq ft is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full Cross City impact fee schedule
- Water Impact Fee (Town of Cross City)$350.00Town of Cross City UtilitiesCross City charges a water impact fee of $350 for an individually metered single-family dwelling (Code Sec. 34-55, Ord. 289). A separate connection tap fee also applies at hookup. Development inside the Community Redevelopment Area with a service meter of 2 inches or smaller is exempt from the water and sewer impact fees.
- Sewer Impact Fee (Town of Cross City)$550.00Town of Cross City UtilitiesCross City charges a sewer impact fee of $550 for an individually metered single-family dwelling (Code Sec. 34-55, Ord. 289). A separate connection tap fee also applies at hookup. Development inside the Community Redevelopment Area with a service meter of 2 inches or smaller is exempt from the water and sewer impact fees.
- City Impact Fee (Town of Cross City)$0.00Town of Cross CityCross City levies no general municipal (non-utility) impact fee. Its only impact fees are the town water and sewer utility impact fees (shown on the Water and Sewer records); Dixie County's countywide impact fee also applies inside the town.
- County Impact Fee (Dixie County) — 2,000 sq ft × $1.00/sq ft$2,000.00Requires confirmationDixie CountyDixie County's countywide single-family impact fee applies inside Cross City: $1.00 per square foot of dwelling (minimum $1,000, maximum $3,500), effective since March 2009 (Ord. 2009-01A). The amount shown is for a representative 2,000 sq ft home. The ordinance provides for an annual CPI adjustment.
Where in Dixie County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Cross City: Multifamily Impact Fees
A new multifamily unit in Cross City pays $2,560.00 per unit in impact fees (rates sourced July 12, 2026). Of that, Dixie County-levied fees account for $1,180.00 and municipal or utility fees for $1,380.00.
The largest line items are Sewer Impact Fee (Town of Cross City, MF) ($940.00) and Water Impact Fee (Town of Cross City, MF) ($440.00).
County Impact Fee (Dixie County, MF) — 1,000 sq ft × $1.18/sq ft is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full Cross City impact fee schedule
- Water Impact Fee (Town of Cross City, MF)$440.00Town of Cross City UtilitiesCross City charges a water impact fee of $440 per dwelling unit for master-metered multifamily development (Code Sec. 34-55, Ord. 289) — higher than the single-family rate. A separate connection tap fee also applies. Development inside the Community Redevelopment Area with a service meter of 2 inches or smaller is exempt from the water and sewer impact fees.
- Sewer Impact Fee (Town of Cross City, MF)$940.00Town of Cross City UtilitiesCross City charges a sewer impact fee of $940 per dwelling unit for master-metered multifamily development (Code Sec. 34-55, Ord. 289) — higher than the single-family rate. A separate connection tap fee also applies. Development inside the Community Redevelopment Area with a service meter of 2 inches or smaller is exempt from the water and sewer impact fees.
- City Impact Fee (Town of Cross City, MF)$0.00Town of Cross CityCross City levies no general municipal (non-utility) impact fee. Its only impact fees are the town water and sewer utility impact fees (shown on the Water and Sewer records); Dixie County's countywide multifamily impact fee also applies inside the town.
- County Impact Fee (Dixie County, MF) — 1,000 sq ft × $1.18/sq ft$1,180.00Requires confirmationDixie CountyDixie County's countywide multifamily impact fee applies inside Cross City: $1.18 per square foot (alternatively $588.20 per room or $735.25 per bed), effective since January 2006 (Ord. 2006-01). The amount shown is for a canonical 1,000 sq ft unit ($1,180 per unit). The ordinance provides for an annual CPI adjustment.
Where in Dixie County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Cross City: Commercial Impact Fees
Commercial development in Cross City pays $1.18 per square foot in impact fees, plus $4,485.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).
For a 50,000 sq ft building, that comes to about $63,485.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (Town of Cross City) — 1" line ($3,055.00 one-time) and Water Impact Fee (Town of Cross City) — 1" line ($1,430.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
County Impact Fee (Dixie County, Commercial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full Cross City impact fee schedule
- Water Impact Fee (Town of Cross City) — 1" line$1,430.00 one-timeTown of Cross City UtilitiesNonresidential water impact fee set by service-line size (adopted 2001), applying to new connections inside or outside the town. Published tiers: 3/4" $550, 1" $1,430, 1.5" $2,530, 2" $3,905; for 3" and larger the fee is $550 per equivalent residential unit (estimated demand in gallons per day divided by 400). An upgrade to an existing service pays the difference between the new and old line-size fees. Development inside the Community Redevelopment Area needing a service of 2 inches or smaller is exempt. A separate tap fee and deposit also apply at connection.
- Sewer Impact Fee (Town of Cross City) — 1" line$3,055.00 one-timeTown of Cross City UtilitiesNonresidential sewer impact fee set by service-line size (adopted 2001), applying to new connections inside or outside the town. Published tiers: 3/4" $1,175, 1" $3,055, 1.5" $5,405, 2" $8,342.50; for 3" and larger the fee is $1,175 per equivalent residential unit (estimated demand in gallons per day divided by 400). An upgrade to an existing service pays the difference between the new and old line-size fees. Development inside the Community Redevelopment Area needing a service of 2 inches or smaller is exempt. A separate tap fee and deposit also apply at connection.
- City Impact Fee (Town of Cross City, Commercial)$0.00Town of Cross City
- County Impact Fee (Dixie County, Commercial)$1.18/sq ftRequires confirmationDixie CountyDixie County's nonresidential impact fee applies countywide, including inside Cross City and Horseshoe Beach town limits. The adopted rate is $1.18 per gross square foot as a single nonresidential rate (the schedule does not separate commercial, office, and industrial), effective from the 2006 adopting ordinance. The ordinance provides for annual CPI adjustment, so the current rate may exceed the base amount shown. Exemptions include churches, schools, and remodels that add no floor area or parking; change of use is charged only on the net increase in impact.
Where in Dixie County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Cross City: Industrial Impact Fees
Industrial development in Cross City pays $1.18 per square foot in impact fees, plus $4,485.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).
For a 50,000 sq ft building, that comes to about $63,485.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (Town of Cross City) — 1" line ($3,055.00 one-time) and Water Impact Fee (Town of Cross City) — 1" line ($1,430.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
County Impact Fee (Dixie County, Industrial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full Cross City impact fee schedule
- Water Impact Fee (Town of Cross City) — 1" line$1,430.00 one-timeTown of Cross City UtilitiesNonresidential water impact fee set by service-line size (adopted 2001), applying to new connections inside or outside the town. Published tiers: 3/4" $550, 1" $1,430, 1.5" $2,530, 2" $3,905; for 3" and larger the fee is $550 per equivalent residential unit (estimated demand in gallons per day divided by 400). An upgrade to an existing service pays the difference between the new and old line-size fees. Development inside the Community Redevelopment Area needing a service of 2 inches or smaller is exempt. A separate tap fee and deposit also apply at connection.
- Sewer Impact Fee (Town of Cross City) — 1" line$3,055.00 one-timeTown of Cross City UtilitiesNonresidential sewer impact fee set by service-line size (adopted 2001), applying to new connections inside or outside the town. Published tiers: 3/4" $1,175, 1" $3,055, 1.5" $5,405, 2" $8,342.50; for 3" and larger the fee is $1,175 per equivalent residential unit (estimated demand in gallons per day divided by 400). An upgrade to an existing service pays the difference between the new and old line-size fees. Development inside the Community Redevelopment Area needing a service of 2 inches or smaller is exempt. A separate tap fee and deposit also apply at connection.
- City Impact Fee (Town of Cross City, Industrial)$0.00Town of Cross City
- County Impact Fee (Dixie County, Industrial)$1.18/sq ftRequires confirmationDixie CountyDixie County's nonresidential impact fee applies countywide, including inside Cross City and Horseshoe Beach town limits. The adopted rate is $1.18 per gross square foot as a single nonresidential rate (the schedule does not separate commercial, office, and industrial), effective from the 2006 adopting ordinance. The ordinance provides for annual CPI adjustment, so the current rate may exceed the base amount shown. Exemptions include churches, schools, and remodels that add no floor area or parking; change of use is charged only on the net increase in impact.
Where in Dixie County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Cross City: Office Impact Fees
Office development in Cross City pays $1.18 per square foot in impact fees, plus $4,485.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).
For a 25,000 sq ft building, that comes to about $33,985.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (Town of Cross City) — 1" line ($3,055.00 one-time) and Water Impact Fee (Town of Cross City) — 1" line ($1,430.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
County Impact Fee (Dixie County, Office) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full Cross City impact fee schedule
- Water Impact Fee (Town of Cross City) — 1" line$1,430.00 one-timeTown of Cross City UtilitiesNonresidential water impact fee set by service-line size (adopted 2001), applying to new connections inside or outside the town. Published tiers: 3/4" $550, 1" $1,430, 1.5" $2,530, 2" $3,905; for 3" and larger the fee is $550 per equivalent residential unit (estimated demand in gallons per day divided by 400). An upgrade to an existing service pays the difference between the new and old line-size fees. Development inside the Community Redevelopment Area needing a service of 2 inches or smaller is exempt. A separate tap fee and deposit also apply at connection.
- Sewer Impact Fee (Town of Cross City) — 1" line$3,055.00 one-timeTown of Cross City UtilitiesNonresidential sewer impact fee set by service-line size (adopted 2001), applying to new connections inside or outside the town. Published tiers: 3/4" $1,175, 1" $3,055, 1.5" $5,405, 2" $8,342.50; for 3" and larger the fee is $1,175 per equivalent residential unit (estimated demand in gallons per day divided by 400). An upgrade to an existing service pays the difference between the new and old line-size fees. Development inside the Community Redevelopment Area needing a service of 2 inches or smaller is exempt. A separate tap fee and deposit also apply at connection.
- City Impact Fee (Town of Cross City, Office)$0.00Town of Cross City
- County Impact Fee (Dixie County, Office)$1.18/sq ftRequires confirmationDixie CountyDixie County's nonresidential impact fee applies countywide, including inside Cross City and Horseshoe Beach town limits. The adopted rate is $1.18 per gross square foot as a single nonresidential rate (the schedule does not separate commercial, office, and industrial), effective from the 2006 adopting ordinance. The ordinance provides for annual CPI adjustment, so the current rate may exceed the base amount shown. Exemptions include churches, schools, and remodels that add no floor area or parking; change of use is charged only on the net increase in impact.
Where in Dixie County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Cross City impact fee calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Cross City impact fee FAQs
What are the total impact fees for a single-family home in Cross City, Florida?
A new single-family home in Cross City pays $2,900.00 per unit in combined impact fees (rates sourced July 12, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
How much are commercial impact fees in Cross City?
Commercial development in Cross City pays $1.18 per square foot in impact fees, plus $4,485.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $63,485.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Cross City charge its own impact fees?
Yes. Cross City levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Cross City, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Dixie County impact fees page.