Horseshoe Beach applies its own fee schedule: municipal fees plus the Dixie County-levied fees that apply inside city limits. Combined, a new single-family home pays $2,625.00 per unit (rates sourced ). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Horseshoe Beach impact fees by project type

Horseshoe Beach: Single-Family Impact Fees

A new single-family home in Horseshoe Beach pays $2,625.00 per unit in impact fees (rates sourced July 12, 2026). Of that, Dixie County-levied fees account for $2,000.00 and municipal or utility fees for $625.00.

The largest line items are Water Connection Fee (Horseshoe Beach) — $300 application + ~$250 meter + ~$75 ball valve ($625.00).

County Impact Fee (Dixie County) — 2,000 sq ft × $1.00/sq ft is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full Horseshoe Beach impact fee schedule
Water$625.00
  • Water Connection Fee (Horseshoe Beach) — $300 application + ~$250 meter + ~$75 ball valve
    Town of Horseshoe Beach Utilities (US Water Corp operator)
    The Town of Horseshoe Beach (water system operated by US Water Corp) charges a standard water connection fee of about $625 for a new metered service — a $300 application fee plus meter (~$250) and ball-valve (~$75) equipment charges (effective December 2022). A new connection also carries a variable quoted component plus the customer's own tap, meter-box, piping and any road-repair costs, so the total depends on the site. The town levies no separate water impact fee.
    $625.00
Sewer$0.00
City$0.00
  • City Impact Fee (Town of Horseshoe Beach)
    Town of Horseshoe Beach
    Horseshoe Beach levies no general municipal impact or development fee. Its only one-time town charge is the water connection fee (shown on the Water record); there is no public sewer. Dixie County's countywide impact fee also applies inside the town.
    $0.00
County$2,000.00
  • County Impact Fee (Dixie County) — 2,000 sq ft × $1.00/sq ft
    Dixie County
    Dixie County's countywide single-family impact fee applies inside Horseshoe Beach: $1.00 per square foot of dwelling (minimum $1,000, maximum $3,500), effective since March 2009 (Ord. 2009-01A). The amount shown is for a representative 2,000 sq ft home. The ordinance provides for an annual CPI adjustment.
    $2,000.00Requires confirmation
Total (Horseshoe Beach): $2,625.00
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Dixie County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Horseshoe Beach: Multifamily Impact Fees

A new multifamily unit in Horseshoe Beach pays $1,805.00 per unit in impact fees (rates sourced July 12, 2026). Of that, Dixie County-levied fees account for $1,180.00 and municipal or utility fees for $625.00.

County Impact Fee (Dixie County, MF) — 1,000 sq ft × $1.18/sq ft and Water Connection Fee (Horseshoe Beach, MF) — $300 application + ~$250 meter + ~$75 ball valve are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the full Horseshoe Beach impact fee schedule
Water$625.00
  • Water Connection Fee (Horseshoe Beach, MF) — $300 application + ~$250 meter + ~$75 ball valve
    Town of Horseshoe Beach Utilities (US Water Corp operator)
    The Town of Horseshoe Beach (water system operated by US Water Corp) charges a meter-based water connection fee of about $625 per metered service (effective December 2022), with no separate multifamily rate — a master-metered project's total depends on meter sizing plus a variable quoted component and the customer's own tap, piping and any road-repair costs. The town levies no separate water impact fee.
    $625.00Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Horseshoe Beach, MF)
    N/A
    Horseshoe Beach has no public sewer system; development relies on private septic, which materially constrains multifamily projects. No sewer connection fee applies.
    $0.00
City$0.00
  • City Impact Fee (Town of Horseshoe Beach, MF)
    Town of Horseshoe Beach
    Horseshoe Beach levies no general municipal impact or development fee. Its only one-time town charge is the water connection fee (shown on the Water record); there is no public sewer. Dixie County's countywide multifamily impact fee also applies inside the town.
    $0.00
County$1,180.00
  • County Impact Fee (Dixie County, MF) — 1,000 sq ft × $1.18/sq ft
    Dixie County
    Dixie County's countywide multifamily impact fee applies inside Horseshoe Beach: $1.18 per square foot (alternatively $588.20 per room or $735.25 per bed), effective since January 2006 (Ord. 2006-01). The amount shown is for a canonical 1,000 sq ft unit ($1,180 per unit). The ordinance provides for an annual CPI adjustment.
    $1,180.00Requires confirmation
Total (Horseshoe Beach): $1,805.00
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Dixie County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Horseshoe Beach: Commercial Impact Fees

Commercial development in Horseshoe Beach pays $1.18 per square foot in impact fees, plus $625.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to about $59,625.00. The calculator below adjusts to your exact square footage.

County Impact Fee (Dixie County, Commercial) and Water Connection Fee (Town of Horseshoe Beach Utilities) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the full Horseshoe Beach impact fee schedule
Water$625.00 one-time
  • Water Connection Fee (Town of Horseshoe Beach Utilities)
    Town of Horseshoe Beach Utilities (US Water Corp operator)
    The town levies no separate water impact fee. New nonresidential connections pay the Standard Connection Fee (effective December 1, 2022): a $300 application fee plus water-meter equipment (about $250) and ball-valve equipment (about $75), roughly $625 for a standard meter. The applicant also bears all equipment and labor costs (meter box, tap, piping, and any road repair). Larger commercial services are quoted individually, so a commercial connection's total will exceed the standard amount. One schedule covers all customer classes.
    $625.00 one-timeRequires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Horseshoe Beach)
    N/A — no public sewer system
    There is no public sewer system in Horseshoe Beach. Nonresidential development uses private on-site septic, permitted through the Florida Department of Health, and no sewer connection or capacity fee applies.
    $0.00
City$0.00
County$1.18/sq ft
  • County Impact Fee (Dixie County, Commercial)
    Dixie County
    Dixie County's nonresidential impact fee applies countywide, including inside Cross City and Horseshoe Beach town limits. The adopted rate is $1.18 per gross square foot as a single nonresidential rate (the schedule does not separate commercial, office, and industrial), effective from the 2006 adopting ordinance. The ordinance provides for annual CPI adjustment, so the current rate may exceed the base amount shown. Exemptions include churches, schools, and remodels that add no floor area or parking; change of use is charged only on the net increase in impact.
    $1.18/sq ftRequires confirmation
Total (Horseshoe Beach): $1.18/sq ft + $625.00 one-time (≈ $59,625.00 at 50,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Dixie County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Horseshoe Beach: Industrial Impact Fees

Industrial development in Horseshoe Beach pays $1.18 per square foot in impact fees, plus $625.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to about $59,625.00. The calculator below adjusts to your exact square footage.

County Impact Fee (Dixie County, Industrial) and Water Connection Fee (Town of Horseshoe Beach Utilities) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the full Horseshoe Beach impact fee schedule
Water$625.00 one-time
  • Water Connection Fee (Town of Horseshoe Beach Utilities)
    Town of Horseshoe Beach Utilities (US Water Corp operator)
    The town levies no separate water impact fee. New nonresidential connections pay the Standard Connection Fee (effective December 1, 2022): a $300 application fee plus water-meter equipment (about $250) and ball-valve equipment (about $75), roughly $625 for a standard meter. The applicant also bears all equipment and labor costs (meter box, tap, piping, and any road repair). Larger commercial services are quoted individually, so a commercial connection's total will exceed the standard amount. One schedule covers all customer classes.
    $625.00 one-timeRequires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Horseshoe Beach)
    N/A — no public sewer system
    There is no public sewer system in Horseshoe Beach. Nonresidential development uses private on-site septic, permitted through the Florida Department of Health, and no sewer connection or capacity fee applies.
    $0.00
City$0.00
County$1.18/sq ft
  • County Impact Fee (Dixie County, Industrial)
    Dixie County
    Dixie County's nonresidential impact fee applies countywide, including inside Cross City and Horseshoe Beach town limits. The adopted rate is $1.18 per gross square foot as a single nonresidential rate (the schedule does not separate commercial, office, and industrial), effective from the 2006 adopting ordinance. The ordinance provides for annual CPI adjustment, so the current rate may exceed the base amount shown. Exemptions include churches, schools, and remodels that add no floor area or parking; change of use is charged only on the net increase in impact.
    $1.18/sq ftRequires confirmation
Total (Horseshoe Beach): $1.18/sq ft + $625.00 one-time (≈ $59,625.00 at 50,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Dixie County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Horseshoe Beach: Office Impact Fees

Office development in Horseshoe Beach pays $1.18 per square foot in impact fees, plus $625.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 25,000 sq ft building, that comes to about $30,125.00. The calculator below adjusts to your exact square footage.

County Impact Fee (Dixie County, Office) and Water Connection Fee (Town of Horseshoe Beach Utilities) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the full Horseshoe Beach impact fee schedule
Water$625.00 one-time
  • Water Connection Fee (Town of Horseshoe Beach Utilities)
    Town of Horseshoe Beach Utilities (US Water Corp operator)
    The town levies no separate water impact fee. New nonresidential connections pay the Standard Connection Fee (effective December 1, 2022): a $300 application fee plus water-meter equipment (about $250) and ball-valve equipment (about $75), roughly $625 for a standard meter. The applicant also bears all equipment and labor costs (meter box, tap, piping, and any road repair). Larger commercial services are quoted individually, so a commercial connection's total will exceed the standard amount. One schedule covers all customer classes.
    $625.00 one-timeRequires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Horseshoe Beach)
    N/A — no public sewer system
    There is no public sewer system in Horseshoe Beach. Nonresidential development uses private on-site septic, permitted through the Florida Department of Health, and no sewer connection or capacity fee applies.
    $0.00
City$0.00
County$1.18/sq ft
  • County Impact Fee (Dixie County, Office)
    Dixie County
    Dixie County's nonresidential impact fee applies countywide, including inside Cross City and Horseshoe Beach town limits. The adopted rate is $1.18 per gross square foot as a single nonresidential rate (the schedule does not separate commercial, office, and industrial), effective from the 2006 adopting ordinance. The ordinance provides for annual CPI adjustment, so the current rate may exceed the base amount shown. Exemptions include churches, schools, and remodels that add no floor area or parking; change of use is charged only on the net increase in impact.
    $1.18/sq ftRequires confirmation
Total (Horseshoe Beach): $1.18/sq ft + $625.00 one-time (≈ $30,125.00 at 25,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Dixie County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Horseshoe Beach impact fee calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Horseshoe Beach impact fee FAQs

What are the total impact fees for a single-family home in Horseshoe Beach, Florida?

A new single-family home in Horseshoe Beach pays $2,625.00 per unit in combined impact fees (rates sourced July 12, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Horseshoe Beach?

Commercial development in Horseshoe Beach pays $1.18 per square foot in impact fees, plus $625.00 in one-time water and sewer connection fees, about $59,625.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Horseshoe Beach charge its own impact fees?

Yes. Horseshoe Beach levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Horseshoe Beach, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Dixie County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000