IMPACTFEES.ORG

Gadsden County, Florida Impact Fees

Impact fees in Gadsden County depend on where you build. This page details the rates for unincorporated Gadsden County: $9,200.00 per single-family unit as of . Inside city limits, each city applies its own schedule and fees may be completely different. Pick your city below.

Gadsden County impact fees by project type

Where in Gadsden County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Gadsden County: Single-Family Impact Fees

A new single-family home in unincorporated Gadsden County pays $9,200.00 per unit in impact fees (rates sourced July 12, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer System Capacity Charge (Talquin — Gadsden Co. Unincorporated) ($8,300.00) and Water System Capacity Charge (Talquin — Gadsden Co. Unincorporated) ($900.00).

View the full Gadsden County impact fee schedule
Water$900.00
  • Water System Capacity Charge (Talquin — Gadsden Co. Unincorporated)
    Talquin Electric Cooperative
    Water in the served parts of unincorporated Gadsden County is provided by Talquin Electric Cooperative (Gadsden County Regional Water System). Rate Schedule W, effective May 1, 2025: System Capacity Charge $900 for a standard 0.75-inch meter, plus a connection fee of the greater of $600 or the actual cost to construct, connect and meter the service. Larger meters pay higher capacity charges. Service is limited to areas where water lines are established; much of the county is on private wells.
    $900.00
Sewer$8,300.00
  • Sewer System Capacity Charge (Talquin — Gadsden Co. Unincorporated)
    Talquin Electric Cooperative
    Sewer in the served parts of unincorporated Gadsden County is provided by Talquin Electric Cooperative. Rate Schedule S, effective May 1, 2025: System Capacity Charge $8,300 for a standard 0.75-inch meter, plus a connection fee of the greater of $600 or actual cost. Larger meters pay higher capacity charges. Central sewer is limited to areas where service is established; much of the county is on private septic.
    $8,300.00
City$0.00
County$0.00
Total (unincorporated Gadsden County): $9,200.00
Sources last checked Official fee schedules:Talquin Electric Cooperative Gadsden County

Where in Gadsden County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Gadsden County: Multifamily Impact Fees

A new multifamily unit in unincorporated Gadsden County pays $9,200.00 per unit in impact fees (rates sourced July 12, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer System Capacity Charge (Talquin — Gadsden Co. Unincorporated, MF) ($8,300.00) and Water System Capacity Charge (Talquin — Gadsden Co. Unincorporated, MF) ($900.00).

View the full Gadsden County impact fee schedule
Water$900.00
  • Water System Capacity Charge (Talquin — Gadsden Co. Unincorporated, MF)
    Talquin Electric Cooperative
    Talquin (Gadsden County Regional Water System) water system capacity charge, effective May 1, 2025: $900 per dwelling unit — the rate schedule's multi-unit provision multiplies the number of units by the applicable system and connection fees, so multifamily is charged per unit rather than by master-meter size. A connection fee (greater of $600 or actual cost) applies per unit in addition.
    $900.00
Sewer$8,300.00
  • Sewer System Capacity Charge (Talquin — Gadsden Co. Unincorporated, MF)
    Talquin Electric Cooperative
    Sewer in the served parts of unincorporated Gadsden County is provided by Talquin Electric Cooperative (Rate Schedule S, effective May 1, 2025). Multifamily is charged per dwelling unit — the schedule's multi-unit provision multiplies units by the applicable system and connection fees: $8,300 per unit (system capacity charge) plus a connection fee (greater of $600 or actual cost) per unit. Central sewer is limited to established-service areas; much of the county is on private septic.
    $8,300.00
City$0.00
County$0.00
Total (unincorporated Gadsden County): $9,200.00
Sources last checked Official fee schedules:Talquin Electric Cooperative Gadsden County

Where in Gadsden County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Gadsden County: Commercial Impact Fees

Commercial development in unincorporated Gadsden County pays no per-square-foot impact fees, but owes $22,515.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to about $22,515.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer System Capacity Charge (Talquin — Gadsden Co. Unincorporated) — 1" meter ($20,750.00 one-time) and Water System Capacity Charge (Talquin — Gadsden Co. Unincorporated) — 1" meter ($1,765.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full Gadsden County impact fee schedule
Water$1,765.00 one-time
  • Water System Capacity Charge (Talquin — Gadsden Co. Unincorporated) — 1" meter
    Talquin Electric Cooperative
    Water service provided by Talquin Electric Cooperative under one system-capacity schedule (set by water meter size) that applies to all customer classes. Amount is the system capacity charge for a 1-inch meter, effective May 1, 2025. Serves unincorporated areas where water service has been established; much of the county relies on private wells. A separate metered-service connection fee (the greater of $600 or the actual cost to construct, connect and meter the service, plus any main-line extension) applies in addition.
    $1,765.00 one-time
Sewer$20,750.00 one-time
  • Sewer System Capacity Charge (Talquin — Gadsden Co. Unincorporated) — 1" meter
    Talquin Electric Cooperative
    Wastewater service provided by Talquin Electric Cooperative under one system-capacity schedule (set by water meter size) that applies to all customer classes. Amount is the system capacity charge for a 1-inch meter, effective May 1, 2025. Available only where wastewater service has been established; much of unincorporated Gadsden County is on private septic. A separate metered-service connection fee (the greater of $600 or the actual cost to construct, connect and meter the service) applies in addition.
    $20,750.00 one-time
City$0.00
Total (unincorporated Gadsden County): $22,515.00 one-time (≈ $22,515.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Talquin Electric Cooperative N/A — unincorporated area Gadsden County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Gadsden County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Gadsden County: Industrial Impact Fees

Industrial development in unincorporated Gadsden County pays no per-square-foot impact fees, but owes $22,515.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to about $22,515.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer System Capacity Charge (Talquin — Gadsden Co. Unincorporated) — 1" meter ($20,750.00 one-time) and Water System Capacity Charge (Talquin — Gadsden Co. Unincorporated) — 1" meter ($1,765.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full Gadsden County impact fee schedule
Water$1,765.00 one-time
  • Water System Capacity Charge (Talquin — Gadsden Co. Unincorporated) — 1" meter
    Talquin Electric Cooperative
    Water service provided by Talquin Electric Cooperative under one system-capacity schedule (set by water meter size) that applies to all customer classes. Amount is the system capacity charge for a 1-inch meter, effective May 1, 2025. Serves unincorporated areas where water service has been established; much of the county relies on private wells. A separate metered-service connection fee (the greater of $600 or the actual cost to construct, connect and meter the service, plus any main-line extension) applies in addition.
    $1,765.00 one-time
Sewer$20,750.00 one-time
  • Sewer System Capacity Charge (Talquin — Gadsden Co. Unincorporated) — 1" meter
    Talquin Electric Cooperative
    Wastewater service provided by Talquin Electric Cooperative under one system-capacity schedule (set by water meter size) that applies to all customer classes. Amount is the system capacity charge for a 1-inch meter, effective May 1, 2025. Available only where wastewater service has been established; much of unincorporated Gadsden County is on private septic. A separate metered-service connection fee (the greater of $600 or the actual cost to construct, connect and meter the service) applies in addition.
    $20,750.00 one-time
City$0.00
Total (unincorporated Gadsden County): $22,515.00 one-time (≈ $22,515.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Talquin Electric Cooperative N/A — unincorporated area Gadsden County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Gadsden County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Gadsden County: Office Impact Fees

Office development in unincorporated Gadsden County pays no per-square-foot impact fees, but owes $22,515.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 25,000 sq ft building, that comes to about $22,515.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer System Capacity Charge (Talquin — Gadsden Co. Unincorporated) — 1" meter ($20,750.00 one-time) and Water System Capacity Charge (Talquin — Gadsden Co. Unincorporated) — 1" meter ($1,765.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full Gadsden County impact fee schedule
Water$1,765.00 one-time
  • Water System Capacity Charge (Talquin — Gadsden Co. Unincorporated) — 1" meter
    Talquin Electric Cooperative
    Water service provided by Talquin Electric Cooperative under one system-capacity schedule (set by water meter size) that applies to all customer classes. Amount is the system capacity charge for a 1-inch meter, effective May 1, 2025. Serves unincorporated areas where water service has been established; much of the county relies on private wells. A separate metered-service connection fee (the greater of $600 or the actual cost to construct, connect and meter the service, plus any main-line extension) applies in addition.
    $1,765.00 one-time
Sewer$20,750.00 one-time
  • Sewer System Capacity Charge (Talquin — Gadsden Co. Unincorporated) — 1" meter
    Talquin Electric Cooperative
    Wastewater service provided by Talquin Electric Cooperative under one system-capacity schedule (set by water meter size) that applies to all customer classes. Amount is the system capacity charge for a 1-inch meter, effective May 1, 2025. Available only where wastewater service has been established; much of unincorporated Gadsden County is on private septic. A separate metered-service connection fee (the greater of $600 or the actual cost to construct, connect and meter the service) applies in addition.
    $20,750.00 one-time
City$0.00
County$0.00
Total (unincorporated Gadsden County): $22,515.00 one-time (≈ $22,515.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Talquin Electric Cooperative N/A — unincorporated area Gadsden County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Gadsden County impact fee calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Brush up on impact fee basics before you budget your next project.

Gadsden County impact fee FAQs

What are single-family impact fees in Gadsden County, Florida?

A new single-family home in unincorporated Gadsden County pays $9,200.00 per unit in impact fees (rates sourced July 12, 2026). Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.

How much are multifamily impact fees in Gadsden County?

Multifamily development in unincorporated Gadsden County pays $9,200.00 per unit in impact fees (rates sourced July 12, 2026). Rates inside city limits depend on the municipality. Pick your city on this page.

How much are commercial impact fees in Gadsden County?

Commercial development in unincorporated Gadsden County pays no per-square-foot impact fees, but owes $22,515.00 in one-time water and sewer connection fees (assuming a 1-inch meter).

Do cities in Gadsden County charge their own impact fees?

Yes. Every incorporated city applies its own fee schedule. 5 of 6 cities in Gadsden County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000