IMPACTFEES.ORG

Quincy, Florida Impact Fees

Quincy applies its own fee schedule. Gadsden County does not currently add county-level impact fees inside city limits. There are currently no published impact fee amounts for a new single-family home (rates sourced July 12, 2026). The full breakdown is below.

Quincy impact fees by project type

Quincy: Single-Family Impact Fees

Quincy has no published impact fee amounts for a new single-family home (rates sourced July 12, 2026). The schedule below documents the status of each fee.

Sewer Connection/Capacity Fee (City of Quincy) and Water Connection/Capacity Fee (City of Quincy) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection/Capacity Fee (City of Quincy)
    City of Quincy
    Internal research note: Code Ch. 74 Art. IV sets out the complete water rate schedule at Sec. 74-95 (residential and commercial readiness-to-serve charges by meter size, usage tiers, annual October 1 escalation of the greater of 2.5 percent or CPI, plus a 25 percent surcharge outside the city within Gadsden County) with no tap, connection or capacity line item. Sec. 74-91(a) expressly leaves the connection charge to 'rules and regulations which shall be adopted from time to time by the city commission, which rules and regulations shall provide for a charge for making any such connections in such reasonable amount as such commission may fix and determine.' Amount therefore exists but is off-code. The city site (myquincy.net) is Cloudflare-gated; indexed rate pages show monthly water/sewer/gas charges only. Codified-but-deferred, so INFERRED_0. 8/5/2026
    Requires confirmation
Sewer$0.00
  • Sewer Connection/Capacity Fee (City of Quincy)
    City of Quincy
    Internal research note: City of Quincy operates both water and sewer (DEP QUINCY, CITY OF WWTF, FL0029033, 1.50 MGD). Code Ch. 74 Art. V sets out the full sewer service rate schedule at Sec. 74-118 (monthly readiness-to-serve by meter size and usage charges, plus a 25 percent outside-city surcharge) with no tap, connection or capacity line item anywhere in it. Sec. 74-142(a) says the applicable charges and fees 'shall be set forth in the city's schedule of charges and fees' — i.e. published separately — and Sec. 74-136(b) requires a permit and inspection fee at application without stating an amount. So a connection charge exists but its amount is off-code. The city's site (myquincy.net) is behind a Cloudflare interstitial that blocks automated retrieval; indexed pages show residential monthly water/sewer/gas rates only and no tap or capacity fee. Codified-but-deferred, so INFERRED_0. 8/5/2026
    Requires confirmation
City$0.00
  • City Impact Fees (City of Quincy)
    City of Quincy
    No municipal development impact fee chapter in the City of Quincy Code (utilities Ch. 74 only). Confirmed $0 None.
    $0.00
County$0.00
  • County Impact Fees (Quincy)
    Gadsden County
    Gadsden County has no development impact fee program (no Impact Fees chapter in county code). Confirmed $0 None.
    $0.00
Total (Quincy): $0.00
Sources last checked July 12, 2026Official fee schedules:City of Quincy Gadsden County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Gadsden County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Quincy: Multifamily Impact Fees

Quincy has no published impact fee amounts for a new multifamily unit (rates sourced July 12, 2026). The schedule below documents the status of each fee.

Sewer Connection/Capacity Fee (City of Quincy, MF) and Water Connection/Capacity Fee (City of Quincy, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection/Capacity Fee (City of Quincy, MF)
    City of Quincy
    Internal research note: Same as the SFR row. Quincy Code Sec. 74-95 sets the complete water rate schedule with no tap, connection or capacity line, and Sec. 74-91(a) leaves the connection charge to rules and an amount fixed by the city commission. Sec. 74-91(f) does supply a per-unit basis — 'each lot or building site shall be considered a separate unit for the payment of the water fees established in this article, and separate connections will be required... Every connection shall be separately metered' — so a per-unit charge exists in principle, but no amount is published anywhere retrievable (myquincy.net is Cloudflare-gated and indexed pages show monthly rates only). Codified-but-deferred, so INFERRED_0. 8/5/2026
    Requires confirmation
Sewer$0.00
  • Sewer Connection/Capacity Fee (City of Quincy, MF)
    City of Quincy
    Internal research note: Same as the SFR row. Quincy Code Sec. 74-118 sets the full sewer rate schedule with no tap, connection or capacity item; it does contain a multiple-unit monthly billing provision (Sec. 74-118(c): greater of the meter-size schedule or $6.40 for the first unit plus $4.25 per additional unit) but that is a recurring service charge, not a one-time capacity charge. Sec. 74-142(a) leaves the applicable charges to the city's separately published schedule of charges and fees, which is not retrievable (myquincy.net is Cloudflare-gated). Codified-but-deferred, so INFERRED_0. 8/5/2026
    Requires confirmation
City$0.00
County$0.00
Total (Quincy): $0.00
Sources last checked July 12, 2026Official fee schedules:City of Quincy Gadsden County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Gadsden County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Quincy: Commercial Impact Fees

Commercial development in Quincy pays no per-square-foot impact fees (rates sourced July 12, 2026).

Sewer Connection/Capacity Fee (City of Quincy) and Water Connection/Capacity Fee (City of Quincy) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection/Capacity Fee (City of Quincy)
    City of Quincy
    UNCONFIRMED (checked 7/12/2026). The City of Quincy operates its own water system. Municode Ch. 74 §74-95 publishes only monthly readiness-to-serve and usage rates (base date 3/15/2014, CPI-adjusted each Oct 1); the one-time water connection/capacity charge is set by resolution and is not codified. The City's Commercial Rates page (myquincy.net/customer-service/page/commercial-rates) contains contact information only — no rates, no connection fee, no meter-size capacity table; the Residential Rates page states rates are "under review." VERIFY: City of Quincy Utilities (850) 627-7681 / Customer Service (850) 618-0017 — ask for the commercial water capacity/connection fee by meter size.
    Requires confirmation
Sewer$0.00
  • Sewer Connection/Capacity Fee (City of Quincy)
    City of Quincy
    UNCONFIRMED (checked 7/12/2026). The City of Quincy operates its own wastewater system. Municode Ch. 74 §§74-116/74-117 cover only O&M user charges and a system-development-charge funding formula — no flat one-time sewer capacity/connection fee is published; it is set by resolution. The City's Commercial Rates page publishes no fees. VERIFY: City of Quincy Utilities (850) 627-7681 / Customer Service (850) 618-0017 — ask for the commercial sewer capacity/connection fee.
    Requires confirmation
City$0.00
  • City Impact Fees (City of Quincy, Commercial)
    City of Quincy
    City of Quincy (county seat) levies NO municipal development impact fees — no impact-fee chapter (transportation/parks/police/fire) in the City Code of Ordinances (Municode); Ch. 74 covers utility charges only, and no development-fee schedule PDF is posted on myquincy.net. Confirmed 7/12/2026 for nonresidential. Documented $0 — the fee does not exist. City of Quincy (850) 618-0017.
    $0.00
County$0.00
  • County Impact Fees (Gadsden County — Quincy, Commercial)
    Gadsden County
    Gadsden County levies NO development impact fees of any kind — no impact-fee chapter in the County Code of Ordinances (Municode) and no posted development-fee schedule. Nothing to overlay inside the City of Quincy (county seat). Confirmed 7/12/2026 for nonresidential. Documented $0 — the fee does not exist. Gadsden County Growth Management (850) 875-8665.
    $0.00
Total (Quincy): $0.00
Sources last checked July 12, 2026Official fee schedules:City of Quincy Gadsden County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Gadsden County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Quincy: Industrial Impact Fees

Industrial development in Quincy pays no per-square-foot impact fees (rates sourced July 12, 2026).

Sewer Connection/Capacity Fee (City of Quincy) and Water Connection/Capacity Fee (City of Quincy) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection/Capacity Fee (City of Quincy)
    City of Quincy
    UNCONFIRMED (checked 7/12/2026). The City of Quincy operates its own water system. Municode Ch. 74 §74-95 publishes only monthly readiness-to-serve and usage rates (base date 3/15/2014, CPI-adjusted each Oct 1); the one-time water connection/capacity charge is set by resolution and is not codified. The City's Commercial Rates page (myquincy.net/customer-service/page/commercial-rates) contains contact information only — no rates, no connection fee, no meter-size capacity table; the Residential Rates page states rates are "under review." VERIFY: City of Quincy Utilities (850) 627-7681 / Customer Service (850) 618-0017 — ask for the commercial water capacity/connection fee by meter size.
    Requires confirmation
Sewer$0.00
  • Sewer Connection/Capacity Fee (City of Quincy)
    City of Quincy
    UNCONFIRMED (checked 7/12/2026). The City of Quincy operates its own wastewater system. Municode Ch. 74 §§74-116/74-117 cover only O&M user charges and a system-development-charge funding formula — no flat one-time sewer capacity/connection fee is published; it is set by resolution. The City's Commercial Rates page publishes no fees. VERIFY: City of Quincy Utilities (850) 627-7681 / Customer Service (850) 618-0017 — ask for the commercial sewer capacity/connection fee.
    Requires confirmation
City$0.00
  • City Impact Fees (City of Quincy, Industrial)
    City of Quincy
    City of Quincy (county seat) levies NO municipal development impact fees — no impact-fee chapter (transportation/parks/police/fire) in the City Code of Ordinances (Municode); Ch. 74 covers utility charges only, and no development-fee schedule PDF is posted on myquincy.net. Confirmed 7/12/2026 for nonresidential. Documented $0 — the fee does not exist. City of Quincy (850) 618-0017.
    $0.00
County$0.00
  • County Impact Fees (Gadsden County — Quincy, Industrial)
    Gadsden County
    Gadsden County levies NO development impact fees of any kind — no impact-fee chapter in the County Code of Ordinances (Municode) and no posted development-fee schedule. Nothing to overlay inside the City of Quincy (county seat). Confirmed 7/12/2026 for nonresidential. Documented $0 — the fee does not exist. Gadsden County Growth Management (850) 875-8665.
    $0.00
Total (Quincy): $0.00
Sources last checked July 12, 2026Official fee schedules:City of Quincy Gadsden County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Gadsden County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Quincy: Office Impact Fees

Office development in Quincy pays no per-square-foot impact fees (rates sourced July 12, 2026).

Sewer Connection/Capacity Fee (City of Quincy) and Water Connection/Capacity Fee (City of Quincy) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection/Capacity Fee (City of Quincy)
    City of Quincy
    UNCONFIRMED (checked 7/12/2026). The City of Quincy operates its own water system. Municode Ch. 74 §74-95 publishes only monthly readiness-to-serve and usage rates (base date 3/15/2014, CPI-adjusted each Oct 1); the one-time water connection/capacity charge is set by resolution and is not codified. The City's Commercial Rates page (myquincy.net/customer-service/page/commercial-rates) contains contact information only — no rates, no connection fee, no meter-size capacity table; the Residential Rates page states rates are "under review." VERIFY: City of Quincy Utilities (850) 627-7681 / Customer Service (850) 618-0017 — ask for the commercial water capacity/connection fee by meter size.
    Requires confirmation
Sewer$0.00
  • Sewer Connection/Capacity Fee (City of Quincy)
    City of Quincy
    UNCONFIRMED (checked 7/12/2026). The City of Quincy operates its own wastewater system. Municode Ch. 74 §§74-116/74-117 cover only O&M user charges and a system-development-charge funding formula — no flat one-time sewer capacity/connection fee is published; it is set by resolution. The City's Commercial Rates page publishes no fees. VERIFY: City of Quincy Utilities (850) 627-7681 / Customer Service (850) 618-0017 — ask for the commercial sewer capacity/connection fee.
    Requires confirmation
City$0.00
  • City Impact Fees (City of Quincy, Office)
    City of Quincy
    City of Quincy (county seat) levies NO municipal development impact fees — no impact-fee chapter (transportation/parks/police/fire) in the City Code of Ordinances (Municode); Ch. 74 covers utility charges only, and no development-fee schedule PDF is posted on myquincy.net. Confirmed 7/12/2026 for nonresidential. Documented $0 — the fee does not exist. City of Quincy (850) 618-0017.
    $0.00
County$0.00
  • County Impact Fees (Gadsden County — Quincy, Office)
    Gadsden County
    Gadsden County levies NO development impact fees of any kind — no impact-fee chapter in the County Code of Ordinances (Municode) and no posted development-fee schedule. Nothing to overlay inside the City of Quincy (county seat). Confirmed 7/12/2026 for nonresidential. Documented $0 — the fee does not exist. Gadsden County Growth Management (850) 875-8665.
    $0.00
Total (Quincy): $0.00
Sources last checked July 12, 2026Official fee schedules:City of Quincy Gadsden County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Gadsden County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Quincy

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Frequently asked questions

How much are commercial impact fees in Quincy?

Quincy does not currently levy impact fees on commercial development.

Does Quincy charge its own impact fees?

Yes. Quincy levies its own municipal impact or utility fees. Gadsden County does not currently add county-level impact fees inside Quincy. The schedule on this page shows every fee that applies to development in Quincy.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Gadsden County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000