Midway, Florida Impact Fees

Midway applies its own fee schedule. Gadsden County does not currently add county-level impact fees inside city limits. A new single-family home pays $9,200.00 per unit (rates sourced ). The full breakdown is below.

Midway impact fees by project type

Midway: Single-Family Impact Fees

A new single-family home in Midway pays $9,200.00 per unit in impact fees (rates sourced July 12, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer System Capacity Charge (Talquin — City of Midway) ($8,300.00) and Water System Capacity Charge (Talquin — City of Midway) ($900.00).

View the full Midway impact fee schedule
Water$900.00
  • Water System Capacity Charge (Talquin — City of Midway)
    Talquin Electric Cooperative
    The City of Midway is served by Talquin Electric Cooperative. Rate Schedule W, effective May 1, 2025: System Capacity Charge $900 for a standard 0.75-inch meter, plus a connection fee of the greater of $600 or actual cost. Larger meters pay higher capacity charges.
    $900.00
Sewer$8,300.00
  • Sewer System Capacity Charge (Talquin — City of Midway)
    Talquin Electric Cooperative
    The City of Midway is served by Talquin Electric Cooperative. Rate Schedule S, effective May 1, 2025: System Capacity Charge $8,300 for a standard 0.75-inch meter, plus a connection fee of the greater of $600 or actual cost. Larger meters pay higher capacity charges.
    $8,300.00
City$0.00
County$0.00
  • County Impact Fees (Midway)
    Gadsden County
    Gadsden County levies no development impact fees, so no county overlay applies in Midway.
    $0.00
Total (Midway): $9,200.00
Sources last checked Official fee schedules:Talquin Electric Cooperative City of Midway Gadsden County

Where in Gadsden County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Midway: Multifamily Impact Fees

A new multifamily unit in Midway pays $9,200.00 per unit in impact fees (rates sourced July 12, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer System Capacity Charge (Talquin — City of Midway, MF) ($8,300.00) and Water System Capacity Charge (Talquin — City of Midway, MF) ($900.00).

View the full Midway impact fee schedule
Water$900.00
  • Water System Capacity Charge (Talquin — City of Midway, MF)
    Talquin Electric Cooperative
    The City of Midway is served by Talquin Electric Cooperative (Rate Schedule W, effective May 1, 2025). Multifamily is charged per dwelling unit — the rate schedule's multi-unit provision multiplies the number of units by the applicable system and connection fees: $900 per unit (system capacity charge) plus a connection fee (greater of $600 or actual cost) per unit.
    $900.00
Sewer$8,300.00
  • Sewer System Capacity Charge (Talquin — City of Midway, MF)
    Talquin Electric Cooperative
    The City of Midway is served by Talquin Electric Cooperative (Rate Schedule S, effective May 1, 2025). Multifamily is charged per dwelling unit — the schedule's multi-unit provision multiplies the number of units by the applicable system and connection fees: $8,300 per unit (system capacity charge) plus a connection fee (greater of $600 or actual cost) per unit.
    $8,300.00
City$0.00
County$0.00
Total (Midway): $9,200.00
Sources last checked Official fee schedules:Talquin Electric Cooperative City of Midway Gadsden County

Where in Gadsden County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Midway: Commercial Impact Fees

Commercial development in Midway pays no per-square-foot impact fees, but owes $22,515.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to about $22,515.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer System Capacity Charge (Talquin — City of Midway) — 1" meter ($20,750.00 one-time) and Water System Capacity Charge (Talquin — City of Midway) — 1" meter ($1,765.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full Midway impact fee schedule
Water$1,765.00 one-time
  • Water System Capacity Charge (Talquin — City of Midway) — 1" meter
    Talquin Electric Cooperative
    Water service provided by Talquin Electric Cooperative under one system-capacity schedule (set by water meter size) that applies to all customer classes. Amount is the system capacity charge for a 1-inch meter, effective May 1, 2025. A separate metered-service connection fee (the greater of $600 or the actual cost to construct, connect and meter the service, plus any main-line extension) applies in addition.
    $1,765.00 one-time
Sewer$20,750.00 one-time
  • Sewer System Capacity Charge (Talquin — City of Midway) — 1" meter
    Talquin Electric Cooperative
    Wastewater service provided by Talquin Electric Cooperative under one system-capacity schedule (set by water meter size) that applies to all customer classes. Amount is the system capacity charge for a 1-inch meter, effective May 1, 2025. A separate metered-service connection fee (the greater of $600 or the actual cost to construct, connect and meter the service) applies in addition.
    $20,750.00 one-time
Total (Midway): $22,515.00 one-time (≈ $22,515.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Talquin Electric Cooperative City of Midway Gadsden County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Gadsden County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Midway: Industrial Impact Fees

Industrial development in Midway pays no per-square-foot impact fees, but owes $22,515.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to about $22,515.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer System Capacity Charge (Talquin — City of Midway) — 1" meter ($20,750.00 one-time) and Water System Capacity Charge (Talquin — City of Midway) — 1" meter ($1,765.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full Midway impact fee schedule
Water$1,765.00 one-time
  • Water System Capacity Charge (Talquin — City of Midway) — 1" meter
    Talquin Electric Cooperative
    Water service provided by Talquin Electric Cooperative under one system-capacity schedule (set by water meter size) that applies to all customer classes. Amount is the system capacity charge for a 1-inch meter, effective May 1, 2025. A separate metered-service connection fee (the greater of $600 or the actual cost to construct, connect and meter the service, plus any main-line extension) applies in addition.
    $1,765.00 one-time
Sewer$20,750.00 one-time
  • Sewer System Capacity Charge (Talquin — City of Midway) — 1" meter
    Talquin Electric Cooperative
    Wastewater service provided by Talquin Electric Cooperative under one system-capacity schedule (set by water meter size) that applies to all customer classes. Amount is the system capacity charge for a 1-inch meter, effective May 1, 2025. A separate metered-service connection fee (the greater of $600 or the actual cost to construct, connect and meter the service) applies in addition.
    $20,750.00 one-time
Total (Midway): $22,515.00 one-time (≈ $22,515.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Talquin Electric Cooperative City of Midway Gadsden County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Gadsden County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Midway: Office Impact Fees

Office development in Midway pays no per-square-foot impact fees, but owes $22,515.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 25,000 sq ft building, that comes to about $22,515.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer System Capacity Charge (Talquin — City of Midway) — 1" meter ($20,750.00 one-time) and Water System Capacity Charge (Talquin — City of Midway) — 1" meter ($1,765.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full Midway impact fee schedule
Water$1,765.00 one-time
  • Water System Capacity Charge (Talquin — City of Midway) — 1" meter
    Talquin Electric Cooperative
    Water service provided by Talquin Electric Cooperative under one system-capacity schedule (set by water meter size) that applies to all customer classes. Amount is the system capacity charge for a 1-inch meter, effective May 1, 2025. A separate metered-service connection fee (the greater of $600 or the actual cost to construct, connect and meter the service, plus any main-line extension) applies in addition.
    $1,765.00 one-time
Sewer$20,750.00 one-time
  • Sewer System Capacity Charge (Talquin — City of Midway) — 1" meter
    Talquin Electric Cooperative
    Wastewater service provided by Talquin Electric Cooperative under one system-capacity schedule (set by water meter size) that applies to all customer classes. Amount is the system capacity charge for a 1-inch meter, effective May 1, 2025. A separate metered-service connection fee (the greater of $600 or the actual cost to construct, connect and meter the service) applies in addition.
    $20,750.00 one-time
City$0.00
Total (Midway): $22,515.00 one-time (≈ $22,515.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Talquin Electric Cooperative City of Midway Gadsden County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Gadsden County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Midway impact fee calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Midway impact fee FAQs

What are the total impact fees for a single-family home in Midway, Florida?

A new single-family home in Midway pays $9,200.00 per unit in combined impact fees (rates sourced July 12, 2026).

How much are commercial impact fees in Midway?

Commercial development in Midway pays no per-square-foot impact fees, but owes $22,515.00 in one-time water and sewer connection fees (assuming a 1-inch meter).

Does Midway charge its own impact fees?

Yes. Midway levies its own municipal impact or utility fees. Gadsden County does not currently add county-level impact fees inside Midway. The schedule on this page shows every fee that applies to development in Midway.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Gadsden County impact fees page.

Missing a jurisdiction? Get in touch.