Plant City impact fees by project type
Plant City: Single-Family Impact Fees
A new single-family home in Plant City pays $21,129.00 per unit in impact fees (rates sourced July 22, 2026). Of that, Hillsborough County-levied fees account for $8,227.00 and municipal or utility fees for $12,902.00.
The largest line items are School Impact Fee (SFR, 1,800-2,499 sq ft) ($8,227.00), Transportation Mobility Fee (SFR-Detached) ($4,383.00) and Wastewater Development Charge (SFR - per ERC) ($3,222.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Development Charge (SFR - 5/8" meter)$1,573.00City of Plant CityCh. 74 Art. IV §74-332. Water development charge is meter-size based. 5/8" meter = $1,573. Per Ord. 41-2023 eff. April 1, 2024.
- Wastewater Development Charge (SFR - per ERC)$3,222.00City of Plant CityCh. 74 Art. IV §74-333. SFR = $3,222/ERC. MF per-unit rate is $2,255 (explicit flat rate in code). Per Ord. 41-2023 eff. April 1, 2024.
- Transportation Mobility Fee (SFR-Detached)$4,383.00City of Plant CityCh. 86 Art. IV §86-113. City of Plant City mobility fee flat schedule rate. SFR-Detached = $4,383; SFR-Attached = $3,766; MF = $2,954. Eff. per Ord. 13-2024 (3-25-2024). Alternative: ITE Trip Generation 11th ed. formula.
- Parks & Recreation Impact Fee (SFR)$1,666.00City of Plant CityCity of Plant City parks & recreation impact fee, Code Sec. 86-153 (Ch. 86 Art. V). Distinct from the Hillsborough County parks fee.
- Law Enforcement Impact Fee (SFR)$1,148.00City of Plant CityCity of Plant City law enforcement impact fee, Code Sec. 86-73 (Ch. 86 Art. III).
- Fire Rescue Impact Fee (SFR)$507.00City of Plant CityCity of Plant City fire rescue impact fee, Code Sec. 86-33 (Ch. 86 Art. II). Distinct from the Hillsborough County fire fee ($335 SFR).
- Library Impact Fee (SFR)$403.00City of Plant CityCity of Plant City library impact fee, Code Ch. 86 Art. VI.
- School Impact Fee (SFR, 1,800-2,499 sq ft)$8,227.00Hillsborough CountyCountywide school impact fee, applies inside Plant City. Schedule eff. 10/1/2022. Living-area brackets: <900 $1,645; 900-1,299 $3,891; 1,300-1,799 $7,027; 1,800-2,499 $8,227; 2,500-3,399 $9,369; 3,400+ $10,976. Default tier = 1,800-2,499 sf (canonical 2,000 sq ft SFR house).
Where in Hillsborough County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Plant City: Multifamily Impact Fees
A new multifamily unit in Plant City pays $13,483.00 per unit in impact fees (rates sourced July 22, 2026). Of that, Hillsborough County-levied fees account for $3,891.00 and municipal or utility fees for $9,592.00.
The largest line items are School Impact Fee (MF, 900-1,299 sq ft) ($3,891.00), Transportation Mobility Fee (MF) ($2,954.00) and Wastewater Development Charge (MF - per unit) ($2,255.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Development Charge (MF - 5/8" meter per unit)$1,573.00City of Plant CityCh. 74 Art. IV §74-332. Water development charge is meter-size based, not ERU-based: 5/8" meter = $1,573 per connection. Unlike the wastewater charge (§74-333), which prints an explicit flat MF per-unit rate of $2,255, the water section sets no separate multifamily basis — MF = SFR here is the correct reading of a meter-size schedule where each unit takes a 5/8" meter, not a copy error. Per Ord. 41-2023 eff. April 1, 2024. Open: whether a master-metered MF complex is instead charged on the larger master meter size.
- Wastewater Development Charge (MF - per unit)$2,255.00City of Plant CityCh. 74 Art. IV §74-333. Explicit MF per-unit rate = $2,255. SFR rate = $3,222/ERC. Per Ord. 41-2023 eff. April 1, 2024. (Prior record of $1,611 based on 0.5 ERU calculation was incorrect.)
- Transportation Mobility Fee (MF)$2,954.00City of Plant CityCh. 86 Art. IV §86-113. City of Plant City mobility fee - flat schedule rate (feepayer option). SFR-Detached = $4,383; SFR-Attached = $3,766; MF = $2,954. Eff. per Ord. 13-2024 (3-25-2024). Alternative: formula using ITE Trip Generation 11th ed.
- Parks & Recreation Impact Fee (MF)$1,256.00City of Plant CityCity of Plant City parks & recreation impact fee, Code Sec. 86-153 (Ch. 86 Art. V), per MF unit. Distinct from the Hillsborough County parks fee.
- Law Enforcement Impact Fee (MF)$867.00City of Plant CityCity of Plant City law enforcement impact fee, Code Sec. 86-73 (Ch. 86 Art. III), per MF unit.
- Fire Rescue Impact Fee (MF)$383.00City of Plant CityCity of Plant City fire rescue impact fee, Code Sec. 86-33 (Ch. 86 Art. II), per MF unit. Distinct from the Hillsborough County fire fee ($249 MF).
- Library Impact Fee (MF)$304.00City of Plant CityCity of Plant City library impact fee, Code Ch. 86 Art. VI, per MF unit.
- School Impact Fee (MF, 900-1,299 sq ft)$3,891.00Hillsborough CountyCountywide school impact fee, applies inside Plant City. Schedule eff. 10/1/2022. Living-area brackets: <900 $1,645; 900-1,299 $3,891; 1,300-1,799 $7,027; 1,800-2,499 $8,227; 2,500-3,399 $9,369; 3,400+ $10,976. Default tier = 900-1,299 sf (canonical 1,000 sq ft MF unit).
Where in Hillsborough County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Plant City: Commercial Impact Fees
Commercial development in Plant City pays $8.70 per square foot in impact fees, plus $7,155.00 in one-time water and sewer connection fees (rates sourced July 22, 2026).
For a 50,000 sq ft building, that comes to about $442,055.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Development Charge (City of Plant City) — 1" meter ($3,933.00 one-time), Wastewater Development Charge (City of Plant City) — 1 ERC minimum ($3,222.00 one-time) and Transportation Mobility Fee (City of Plant City, Commercial) ($6.01/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the full fee schedule
- Water Development Charge (City of Plant City) — 1" meter$3,933.00 one-timeCity of Plant CityCode Ch. 74 Art. IV §74-332, Ord. No. 41-2023 (12-11-2023), eff. 4/1/2024. Single meter-size ladder applies to all customer classes (no separate commercial table). Canonical 1" meter = $3,933.00. Full ladder: 5/8" $1,573; 1" $3,933; 1.5" $7,865; 2" $12,584; 3" $23,595; 4" $39,325; 6" $78,650; 8" $125,840; 10" $180,895. No water development charge is due on reclaimed-water irrigation connections (§74-332). Meter-replacement exemption at §74-336(b).
- Wastewater Development Charge (City of Plant City) — 1 ERC minimum$3,222.00 one-timeCity of Plant CityCode Ch. 74 Art. IV §74-333(2), Ord. No. 41-2023 (12-11-2023), eff. 4/1/2024. Commercial and industrial development charge is ERC-based, NOT meter-based: 1 ERC = 350 gpd OR 20 fixture units. Fixture units per Florida Building Code; estimated sewage flows per FAC Rule 64E-6.008 (as in effect 11/1/2005). Both are computed and the HIGHER ERC governs; partial ERCs round UP to the next full ERC. Adopted charge = $3,222.00 per ERC (§74-333(1)). Amount entered = the 1-ERC minimum. (SFR is also $3,222/ERC — shared per-ERC rate by design, not residential-rate contamination.)
- Transportation Mobility Fee (City of Plant City, Commercial)$6.01/sq ftCity of Plant CityCode Ch. 86 Art. IV §86-113(a), Ord. No. 13-2024 (3-25-2024) — 'Plant City Calculated Mobility Fee Rates'. Schedule row: 'Commercial/Shopping Center 40,000 to 150,000 sfgla' $6,007 per 1,000 sfGLA. Adjacent tiers: <40,000 $2,908; >150,000 $6,462. Alternative independent fee study permitted (§86-113(b)(3)).
- Law Enforcement Impact Fee (City of Plant City, Commercial)$1.83/sq ftCity of Plant CityCode Ch. 86 Art. III §86-73(a), Ord. No. 10-2024 (3-25-2024). Schedule row: 'Commercial/Shopping Center 40,000 to 150,000 sfgla' $1,829 per 1,000 sfGLA. Adjacent tiers: <40,000 $1,304; >150,000 $1,273. Nonres not exempt.
- Fire Rescue Impact Fee (City of Plant City, Commercial)$0.86/sq ftCity of Plant CityCode Ch. 86 Art. II §86-33(a), Ord. No. 9-2024 (3-25-2024), based on the Jan 30 2024 Benesch Impact Fee Update Study. Schedule row: 'Commercial/Shopping Center 40,000 to 150,000 sfgla' $862 per 1,000 sfGLA (nearest the 50,000 sq ft canonical size). Adjacent tiers: <40,000 sfgla $615; >150,000 sfgla $600. Basis = gross LEASABLE area. Nonres not exempt (§86-39(a) exemptions cover only alterations, replacements, government facilities, and Laura St. low-income).
- County Impact Fee — Not Applicable In-City (City of Plant City, Commercial)$0.00Hillsborough CountyConfirmed $0. Hillsborough County Code Sec. 40-50(1) limits transportation and fire rescue impact assessments (and the Art. III mobility fee) to the UNINCORPORATED area; Sec. 40-50(3) makes the countywide school fee residential-only. Plant City levies its own fire rescue, law enforcement and mobility fees instead (see City records).
Where in Hillsborough County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Plant City: Industrial Impact Fees
Industrial development in Plant City pays $2.40 per square foot in impact fees, plus $7,155.00 in one-time water and sewer connection fees (rates sourced July 22, 2026).
For a 50,000 sq ft building, that comes to about $127,055.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Development Charge (City of Plant City) — 1" meter ($3,933.00 one-time), Wastewater Development Charge (City of Plant City) — 1 ERC minimum ($3,222.00 one-time) and Transportation Mobility Fee (City of Plant City, Industrial) ($1.94/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the full fee schedule
- Water Development Charge (City of Plant City) — 1" meter$3,933.00 one-timeCity of Plant CityCode Ch. 74 Art. IV §74-332, Ord. No. 41-2023 (12-11-2023), eff. 4/1/2024. Single meter-size ladder applies to all customer classes (no separate commercial table). Canonical 1" meter = $3,933.00. Full ladder: 5/8" $1,573; 1" $3,933; 1.5" $7,865; 2" $12,584; 3" $23,595; 4" $39,325; 6" $78,650; 8" $125,840; 10" $180,895. No water development charge is due on reclaimed-water irrigation connections (§74-332). Meter-replacement exemption at §74-336(b).
- Wastewater Development Charge (City of Plant City) — 1 ERC minimum$3,222.00 one-timeCity of Plant CityCode Ch. 74 Art. IV §74-333(2), Ord. No. 41-2023 (12-11-2023), eff. 4/1/2024. Commercial and industrial development charge is ERC-based, NOT meter-based: 1 ERC = 350 gpd OR 20 fixture units. Fixture units per Florida Building Code; estimated sewage flows per FAC Rule 64E-6.008 (as in effect 11/1/2005). Both are computed and the HIGHER ERC governs; partial ERCs round UP to the next full ERC. Adopted charge = $3,222.00 per ERC (§74-333(1)). Amount entered = the 1-ERC minimum. (SFR is also $3,222/ERC — shared per-ERC rate by design, not residential-rate contamination.)
- Transportation Mobility Fee (City of Plant City, Industrial)$1.94/sq ftCity of Plant CityCode §86-113(a), Ord. No. 13-2024 (3-25-2024). Schedule row: 'General Light Industrial' $1,939 per 1,000 sq ft. (Manufacturing $1,887; Warehouse $611 — not entered.) NOTE: Plant City's Parks & Recreation (§86-153) and Library (§86-182) impact fees are RESIDENTIAL-ONLY — §§86-159(a)(6) and 86-188(a)(6) expressly exempt 'the construction of any nonresidential building or structure'; no nonres rows exist in either schedule.
- Law Enforcement Impact Fee (City of Plant City, Industrial)$0.31/sq ftCity of Plant CityCode §86-73(a), Ord. No. 10-2024 (3-25-2024). Schedule row: 'General Light Industrial' $312 per 1,000 sq ft. (Manufacturing $362; Warehouse $74 — not entered.)
- Fire Rescue Impact Fee (City of Plant City, Industrial)$0.15/sq ftCity of Plant CityCode §86-33(a), Ord. No. 9-2024 (3-25-2024). Schedule row: 'General Light Industrial' $147 per 1,000 sq ft. (Manufacturing $170; Warehouse $35; Mini-Warehouse $14 — not entered.)
- County Impact Fee — Not Applicable In-City (City of Plant City, Industrial)$0.00Hillsborough CountyConfirmed $0 — county nonres impact fees are unincorporated-only (Code Sec. 40-50(1)); school fee residential-only (Sec. 40-50(3)).
Where in Hillsborough County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Plant City: Office Impact Fees
Office development in Plant City pays $5.20 per square foot in impact fees, plus $7,155.00 in one-time water and sewer connection fees (rates sourced July 22, 2026).
For a 25,000 sq ft building, that comes to about $137,130.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Development Charge (City of Plant City) — 1" meter ($3,933.00 one-time), Wastewater Development Charge (City of Plant City) — 1 ERC minimum ($3,222.00 one-time) and Transportation Mobility Fee (City of Plant City, Office) ($4.31/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the full fee schedule
- Water Development Charge (City of Plant City) — 1" meter$3,933.00 one-timeCity of Plant CityCode Ch. 74 Art. IV §74-332, Ord. No. 41-2023 (12-11-2023), eff. 4/1/2024. Single meter-size ladder applies to all customer classes (no separate commercial table). Canonical 1" meter = $3,933.00. Full ladder: 5/8" $1,573; 1" $3,933; 1.5" $7,865; 2" $12,584; 3" $23,595; 4" $39,325; 6" $78,650; 8" $125,840; 10" $180,895. No water development charge is due on reclaimed-water irrigation connections (§74-332). Meter-replacement exemption at §74-336(b).
- Wastewater Development Charge (City of Plant City) — 1 ERC minimum$3,222.00 one-timeCity of Plant CityCode Ch. 74 Art. IV §74-333(2), Ord. No. 41-2023 (12-11-2023), eff. 4/1/2024. Commercial and industrial development charge is ERC-based, NOT meter-based: 1 ERC = 350 gpd OR 20 fixture units. Fixture units per Florida Building Code; estimated sewage flows per FAC Rule 64E-6.008 (as in effect 11/1/2005). Both are computed and the HIGHER ERC governs; partial ERCs round UP to the next full ERC. Adopted charge = $3,222.00 per ERC (§74-333(1)). Amount entered = the 1-ERC minimum. (SFR is also $3,222/ERC — shared per-ERC rate by design, not residential-rate contamination.)
- Transportation Mobility Fee (City of Plant City, Office)$4.31/sq ftCity of Plant CityCode §86-113(a), Ord. No. 13-2024 (3-25-2024). Schedule row: 'Office' $4,309 per 1,000 sq ft (no size tiers).
- Law Enforcement Impact Fee (City of Plant City, Office)$0.60/sq ftCity of Plant CityCode §86-73(a), Ord. No. 10-2024 (3-25-2024). Schedule row: 'Office' $605 per 1,000 sq ft (no size tiers).
- Fire Rescue Impact Fee (City of Plant City, Office)$0.28/sq ftCity of Plant CityCode §86-33(a), Ord. No. 9-2024 (3-25-2024). Schedule row: 'Office' $285 per 1,000 sq ft — the general office row has no size tiers (only Medical-Dental is tiered). GFA basis.
- County Impact Fee — Not Applicable In-City (City of Plant City, Office)$0.00Hillsborough CountyConfirmed $0 — county nonres impact fees are unincorporated-only (Code Sec. 40-50(1)); school fee residential-only (Sec. 40-50(3)).
Where in Hillsborough County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Plant City
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Plant City, Florida?
A new single-family home in Plant City pays $21,129.00 per unit in combined impact fees (rates sourced July 22, 2026).
How much are commercial impact fees in Plant City?
Commercial development in Plant City pays $8.70 per square foot in impact fees, plus $7,155.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $442,055.00 for a 50,000 sq ft building.
Does Plant City charge its own impact fees?
Yes. Plant City levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Plant City, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Hillsborough County impact fees page.