IMPACTFEES.ORG

Plant City, Florida Impact Fees

Plant City applies its own fee schedule: municipal fees plus the Hillsborough County-levied fees that apply inside city limits. Combined, a new single-family home pays $19,929.00 per unit (rates sourced July 13, 2026). The full breakdown is below.

Plant City impact fees by project type

Plant City: Single-Family Impact Fees

A new single-family home in Plant City pays $19,929.00 per unit in impact fees (rates sourced July 13, 2026). Of that, Hillsborough County-levied fees account for $7,027.00 and municipal or utility fees for $12,902.00.

The largest line items are School Impact Fee (SFR, 1,300-1,799 sq ft) ($7,027.00), Transportation Mobility Fee (SFR-Detached) ($4,383.00) and Wastewater Development Charge (SFR - per ERC) ($3,222.00).

View the full fee schedule
Water$1,573.00
Sewer$3,222.00
City$8,107.00
  • Transportation Mobility Fee (SFR-Detached)
    City of Plant City
    Ch. 86 Art. IV §86-113. City of Plant City mobility fee flat schedule rate. SFR-Detached = $4,383; SFR-Attached = $3,766; MF = $2,954. Eff. per Ord. 13-2024 (3-25-2024). Alternative: ITE Trip Generation 11th ed. formula.
    $4,383.00
  • Parks & Recreation Impact Fee (SFR)
    City of Plant City
    Ch. 86 Art. V §86-153. City parks fee distinct from Hillsborough County parks fee. Current as of Feb 3, 2026.
    $1,666.00
  • Law Enforcement Impact Fee (SFR)
    City of Plant City
    Ch. 86 Art. III §86-73. City of Plant City law enforcement impact fee. Current as of Feb 3, 2026.
    $1,148.00
  • Fire Rescue Impact Fee (SFR)
    City of Plant City
    Ch. 86 Art. II §86-33. City fee distinct from Hillsborough County fire fee ($335 SFR). Current as of Feb 3, 2026.
    $507.00
  • Library Impact Fee (SFR)
    City of Plant City
    Ch. 86 Art. VI. City of Plant City library impact fee. Current as of Feb 3, 2026.
    $403.00
County$7,027.00
  • School Impact Fee (SFR, 1,300-1,799 sq ft)
    Hillsborough County
    Hillsborough County school impact fee — countywide, incl. Plant City. 1,300-1,799 sf bracket (typical SFR). 900-1,299 sf = $3,891; 1,800-2,499 sf = $8,227.
    $7,027.00
Total (Plant City): $19,929.00
Sources last checked July 13, 2026Official fee schedules:City of Plant City Hillsborough County

Where in Hillsborough County are you building?

Each jurisdiction applies its own fee schedule. Pick yours.

Plant City: Multifamily Impact Fees

A new multifamily unit in Plant City pays $13,483.00 per unit in impact fees (rates sourced July 13, 2026). Of that, Hillsborough County-levied fees account for $3,891.00 and municipal or utility fees for $9,592.00.

The largest line items are School Impact Fee (MF, 900-1,299 sq ft) ($3,891.00), Transportation Mobility Fee (MF) ($2,954.00) and Wastewater Development Charge (MF - per unit) ($2,255.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$1,573.00
  • Water Development Charge (MF - 5/8" meter per unit)
    City of Plant City
    Ch. 74 Art. IV §74-332. Water development charge is meter-size based, not ERU-based. 5/8" meter = $1,573 per connection. Multifamily units typically connect at 5/8" per unit or via master meter. Per Ord. 41-2023 eff. April 1, 2024.
    $1,573.00
Sewer$2,255.00
  • Wastewater Development Charge (MF - per unit)
    City of Plant City
    Ch. 74 Art. IV §74-333. Explicit MF per-unit rate = $2,255. SFR rate = $3,222/ERC. Per Ord. 41-2023 eff. April 1, 2024. (Prior record of $1,611 based on 0.5 ERU calculation was incorrect.)
    $2,255.00
City$5,764.00
  • Transportation Mobility Fee (MF)
    City of Plant City
    Ch. 86 Art. IV §86-113. City of Plant City mobility fee - flat schedule rate (feepayer option). SFR-Detached = $4,383; SFR-Attached = $3,766; MF = $2,954. Eff. per Ord. 13-2024 (3-25-2024). Alternative: formula using ITE Trip Generation 11th ed.
    $2,954.00
  • Parks & Recreation Impact Fee (MF)
    City of Plant City
    Ch. 86 Art. V §86-153. City parks fee distinct from Hillsborough County parks fee. Current as of Feb 3, 2026.
    $1,256.00
  • Law Enforcement Impact Fee (MF)
    City of Plant City
    Ch. 86 Art. III §86-73. City of Plant City law enforcement impact fee. Current as of Feb 3, 2026.
    $867.00
  • Fire Rescue Impact Fee (MF)
    City of Plant City
    Ch. 86 Art. II §86-33. City fee distinct from Hillsborough County fire fee ($249 MF). Current as of Feb 3, 2026.
    $383.00
  • Library Impact Fee (MF)
    City of Plant City
    Ch. 86 Art. VI. City of Plant City library impact fee. Current as of Feb 3, 2026.
    $304.00
County$3,891.00
  • School Impact Fee (MF, 900-1,299 sq ft)
    Hillsborough County
    Hillsborough County school impact fee — countywide, incl. Plant City. 900-1,299 sf bracket (typical MF unit). <900 sf: $1,645; 1,300-1,799 sf: $7,027.
    $3,891.00
Total (Plant City): $13,483.00
Sources last checked July 13, 2026Official fee schedules:City of Plant City Hillsborough County

Where in Hillsborough County are you building?

Each jurisdiction applies its own fee schedule. Pick yours.

Plant City: Commercial Impact Fees

Commercial development in Plant City pays $8.70 per square foot in impact fees, plus $7,155.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).

For a 50,000 sq ft building, that comes to about $442,055.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Development Charge (City of Plant City) — 1" meter ($3,933.00 one-time), Wastewater Development Charge (City of Plant City) — 1 ERC minimum ($3,222.00 one-time) and Transportation Mobility Fee (City of Plant City, Commercial) ($6.01/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full fee schedule
Water$3,933.00 one-time
  • Water Development Charge (City of Plant City) — 1" meter
    City of Plant City
    Code Ch. 74 Art. IV §74-332, Ord. No. 41-2023 (12-11-2023), eff. 4/1/2024. Single meter-size ladder applies to all customer classes (no separate commercial table). Canonical 1" meter = $3,933.00. Full ladder: 5/8" $1,573; 1" $3,933; 1.5" $7,865; 2" $12,584; 3" $23,595; 4" $39,325; 6" $78,650; 8" $125,840; 10" $180,895. No water development charge is due on reclaimed-water irrigation connections (§74-332). Meter-replacement exemption at §74-336(b).
    $3,933.00 one-time
Sewer$3,222.00 one-time
  • Wastewater Development Charge (City of Plant City) — 1 ERC minimum
    City of Plant City
    Code Ch. 74 Art. IV §74-333(2), Ord. No. 41-2023 (12-11-2023), eff. 4/1/2024. Commercial and industrial development charge is ERC-based, NOT meter-based: 1 ERC = 350 gpd OR 20 fixture units. Fixture units per Florida Building Code; estimated sewage flows per FAC Rule 64E-6.008 (as in effect 11/1/2005). Both are computed and the HIGHER ERC governs; partial ERCs round UP to the next full ERC. Adopted charge = $3,222.00 per ERC (§74-333(1)). Amount entered = the 1-ERC minimum. (SFR is also $3,222/ERC — shared per-ERC rate by design, not residential-rate contamination.)
    $3,222.00 one-time
City$8.70/sq ft
  • Transportation Mobility Fee (City of Plant City, Commercial)
    City of Plant City
    Code Ch. 86 Art. IV §86-113(a), Ord. No. 13-2024 (3-25-2024) — 'Plant City Calculated Mobility Fee Rates'. Schedule row: 'Commercial/Shopping Center 40,000 to 150,000 sfgla' $6,007 per 1,000 sfGLA. Adjacent tiers: <40,000 $2,908; >150,000 $6,462. Alternative independent fee study permitted (§86-113(b)(3)).
    $6.01/sq ft
  • Law Enforcement Impact Fee (City of Plant City, Commercial)
    City of Plant City
    Code Ch. 86 Art. III §86-73(a), Ord. No. 10-2024 (3-25-2024). Schedule row: 'Commercial/Shopping Center 40,000 to 150,000 sfgla' $1,829 per 1,000 sfGLA. Adjacent tiers: <40,000 $1,304; >150,000 $1,273. Nonres not exempt.
    $1.83/sq ft
  • Fire Rescue Impact Fee (City of Plant City, Commercial)
    City of Plant City
    Code Ch. 86 Art. II §86-33(a), Ord. No. 9-2024 (3-25-2024), based on the Jan 30 2024 Benesch Impact Fee Update Study. Schedule row: 'Commercial/Shopping Center 40,000 to 150,000 sfgla' $862 per 1,000 sfGLA (nearest the 50,000 sq ft canonical size). Adjacent tiers: <40,000 sfgla $615; >150,000 sfgla $600. Basis = gross LEASABLE area. Nonres not exempt (§86-39(a) exemptions cover only alterations, replacements, government facilities, and Laura St. low-income).
    $0.86/sq ft
County$0.00
  • County Impact Fee — Not Applicable In-City (City of Plant City, Commercial)
    Hillsborough County
    Confirmed $0. Hillsborough County Code Sec. 40-50(1) limits transportation and fire rescue impact assessments (and the Art. III mobility fee) to the UNINCORPORATED area; Sec. 40-50(3) makes the countywide school fee residential-only. Plant City levies its own fire rescue, law enforcement and mobility fees instead (see City records).
    $0.00
Total (Plant City): $8.70/sq ft + $7,155.00 one-time (≈ $442,055.00 at 50,000 sq ft)
Sources last checked July 13, 2026Official fee schedules:City of Plant City Hillsborough County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Hillsborough County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Plant City: Industrial Impact Fees

Industrial development in Plant City pays $2.40 per square foot in impact fees, plus $7,155.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).

For a 50,000 sq ft building, that comes to about $127,055.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Development Charge (City of Plant City) — 1" meter ($3,933.00 one-time), Wastewater Development Charge (City of Plant City) — 1 ERC minimum ($3,222.00 one-time) and Transportation Mobility Fee (City of Plant City, Industrial) ($1.94/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full fee schedule
Water$3,933.00 one-time
  • Water Development Charge (City of Plant City) — 1" meter
    City of Plant City
    Code Ch. 74 Art. IV §74-332, Ord. No. 41-2023 (12-11-2023), eff. 4/1/2024. Single meter-size ladder applies to all customer classes (no separate commercial table). Canonical 1" meter = $3,933.00. Full ladder: 5/8" $1,573; 1" $3,933; 1.5" $7,865; 2" $12,584; 3" $23,595; 4" $39,325; 6" $78,650; 8" $125,840; 10" $180,895. No water development charge is due on reclaimed-water irrigation connections (§74-332). Meter-replacement exemption at §74-336(b).
    $3,933.00 one-time
Sewer$3,222.00 one-time
  • Wastewater Development Charge (City of Plant City) — 1 ERC minimum
    City of Plant City
    Code Ch. 74 Art. IV §74-333(2), Ord. No. 41-2023 (12-11-2023), eff. 4/1/2024. Commercial and industrial development charge is ERC-based, NOT meter-based: 1 ERC = 350 gpd OR 20 fixture units. Fixture units per Florida Building Code; estimated sewage flows per FAC Rule 64E-6.008 (as in effect 11/1/2005). Both are computed and the HIGHER ERC governs; partial ERCs round UP to the next full ERC. Adopted charge = $3,222.00 per ERC (§74-333(1)). Amount entered = the 1-ERC minimum. (SFR is also $3,222/ERC — shared per-ERC rate by design, not residential-rate contamination.)
    $3,222.00 one-time
City$2.40/sq ft
  • Transportation Mobility Fee (City of Plant City, Industrial)
    City of Plant City
    Code §86-113(a), Ord. No. 13-2024 (3-25-2024). Schedule row: 'General Light Industrial' $1,939 per 1,000 sq ft. (Manufacturing $1,887; Warehouse $611 — not entered.) NOTE: Plant City's Parks & Recreation (§86-153) and Library (§86-182) impact fees are RESIDENTIAL-ONLY — §§86-159(a)(6) and 86-188(a)(6) expressly exempt 'the construction of any nonresidential building or structure'; no nonres rows exist in either schedule.
    $1.94/sq ft
  • Law Enforcement Impact Fee (City of Plant City, Industrial)
    City of Plant City
    Code §86-73(a), Ord. No. 10-2024 (3-25-2024). Schedule row: 'General Light Industrial' $312 per 1,000 sq ft. (Manufacturing $362; Warehouse $74 — not entered.)
    $0.31/sq ft
  • Fire Rescue Impact Fee (City of Plant City, Industrial)
    City of Plant City
    Code §86-33(a), Ord. No. 9-2024 (3-25-2024). Schedule row: 'General Light Industrial' $147 per 1,000 sq ft. (Manufacturing $170; Warehouse $35; Mini-Warehouse $14 — not entered.)
    $0.15/sq ft
County$0.00
Total (Plant City): $2.40/sq ft + $7,155.00 one-time (≈ $127,055.00 at 50,000 sq ft)
Sources last checked July 13, 2026Official fee schedules:City of Plant City Hillsborough County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Hillsborough County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Plant City: Office Impact Fees

Office development in Plant City pays $5.20 per square foot in impact fees, plus $7,155.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).

For a 25,000 sq ft building, that comes to about $137,130.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Development Charge (City of Plant City) — 1" meter ($3,933.00 one-time), Wastewater Development Charge (City of Plant City) — 1 ERC minimum ($3,222.00 one-time) and Transportation Mobility Fee (City of Plant City, Office) ($4.31/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full fee schedule
Water$3,933.00 one-time
  • Water Development Charge (City of Plant City) — 1" meter
    City of Plant City
    Code Ch. 74 Art. IV §74-332, Ord. No. 41-2023 (12-11-2023), eff. 4/1/2024. Single meter-size ladder applies to all customer classes (no separate commercial table). Canonical 1" meter = $3,933.00. Full ladder: 5/8" $1,573; 1" $3,933; 1.5" $7,865; 2" $12,584; 3" $23,595; 4" $39,325; 6" $78,650; 8" $125,840; 10" $180,895. No water development charge is due on reclaimed-water irrigation connections (§74-332). Meter-replacement exemption at §74-336(b).
    $3,933.00 one-time
Sewer$3,222.00 one-time
  • Wastewater Development Charge (City of Plant City) — 1 ERC minimum
    City of Plant City
    Code Ch. 74 Art. IV §74-333(2), Ord. No. 41-2023 (12-11-2023), eff. 4/1/2024. Commercial and industrial development charge is ERC-based, NOT meter-based: 1 ERC = 350 gpd OR 20 fixture units. Fixture units per Florida Building Code; estimated sewage flows per FAC Rule 64E-6.008 (as in effect 11/1/2005). Both are computed and the HIGHER ERC governs; partial ERCs round UP to the next full ERC. Adopted charge = $3,222.00 per ERC (§74-333(1)). Amount entered = the 1-ERC minimum. (SFR is also $3,222/ERC — shared per-ERC rate by design, not residential-rate contamination.)
    $3,222.00 one-time
City$5.20/sq ft
County$0.00
Total (Plant City): $5.20/sq ft + $7,155.00 one-time (≈ $137,130.00 at 25,000 sq ft)
Sources last checked July 13, 2026Official fee schedules:City of Plant City Hillsborough County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Hillsborough County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Plant City

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Plant City, Florida?

A new single-family home in Plant City pays $19,929.00 per unit in combined impact fees (rates sourced July 13, 2026).

How much are commercial impact fees in Plant City?

Commercial development in Plant City pays $8.70 per square foot in impact fees, plus $7,155.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $442,055.00 for a 50,000 sq ft building.

Does Plant City charge its own impact fees?

Yes. Plant City levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Plant City, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Hillsborough County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000