Tampa Impact Fees by Project Type

Tampa: Single-Family Impact Fees

A new single-family home in Tampa pays $20,769.11 per unit in impact fees (rates sourced October 18, 2026). Of that, Hillsborough County-levied fees account for $12,323.11 and municipal or utility fees for $8,446.00.

The largest line items are School Impact Fee (SFR, 1,800-2,499 sq ft) ($8,227.00), Multi-Modal Transportation Impact Fee (City of Tampa, SFR-Detached 1,500-2,499 sq ft) - University North District ($4,096.11) and Water Capacity Fee (City of Tampa) — Northeast Area, $1,020 capacity + $2,724 CIAC per ERU ($3,744.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Tampa Impact Fee Schedule
Water$7,209.00
  • Water Capacity Fee (City of Tampa) — Northeast Area, $1,020 capacity + $2,724 CIAC per ERU
    City of Tampa Water Department
    City of Tampa water capacity fee in the Northeast Area, the highest of three rate areas: a $1,020 capacity fee plus a $2,724 contribution in aid of construction (CIAC) per ERU, charged per home (1 ERU). Schedule: $3,744 per ERU now; $3,871.50 from March 1, 2027, $3,999 from March 1, 2028, $4,126.50 from March 1, 2029 and $4,254 from March 1, 2030 (the capacity part steps up under Ordinance 2026-36; the CIAC part does not change). Downtown and South Tampa pay $1,020 plus $2,145, and the rest of the city pays $1,713 with no CIAC.
    $3,744.00
  • Water Connection Fee (City of Tampa) — 3/4 in. meter, 0-20 gpm
    City of Tampa
    City of Tampa Water Department connection fee, a one-time charge for each new water service, paid in addition to the water capacity fee. The amount is set by the service's flow rate; this is the 3/4 inch meter (0 to 20 gpm), the standard single-family service, at the new-construction inside-city rate. Larger services pay from $7,000 (1 inch, 21 to 50 gpm) up to $420,000 (6 or 8 inch, 1,501 to 3,000 gpm). New construction outside the city pays 125%.
    $2,800.00
  • Water Meter Installation Charge (City of Tampa) — 3/4 in. meter
    3/4 in. meter, 0-20 gpm
    City of Tampa
    City of Tampa Water Department charge to install a new 3/4 inch water meter (0 to 20 gpm), the standard single-family service, paid before installation along with the connection and capacity fees. Other sizes: 1 inch $715, 1-1/2 inch $990, 2 inch $1,035; meters larger than 2 inches are priced individually by the Water Department.
    $665.00
Sewer$1,237.00
  • Wastewater Capacity Fee (SFR - 1.0 ERU)
    Tampa
    City of Tampa wastewater capacity fee under Code Sec. 26-31, charged on new connections to the city's wastewater system. Assessed per equivalent residential unit (ERU) at $1,237 per ERU; a single-family house is 1.0 ERU. Ordinance 2026-36 (adopted May 7, 2026) raises the rate each March 1: $1,389.50 in 2027, $1,542 in 2028, $1,694.50 in 2029 and $1,847 in 2030. Qualifying affordable housing can be waived.
    $1,237.00
City$4,096.11
  • Multi-Modal Transportation Impact Fee (City of Tampa, SFR-Detached 1,500-2,499 sq ft) - University North District
    University North District - 1,500-2,499 sq ft
    Hillsborough County
    The City of Tampa levies its own Multi-Modal Transportation Impact Fee under Chapter 25 of the Tampa Code; Hillsborough County's mobility, parks and fire impact fees do not apply inside city limits, though the countywide school impact fee does. The fee varies across six geographic benefit districts (Central Business, Central East, Interbay, North Central, University North, Westshore) and by land use and unit size. Rates were increased effective July 1, 2026 by Ordinance 2025-152 and phase in over four years in annual increments each July 1 through July 1, 2029. The amount shown is the University North district, the highest of the six, for a detached single-family home of 1,500-2,499 sq ft in the first phase-in year. Other districts in year one: Central Business $2,037; Central East $2,891; Interbay $2,743; North Central $2,669; Westshore $3,461. At full phase-in on July 1, 2029 the same unit pays $9,856 in University North, ranging down to $5,284 in Central Business. The district containing a given parcel determines the rate.
    $4,096.11
County$8,227.00
  • School Impact Fee (SFR, 1,800-2,499 sq ft)
    Hillsborough County
    Hillsborough County school impact fee, assessed countywide including inside the City of Tampa. Rate is tiered by heated living area per dwelling unit; the amount shown is the 1,800-2,499 sq ft tier, which covers a typical 2,000 sq ft single-family house. Other tiers: under 900 sq ft $1,645; 900-1,299 $3,891; 1,300-1,799 $7,027; 2,500-3,399 $9,369; 3,400 sq ft and above $10,976. Schedule effective October 1, 2022.
    $8,227.00
Total (Tampa): $20,769.11
Sources last checked Official fee schedules:City of Tampa Water Department City of Tampa Tampa Hillsborough County

Where in Hillsborough County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Tampa: Multifamily Impact Fees

A new multifamily unit in Tampa pays $11,691.00 per unit in impact fees (rates sourced October 18, 2026). Of that, Hillsborough County-levied fees account for $5,735.50 and municipal or utility fees for $5,955.50.

The largest line items are School Impact Fee (MF, 900-1,299 sq ft) ($3,891.00), Water Connection Fee (City of Tampa, MF) — 3/4 in. meter, 0-20 gpm ($2,800.00) and Multi-Modal Transportation Impact Fee (City of Tampa, MF Mid-Rise) - University North District ($1,844.50).

Wastewater Capacity Fee (City of Tampa - 0.5 ERU/unit) and Water Capacity Fee (City of Tampa, MF) — Northeast Area, $1,020 capacity + $2,724 CIAC per ERU per unit (0.5 ERU) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Tampa Impact Fee Schedule
Water$5,337.00
  • Water Connection Fee (City of Tampa, MF) — 3/4 in. meter, 0-20 gpm
    City of Tampa
    City of Tampa Water Department connection fee, a one-time charge for each new water service, paid in addition to the water capacity fee. It is charged per service connection by flow rate, not per unit: the amount shown is the smallest service, a 3/4 inch meter (0 to 20 gpm), at the new-construction inside-city rate. A building served through one larger master meter pays once, at that meter's tier, from $7,000 (1 inch) up to $420,000 (6 or 8 inch, 1,501 to 3,000 gpm).
    $2,800.00
  • Water Capacity Fee (City of Tampa, MF) — Northeast Area, $1,020 capacity + $2,724 CIAC per ERU per unit (0.5 ERU)
    City of Tampa Water Department
    City of Tampa water capacity fee in the Northeast Area, the highest of three rate areas: a $1,020 capacity fee plus a $2,724 contribution in aid of construction (CIAC) per ERU, charged per multifamily unit under 1,600 sq ft (0.5 ERU); amounts below are per ERU. Schedule: $3,744 per ERU now; $3,871.50 from March 1, 2027, $3,999 from March 1, 2028, $4,126.50 from March 1, 2029 and $4,254 from March 1, 2030 (the capacity part steps up under Ordinance 2026-36; the CIAC part does not change). Downtown and South Tampa pay $1,020 plus $2,145, and the rest of the city pays $1,713 with no CIAC.
    $1,872.00Requires confirmation
  • Water Meter Installation Charge (City of Tampa, MF) — 3/4 in. meter
    3/4 in. meter, 0-20 gpm
    City of Tampa
    City of Tampa Water Department charge to install a new water meter, paid before installation along with the connection and capacity fees. It is charged per meter, not per unit: the amount shown is the smallest, a 3/4 inch meter (0 to 20 gpm). Other sizes: 1 inch $715, 1-1/2 inch $990, 2 inch $1,035; meters larger than 2 inches are priced individually by the Water Department.
    $665.00
Sewer$618.50
  • Wastewater Capacity Fee (City of Tampa - 0.5 ERU/unit)
    0.5 ERU per unit
    Tampa
    City of Tampa wastewater capacity fee, charged on new connections inside the city. Assessed per equivalent residential unit (ERU) at $1,237 per ERU, with multifamily units rated at 0.75 ERU each. Ordinance 2026-36 (adopted May 7, 2026) raises the per-ERU rate each March 1: $1,389.50 in 2027, $1,542 in 2028, $1,694.50 in 2029 and $1,847 in 2030. Hillsborough County's utility serves the unincorporated area rather than the city, so parcels inside Tampa pay the city rate.
    $618.50Requires confirmation
City$1,844.50
  • Multi-Modal Transportation Impact Fee (City of Tampa, MF Mid-Rise) - University North District
    University North District - Mid-Rise (ITE 221)
    Hillsborough County
    The City of Tampa levies its own Multi-Modal Transportation Impact Fee under Chapter 25 of the Tampa Code; Hillsborough County's mobility, parks and fire impact fees do not apply inside city limits, though the countywide school impact fee does. The fee varies across six geographic benefit districts (Central Business, Central East, Interbay, North Central, University North, Westshore) and by land use. Rates were increased effective July 1, 2026 by Ordinance 2025-152 and phase in over four years in annual increments each July 1 through July 1, 2029. The update split multifamily into low-rise, mid-rise and high-rise rates; the amount shown is the mid-rise category, which covers a typical 4-story apartment building, in the University North district (the highest of the six) in the first phase-in year. At full phase-in on July 1, 2029 the mid-rise rate reaches $4,789 in University North, ranging down to $2,527 in Central Business. Low-rise units are charged a higher rate than mid-rise, and a reduced low-rise rate applies to sites close to transit. The district containing a given parcel determines the rate.
    $1,844.50
County$3,891.00
  • School Impact Fee (MF, 900-1,299 sq ft)
    Hillsborough County
    Hillsborough County school impact fee, assessed countywide including inside the City of Tampa. Rate is tiered by heated living area per dwelling unit; the amount shown is the 900-1,299 sq ft tier, covering a typical 1,000 sq ft apartment unit. Other tiers: under 900 sq ft $1,645; 1,300-1,799 $7,027; 1,800-2,499 $8,227; 2,500-3,399 $9,369; 3,400 sq ft and above $10,976. Schedule effective October 1, 2022.
    $3,891.00
Total (Tampa): $11,691.00
Sources last checked Official fee schedules:City of Tampa City of Tampa Water Department Tampa Hillsborough County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Hillsborough County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Tampa: Commercial Impact Fees

Commercial development in Tampa pays $9.28 per square foot in impact fees, plus $12,696.00 in one-time water and sewer connection fees (rates sourced October 18, 2026).

For a 50,000 sq ft building, that comes to about $476,887.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (City of Tampa) — 1" meter ($7,000.00 one-time), Water Capacity Fee (City of Tampa) — Northeast Area, $1,020 capacity + $2,724 CIAC per ERU ($3,744.00 one-time) and Wastewater Capacity Fee (City of Tampa) — 1.0 ERU ($1,237.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Tampa Impact Fee Schedule
Water$11,459.00 one-time
  • Water Connection Fee (City of Tampa) — 1" meter
    1", 21-50 gpm
    City of Tampa Water Department
    City of Tampa Water Department connection fee, a one-time charge for each new water service paid in addition to the water capacity fee, at the new-construction inside-city rate (fee sheet updated March 2021). The fee is set by meter size and peak flow; this is the 1 inch service at 21 to 50 gpm. Services run from $2,800 (3/4 inch, 0 to 20 gpm) to $420,000 (6 or 8 inch, 1,501 to 3,000 gpm). Outside-city new construction pays 25% more.
    $7,000.00 one-time
  • Water Capacity Fee (City of Tampa) — Northeast Area, $1,020 capacity + $2,724 CIAC per ERU
    City of Tampa Water Department
    City of Tampa water capacity fee in the Northeast Area, the highest of three rate areas: a $1,020 capacity fee plus a $2,724 contribution in aid of construction (CIAC) per ERU, charged per ERU of projected water demand; the amount shown is 1 ERU. Schedule: $3,744 per ERU now; $3,871.50 from March 1, 2027, $3,999 from March 1, 2028, $4,126.50 from March 1, 2029 and $4,254 from March 1, 2030 (the capacity part steps up under Ordinance 2026-36; the CIAC part does not change). Downtown and South Tampa pay $1,020 plus $2,145, and the rest of the city pays $1,713 with no CIAC.
    $3,744.00 one-time
  • Water Meter Installation Charge (City of Tampa) — 1" meter
    1", 21-50 gpm
    City of Tampa Water Department
    City of Tampa Water Department charge to install a new 1 inch water meter (21 to 50 gpm), paid before installation along with the connection and capacity fees. Other sizes: 3/4 inch $665, 1-1/2 inch $990, 2 inch $1,035; meters larger than 2 inches are priced individually by the Water Department.
    $715.00 one-time
Sewer$1,237.00 one-time
  • Wastewater Capacity Fee (City of Tampa) — 1.0 ERU
    City of Tampa Wastewater Department
    City of Tampa wastewater capacity fee: $1,237 per ERU, 1-ERU minimum shown; the number of wastewater ERUs follows the water ERU determination (300 gallons per day per ERU), not meter size. Neighborhood sewer improvement charges may also apply where the city funded the collection system. Ordinance 2026-36 raises the rate to $1,389.50 on March 1, 2027, $1,542 on March 1, 2028, $1,694.50 on March 1, 2029 and $1,847 on March 1, 2030.
    $1,237.00 one-time
City$9.28/sq ft
  • Multi-Modal Transportation Impact Fee (City of Tampa, Commercial)
    University North District, 40,000 to 150,000 sf plaza
    City of Tampa
    City of Tampa multi-modal transportation impact fee for a shopping plaza of 40,000 to 150,000 sq ft without a grocery store, charged per 1,000 sq ft. University North is the highest of six benefit districts; rates in the other five are lower. Four-year phase-in on the adopted schedule: $9,283.82 from July 1, 2026; $14,568.64 from July 1, 2027; $19,853.46 from July 1, 2028; $25,138.28 from July 1, 2029. Hillsborough County's mobility fee does not apply inside Tampa.
    $9.28/sq ft
County$0.00
Total (Tampa): $9.28/sq ft + $12,696.00 one-time (≈ $476,887.00 at 50,000 sq ft)
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Hillsborough County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Tampa: Industrial Impact Fees

Industrial development in Tampa pays $2.50 per square foot in impact fees, plus $12,696.00 in one-time water and sewer connection fees (rates sourced October 18, 2026).

For a 50,000 sq ft building, that comes to about $137,577.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (City of Tampa) — 1" meter ($7,000.00 one-time), Water Capacity Fee (City of Tampa) — Northeast Area, $1,020 capacity + $2,724 CIAC per ERU ($3,744.00 one-time) and Wastewater Capacity Fee (City of Tampa) — 1.0 ERU ($1,237.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Tampa Impact Fee Schedule
Water$11,459.00 one-time
  • Water Connection Fee (City of Tampa) — 1" meter
    1", 21-50 gpm
    City of Tampa Water Department
    City of Tampa Water Department connection fee, a one-time charge for each new water service paid in addition to the water capacity fee, at the new-construction inside-city rate (fee sheet updated March 2021). The fee is set by meter size and peak flow; this is the 1 inch service at 21 to 50 gpm. Services run from $2,800 (3/4 inch, 0 to 20 gpm) to $420,000 (6 or 8 inch, 1,501 to 3,000 gpm). Outside-city new construction pays 25% more.
    $7,000.00 one-time
  • Water Capacity Fee (City of Tampa) — Northeast Area, $1,020 capacity + $2,724 CIAC per ERU
    City of Tampa Water Department
    City of Tampa water capacity fee in the Northeast Area, the highest of three rate areas: a $1,020 capacity fee plus a $2,724 contribution in aid of construction (CIAC) per ERU, charged per ERU of projected water demand; the amount shown is 1 ERU. Schedule: $3,744 per ERU now; $3,871.50 from March 1, 2027, $3,999 from March 1, 2028, $4,126.50 from March 1, 2029 and $4,254 from March 1, 2030 (the capacity part steps up under Ordinance 2026-36; the CIAC part does not change). Downtown and South Tampa pay $1,020 plus $2,145, and the rest of the city pays $1,713 with no CIAC.
    $3,744.00 one-time
  • Water Meter Installation Charge (City of Tampa) — 1" meter
    1", 21-50 gpm
    City of Tampa Water Department
    City of Tampa Water Department charge to install a new 1 inch water meter (21 to 50 gpm), paid before installation along with the connection and capacity fees. Other sizes: 3/4 inch $665, 1-1/2 inch $990, 2 inch $1,035; meters larger than 2 inches are priced individually by the Water Department.
    $715.00 one-time
Sewer$1,237.00 one-time
  • Wastewater Capacity Fee (City of Tampa) — 1.0 ERU
    City of Tampa Wastewater Department
    City of Tampa wastewater capacity fee: $1,237 per ERU, 1-ERU minimum shown; the number of wastewater ERUs follows the water ERU determination (300 gallons per day per ERU), not meter size. Neighborhood sewer improvement charges may also apply where the city funded the collection system. Ordinance 2026-36 raises the rate to $1,389.50 on March 1, 2027, $1,542 on March 1, 2028, $1,694.50 on March 1, 2029 and $1,847 on March 1, 2030.
    $1,237.00 one-time
City$2.50/sq ft
  • Multi-Modal Transportation Impact Fee (City of Tampa, Industrial)
    University North District
    City of Tampa
    City of Tampa multi-modal transportation impact fee for general light industrial buildings, charged per 1,000 sq ft. University North is the highest of six benefit districts; rates in the other five are lower. Four-year phase-in on the adopted schedule: $2,497.63 from July 1, 2026; $3,514.27 from July 1, 2027; $4,530.90 from July 1, 2028; $5,547.53 from July 1, 2029. Hillsborough County's mobility fee does not apply inside Tampa.
    $2.50/sq ft
County$0.00
Total (Tampa): $2.50/sq ft + $12,696.00 one-time (≈ $137,577.50 at 50,000 sq ft)
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Hillsborough County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Tampa: Office Impact Fees

Office development in Tampa pays $7.21 per square foot in impact fees, plus $12,696.00 in one-time water and sewer connection fees (rates sourced October 18, 2026).

For a 25,000 sq ft building, that comes to about $192,826.75. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (City of Tampa) — 1" meter ($7,000.00 one-time), Water Capacity Fee (City of Tampa) — Northeast Area, $1,020 capacity + $2,724 CIAC per ERU ($3,744.00 one-time) and Wastewater Capacity Fee (City of Tampa) — 1.0 ERU ($1,237.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Tampa Impact Fee Schedule
Water$11,459.00 one-time
  • Water Connection Fee (City of Tampa) — 1" meter
    1", 21-50 gpm
    City of Tampa Water Department
    City of Tampa Water Department connection fee, a one-time charge for each new water service paid in addition to the water capacity fee, at the new-construction inside-city rate (fee sheet updated March 2021). The fee is set by meter size and peak flow; this is the 1 inch service at 21 to 50 gpm. Services run from $2,800 (3/4 inch, 0 to 20 gpm) to $420,000 (6 or 8 inch, 1,501 to 3,000 gpm). Outside-city new construction pays 25% more.
    $7,000.00 one-time
  • Water Capacity Fee (City of Tampa) — Northeast Area, $1,020 capacity + $2,724 CIAC per ERU
    City of Tampa Water Department
    City of Tampa water capacity fee in the Northeast Area, the highest of three rate areas: a $1,020 capacity fee plus a $2,724 contribution in aid of construction (CIAC) per ERU, charged per ERU of projected water demand; the amount shown is 1 ERU. Schedule: $3,744 per ERU now; $3,871.50 from March 1, 2027, $3,999 from March 1, 2028, $4,126.50 from March 1, 2029 and $4,254 from March 1, 2030 (the capacity part steps up under Ordinance 2026-36; the CIAC part does not change). Downtown and South Tampa pay $1,020 plus $2,145, and the rest of the city pays $1,713 with no CIAC.
    $3,744.00 one-time
  • Water Meter Installation Charge (City of Tampa) — 1" meter
    1", 21-50 gpm
    City of Tampa Water Department
    City of Tampa Water Department charge to install a new 1 inch water meter (21 to 50 gpm), paid before installation along with the connection and capacity fees. Other sizes: 3/4 inch $665, 1-1/2 inch $990, 2 inch $1,035; meters larger than 2 inches are priced individually by the Water Department.
    $715.00 one-time
Sewer$1,237.00 one-time
  • Wastewater Capacity Fee (City of Tampa) — 1.0 ERU
    City of Tampa Wastewater Department
    City of Tampa wastewater capacity fee: $1,237 per ERU, 1-ERU minimum shown; the number of wastewater ERUs follows the water ERU determination (300 gallons per day per ERU), not meter size. Neighborhood sewer improvement charges may also apply where the city funded the collection system. Ordinance 2026-36 raises the rate to $1,389.50 on March 1, 2027, $1,542 on March 1, 2028, $1,694.50 on March 1, 2029 and $1,847 on March 1, 2030.
    $1,237.00 one-time
City$7.21/sq ft
  • Multi-Modal Transportation Impact Fee (City of Tampa, Office)
    University North District, 100,000 sf or less
    City of Tampa
    City of Tampa multi-modal transportation impact fee for general office space up to 100,000 sq ft, charged per 1,000 sq ft. University North is the highest of six benefit districts; rates in the other five are lower. Four-year phase-in on the adopted schedule: $7,205.23 from July 1, 2026; $9,645.47 from July 1, 2027; $12,085.70 from July 1, 2028; $14,525.93 from July 1, 2029. Hillsborough County's mobility fee does not apply inside Tampa.
    $7.21/sq ft
County$0.00
Total (Tampa): $7.21/sq ft + $12,696.00 one-time (≈ $192,826.75 at 25,000 sq ft)
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Hillsborough County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Tampa Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Tampa Impact Fee FAQs

What are the total impact fees for a single-family home in Tampa, Florida?

A new single-family home in Tampa pays $20,769.11 per unit in combined impact fees (rates sourced October 18, 2026).

How much are commercial impact fees in Tampa?

Commercial development in Tampa pays $9.28 per square foot in impact fees, plus $12,696.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $476,887.00 for a 50,000 sq ft building.

Does Tampa charge its own impact fees?

Yes. Tampa levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Tampa, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Hillsborough County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000