Temple Terrace, Florida Impact Fees

Temple Terrace applies its own fee schedule: municipal fees plus the Hillsborough County-levied fees that apply inside city limits. Combined, a new single-family home pays $13,546.00 per unit (rates sourced July 22, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Temple Terrace impact fees by project type

Temple Terrace: Single-Family Impact Fees

A new single-family home in Temple Terrace pays $13,546.00 per unit in impact fees (rates sourced July 22, 2026). Of that, Hillsborough County-levied fees account for $8,227.00 and municipal or utility fees for $5,319.00.

The largest line items are School Impact Fee (SFR, 1,800-2,499 sq ft) ($8,227.00).

Water Improvement Charge (City of Temple Terrace, SFR) and Sewer Improvement Charge (City of Temple Terrace, SFR) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$2,750.00
  • Water Improvement Charge (City of Temple Terrace, SFR)
    City of Temple Terrace
    CITY-QUOTED SF FIGURE, RESOLUTION UNPUBLISHED (8/4/2026; Temple Terrace family). $2,750 matches the city's own FAQ quote for a 'typical single-family new residential connection' water improvement charge — the SFR figure is corroborated, but the enabling resolution and schedule are unpublished (uncodified, set under Sec. 22-48). Engineering (813) 506-6570.
    $2,750.00Requires confirmation
Sewer$2,569.00
  • Sewer Improvement Charge (City of Temple Terrace, SFR)
    City of Temple Terrace
    CITY-QUOTED SF FIGURE, RESOLUTION UNPUBLISHED (8/4/2026; Temple Terrace family). $2,569 matches the city FAQ's typical single-family sewer improvement figure; resolution/schedule unpublished. Engineering (813) 506-6570.
    $2,569.00Requires confirmation
City$0.00
  • City Mobility Fee (Temple Terrace Multimodal Transportation District, SFR)
    City of Temple Terrace
    Temple Terrace's entire city area is a state-designated Multimodal Transportation District. Land Development Code secs. 12-1148 through 12-1155 create the mobility fee program but set no amounts; the amounts live in the city's adopted Traffic Circulation and MTD Concurrency Policy and Procedures Manual (updated 09-2018, documentcenter/view/814). Manual sec. 4.5.4(a) computes the fee project-by-project as [Total Development Trips / Total TTMTD Trips] x Cost of the multimodal improvement program - there is no per-dwelling-unit fee schedule. Decisive for this row: manual sec. 1.3.11 states that 'an impact of a single family home on an existing lot will constitute a de minimis impact on all roadways regardless of the level of the deficiency of the roadway,' and the city's published Transportation Review Process flowchart (documentcenter/view/256) confirms 'Formal review not required, i.e. a single family lot ... Issue Certificate of Completion.' A de minimis finding satisfies concurrency with no mitigation, so no mobility fee is assessed on a single-family house on an existing lot. For context only, the manual's Appendix illustrates a 100-unit new single-family subdivision at $1,381 per unit (100% of full cost, derived from a multimodal cost of about $132 per daily trip); that figure is labelled a sample calculation, not an adopted per-unit rate. SB 180 check: Hillsborough County is in the Debby/Helene/Milton federal disaster declarations, so the city is a covered jurisdiction, but the mobility fee program was adopted in 2009-2013 and last updated in 2018 - no adoption or increase after 8/1/2024 was found, so SB 180 does not affect it. 8/5/2026
    $0.00
County$8,227.00
  • School Impact Fee (SFR, 1,800-2,499 sq ft)
    Hillsborough County Public Schools
    Countywide school impact fee, applies inside Temple Terrace. Schedule eff. 10/1/2022. Living-area brackets: <900 $1,645; 900-1,299 $3,891; 1,300-1,799 $7,027; 1,800-2,499 $8,227; 2,500-3,399 $9,369; 3,400+ $10,976. Default tier = 1,800-2,499 sf (canonical 2,000 sq ft SFR house).
    $8,227.00
Total (Temple Terrace): $13,546.00
Sources last checked July 22, 2026Official fee schedules:City of Temple Terrace Hillsborough County Public Schools
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Hillsborough County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Hillsborough County$32,078.75Plant City$21,129.00Tampa$15,273.11
Temple Terrace$13,546.00this pageIncludes unconfirmed fees

Temple Terrace: Multifamily Impact Fees

A new multifamily unit in Temple Terrace pays at least $9,210.00 per unit in impact fees (rates sourced July 22, 2026). Of that, Hillsborough County-levied fees account for $3,891.00 and municipal or utility fees for $5,319.00.

The largest line items are School Impact Fee (MF, 900-1,299 sq ft) ($3,891.00).

Water Improvement Charge (City of Temple Terrace, MF) and Sewer Improvement Charge (City of Temple Terrace, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

City Mobility Fee (Temple Terrace Multimodal Transportation District, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$2,750.00
  • Water Improvement Charge (City of Temple Terrace, MF)
    City of Temple Terrace
    ⚠️ SFR FIGURE, MF RATE EXISTS BUT UNPUBLISHED (re-checked 8/3/2026). $2,750 matches the city-quoted TYPICAL SINGLE-FAMILY water improvement figure; Code Sec. 22-48(a)(1) provides a DISTINCT per-unit multifamily rate set by uncodified resolution — not published anywhere online (no fee schedule or enabling resolution posted). City directs impact-fee questions to Engineering: (813) 506-6570.
    $2,750.00Requires confirmation
Sewer$2,569.00
  • Sewer Improvement Charge (City of Temple Terrace, MF)
    City of Temple Terrace
    City owns sewer collection; treated at the City of Tampa regional plant. Code Sec. 22-48 imposes an improvement charge on all new connections, amount set by city resolution (not codified, not currently published). Sec. 22-48(a)(1) provides a separate per-unit multifamily rate; Sec. 22-48(a)(3) counts each apartment as a unit even under a master connection; Sec. 22-48(e) makes charges for all units due before service to any unit. MF rate distinct from SFR (figure pending a posted resolution).
    $2,569.00Requires confirmation
City$0.00
  • City Mobility Fee (Temple Terrace Multimodal Transportation District, MF)
    City of Temple Terrace
    Temple Terrace's mobility fee affirmatively exists for multifamily development - there is no de minimis exemption comparable to the single-family-home-on-an-existing-lot rule in sec. 1.3.11 of the adopted Concurrency Manual - but the city publishes no per-unit fee schedule. Land Development Code secs. 12-1148 to 12-1155 create the program and defer method and amounts to the manual; manual sec. 4.5.4(a) computes the fee as [Total Development Trips / Total TTMTD Trips] x Cost of the multimodal improvement program, i.e. project by project. The manual's Appendix contains a worked illustration for 300 apartments (ITE 220) yielding $964 per unit at 100% of full cost, derived from a multimodal cost of about $132 per daily person trip ($29,693,556 program cost / 225,208 trips), but it is expressly headed 'Sample Temple Terrace Mobility Fees' and rests on a 2018 CIP with a 2025 horizon, so it is not an adopted current per-unit rate. Searched the city's site for any adopted mobility fee schedule or newer concurrency manual (only the 09-2018 version exists) and the building permit fee page (no mobility fee line). This is the codified-but-deferred pattern: the fee exists, the per-unit number does not. SB 180 check: Hillsborough County is covered, but no adoption or increase of this fee after 8/1/2024 was found, so SB 180 does not appear to bear on it. 8/5/2026
    Requires confirmation
County$3,891.00
Total (Temple Terrace): $9,210.00
Sources last checked July 22, 2026Official fee schedules:City of Temple Terrace Hillsborough County Public Schools
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Hillsborough County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Hillsborough County$17,771.83Plant City$13,483.00Tampa$7,948.00
Temple Terrace$9,210.00this pageIncludes unconfirmed fees

Temple Terrace: Commercial Impact Fees

Commercial development in Temple Terrace pays no per-square-foot impact fees, but owes $5,319.00 in one-time water and sewer connection fees (rates sourced July 22, 2026).

For a 50,000 sq ft building, that comes to at least $5,319.00. The calculator below adjusts to your exact square footage.

Water Improvement Charge (City of Temple Terrace) and Sewer Improvement Charge (City of Temple Terrace) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

City Mobility Fee (Temple Terrace MTD, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$2,750.00 one-time
  • Water Improvement Charge (City of Temple Terrace)
    City of Temple Terrace
    ⚠️ UNCONFIRMED AMOUNT. Code §22-48 imposes a water 'improvement charge' (= impact fee) on every new connection and §22-48(a)(1)+(b) make the COMMERCIAL/INDUSTRIAL charge METER-SIZE based — but the code sets no dollar figures ('improvement charge established by the city') and the city publishes NO meter-size ladder anywhere. The only published figure is the city's own statement that a typical new SFR connection is ~$2,750 water, and that 'for each connection, basic fees for a 5/8-inch meter is the same as residential' — so $2,750 is entered as the 5/8"-meter base, NOT a 1" canonical default. The nonres meter-size multipliers are unpublished. Sources checked: Municode Ch. 22, templeterrace.gov Utility Rates & Fees page, Utility Accounts & Deposits, city FAQ, web search. AUDIT RE-CHECK 2026-07-13: the Rates & Fees page has MOVED to templeterrace.gov/137/Utility-Rates-Fees (JS-rendered; read via Chrome) and now publishes only monthly consumption/base/meter rates and service fees — still no improvement-charge dollar schedule. The FY2026 water/wastewater rate exhibit is monthly user rates only. Remains Unconfirmed. Call Engineering (813) 506-6570 for the adopted improvement-charge schedule.
    $2,750.00 one-timeRequires confirmation
Sewer$2,569.00 one-time
  • Sewer Improvement Charge (City of Temple Terrace)
    City of Temple Terrace
    ⚠️ UNCONFIRMED AMOUNT. Code §22-48 imposes a sewer 'improvement charge' on every new connection; commercial/industrial is meter-size based per §22-48(a)(1), but no dollar schedule is published in the code or on the city site. $2,569 is the city's stated typical new-SFR sewer connection figure, used here as the 5/8"-meter base (city states the 5/8" basic fee is the same for commercial). Nonres meter multipliers unpublished. Sources checked: Municode Ch. 22, city Utility Rates & Fees page, city FAQ, web search. AUDIT RE-CHECK 2026-07-13: Rates & Fees page (now templeterrace.gov/137/Utility-Rates-Fees) still publishes only monthly rates and service fees — no improvement-charge schedule. Remains Unconfirmed. Call Engineering (813) 506-6570.
    $2,569.00 one-timeRequires confirmation
City$0.00
  • City Mobility Fee (Temple Terrace MTD, Commercial)
    City of Temple Terrace
    ⚠️ UNCONFIRMED — no published per-sq-ft schedule exists. The ENTIRE city is a state-designated Multimodal Transportation District (first in Florida). Per the city's MTD page, mobility fees are assessed 'using a pay-as-you-go system' — each new development pays 'a predetermined cost per trip for each new vehicle trip generated', with the cost-per-trip set in the city's Transportation Procedures Manual, not in a posted rate table. Sources checked: Municode (no impact-fee chapter), templeterrace.gov MTD page, Utility Rates & Fees page, city FAQ, targeted web search — none publish a $/trip figure or a nonres fee schedule. Fee is real and nonzero for a trip-generating nonres project; $0 is a placeholder. AUDIT RE-CHECK 2026-07-13: re-searched city site + web; still no published cost-per-trip figure or nonres schedule. Remains Unconfirmed. Confirm rate + trip rates: Planning Dept (813) 506-6480.
    Requires confirmation
County$0.00
  • County Impact Fee — Not Applicable In-City (City of Temple Terrace, Commercial)
    Hillsborough County
    Confirmed $0. Hillsborough County Code Sec. 40-50(1) limits transportation and fire rescue impact assessments (and the Art. III mobility fee) to the UNINCORPORATED area; Sec. 40-50(2) parks = unincorporated + residential/lodging only; Sec. 40-50(3) school = countywide but expressly not applicable to nonresidential development. Temple Terrace levies its own MTD mobility fee instead.
    $0.00
Total (Temple Terrace): $5,319.00 one-time (≈ $5,319.00 at 50,000 sq ft)
Sources last checked July 22, 2026Official fee schedules:City of Temple Terrace Hillsborough County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Hillsborough County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Temple Terrace: Industrial Impact Fees

Industrial development in Temple Terrace pays no per-square-foot impact fees, but owes $5,319.00 in one-time water and sewer connection fees (rates sourced July 22, 2026).

For a 50,000 sq ft building, that comes to at least $5,319.00. The calculator below adjusts to your exact square footage.

Water Improvement Charge (City of Temple Terrace) and Sewer Improvement Charge (City of Temple Terrace) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

City Mobility Fee (Temple Terrace MTD, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$2,750.00 one-time
  • Water Improvement Charge (City of Temple Terrace)
    City of Temple Terrace
    ⚠️ UNCONFIRMED AMOUNT. Code §22-48 imposes a water 'improvement charge' (= impact fee) on every new connection and §22-48(a)(1)+(b) make the COMMERCIAL/INDUSTRIAL charge METER-SIZE based — but the code sets no dollar figures ('improvement charge established by the city') and the city publishes NO meter-size ladder anywhere. The only published figure is the city's own statement that a typical new SFR connection is ~$2,750 water, and that 'for each connection, basic fees for a 5/8-inch meter is the same as residential' — so $2,750 is entered as the 5/8"-meter base, NOT a 1" canonical default. The nonres meter-size multipliers are unpublished. Sources checked: Municode Ch. 22, templeterrace.gov Utility Rates & Fees page, Utility Accounts & Deposits, city FAQ, web search. AUDIT RE-CHECK 2026-07-13: the Rates & Fees page has MOVED to templeterrace.gov/137/Utility-Rates-Fees (JS-rendered; read via Chrome) and now publishes only monthly consumption/base/meter rates and service fees — still no improvement-charge dollar schedule. The FY2026 water/wastewater rate exhibit is monthly user rates only. Remains Unconfirmed. Call Engineering (813) 506-6570 for the adopted improvement-charge schedule.
    $2,750.00 one-timeRequires confirmation
Sewer$2,569.00 one-time
  • Sewer Improvement Charge (City of Temple Terrace)
    City of Temple Terrace
    ⚠️ UNCONFIRMED AMOUNT. Code §22-48 imposes a sewer 'improvement charge' on every new connection; commercial/industrial is meter-size based per §22-48(a)(1), but no dollar schedule is published in the code or on the city site. $2,569 is the city's stated typical new-SFR sewer connection figure, used here as the 5/8"-meter base (city states the 5/8" basic fee is the same for commercial). Nonres meter multipliers unpublished. Sources checked: Municode Ch. 22, city Utility Rates & Fees page, city FAQ, web search. AUDIT RE-CHECK 2026-07-13: Rates & Fees page (now templeterrace.gov/137/Utility-Rates-Fees) still publishes only monthly rates and service fees — no improvement-charge schedule. Remains Unconfirmed. Call Engineering (813) 506-6570.
    $2,569.00 one-timeRequires confirmation
City$0.00
  • City Mobility Fee (Temple Terrace MTD, Industrial)
    City of Temple Terrace
    ⚠️ UNCONFIRMED — citywide MTD mobility fee is a pay-as-you-go per-vehicle-trip charge (cost-per-trip in the Transportation Procedures Manual); no published $/sq ft nonres schedule anywhere. $0 is a placeholder, not a confirmed zero. AUDIT RE-CHECK 2026-07-13: still unpublished. Confirm: Planning Dept (813) 506-6480.
    Requires confirmation
County$0.00
Total (Temple Terrace): $5,319.00 one-time (≈ $5,319.00 at 50,000 sq ft)
Sources last checked July 22, 2026Official fee schedules:City of Temple Terrace Hillsborough County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Hillsborough County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Temple Terrace: Office Impact Fees

Office development in Temple Terrace pays no per-square-foot impact fees, but owes $5,319.00 in one-time water and sewer connection fees (rates sourced July 22, 2026).

For a 25,000 sq ft building, that comes to at least $5,319.00. The calculator below adjusts to your exact square footage.

Water Improvement Charge (City of Temple Terrace) and Sewer Improvement Charge (City of Temple Terrace) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

City Mobility Fee (Temple Terrace MTD, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$2,750.00 one-time
  • Water Improvement Charge (City of Temple Terrace)
    City of Temple Terrace
    ⚠️ UNCONFIRMED AMOUNT. Code §22-48 imposes a water 'improvement charge' (= impact fee) on every new connection and §22-48(a)(1)+(b) make the COMMERCIAL/INDUSTRIAL charge METER-SIZE based — but the code sets no dollar figures ('improvement charge established by the city') and the city publishes NO meter-size ladder anywhere. The only published figure is the city's own statement that a typical new SFR connection is ~$2,750 water, and that 'for each connection, basic fees for a 5/8-inch meter is the same as residential' — so $2,750 is entered as the 5/8"-meter base, NOT a 1" canonical default. The nonres meter-size multipliers are unpublished. Sources checked: Municode Ch. 22, templeterrace.gov Utility Rates & Fees page, Utility Accounts & Deposits, city FAQ, web search. AUDIT RE-CHECK 2026-07-13: the Rates & Fees page has MOVED to templeterrace.gov/137/Utility-Rates-Fees (JS-rendered; read via Chrome) and now publishes only monthly consumption/base/meter rates and service fees — still no improvement-charge dollar schedule. The FY2026 water/wastewater rate exhibit is monthly user rates only. Remains Unconfirmed. Call Engineering (813) 506-6570 for the adopted improvement-charge schedule.
    $2,750.00 one-timeRequires confirmation
Sewer$2,569.00 one-time
  • Sewer Improvement Charge (City of Temple Terrace)
    City of Temple Terrace
    ⚠️ UNCONFIRMED AMOUNT. Code §22-48 imposes a sewer 'improvement charge' on every new connection; commercial/industrial is meter-size based per §22-48(a)(1), but no dollar schedule is published in the code or on the city site. $2,569 is the city's stated typical new-SFR sewer connection figure, used here as the 5/8"-meter base (city states the 5/8" basic fee is the same for commercial). Nonres meter multipliers unpublished. Sources checked: Municode Ch. 22, city Utility Rates & Fees page, city FAQ, web search. AUDIT RE-CHECK 2026-07-13: Rates & Fees page (now templeterrace.gov/137/Utility-Rates-Fees) still publishes only monthly rates and service fees — no improvement-charge schedule. Remains Unconfirmed. Call Engineering (813) 506-6570.
    $2,569.00 one-timeRequires confirmation
City$0.00
  • City Mobility Fee (Temple Terrace MTD, Office)
    City of Temple Terrace
    ⚠️ UNCONFIRMED — citywide MTD mobility fee is a pay-as-you-go per-vehicle-trip charge (cost-per-trip in the Transportation Procedures Manual); no published $/sq ft nonres schedule anywhere. $0 is a placeholder, not a confirmed zero. AUDIT RE-CHECK 2026-07-13: still unpublished. Confirm: Planning Dept (813) 506-6480.
    Requires confirmation
County$0.00
Total (Temple Terrace): $5,319.00 one-time (≈ $5,319.00 at 25,000 sq ft)
Sources last checked July 22, 2026Official fee schedules:City of Temple Terrace Hillsborough County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Hillsborough County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Temple Terrace

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Frequently asked questions

What are the total impact fees for a single-family home in Temple Terrace, Florida?

A new single-family home in Temple Terrace pays $13,546.00 per unit in combined impact fees (rates sourced July 22, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Temple Terrace?

Commercial development in Temple Terrace pays no per-square-foot impact fees, but owes $5,319.00 in one-time water and sewer connection fees. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

Does Temple Terrace charge its own impact fees?

Yes. Temple Terrace levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Temple Terrace, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Hillsborough County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000