Temple Terrace, Florida Impact Fees

Temple Terrace applies its own fee schedule: municipal fees plus the Hillsborough County-levied fees that apply inside city limits. Combined, a new single-family home pays $12,346.00 per unit (rates sourced July 13, 2026). The full breakdown is below.

Temple Terrace impact fees by project type

Temple Terrace: Single-Family Impact Fees

A new single-family home in Temple Terrace pays $12,346.00 per unit in impact fees (rates sourced July 13, 2026). Of that, Hillsborough County-levied fees account for $7,027.00 and municipal or utility fees for $5,319.00.

The largest line items are School Impact Fee (SFR, 1,300-1,799 sq ft) ($7,027.00), Water Improvement Fee (City of Temple Terrace, SFR) (⚠️ VERIFY) ($2,750.00) and Sewer Improvement Fee (City of Temple Terrace, SFR) (⚠️ VERIFY) ($2,569.00).

View the full fee schedule
Water$2,750.00
  • Water Improvement Fee (City of Temple Terrace, SFR) (⚠️ VERIFY)
    City of Temple Terrace
    ⚠️ VERIFY. City operates own water utility. City utility page states a typical new SFR connection is ~$2,750 water (impact/improvement) plus connection fees — not confirmed against an adopted fee schedule. Confirm exact impact fee: Engineering (813) 506-6570.
    $2,750.00
Sewer$2,569.00
  • Sewer Improvement Fee (City of Temple Terrace, SFR) (⚠️ VERIFY)
    City of Temple Terrace
    ⚠️ VERIFY. City owns sewer collection; wastewater treated at City of Tampa regional plant. City utility page states typical new SFR connection ~$2,569 sewer plus connection fees — not confirmed against adopted schedule. Engineering (813) 506-6570.
    $2,569.00
City$0.00
  • City Mobility Fee (Temple Terrace MTD, SFR) (⚠️ VERIFY)
    City of Temple Terrace
    ⚠️ VERIFY. Entire city is a Multimodal Transportation District. Mobility fee is pay-as-you-go: predetermined cost per new vehicle trip (per Transportation Procedures Manual) — no published flat residential rate. County mobility/parks/fire do NOT apply inside city limits. Planning (813) 506-6480.
    $0.00
County$7,027.00
  • School Impact Fee (SFR, 1,300-1,799 sq ft)
    Hillsborough County Public Schools
    Countywide school impact fee applies within Temple Terrace (eff. 10/1/22). 1,300-1,799 sf $7,027 (typical). Other brackets: <900 $1,645; 900-1,299 $3,891; 1,800-2,499 $8,227.
    $7,027.00
Total (Temple Terrace): $12,346.00
Sources last checked July 13, 2026Official fee schedules:City of Temple Terrace Hillsborough County Public Schools

Where in Hillsborough County are you building?

Each jurisdiction applies its own fee schedule. Pick yours.

Temple Terrace: Multifamily Impact Fees

A new multifamily unit in Temple Terrace pays $9,210.00 per unit in impact fees (rates sourced July 13, 2026). Of that, Hillsborough County-levied fees account for $3,891.00 and municipal or utility fees for $5,319.00.

The largest line items are School Impact Fee (MF, 900-1,299 sq ft) ($3,891.00), Water Improvement Fee (City of Temple Terrace, MF) (⚠️ VERIFY) ($2,750.00) and Sewer Improvement Fee (City of Temple Terrace, MF) (⚠️ VERIFY) ($2,569.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$2,750.00
Sewer$2,569.00
City$0.00
  • City Mobility Fee (Temple Terrace MTD, MF) (⚠️ VERIFY)
    City of Temple Terrace
    ⚠️ VERIFY. Citywide Multimodal Transportation District; mobility fee is pay-as-you-go per new vehicle trip (no published flat MF rate). County mobility/parks/fire do NOT apply inside city. Planning (813) 506-6480.
    $0.00
County$3,891.00
Total (Temple Terrace): $9,210.00
Sources last checked July 13, 2026Official fee schedules:City of Temple Terrace Hillsborough County Public Schools

Where in Hillsborough County are you building?

Each jurisdiction applies its own fee schedule. Pick yours.

Temple Terrace: Commercial Impact Fees

Commercial development in Temple Terrace pays no per-square-foot impact fees, but owes $5,319.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).

For a 50,000 sq ft building, that comes to at least $5,319.00. The calculator below adjusts to your exact square footage.

Water Improvement Charge (City of Temple Terrace) and Sewer Improvement Charge (City of Temple Terrace) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

City Mobility Fee (Temple Terrace MTD, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$2,750.00 one-time
  • Water Improvement Charge (City of Temple Terrace)
    City of Temple Terrace
    ⚠️ UNCONFIRMED AMOUNT. Code §22-48 imposes a water 'improvement charge' (= impact fee) on every new connection and §22-48(a)(1)+(b) make the COMMERCIAL/INDUSTRIAL charge METER-SIZE based — but the code sets no dollar figures ('improvement charge established by the city') and the city publishes NO meter-size ladder anywhere. The only published figure is the city's own statement that a typical new SFR connection is ~$2,750 water, and that 'for each connection, basic fees for a 5/8-inch meter is the same as residential' — so $2,750 is entered as the 5/8"-meter base, NOT a 1" canonical default. The nonres meter-size multipliers are unpublished. Sources checked: Municode Ch. 22, templeterrace.gov Utility Rates & Fees page, Utility Accounts & Deposits, city FAQ, web search. AUDIT RE-CHECK 2026-07-13: the Rates & Fees page has MOVED to templeterrace.gov/137/Utility-Rates-Fees (JS-rendered; read via Chrome) and now publishes only monthly consumption/base/meter rates and service fees — still no improvement-charge dollar schedule. The FY2026 water/wastewater rate exhibit is monthly user rates only. Remains Unconfirmed. Call Engineering (813) 506-6570 for the adopted improvement-charge schedule.
    $2,750.00 one-timeRequires confirmation
Sewer$2,569.00 one-time
  • Sewer Improvement Charge (City of Temple Terrace)
    City of Temple Terrace
    ⚠️ UNCONFIRMED AMOUNT. Code §22-48 imposes a sewer 'improvement charge' on every new connection; commercial/industrial is meter-size based per §22-48(a)(1), but no dollar schedule is published in the code or on the city site. $2,569 is the city's stated typical new-SFR sewer connection figure, used here as the 5/8"-meter base (city states the 5/8" basic fee is the same for commercial). Nonres meter multipliers unpublished. Sources checked: Municode Ch. 22, city Utility Rates & Fees page, city FAQ, web search. AUDIT RE-CHECK 2026-07-13: Rates & Fees page (now templeterrace.gov/137/Utility-Rates-Fees) still publishes only monthly rates and service fees — no improvement-charge schedule. Remains Unconfirmed. Call Engineering (813) 506-6570.
    $2,569.00 one-timeRequires confirmation
City$0.00
  • City Mobility Fee (Temple Terrace MTD, Commercial)
    City of Temple Terrace
    ⚠️ UNCONFIRMED — no published per-sq-ft schedule exists. The ENTIRE city is a state-designated Multimodal Transportation District (first in Florida). Per the city's MTD page, mobility fees are assessed 'using a pay-as-you-go system' — each new development pays 'a predetermined cost per trip for each new vehicle trip generated', with the cost-per-trip set in the city's Transportation Procedures Manual, not in a posted rate table. Sources checked: Municode (no impact-fee chapter), templeterrace.gov MTD page, Utility Rates & Fees page, city FAQ, targeted web search — none publish a $/trip figure or a nonres fee schedule. Fee is real and nonzero for a trip-generating nonres project; $0 is a placeholder. AUDIT RE-CHECK 2026-07-13: re-searched city site + web; still no published cost-per-trip figure or nonres schedule. Remains Unconfirmed. Confirm rate + trip rates: Planning Dept (813) 506-6480.
    Requires confirmation
County$0.00
  • County Impact Fee — Not Applicable In-City (City of Temple Terrace, Commercial)
    Hillsborough County
    Confirmed $0. Hillsborough County Code Sec. 40-50(1) limits transportation and fire rescue impact assessments (and the Art. III mobility fee) to the UNINCORPORATED area; Sec. 40-50(2) parks = unincorporated + residential/lodging only; Sec. 40-50(3) school = countywide but expressly not applicable to nonresidential development. Temple Terrace levies its own MTD mobility fee instead.
    $0.00
Total (Temple Terrace): $5,319.00 one-time (≈ $5,319.00 at 50,000 sq ft)
Sources last checked July 13, 2026Official fee schedules:City of Temple Terrace Hillsborough County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Hillsborough County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Temple Terrace: Industrial Impact Fees

Industrial development in Temple Terrace pays no per-square-foot impact fees, but owes $5,319.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).

For a 50,000 sq ft building, that comes to at least $5,319.00. The calculator below adjusts to your exact square footage.

Water Improvement Charge (City of Temple Terrace) and Sewer Improvement Charge (City of Temple Terrace) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

City Mobility Fee (Temple Terrace MTD, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$2,750.00 one-time
  • Water Improvement Charge (City of Temple Terrace)
    City of Temple Terrace
    ⚠️ UNCONFIRMED AMOUNT. Code §22-48 imposes a water 'improvement charge' (= impact fee) on every new connection and §22-48(a)(1)+(b) make the COMMERCIAL/INDUSTRIAL charge METER-SIZE based — but the code sets no dollar figures ('improvement charge established by the city') and the city publishes NO meter-size ladder anywhere. The only published figure is the city's own statement that a typical new SFR connection is ~$2,750 water, and that 'for each connection, basic fees for a 5/8-inch meter is the same as residential' — so $2,750 is entered as the 5/8"-meter base, NOT a 1" canonical default. The nonres meter-size multipliers are unpublished. Sources checked: Municode Ch. 22, templeterrace.gov Utility Rates & Fees page, Utility Accounts & Deposits, city FAQ, web search. AUDIT RE-CHECK 2026-07-13: the Rates & Fees page has MOVED to templeterrace.gov/137/Utility-Rates-Fees (JS-rendered; read via Chrome) and now publishes only monthly consumption/base/meter rates and service fees — still no improvement-charge dollar schedule. The FY2026 water/wastewater rate exhibit is monthly user rates only. Remains Unconfirmed. Call Engineering (813) 506-6570 for the adopted improvement-charge schedule.
    $2,750.00 one-timeRequires confirmation
Sewer$2,569.00 one-time
  • Sewer Improvement Charge (City of Temple Terrace)
    City of Temple Terrace
    ⚠️ UNCONFIRMED AMOUNT. Code §22-48 imposes a sewer 'improvement charge' on every new connection; commercial/industrial is meter-size based per §22-48(a)(1), but no dollar schedule is published in the code or on the city site. $2,569 is the city's stated typical new-SFR sewer connection figure, used here as the 5/8"-meter base (city states the 5/8" basic fee is the same for commercial). Nonres meter multipliers unpublished. Sources checked: Municode Ch. 22, city Utility Rates & Fees page, city FAQ, web search. AUDIT RE-CHECK 2026-07-13: Rates & Fees page (now templeterrace.gov/137/Utility-Rates-Fees) still publishes only monthly rates and service fees — no improvement-charge schedule. Remains Unconfirmed. Call Engineering (813) 506-6570.
    $2,569.00 one-timeRequires confirmation
City$0.00
  • City Mobility Fee (Temple Terrace MTD, Industrial)
    City of Temple Terrace
    ⚠️ UNCONFIRMED — citywide MTD mobility fee is a pay-as-you-go per-vehicle-trip charge (cost-per-trip in the Transportation Procedures Manual); no published $/sq ft nonres schedule anywhere. $0 is a placeholder, not a confirmed zero. AUDIT RE-CHECK 2026-07-13: still unpublished. Confirm: Planning Dept (813) 506-6480.
    Requires confirmation
County$0.00
Total (Temple Terrace): $5,319.00 one-time (≈ $5,319.00 at 50,000 sq ft)
Sources last checked July 13, 2026Official fee schedules:City of Temple Terrace Hillsborough County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Hillsborough County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Temple Terrace: Office Impact Fees

Office development in Temple Terrace pays no per-square-foot impact fees, but owes $5,319.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).

For a 25,000 sq ft building, that comes to at least $5,319.00. The calculator below adjusts to your exact square footage.

Water Improvement Charge (City of Temple Terrace) and Sewer Improvement Charge (City of Temple Terrace) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

City Mobility Fee (Temple Terrace MTD, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$2,750.00 one-time
  • Water Improvement Charge (City of Temple Terrace)
    City of Temple Terrace
    ⚠️ UNCONFIRMED AMOUNT. Code §22-48 imposes a water 'improvement charge' (= impact fee) on every new connection and §22-48(a)(1)+(b) make the COMMERCIAL/INDUSTRIAL charge METER-SIZE based — but the code sets no dollar figures ('improvement charge established by the city') and the city publishes NO meter-size ladder anywhere. The only published figure is the city's own statement that a typical new SFR connection is ~$2,750 water, and that 'for each connection, basic fees for a 5/8-inch meter is the same as residential' — so $2,750 is entered as the 5/8"-meter base, NOT a 1" canonical default. The nonres meter-size multipliers are unpublished. Sources checked: Municode Ch. 22, templeterrace.gov Utility Rates & Fees page, Utility Accounts & Deposits, city FAQ, web search. AUDIT RE-CHECK 2026-07-13: the Rates & Fees page has MOVED to templeterrace.gov/137/Utility-Rates-Fees (JS-rendered; read via Chrome) and now publishes only monthly consumption/base/meter rates and service fees — still no improvement-charge dollar schedule. The FY2026 water/wastewater rate exhibit is monthly user rates only. Remains Unconfirmed. Call Engineering (813) 506-6570 for the adopted improvement-charge schedule.
    $2,750.00 one-timeRequires confirmation
Sewer$2,569.00 one-time
  • Sewer Improvement Charge (City of Temple Terrace)
    City of Temple Terrace
    ⚠️ UNCONFIRMED AMOUNT. Code §22-48 imposes a sewer 'improvement charge' on every new connection; commercial/industrial is meter-size based per §22-48(a)(1), but no dollar schedule is published in the code or on the city site. $2,569 is the city's stated typical new-SFR sewer connection figure, used here as the 5/8"-meter base (city states the 5/8" basic fee is the same for commercial). Nonres meter multipliers unpublished. Sources checked: Municode Ch. 22, city Utility Rates & Fees page, city FAQ, web search. AUDIT RE-CHECK 2026-07-13: Rates & Fees page (now templeterrace.gov/137/Utility-Rates-Fees) still publishes only monthly rates and service fees — no improvement-charge schedule. Remains Unconfirmed. Call Engineering (813) 506-6570.
    $2,569.00 one-timeRequires confirmation
City$0.00
  • City Mobility Fee (Temple Terrace MTD, Office)
    City of Temple Terrace
    ⚠️ UNCONFIRMED — citywide MTD mobility fee is a pay-as-you-go per-vehicle-trip charge (cost-per-trip in the Transportation Procedures Manual); no published $/sq ft nonres schedule anywhere. $0 is a placeholder, not a confirmed zero. AUDIT RE-CHECK 2026-07-13: still unpublished. Confirm: Planning Dept (813) 506-6480.
    Requires confirmation
County$0.00
Total (Temple Terrace): $5,319.00 one-time (≈ $5,319.00 at 25,000 sq ft)
Sources last checked July 13, 2026Official fee schedules:City of Temple Terrace Hillsborough County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Hillsborough County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Temple Terrace

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Temple Terrace, Florida?

A new single-family home in Temple Terrace pays $12,346.00 per unit in combined impact fees (rates sourced July 13, 2026).

How much are commercial impact fees in Temple Terrace?

Commercial development in Temple Terrace pays no per-square-foot impact fees, but owes $5,319.00 in one-time water and sewer connection fees. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

Does Temple Terrace charge its own impact fees?

Yes. Temple Terrace levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Temple Terrace, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Hillsborough County impact fees page.

Missing a jurisdiction? Get in touch.