Alford has no published impact fee amounts for a new single-family home (rates sourced July 13, 2026). The schedule below documents the status of each fee.
Water Connection Fee and Sewer Connection Fee are set by the utility and not published online. City Impact Fee is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection FeeRequires confirmationCity of AlfordCity of Alford operates own water/sewer utility. No published fee schedule found online. Contact: (850) 579-4684.
- Sewer Connection FeeRequires confirmationCity of AlfordCity of Alford operates own water/sewer utility. No published fee schedule found online. Contact: (850) 579-4684.
- City Impact FeeRequires confirmation$0 City placeholder. Small municipality; no municipal (non-utility) impact fees found. Jackson County charges no impact fees (2025 Community Development Guidebook FAQ). Confirm city-specific fees: City of Alford (850) 579-4684.
- Jackson County Impact Fee$0.00Jackson CountyJackson County does not charge impact fees per 2025 Community Development Guidebook FAQ.
Where in Jackson County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Alford: Multifamily Impact Fees
Alford has no published impact fee amounts for a new multifamily unit (rates sourced July 13, 2026). The schedule below documents the status of each fee.
Water Connection Fee and Sewer Connection Fee are set by the utility and not published online. City Impact Fee (MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection FeeRequires confirmationCity of AlfordCity of Alford operates own water/sewer utility. No published fee schedule found online. Contact: (850) 579-4684.
- Sewer Connection FeeRequires confirmationCity of AlfordCity of Alford operates own water/sewer utility. No published fee schedule found online. Contact: (850) 579-4684.
- City Impact Fee (MF)Requires confirmation$0 City placeholder. Small municipality; no municipal (non-utility) impact fees found. Jackson County charges no impact fees (2025 Community Development Guidebook FAQ). Confirm city-specific fees: City of Alford (850) 579-4684.
- Jackson County Impact Fee$0.00Jackson CountyJackson County does not charge impact fees per 2025 Community Development Guidebook FAQ.
Where in Jackson County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Alford: Commercial Impact Fees
Commercial development in Alford pays no per-square-foot impact fees (rates sourced July 13, 2026).
Sewer Connection Fee (Town of Alford) and Water Connection Fee (Town of Alford) are set by the utility and not published online. City Impact Fee (Town of Alford, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (Town of Alford)Requires confirmationTown of Alford$0 placeholder — no published amount. The Town of Alford operates its own water system (received a $600,000 state grant in 2021 to harden it) but publishes no ordinances, no code and no rate/fee schedule; alfordfl.com is a minimal Wix site and the Town is on no codifier. VERIFY: Town Clerk Silvestra Tharp, Alford Town Hall, (850) 579-4684, 1768 Georgia Street, Alford FL 32420.
- Sewer Connection Fee (Town of Alford)Requires confirmationTown of Alford$0 placeholder — no published amount. Alford built a NEW central sewer system (CDBG-funded) to replace septic, with collected wastewater sent to the City of Marianna's plant; local news reported the initial residential hook-up was offered free during sign-up, with later connections quoted at roughly $10,000–$14,000 — a lead, NOT an adopted schedule, and no nonresidential figure exists. No ordinance or fee schedule is published; Town is on no codifier. VERIFY: Town Clerk Silvestra Tharp, (850) 579-4684, 1768 Georgia Street, Alford FL 32420 — ask for the adopted commercial sewer connection fee and whether Marianna's §70-56 tap fee is passed through.
- City Impact Fee (Town of Alford, Commercial)Requires confirmationTown of Alford$0 entered as the expected value but CANNOT BE PROVED. Town of Alford publishes no ordinances, no code and no fee schedule — alfordfl.com is a minimal Wix site (Home, TextMyGov, Public Notices, CDBG-DR projects only) and the Town is on no codifier. VERIFY: call Town Clerk Silvestra Tharp, Alford Town Hall, (850) 579-4684, 1768 Georgia Street, Alford FL 32420.
- County Impact Fee (Jackson County, Commercial)$0.00Jackson County Board of County CommissionersJackson County levies NO impact fees of any kind — county fee is $0 inside the Town of Alford as everywhere else. Proved two ways: (1) 2025 Jackson County Development Guidebook FAQ: 'Jackson County does not charge impact fees.' (2) County Code of Ordinances (Municode, thru Ord. No. 2025-06) has no impact-fee chapter. Confirmed $0.
Where in Jackson County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Alford: Industrial Impact Fees
Industrial development in Alford pays no per-square-foot impact fees (rates sourced July 13, 2026).
Sewer Connection Fee (Town of Alford) and Water Connection Fee (Town of Alford) are set by the utility and not published online. City Impact Fee (Town of Alford, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (Town of Alford)Requires confirmationTown of Alford$0 placeholder — no published amount. The Town of Alford operates its own water system (received a $600,000 state grant in 2021 to harden it) but publishes no ordinances, no code and no rate/fee schedule; alfordfl.com is a minimal Wix site and the Town is on no codifier. VERIFY: Town Clerk Silvestra Tharp, Alford Town Hall, (850) 579-4684, 1768 Georgia Street, Alford FL 32420.
- Sewer Connection Fee (Town of Alford)Requires confirmationTown of Alford$0 placeholder — no published amount. Alford built a NEW central sewer system (CDBG-funded) to replace septic, with collected wastewater sent to the City of Marianna's plant; local news reported the initial residential hook-up was offered free during sign-up, with later connections quoted at roughly $10,000–$14,000 — a lead, NOT an adopted schedule, and no nonresidential figure exists. No ordinance or fee schedule is published; Town is on no codifier. VERIFY: Town Clerk Silvestra Tharp, (850) 579-4684, 1768 Georgia Street, Alford FL 32420 — ask for the adopted commercial sewer connection fee and whether Marianna's §70-56 tap fee is passed through.
- City Impact Fee (Town of Alford, Industrial)Requires confirmationTown of Alford$0 entered as expected value but CANNOT BE PROVED. Town of Alford publishes no ordinances, code or fee schedule; on no codifier. VERIFY: call Town Clerk Silvestra Tharp, (850) 579-4684, 1768 Georgia Street, Alford FL 32420.
- County Impact Fee (Jackson County, Industrial)$0.00Jackson County Board of County CommissionersJackson County levies NO impact fees of any kind — county fee is $0 inside the Town of Alford as everywhere else. Proved two ways: (1) 2025 Jackson County Development Guidebook FAQ: 'Jackson County does not charge impact fees.' (2) County Code of Ordinances (Municode, thru Ord. No. 2025-06) has no impact-fee chapter. Confirmed $0.
Where in Jackson County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Alford: Office Impact Fees
Office development in Alford pays no per-square-foot impact fees (rates sourced July 13, 2026).
Sewer Connection Fee (Town of Alford) and Water Connection Fee (Town of Alford) are set by the utility and not published online. City Impact Fee (Town of Alford, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (Town of Alford)Requires confirmationTown of Alford$0 placeholder — no published amount. The Town of Alford operates its own water system (received a $600,000 state grant in 2021 to harden it) but publishes no ordinances, no code and no rate/fee schedule; alfordfl.com is a minimal Wix site and the Town is on no codifier. VERIFY: Town Clerk Silvestra Tharp, Alford Town Hall, (850) 579-4684, 1768 Georgia Street, Alford FL 32420.
- Sewer Connection Fee (Town of Alford)Requires confirmationTown of Alford$0 placeholder — no published amount. Alford built a NEW central sewer system (CDBG-funded) to replace septic, with collected wastewater sent to the City of Marianna's plant; local news reported the initial residential hook-up was offered free during sign-up, with later connections quoted at roughly $10,000–$14,000 — a lead, NOT an adopted schedule, and no nonresidential figure exists. No ordinance or fee schedule is published; Town is on no codifier. VERIFY: Town Clerk Silvestra Tharp, (850) 579-4684, 1768 Georgia Street, Alford FL 32420 — ask for the adopted commercial sewer connection fee and whether Marianna's §70-56 tap fee is passed through.
- City Impact Fee (Town of Alford, Office)Requires confirmationTown of Alford$0 entered as expected value but CANNOT BE PROVED. Town of Alford publishes no ordinances, code or fee schedule; on no codifier. VERIFY: call Town Clerk Silvestra Tharp, (850) 579-4684, 1768 Georgia Street, Alford FL 32420.
- County Impact Fee (Jackson County, Office)$0.00Jackson County Board of County CommissionersJackson County levies NO impact fees of any kind — county fee is $0 inside the Town of Alford as everywhere else. Proved two ways: (1) 2025 Jackson County Development Guidebook FAQ: 'Jackson County does not charge impact fees.' (2) County Code of Ordinances (Municode, thru Ord. No. 2025-06) has no impact-fee chapter. Confirmed $0.
Where in Jackson County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Alford
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
How much are commercial impact fees in Alford?
Alford does not currently levy impact fees on commercial development.
Does Alford charge its own impact fees?
Yes. Alford levies its own municipal impact or utility fees. Jackson County does not currently add county-level impact fees inside Alford. The schedule on this page shows every fee that applies to development in Alford.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.