Skip to content
IMPACTFEES.ORG

Campbellton, Florida Impact Fees

Campbellton applies its own fee schedule. Jackson County does not currently add county-level impact fees inside city limits. There are currently no published impact fee amounts for a new single-family home (rates sourced ). The full breakdown is below.

Campbellton Impact Fees by Project Type

Campbellton: Single-Family Impact Fees

Campbellton has no published impact fee amounts for a new single-family home (rates sourced July 13, 2026). The schedule below documents the status of each fee.

Water Connection Fee is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Campbellton Impact Fee Schedule
Water$0.00
  • Water Connection Fee
    Campbellton
    The Town of Campbellton operates the community water system (water only; properties are otherwise on septic). A one-time water tap fee applies to new service, but the town has not adopted a publicly posted fee schedule, so the charge is set at the time of application.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee
    Campbellton
    The Town of Campbellton does not operate a municipal sewer system; properties are served by septic systems, so no town sewer connection fee applies.
    $0.00
City$0.00
  • City Impact Fee
    Town of Campbellton does not charge municipal impact fees on new residential construction, and Jackson County levies no county impact fees.
    $0.00
County$0.00
  • Jackson County Impact Fee
    Jackson County
    Jackson County levies no land-use impact fees (roads, parks, schools, fire, etc.) per the county's Community Development guidance.
    $0.00
Total (Campbellton): $0.00
Sources last checked Official fee schedule:Jackson County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Campbellton: Multifamily Impact Fees

Campbellton has no published impact fee amounts for a new multifamily unit (rates sourced July 13, 2026). The schedule below documents the status of each fee.

Water Connection Fee is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Campbellton Impact Fee Schedule
Water$0.00
  • Water Connection Fee
    Campbellton
    The Town of Campbellton operates the community water system (water only; properties are otherwise on septic). A one-time water tap fee applies to new service, but the town has not adopted a publicly posted fee schedule, so the charge is set at the time of application. Each dwelling unit is separately metered.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee
    Campbellton
    The Town of Campbellton does not operate a municipal sewer system; properties are served by septic systems, so no town sewer connection fee applies.
    $0.00
City$0.00
  • City Impact Fee (MF)
    Town of Campbellton does not charge municipal impact fees on new residential construction, and Jackson County levies no county impact fees.
    $0.00
County$0.00
  • Jackson County Impact Fee
    Jackson County
    Jackson County levies no land-use impact fees (roads, parks, schools, fire, etc.) per the county's Community Development guidance.
    $0.00
Total (Campbellton): $0.00
Sources last checked Official fee schedule:Jackson County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Campbellton: Commercial Impact Fees

Commercial development in Campbellton pays no per-square-foot impact fees (rates sourced July 13, 2026).

Water Connection Fee (Town of Campbellton) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Campbellton Impact Fee Schedule
Water$0.00
  • Water Connection Fee (Town of Campbellton)
    Town of Campbellton
    The Town of Campbellton operates the community water system (water only). A one-time water tap fee applies to new commercial service, but the town has not published a fee schedule, so the charge is set at application.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Campbellton)
    Town of Campbellton
    The Town of Campbellton does not operate a municipal sewer system; properties use septic systems, so no town sewer connection fee applies.
    $0.00
City$0.00
County$0.00
Total (Campbellton): $0.00
Sources last checked Official fee schedules:Town of Campbellton Jackson County Board of County Commissioners
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Jackson County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Campbellton: Industrial Impact Fees

Industrial development in Campbellton pays no per-square-foot impact fees (rates sourced July 13, 2026).

Water Connection Fee (Town of Campbellton) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Campbellton Impact Fee Schedule
Water$0.00
  • Water Connection Fee (Town of Campbellton)
    Town of Campbellton
    The Town of Campbellton operates the community water system (water only). A one-time water tap fee applies to new commercial service, but the town has not published a fee schedule, so the charge is set at application.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Campbellton)
    Town of Campbellton
    The Town of Campbellton does not operate a municipal sewer system; properties use septic systems, so no town sewer connection fee applies.
    $0.00
City$0.00
County$0.00
Total (Campbellton): $0.00
Sources last checked Official fee schedules:Town of Campbellton Jackson County Board of County Commissioners
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Jackson County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Campbellton: Office Impact Fees

Office development in Campbellton pays no per-square-foot impact fees (rates sourced July 13, 2026).

Water Connection Fee (Town of Campbellton) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Campbellton Impact Fee Schedule
Water$0.00
  • Water Connection Fee (Town of Campbellton)
    Town of Campbellton
    The Town of Campbellton operates the community water system (water only). A one-time water tap fee applies to new commercial service, but the town has not published a fee schedule, so the charge is set at application.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Campbellton)
    Town of Campbellton
    The Town of Campbellton does not operate a municipal sewer system; properties use septic systems, so no town sewer connection fee applies.
    $0.00
City$0.00
County$0.00
Total (Campbellton): $0.00
Sources last checked Official fee schedules:Town of Campbellton Jackson County Board of County Commissioners
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Jackson County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Campbellton Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Amendments since 2021 also limit how fast fees can rise: an increase of up to 25% phases in over two years and one of 25–50% over four years, no single increase may exceed 50%, and a fee can be raised no more than once every four years. Going beyond those limits requires a recent study showing extraordinary circumstances, two public workshops, and a unanimous vote of the governing body, and even then the increase is capped at 100%.

Counties and cities can both levy impact fees. Inside an incorporated city, a project usually pays the county fees that apply countywide plus any municipal fees the city has adopted; in some counties, county fees apply only in unincorporated areas. That is why totals differ between a city and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Campbellton Impact Fee FAQs

How much are commercial impact fees in Campbellton?

Campbellton does not currently levy impact fees on commercial development.

Does Campbellton charge its own impact fees?

Yes. Campbellton levies its own municipal impact or utility fees. Jackson County does not currently add county-level impact fees inside Campbellton. The schedule on this page shows every fee that applies to development in Campbellton.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes caps an increase at 50%, phased in over two to four years, and allows a fee to be raised no more than once every four years. Going beyond that requires an extraordinary-circumstances study, two public workshops, and a unanimous vote of the governing body, and is still capped at 100%.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Jackson County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000