Bonita Springs impact fees by project type
Bonita Springs: Single-Family Impact Fees
A new single-family home in Bonita Springs pays $31,136.95 per unit in impact fees (rates sourced July 14, 2026). Of that, Lee County-levied fees account for $9,991.95 and municipal or utility fees for $21,145.00.
The largest line items are Roads Impact Fee (SFR - Bonita Springs city) ($12,350.00), Wastewater Connection Fee (SFR - Bonita Springs Utilities ANC) ($4,459.00) and Water Connection Fee (SFR - Bonita Springs Utilities ANC) ($3,424.00).
Parks Impact Fee (SFR - Lee County, 52.5%), Roads Impact Fee (SFR - Lee County, 52.5%), and School Impact Fee (SFR - Lee County, 55%) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the full fee schedule
- Water Connection Fee (SFR - Bonita Springs Utilities ANC)$3,424.00Bonita Springs UtilitiesBSU Aid-to-New-Construction (ANC) fee. Per unit served. Updated Jan 2026.
- Wastewater Connection Fee (SFR - Bonita Springs Utilities ANC)$4,459.00Bonita Springs UtilitiesBSU Aid-to-New-Construction (ANC) fee. Per unit served. Updated Jan 2026.
- Roads Impact Fee (SFR - Bonita Springs city)$12,350.00Bonita SpringsBonita Springs city road impact fee, LDC Ch. 2 Art. VI Div. 2 (Ord. 18-10), $12,350 per single-family dwelling. Re-confirmed 7/13/2026 against the codified schedule in Municode. This is a CITY fee at 100% of the city's own study rate - NOT the Lee County road fee ($5,248 SFR). See the county Roads record for this jurisdiction, now flagged Unconfirmed pending confirmation of whether both are collected.
- Parks Impact Fee (SFR - Bonita Springs city)$912.00Bonita SpringsBonita Springs city parks impact fee, LDC Ch. 2 Art. VI (Ord. 18-07), $912 per single-family dwelling. Re-confirmed 7/13/2026. This is a CITY fee - NOT the Lee County park fee ($806 SFR). See the county Parks record for this jurisdiction, now flagged Unconfirmed pending confirmation of whether both are collected.
- Roads Impact Fee (SFR - Lee County, 52.5%)$5,248.00Requires confirmationLee CountyUNCONFIRMED (flagged 7/13/2026) - POSSIBLE DOUBLE-COUNT. Bonita Springs levies its OWN road impact fee under LDC Ch. 2 Art. VI Div. 2 (Ord. 18-10), $12,350 SFR - see the City record. The city's official impact-fee calculator offers only ONE 'Roads' category, which suggests the city fee is charged IN LIEU OF (not in addition to) the Lee County road fee inside city limits. Prior note asserting both are collected is unverified. Confirm with Bonita Springs Community Development (239) 444-6150 before relying on this record.
- School Impact Fee (SFR - Lee County, 55%)$3,016.20Requires confirmationLee CountyUNCONFIRMED (flagged 7/13/2026). Entered at a 55% collection rate ($5,484 base x 55% = $3,016.20), sourced from the Bonita Springs impact-fee calculator. BUT Lee County's own published schedule states Road, Park and School impact fees are collected countywide at 52.5% of the adopted base fee (which would give $2,879). Bonita's fee page separately links Lee County Ord. 18-08 'School Rate Reduction'. Confirm the in-city school collection rate with Lee County Impact Fee Coordinator Jennifer Cavanaugh (JCavanaugh@leegov.com) or Bonita Springs Community Development (239) 444-6150.
- Fire/EMS Impact Fee (SFR - Bonita Springs fire district)$921.75Lee CountyUPDATED 7/13/2026 (was $821). Lee County Ord. 26-01, eff. 5/4/2026: Bonita Springs fire district SFR = $861.75 + countywide EMS SFR $60.00 = $921.75. NOTE: the City of Bonita Springs COLLECTS this county fee on its permits (its impact-fee calculator's Fire dropdown offers 'Bonita Springs Fire District' and 'Estero Fire District' - parts of the city are in the Estero district, where SFR fire is also $861.75). Duplicate City-typed Fire and EMS records were deleted in the 7/13/2026 audit. Source: leegov.com DCD Impact Fee Schedule; cityofbonitaspringscd.org impact fee calculator.
- Parks Impact Fee (SFR - Lee County, 52.5%)$806.00Requires confirmationLee CountyUNCONFIRMED (flagged 7/13/2026) - POSSIBLE DOUBLE-COUNT. Bonita Springs levies its OWN parks impact fee under LDC Ch. 2 Art. VI (Ord. 18-07), $912 SFR - see the City record. The city's official impact-fee calculator offers only ONE 'Parks' category, suggesting the city fee replaces the Lee County park fee inside city limits. Confirm with Bonita Springs Community Development (239) 444-6150.
Where in Lee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bonita Springs: Multifamily Impact Fees
A new multifamily unit in Bonita Springs pays $22,056.55 per unit in impact fees (rates sourced July 14, 2026). Of that, Lee County-levied fees account for $5,484.15 and municipal or utility fees for $16,572.40.
The largest line items are Roads Impact Fee (MF - Bonita Springs city) ($9,576.00), Wastewater Connection Fee (MF - Bonita Springs Utilities ANC) ($3,567.20) and Water Connection Fee (MF - Bonita Springs Utilities ANC) ($2,739.20).
Roads Impact Fee - Mid-Rise (3-10 stories, 52.5%), Parks Impact Fee (MF - Lee County, combined), and School Impact Fee (MF - Lee County, 55%) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Connection Fee (MF - Bonita Springs Utilities ANC)$2,739.20Bonita Springs UtilitiesBSU Aid-to-New-Construction (ANC) fee for MF. Per unit served. Updated Jan 2026.
- Wastewater Connection Fee (MF - Bonita Springs Utilities ANC)$3,567.20Bonita Springs UtilitiesBSU Aid-to-New-Construction (ANC) fee for MF. Per unit served. Updated Jan 2026.
- Roads Impact Fee (MF - Bonita Springs city)$9,576.00Bonita SpringsBonita Springs city road impact fee, LDC Ch. 2 Art. VI Div. 2 (Ord. 18-10), $9,576 per multifamily dwelling unit. Re-confirmed 7/13/2026 against the codified schedule in Municode. This is a CITY fee at 100% of the city's own study rate - it is NOT the Lee County road fee (county MF mid-rise = $3,024). See the county Roads records for this jurisdiction, now flagged Unconfirmed pending confirmation of whether both are collected.
- Parks Impact Fee (MF - Bonita Springs city)$690.00Bonita SpringsBonita Springs city parks impact fee, LDC Ch. 2 Art. VI (Ord. 18-07), $690 per multifamily dwelling unit. Re-confirmed 7/13/2026. This is a CITY fee - NOT the Lee County park fee ($610 MF). See the county Parks record for this jurisdiction, now flagged Unconfirmed pending confirmation of whether both are collected.
- Roads Impact Fee - Mid-Rise (3-10 stories, 52.5%)$3,024.00Requires confirmationLee CountyUNCONFIRMED (flagged 7/13/2026) - POSSIBLE DOUBLE-COUNT. Bonita Springs levies its own road impact fee (LDC Ch. 2 Art. VI Div. 2, Ord. 18-10; $9,576/MF unit) and its impact-fee calculator offers only ONE 'Roads' category, suggesting the city fee is charged in lieu of the Lee County road fee inside city limits. Confirm with Bonita Springs Community Development (239) 444-6150.
- School Impact Fee (MF - Lee County, 55%)$1,167.65Requires confirmationLee CountyUNCONFIRMED (flagged 7/13/2026). Entered at a 55% collection rate ($2,123 base x 55% = $1,167.65) from the Bonita Springs impact-fee calculator. BUT Lee County's published schedule states Road, Park and School impact fees are collected countywide at 52.5% of base (= $1,115). Confirm the in-city school collection rate with Lee County Impact Fee Coordinator (JCavanaugh@leegov.com) or Bonita Springs Community Development (239) 444-6150.
- Fire/EMS Impact Fee (MF - Bonita Springs fire district)$682.50Lee CountyUPDATED 7/13/2026 (was $620). Lee County Ord. 26-01, eff. 5/4/2026: Bonita Springs fire district MF = $644.50 + countywide EMS MF $38.00 = $682.50. Fire steps: 5/4/2027 $707; 5/4/2028 $769.50; 5/4/2029 $832. The City of Bonita Springs collects this county fee on its permits; duplicate City-typed Fire ($644.50) and EMS ($38) records were deleted in the 7/13/2026 audit. Source: leegov.com DCD Impact Fee Schedule.
- Parks Impact Fee (MF - Lee County, combined)$610.00Requires confirmationLee CountyUNCONFIRMED (flagged 7/13/2026) - POSSIBLE DOUBLE-COUNT. Bonita Springs levies its OWN parks impact fee under LDC Ch. 2 Art. VI (Ord. 18-07), $690/MF unit - see the City record. The city's official impact-fee calculator offers only ONE 'Parks' category, suggesting the city fee replaces the Lee County park fee inside city limits. Confirm with Bonita Springs Community Development (239) 444-6150.
Where in Lee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bonita Springs: Commercial Impact Fees
Commercial development in Bonita Springs pays $15.17 per square foot in impact fees, plus $19,707.50 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to about $778,145.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater ANC Fee (Bonita Springs Utilities) — 1" meter ($11,147.50 one-time), Water ANC Fee (Bonita Springs Utilities) — 1" meter ($8,560.00 one-time) and Roads Impact Fee (City of Bonita Springs, Commercial) ($14.18/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the full fee schedule
- Water ANC Fee (Bonita Springs Utilities) — 1" meter$8,560.00 one-timeBonita Springs Utilities, Inc. (member-owned nonprofit)BSU Aid-to-New-Construction (ANC) Fee, General Service (commercial/irrigation) meter ladder, tariff eff. 1-1-2026. 1" = 2.5 ERC × $3,424/ERC = $8,560. One ERC = 250 gpd average daily flow. BSU is the water/sewer provider for the City of Bonita Springs.
- Wastewater ANC Fee (Bonita Springs Utilities) — 1" meter$11,147.50 one-timeBonita Springs Utilities, Inc.BSU Aid-to-New-Construction (ANC) Fee, General Service (commercial) meter ladder, tariff eff. 1-1-2026. 1" = 2.5 ERC × $4,459/ERC = $11,147.50. One ERC = 250 gpd average daily flow.
- Roads Impact Fee (City of Bonita Springs, Commercial)$14.18/sq ftCity of Bonita SpringsBonita Springs Code, Roads Impact Fee Schedule (Ord. 18-10, schedule eff. 8-15-2018). Schedule row: 'Shopping center' (Retail Commercial), $14,180 per 1,000 sq. ft. Fee is 'due at 100% of Actual Full Cost' — no collection-rate discount. Basis = gross sq ft of each floor measured to outside of exterior walls, excluding structured parking (GFA). City charges up to 3% administrative fee on top. Bonita levies its OWN roads fee; Lee County's roads fee does not apply here.
- Parks Impact Fee (City of Bonita Springs, Commercial)$0.00City of Bonita SpringsCONFIRMED $0. Bonita Springs Code Sec. 2-237 Parks Impact Fee schedule (Ord. 18-07, eff. 8-15-2018) contains ONLY residential rows (single-family, multi-family, mobile home, RV pad, timeshare) plus hotel/motel room. No commercial/office/industrial row exists — nonresidential development pays no city parks impact fee.
- Fire Impact Fee (Bonita Springs Fire District, Commercial)$0.92/sq ftLee County (collected for Bonita Springs Fire Control & Rescue District)Lee County LDC Ch. 2, Art. VII, Div. 5 (Fire Protection & EMS Impact Fee), amended by Lee Ord. 26-01 adopted 2-3-2026. Bonita Springs fire-district column. Rate eff. 5-4-2026; all three retail size tiers (<40,000 / 40,000-150,000 / >150,000 sf) are the same $922.50 per 1,000 sf, so no size Subtype. NEXT STEP-UP 5-4-2027 = $1,025.00 (then $1,127.50 on 5-4-2028, $1,230.00 on 5-4-2029) — re-read then. 3% county admin fee added.
- EMS Impact Fee (Lee County, Commercial)$0.07/sq ftLee County Division of Public SafetyLee County LDC Ch. 2, Art. VII, Div. 5 (EMS), Lee Ord. 26-01 adopted 2-3-2026. EMS is a single countywide schedule (not district-based) — Lee County retains all EMS impact fees. Non-Residential 'Retail' row, eff. 5-4-2026. NEXT STEP-UP 5-4-2027 = $73.50 (then $80.75, $88.00). 3% admin fee added.
- Roads Impact Fee (Lee County — not applicable in Bonita Springs, Commercial)$0.00Lee CountyCONFIRMED $0. Lee County LDC Sec. 2-262: the county roads impact fee 'applies in the unincorporated areas of the County' and only in municipalities with a roads-impact-fee interlocal. Bonita Springs is NOT a participating municipality — it levies its own roads impact fee (Ord. 18-10) and its Community Development fee page lists only city Roads, city Parks, Lee County Fire/EMS and Lee County Schools. Lee County parks impact fees (Divs. 3 & 4) likewise have NO nonresidential rows at all, and Lee County school fees do not apply to nonresidential development.
Where in Lee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bonita Springs: Industrial Impact Fees
Industrial development in Bonita Springs pays $4.35 per square foot in impact fees, plus $19,707.50 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to about $237,270.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater ANC Fee (Bonita Springs Utilities) — 1" meter ($11,147.50 one-time), Water ANC Fee (Bonita Springs Utilities) — 1" meter ($8,560.00 one-time) and Roads Impact Fee (City of Bonita Springs, Industrial) ($4.18/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the full fee schedule
- Water ANC Fee (Bonita Springs Utilities) — 1" meter$8,560.00 one-timeBonita Springs Utilities, Inc. (member-owned nonprofit)BSU Aid-to-New-Construction (ANC) Fee, General Service (commercial/irrigation) meter ladder, tariff eff. 1-1-2026. 1" = 2.5 ERC × $3,424/ERC = $8,560. One ERC = 250 gpd average daily flow. BSU is the water/sewer provider for the City of Bonita Springs.
- Wastewater ANC Fee (Bonita Springs Utilities) — 1" meter$11,147.50 one-timeBonita Springs Utilities, Inc.BSU Aid-to-New-Construction (ANC) Fee, General Service (commercial) meter ladder, tariff eff. 1-1-2026. 1" = 2.5 ERC × $4,459/ERC = $11,147.50. One ERC = 250 gpd average daily flow.
- Roads Impact Fee (City of Bonita Springs, Industrial)$4.18/sq ftCity of Bonita SpringsBonita Springs Code, Roads Impact Fee Schedule (Ord. 18-10, eff. 8-15-2018). Schedule row: 'Industrial park or general industrial', $4,177 per 1,000 sq. ft. 100% of actual full cost. GFA basis. Up to 3% admin fee added.
- Parks Impact Fee (City of Bonita Springs, Industrial)$0.00City of Bonita SpringsCONFIRMED $0. Bonita Springs Code Sec. 2-237 parks schedule (Ord. 18-07) is residential + hotel/motel only; no industrial row.
- Fire Impact Fee (Bonita Springs Fire District, Industrial)$0.16/sq ftLee County (collected for Bonita Springs Fire Control & Rescue District)Lee Ord. 26-01 (2-3-2026), Bonita Springs fire-district column, 'General Industrial' row. Rate eff. 5-4-2026. NEXT STEP-UP 5-4-2027 = $182.50 (then $200.75, $219.00). Separate lower 'Public or Private Warehouse' row = $90.00 (not entered — warehouse is not the default industrial row). 3% admin fee added.
- EMS Impact Fee (Lee County, Industrial)$0.01/sq ftLee County Division of Public SafetyLee Ord. 26-01 (2-3-2026), countywide EMS schedule, Non-Residential 'General Industrial' row, eff. 5-4-2026. Rate holds flat at $10.00 through 5-4-2029. Separate 'Public or Private Warehouse' row = $4.00 (not entered). 3% admin fee added.
- Roads Impact Fee (Lee County — not applicable in Bonita Springs, Industrial)$0.00Lee CountyCONFIRMED $0. Lee County LDC Sec. 2-262 — county roads fee applies only in unincorporated area + participating municipalities. Bonita Springs levies its own (Ord. 18-10). County parks fees have no nonres rows; county school fees exempt nonres.
Where in Lee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bonita Springs: Office Impact Fees
Office development in Bonita Springs pays $9.88 per square foot in impact fees, plus $19,707.50 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 25,000 sq ft building, that comes to about $266,826.25. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater ANC Fee (Bonita Springs Utilities) — 1" meter ($11,147.50 one-time), Water ANC Fee (Bonita Springs Utilities) — 1" meter ($8,560.00 one-time) and Roads Impact Fee (City of Bonita Springs, Office) ($9.41/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the full fee schedule
- Water ANC Fee (Bonita Springs Utilities) — 1" meter$8,560.00 one-timeBonita Springs Utilities, Inc. (member-owned nonprofit)BSU Aid-to-New-Construction (ANC) Fee, General Service (commercial/irrigation) meter ladder, tariff eff. 1-1-2026. 1" = 2.5 ERC × $3,424/ERC = $8,560. One ERC = 250 gpd average daily flow. BSU is the water/sewer provider for the City of Bonita Springs.
- Wastewater ANC Fee (Bonita Springs Utilities) — 1" meter$11,147.50 one-timeBonita Springs Utilities, Inc.BSU Aid-to-New-Construction (ANC) Fee, General Service (commercial) meter ladder, tariff eff. 1-1-2026. 1" = 2.5 ERC × $4,459/ERC = $11,147.50. One ERC = 250 gpd average daily flow.
- Roads Impact Fee (City of Bonita Springs, Office)$9.41/sq ftCity of Bonita SpringsBonita Springs Code, Roads Impact Fee Schedule (Ord. 18-10, eff. 8-15-2018). Schedule row: 'Office, general' (Office/Institutional), $9,406 per 1,000 sq. ft. 100% of actual full cost, no discount. GFA basis. Up to 3% admin fee added.
- Parks Impact Fee (City of Bonita Springs, Office)$0.00City of Bonita SpringsCONFIRMED $0. Bonita Springs Code Sec. 2-237 parks schedule (Ord. 18-07) is residential + hotel/motel only; no office row.
- Fire Impact Fee (Bonita Springs Fire District, Office)$0.45/sq ftLee County (collected for Bonita Springs Fire Control & Rescue District)Lee Ord. 26-01 (2-3-2026), Bonita Springs fire-district column, 'Office' row. Rate eff. 5-4-2026. NEXT STEP-UP 5-4-2027 = $497.50 (then $547.25, $597.00). 3% admin fee added.
- EMS Impact Fee (Lee County, Office)$0.03/sq ftLee County Division of Public SafetyLee Ord. 26-01 (2-3-2026), countywide EMS schedule, Non-Residential 'Office' row, eff. 5-4-2026. NEXT STEP-UP 5-4-2027 = $33.00 (then flat at $33.00). 3% admin fee added.
- Roads Impact Fee (Lee County — not applicable in Bonita Springs, Office)$0.00Lee CountyCONFIRMED $0. Lee County LDC Sec. 2-262 — county roads fee applies only in unincorporated area + participating municipalities. Bonita Springs levies its own (Ord. 18-10). County parks fees have no nonres rows; county school fees exempt nonres.
Where in Lee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Bonita Springs
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Bonita Springs, Florida?
A new single-family home in Bonita Springs pays $31,136.95 per unit in combined impact fees (rates sourced July 14, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
How much are commercial impact fees in Bonita Springs?
Commercial development in Bonita Springs pays $15.17 per square foot in impact fees, plus $19,707.50 in one-time water and sewer connection fees (assuming a 1-inch meter), about $778,145.00 for a 50,000 sq ft building.
Does Bonita Springs charge its own impact fees?
Yes. Bonita Springs levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Bonita Springs, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.