Fort Myers impact fees by project type
Fort Myers: Single-Family Impact Fees
A new single-family home in Fort Myers pays at least $16,086.25 per unit in impact fees (rates sourced July 14, 2026). Of that, Lee County-levied fees account for $9,373.25 and municipal or utility fees for $6,713.00.
The largest line items are Roads Impact Fee (SFR - Lee County, 52.5%) ($5,248.00), Sewer Impact Fee (SFR - Fort Myers city) ($3,435.00) and Water Impact Fee (SFR - Fort Myers city) ($3,278.00).
City Impact Fees (City of Fort Myers) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Impact Fee (SFR - Fort Myers city)$3,278.00Fort MyersCity-owned water system impact fee per Sec. 122-53, eff. 7-1-2024 (Ord. 4013). Fort Myers operates its own water utility (not LCUB).
- Sewer Impact Fee (SFR - Fort Myers city)$3,435.00Fort MyersCity-owned sewer system impact fee per Sec. 122-133, eff. 7-1-2024 (Ord. 4013). Fort Myers operates its own sewer utility (not LCUB).
- City Impact Fees (City of Fort Myers)Requires confirmationCity of Fort MyersPlaceholder — Fort Myers municipal (non-W/S) impact fees not yet researched. City operates its own water/sewer (separate records) and county overlay fees apply. ⚠️ VERIFY whether the city levies additional municipal impact fees (parks/police/fire). Contact City of Fort Myers Community Development (239) 321-7920.
- Roads Impact Fee (SFR - Lee County, 52.5%)$5,248.00Lee CountyLee County base fee $9,996 x 52.5% collection rate = $5,248 for SFR detached.
- School Impact Fee (SFR - Lee County, 52.5%)$2,879.00Lee CountyLee County base fee $5,484 x 52.5% = $2,879 for SFR.
- Parks Impact Fee (SFR - Lee County, 52.5%)$806.00Lee CountyCommunity + Regional Parks combined at 52.5%: $1,535 x 52.5% = $806. (Community $464 + Regional $342.)
- Fire/EMS Impact Fee (SFR - Fort Myers fire district)$440.25Lee CountyCORRECTED 7/13/2026 (was $821 = superseded countywide max). Lee County Ord. 26-01, eff. 5/4/2026: City of Fort Myers fire district SFR/MH Lot = $380.25 + countywide EMS SFR $60.00 = $440.25. Steps: 5/4/2027 $422.50+$65; 5/4/2028 $464.75+$65; 5/4/2029 $507+$65. Source: leegov.com DCD Impact Fee Schedule (Fire table, Fort Myers district; EMS Residential table).
Where in Lee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Fort Myers: Multifamily Impact Fees
A new multifamily unit in Fort Myers pays at least $10,849.00 per unit in impact fees (rates sourced July 14, 2026). Of that, Lee County-levied fees account for $5,076.00 and municipal or utility fees for $5,773.00.
The largest line items are Roads Impact Fee - Mid-Rise (3-10 stories, 52.5% collection rate) ($3,024.00), Sewer Impact Fee (MF - Fort Myers city) ($2,954.00) and Water Impact Fee (MF - Fort Myers city) ($2,819.00).
City Impact Fees (MF - City of Fort Myers) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Impact Fee (MF - Fort Myers city)$2,819.00Fort MyersCity-owned water system impact fee (MF) per Sec. 122-53, eff. 7-1-2024 (Ord. 4013). Fort Myers operates its own water utility (not LCUB).
- Sewer Impact Fee (MF - Fort Myers city)$2,954.00Fort MyersCity-owned sewer system impact fee (MF) per Sec. 122-133, eff. 7-1-2024 (Ord. 4013). Fort Myers operates its own sewer utility (not LCUB).
- City Impact Fees (MF - City of Fort Myers)Requires confirmationPlaceholder — Fort Myers municipal (non-W/S) impact fees not yet researched. City operates its own water/sewer (separate records) and county overlay fees apply. ⚠️ VERIFY whether the city levies additional municipal impact fees (parks/police/fire). Contact City of Fort Myers Community Development (239) 321-7920.
- Roads Impact Fee - Mid-Rise (3-10 stories, 52.5% collection rate)$3,024.00Lee CountyLee County road impact fee for multifamily mid-rise (3-10 stories). Base fee $5,760/unit; collected at 52.5% = $3,024/unit.
- School Impact Fee (52.5% collection rate)$1,115.00Lee CountyLee County school impact fee for multifamily. Base fee $2,123/unit; collected at 52.5% = $1,115/unit.
- Community Parks Impact Fee (52.5% collection rate)$351.00Lee CountyLee County community parks impact fee for multifamily. Base fee $669/unit; collected at 52.5% = $351/unit.
- Fire Impact Fee (MF - Fort Myers fire district)$289.00Lee CountyRE-CONFIRMED 7/13/2026. Lee County Ord. 26-01, eff. 5/4/2026: City of Fort Myers fire district MF = $289.00/dwelling unit (up from $257). Steps: 5/4/2027 $321; 5/4/2028 $353; 5/4/2029 $385. Fort Myers is its own fire impact-fee district with rates far below the countywide districts. Paired with the separate county EMS record ($38). Source: leegov.com DCD Impact Fee Schedule (Fire table, Fort Myers district).
- Regional Parks Impact Fee (52.5% collection rate)$259.00Lee CountyLee County regional parks impact fee for multifamily. Base fee $493/unit; collected at 52.5% = $259/unit.
- EMS Impact Fee (MF - Lee County)$38.00Lee CountyRE-CONFIRMED 7/13/2026. Lee County countywide EMS impact fee, MF = $38.00/dwelling unit. Reduced from $42 by Ord. 26-01 (adopted 2/3/2026); fee REDUCTIONS took effect immediately rather than on 5/4/2026, and $38 holds through 5/4/2029. Source: leegov.com DCD Impact Fee Schedule (EMS Residential table).
Where in Lee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Fort Myers: Commercial Impact Fees
Commercial development in Fort Myers pays $6.50 per square foot in impact fees, plus $16,783.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to about $341,703.00. The calculator below adjusts to your exact square footage.
The largest line items are Sanitary Sewer Connection Impact Fee (City of Fort Myers) — 1" meter ($8,588.00 one-time), Water Connection Impact Fee (City of Fort Myers) — 1" meter ($8,195.00 one-time) and Roads Impact Fee (City of Fort Myers — Lee County schedule, Commercial) ($6.02/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the full fee schedule
- Water Connection Impact Fee (City of Fort Myers) — 1" meter$8,195.00 one-timeCity of Fort Myers Public Works / UtilitiesCity of Fort Myers Impact Fee Schedule eff. 5-4-2026 to 5-3-2027, 'Water and Sewer Impact Fees', COMMERCIAL / INDUSTRIAL CLASS (Impact fee by Meter Size), Water Connection. 1" = $8,195 (= 2.5 × the 5/8-3/4" base of $3,278). Plus 3% admin ($188.49) and a $225 meter installation fee; total $8,608.49 + install. Meter capacity 40 gpm.
- Sanitary Sewer Connection Impact Fee (City of Fort Myers) — 1" meter$8,588.00 one-timeCity of Fort Myers Public Works / UtilitiesCity of Fort Myers Impact Fee Schedule eff. 5-4-2026 to 5-3-2027, 'Water and Sewer Impact Fees', COMMERCIAL / INDUSTRIAL CLASS, Sanitary Sewer Connection by meter size. 1" = $8,588 (2.5 × the 5/8-3/4" base of $3,435). Plus 3% admin ($197.52); total $8,785.52.
- City Impact Fees (City of Fort Myers, Commercial)$0.00City of Fort MyersCONFIRMED $0. The City of Fort Myers levies no municipal (non-utility) nonresidential impact fee of its own. Its published Impact Fee Schedule (eff. 5-4-2026 to 5-3-2027) contains exactly seven programs — Road, Fire, EMS, School, Regional Park, Community Park and Water & Sewer — and every one of the first six is the Lee County fee, administered through the city's LDC Ch. 122, Art. IX Impact Fee Program at Lee County's rates. The Regional Park and Community Park schedules are residential-only (single-family, multi-family, mobile home, timeshare) with no nonres rows, and school fees do not apply to nonres. The city's own one-time charges are the Water and Sewer connection impact fees, which are recorded in the Water/Sewer table.
- Roads Impact Fee (City of Fort Myers — Lee County schedule, Commercial)$6.02/sq ftLee County (collected by the City of Fort Myers under interlocal)City of Fort Myers published Impact Fee Schedule effective 5-4-2026 through 5-3-2027, 'Road Impact Fees' page, row 'Shopping Center / General Retail'. Fort Myers is a PARTICIPATING MUNICIPALITY under Lee County LDC Sec. 2-262 — it collects the Lee County road impact fee at the county's 52.5% collection rate (base $11,476 × 52.5% = $6,024.90) and retains the proceeds for use within the city. Plus 3% admin fee ($180.75); total $6,205.65. City schedule notes rates change with Lee County code/ordinance changes.
- Fire Impact Fee (Fort Myers Fire District, Commercial)$0.41/sq ftLee County / City of Fort Myers Fire DepartmentCity of Fort Myers Impact Fee Schedule eff. 5-4-2026 to 5-3-2027, 'Fire Impact Fees', 'Retail' row. Matches Lee County Ord. 26-01 (2-3-2026) Fort Myers fire-district column exactly. The Fort Myers district rate is roughly half the standard Lee district rate. NEXT STEP-UP 5-4-2027 = $452.50 (then $497.75, $543.00). Plus 3% admin ($12.22); total $419.47.
- EMS Impact Fee (Lee County, Commercial)$0.07/sq ftLee County Division of Public SafetyCity of Fort Myers Impact Fee Schedule eff. 5-4-2026 to 5-3-2027, 'EMS Impact Fees', 'Retail' row — matches the Lee County countywide EMS schedule (Ord. 26-01). NEXT STEP-UP 5-4-2027 = $73.50. Plus 3% admin ($1.99).
Where in Lee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Fort Myers: Industrial Impact Fees
Industrial development in Fort Myers pays $1.86 per square foot in impact fees, plus $16,783.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to about $109,608.00. The calculator below adjusts to your exact square footage.
The largest line items are Sanitary Sewer Connection Impact Fee (City of Fort Myers) — 1" meter ($8,588.00 one-time), Water Connection Impact Fee (City of Fort Myers) — 1" meter ($8,195.00 one-time) and Roads Impact Fee (City of Fort Myers — Lee County schedule, Industrial) ($1.77/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the full fee schedule
- Water Connection Impact Fee (City of Fort Myers) — 1" meter$8,195.00 one-timeCity of Fort Myers Public Works / UtilitiesCity of Fort Myers Impact Fee Schedule eff. 5-4-2026 to 5-3-2027, 'Water and Sewer Impact Fees', COMMERCIAL / INDUSTRIAL CLASS (Impact fee by Meter Size), Water Connection. 1" = $8,195 (= 2.5 × the 5/8-3/4" base of $3,278). Plus 3% admin ($188.49) and a $225 meter installation fee; total $8,608.49 + install. Meter capacity 40 gpm.
- Sanitary Sewer Connection Impact Fee (City of Fort Myers) — 1" meter$8,588.00 one-timeCity of Fort Myers Public Works / UtilitiesCity of Fort Myers Impact Fee Schedule eff. 5-4-2026 to 5-3-2027, 'Water and Sewer Impact Fees', COMMERCIAL / INDUSTRIAL CLASS, Sanitary Sewer Connection by meter size. 1" = $8,588 (2.5 × the 5/8-3/4" base of $3,435). Plus 3% admin ($197.52); total $8,785.52.
- City Impact Fees (City of Fort Myers, Industrial)$0.00City of Fort MyersCONFIRMED $0. No municipal nonresidential impact fee. The city's impact fee program (LDC Ch. 122, Art. IX) administers the Lee County Road/Fire/EMS/School/Park fees; its only city-levied one-time charges are the Water and Sewer connection impact fees (see Water/Sewer table).
- Roads Impact Fee (City of Fort Myers — Lee County schedule, Industrial)$1.77/sq ftLee County (collected by the City of Fort Myers under interlocal)City of Fort Myers Impact Fee Schedule eff. 5-4-2026 to 5-3-2027, 'Road Impact Fees', row 'Industrial Park or General Industrial'. Lee County base $3,380 × 52.5% = $1,774.50. Plus 3% admin ($53.24); total $1,827.74. Separate Warehouse rows are lower (not entered).
- Fire Impact Fee (Fort Myers Fire District, Industrial)$0.07/sq ftLee County / City of Fort Myers Fire DepartmentCity of Fort Myers Impact Fee Schedule eff. 5-4-2026, 'Fire Impact Fees', 'General Industrial' row (Lee Ord. 26-01, Fort Myers district). NEXT STEP-UP 5-4-2027 = $80.00 (then $88.00, $96.00). Separate 'Industrial Warehouse' row = $41.50 (not entered). Plus 3% admin ($2.16).
- EMS Impact Fee (Lee County, Industrial)$0.01/sq ftLee County Division of Public SafetyCity of Fort Myers Impact Fee Schedule eff. 5-4-2026, 'EMS Impact Fees', 'General Industrial' row (Lee Ord. 26-01 countywide); flat at $10.00 through 2029. Separate 'Industrial Warehouse' row = $4.00 (not entered). Plus 3% admin ($0.30).
Where in Lee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Fort Myers: Office Impact Fees
Office development in Fort Myers pays $4.23 per square foot in impact fees, plus $16,783.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 25,000 sq ft building, that comes to about $122,441.75. The calculator below adjusts to your exact square footage.
The largest line items are Sanitary Sewer Connection Impact Fee (City of Fort Myers) — 1" meter ($8,588.00 one-time), Water Connection Impact Fee (City of Fort Myers) — 1" meter ($8,195.00 one-time) and Roads Impact Fee (City of Fort Myers — Lee County schedule, Office) ($4.00/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the full fee schedule
- Water Connection Impact Fee (City of Fort Myers) — 1" meter$8,195.00 one-timeCity of Fort Myers Public Works / UtilitiesCity of Fort Myers Impact Fee Schedule eff. 5-4-2026 to 5-3-2027, 'Water and Sewer Impact Fees', COMMERCIAL / INDUSTRIAL CLASS (Impact fee by Meter Size), Water Connection. 1" = $8,195 (= 2.5 × the 5/8-3/4" base of $3,278). Plus 3% admin ($188.49) and a $225 meter installation fee; total $8,608.49 + install. Meter capacity 40 gpm.
- Sanitary Sewer Connection Impact Fee (City of Fort Myers) — 1" meter$8,588.00 one-timeCity of Fort Myers Public Works / UtilitiesCity of Fort Myers Impact Fee Schedule eff. 5-4-2026 to 5-3-2027, 'Water and Sewer Impact Fees', COMMERCIAL / INDUSTRIAL CLASS, Sanitary Sewer Connection by meter size. 1" = $8,588 (2.5 × the 5/8-3/4" base of $3,435). Plus 3% admin ($197.52); total $8,785.52.
- City Impact Fees (City of Fort Myers, Office)$0.00City of Fort MyersCONFIRMED $0. No municipal nonresidential impact fee. The city's impact fee program (LDC Ch. 122, Art. IX) administers the Lee County Road/Fire/EMS/School/Park fees; its only city-levied one-time charges are the Water and Sewer connection impact fees (see Water/Sewer table).
- Roads Impact Fee (City of Fort Myers — Lee County schedule, Office)$4.00/sq ftLee County (collected by the City of Fort Myers under interlocal)City of Fort Myers Impact Fee Schedule eff. 5-4-2026 to 5-3-2027, 'Road Impact Fees', row 'Office' (Office/Institutional). Lee County base $7,614 × 52.5% collection rate = $3,997.35. Plus 3% admin ($119.92); total $4,117.27.
- Fire Impact Fee (Fort Myers Fire District, Office)$0.20/sq ftLee County / City of Fort Myers Fire DepartmentCity of Fort Myers Impact Fee Schedule eff. 5-4-2026, 'Fire Impact Fees', 'Office' row (Lee Ord. 26-01, Fort Myers district). NEXT STEP-UP 5-4-2027 = $220.00 (then $242.00, $264.00). Plus 3% admin ($5.94).
- EMS Impact Fee (Lee County, Office)$0.03/sq ftLee County Division of Public SafetyCity of Fort Myers Impact Fee Schedule eff. 5-4-2026, 'EMS Impact Fees', 'Office' row (Lee Ord. 26-01 countywide). NEXT STEP-UP 5-4-2027 = $33.00. Plus 3% admin ($0.93).
Where in Lee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Fort Myers
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Fort Myers, Florida?
A new single-family home in Fort Myers pays at least $16,086.25 per unit in combined impact fees (rates sourced July 14, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Fort Myers?
Commercial development in Fort Myers pays $6.50 per square foot in impact fees, plus $16,783.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $341,703.00 for a 50,000 sq ft building.
Does Fort Myers charge its own impact fees?
Yes. Fort Myers levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Fort Myers, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Lee County impact fees page.