Indiantown impact fees by project type
Indiantown: Single-Family Impact Fees
A new single-family home in Indiantown pays $18,060.39 per unit in impact fees (rates sourced July 14, 2026). Of that, Martin County-levied fees account for $13,770.39 and municipal or utility fees for $4,290.00.
The largest line items are Water Capital Connection Fee (Indiantown Utility) ($2,790.00) and Sewer Capital Connection Fee (Indiantown Utility) ($1,500.00).
School Impact Fee (Martin County School District - Indiantown) and County Impact Fee (Martin County - Indiantown) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Capital Connection Fee (Indiantown Utility)$2,790.00Village of Indiantown Water & WastewaterFY 2025-2026 rate. Per ERC (250 gpd ADF for water). SFR = 1.0 ERC = $2,790. Source: Indiantown FY 2025-2026 Water and Wastewater Rate Schedule, Exhibit 'A' — Capital Connection Fees (https://www.indiantownfl.gov/media/9571)
- Sewer Capital Connection Fee (Indiantown Utility)$1,500.00Village of Indiantown Water & WastewaterFY 2025-2026 rate. Per ERC (250 gpd MTMADF for wastewater). SFR = 1.0 ERC = $1,500. Source: Indiantown FY 2025-2026 Water and Wastewater Rate Schedule, Exhibit 'A' — Capital Connection Fees (https://www.indiantownfl.gov/media/9571)
- City Impact Fee (Village of Indiantown)$0.00Village of IndiantownVillage of Indiantown has no independent city impact fees. Master Fee Schedule (effective April 8, 2021, Res. No. 017-2021) explicitly defers to Martin County: 'Martin County Impact Fees (if required) — Contact the Martin County Growth Management Department (772) 288-5495.' See County and Water/Sewer records below.
- County Impact Fee (Martin County - Indiantown)$8,203.00Requires confirmationMartin County Board of County CommissionersAmount CONFIRMED against the adopted schedule (re-verified 7/12/2026): Martin County LDR Art. 6 Exhibit B, Figure 6.1, Table 1, eff. 1/1/2026 — Single Family 1,101-2,300 sq ft = $8,203/du. Phase-in: 1/1/2027 $8,654; 1/1/2028 $9,103. Applicability basis: the Village of Indiantown Master Fee Schedule (Res. 017-2021) expressly defers to Martin County ('Martin County Impact Fees (if required) — Contact the Martin County Growth Management Department'). UNCONFIRMED: written confirmation that county LDR fees are collected within Indiantown's incorporated limits (incorporated 2018) — Growth Management (772) 288-5495.
- School Impact Fee (Martin County School District - Indiantown)$5,567.39Requires confirmationMartin County School DistrictSchool impact fees are set by the school district and normally apply countywide including incorporated municipalities. Re-verified 7/12/2026: the only posted schedule remains 'School Impact Fee Schedule, Effective October 1, 2008' — 1,101-2,300 sf tier = $5,567.39 (entered). UNCONFIRMED: currency of the 2008 rate and its collection inside Indiantown. Contact: Martin County School Board (772) 219-1200 x30272.
Where in Martin County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Indiantown: Multifamily Impact Fees
A new multifamily unit in Indiantown pays at least $10,664.08 per unit in impact fees (rates sourced July 14, 2026). All of it is levied by Martin County.
County Impact Fee (Martin County - Indiantown, MF) and School Impact Fee (Martin County School District - Indiantown, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Water Capital Connection Fee (Indiantown Utility, MF) and Sewer Capital Connection Fee (Indiantown Utility, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Capital Connection Fee (Indiantown Utility, MF)Requires confirmationVillage of Indiantown Water & Wastewater$0 — amount not derivable. SFR water capital connection fee is $2,790/ERC (250 gpd ADF), FY 2025-2026 Water and Wastewater Rate Schedule, Exhibit 'A'. UNCONFIRMED: Indiantown publishes no MF ERC-equivalency factor, so the per-unit MF fee cannot be computed from the posted schedule (unlike Martin County Utilities and SMRU, which both publish explicit MF per-unit rates). Obtain the MF ERC factor from Village of Indiantown Water & Wastewater (772) 597-2121.
- Sewer Capital Connection Fee (Indiantown Utility, MF)Requires confirmationVillage of Indiantown Water & Wastewater$0 — amount not derivable. SFR sewer capital connection fee is $1,500/ERC (250 gpd MTMADF), FY 2025-2026 Rate Schedule, Exhibit 'A'. UNCONFIRMED: no MF ERC-equivalency factor is published, so the per-unit MF fee cannot be computed. Village of Indiantown Water & Wastewater (772) 597-2121.
- City Impact Fee (Village of Indiantown, MF)$0.00Village of IndiantownVillage of Indiantown has no independent city impact fees for any residential type. Master Fee Schedule (2021) defers to Martin County for impact fees.
- School Impact Fee (Martin County School District - Indiantown, MF)$5,355.08Requires confirmationMartin County School DistrictPriced off $0 on 7/12/2026. The posted 2008 school impact fee schedule brackets by DWELLING UNIT SIZE, not housing type, so MF units fall on the same table. Canonical MF unit (2BR/2BA, 1,000 sq ft) = 801-1,100 sq ft tier = $5,355.08. UNCONFIRMED: currency of the 2008 rate; that MF is assessed off this size table; and collection inside Indiantown. Martin County School Board (772) 219-1200 x30272.
- County Impact Fee (Martin County - Indiantown, MF)$5,309.00Requires confirmationMartin County Board of County CommissionersAmount CONFIRMED against the adopted schedule (re-verified 7/12/2026): LDR Art. 6 Exhibit B, Figure 6.1, Table 1, eff. 1/1/2026 — ITE LUC 220/221 Multi-Family = $5,309/du (flat, all MF types). Phase-in: 1/1/2027 $5,658; 1/1/2028 $6,004. Applicability basis: the Village of Indiantown Master Fee Schedule (Res. 017-2021) expressly defers to Martin County for impact fees. UNCONFIRMED: written confirmation that county LDR fees are collected within Indiantown's incorporated limits — Growth Management (772) 288-5495.
Where in Martin County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Indiantown: Commercial Impact Fees
Commercial development in Indiantown pays $8.02 per square foot in impact fees, plus $4,290.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to about $405,490.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Capital Connection Fee (Village of Indiantown Utility) — 1 ERC ($2,790.00 one-time) and Sewer Capital Connection Fee (Village of Indiantown Utility) — 1 ERC ($1,500.00 one-time).
County Impact Fee (Martin County - Indiantown, Commercial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full fee schedule
- Water Capital Connection Fee (Village of Indiantown Utility) — 1 ERC$2,790.00 one-timeVillage of Indiantown Water & WastewaterVillage of Indiantown Utility, FY 2025-2026 Water and Wastewater Rate Schedule (eff. 10/1/2025), Exhibit 'A' — Water and Wastewater Capital Connection Fees (per ERC): Water = $2,790 per ERC. NONRES ERC BASIS CONFIRMED ON AUDIT 2026-07-14: Exhibit 'A' publishes the basis on its face — 'ERC Water (ADF) 250 gpd.' Nonres ERC count = average daily flow / 250 gpd; the published 1-ERC charge is entered as the default. No meter-size ladder exists for the capital connection fee (the monthly base facility charges ARE meter-tiered, but those are recurring, not capital). Physical connection charges (meter and line) are separate and quoted at cost + 10%. Village Master Fee Schedule (Res. 017-2021) confirms the Village levies no municipal impact fee and defers to Martin County. RE-READ AFTER 10/1/2026 — schedule is adopted on a fiscal-year basis. Resolves the prior 'multiplier unconfirmed' flag.
- Sewer Capital Connection Fee (Village of Indiantown Utility) — 1 ERC$1,500.00 one-timeVillage of Indiantown Water & WastewaterVillage of Indiantown Utility, FY 2025-2026 Water and Wastewater Rate Schedule (eff. 10/1/2025), Exhibit 'A' — Water and Wastewater Capital Connection Fees (per ERC): Wastewater = $1,500 per ERC. NONRES ERC BASIS CONFIRMED ON AUDIT 2026-07-14: Exhibit 'A' publishes the basis on its face — 'ERC Wastewater (MTMADF) 250 gpd' (max-month average daily flow). Nonres ERC count = flow / 250 gpd; the published 1-ERC charge is entered as the default. No meter-size ladder exists for the capital connection fee (the monthly general-service base facility charges ARE meter-tiered, but those are recurring, not capital). RE-READ AFTER 10/1/2026 — schedule is adopted on a fiscal-year basis. Resolves the prior 'multiplier unconfirmed' flag.
- City Impact Fee (Village of Indiantown, Commercial)$0.00Village of Indiantown$0 CONFIRMED — the Village of Indiantown levies no municipal impact fee of any kind. Its Master Fee Schedule (Res. No. 017-2021, eff. April 8, 2021) expressly defers to the county: 'Martin County Impact Fees (if required) — Contact the Martin County Growth Management Department (772) 288-5495.' The Village (incorporated 2018) carries only permit/review fees. Nonres development impact is captured on the County records; W/S capital connection fees are levied by the Village utility (see W/S table).
- County Impact Fee (Martin County - Indiantown, Commercial)$8.02/sq ftRequires confirmationMartin County Board of County CommissionersRate = Martin County LDR Art. 6 Exhibit B, Fig. 6.1, Table 7, eff. 1/1/2026: ITE 821 Retail/Shopping Center (40,000-150,000 sfgla) = $8,024 per 1,000 sfgla (GLA basis). Phase-in: 1/1/2027 $8,826; 1/1/2028 $9,626. APPLICABILITY: LDR §6.3 applies Art. 6 to the unincorporated area AND to incorporated areas 'to the extent permitted by art. VIII, §1(f), Fla. Const.' (Martin is a non-charter county — county ordinances are effective inside municipalities except to the extent a municipal ordinance conflicts). Indiantown levies NO municipal impact fee and its Master Fee Schedule (Res. 017-2021) expressly defers to the county, so no conflict exists and the county fee applies. UNCONFIRMED: written confirmation from Martin County Growth Management (772) 288-5495 that county fees are collected inside Indiantown's limits (incorporated 2018).
Where in Martin County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Indiantown: Industrial Impact Fees
Industrial development in Indiantown pays $2.70 per square foot in impact fees, plus $4,290.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to about $139,190.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Capital Connection Fee (Village of Indiantown Utility) — 1 ERC ($2,790.00 one-time) and Sewer Capital Connection Fee (Village of Indiantown Utility) — 1 ERC ($1,500.00 one-time).
County Impact Fee (Martin County - Indiantown, Industrial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full fee schedule
- Water Capital Connection Fee (Village of Indiantown Utility) — 1 ERC$2,790.00 one-timeVillage of Indiantown Water & WastewaterVillage of Indiantown Utility, FY 2025-2026 Water and Wastewater Rate Schedule (eff. 10/1/2025), Exhibit 'A' — Water and Wastewater Capital Connection Fees (per ERC): Water = $2,790 per ERC. NONRES ERC BASIS CONFIRMED ON AUDIT 2026-07-14: Exhibit 'A' publishes the basis on its face — 'ERC Water (ADF) 250 gpd.' Nonres ERC count = average daily flow / 250 gpd; the published 1-ERC charge is entered as the default. No meter-size ladder exists for the capital connection fee (the monthly base facility charges ARE meter-tiered, but those are recurring, not capital). Physical connection charges (meter and line) are separate and quoted at cost + 10%. Village Master Fee Schedule (Res. 017-2021) confirms the Village levies no municipal impact fee and defers to Martin County. RE-READ AFTER 10/1/2026 — schedule is adopted on a fiscal-year basis. Resolves the prior 'multiplier unconfirmed' flag.
- Sewer Capital Connection Fee (Village of Indiantown Utility) — 1 ERC$1,500.00 one-timeVillage of Indiantown Water & WastewaterVillage of Indiantown Utility, FY 2025-2026 Water and Wastewater Rate Schedule (eff. 10/1/2025), Exhibit 'A' — Water and Wastewater Capital Connection Fees (per ERC): Wastewater = $1,500 per ERC. NONRES ERC BASIS CONFIRMED ON AUDIT 2026-07-14: Exhibit 'A' publishes the basis on its face — 'ERC Wastewater (MTMADF) 250 gpd' (max-month average daily flow). Nonres ERC count = flow / 250 gpd; the published 1-ERC charge is entered as the default. No meter-size ladder exists for the capital connection fee (the monthly general-service base facility charges ARE meter-tiered, but those are recurring, not capital). RE-READ AFTER 10/1/2026 — schedule is adopted on a fiscal-year basis. Resolves the prior 'multiplier unconfirmed' flag.
- City Impact Fee (Village of Indiantown, Industrial)$0.00Village of Indiantown$0 CONFIRMED — the Village of Indiantown levies no municipal impact fee. Master Fee Schedule (Res. No. 017-2021, eff. 4/8/2021) expressly defers to Martin County for impact fees. Only permit/review fees are charged. See County records and the W/S table.
- County Impact Fee (Martin County - Indiantown, Industrial)$2.70/sq ftRequires confirmationMartin County Board of County CommissionersRate = Martin County LDR Art. 6 Exhibit B, Fig. 6.1, Table 9, eff. 1/1/2026: ITE 110 General Industrial = $2,698 per 1,000 sf. Phase-in: 1/1/2027 $2,926; 1/1/2028 $3,158. APPLICABILITY: LDR §6.3 reaches incorporated areas to the extent permitted by art. VIII, §1(f), Fla. Const. Indiantown levies no municipal impact fee and expressly defers to Martin County (Res. 017-2021) — no conflict, county fee applies. UNCONFIRMED: written confirmation of in-city collection — Growth Management (772) 288-5495.
Where in Martin County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Indiantown: Office Impact Fees
Office development in Indiantown pays $3.52 per square foot in impact fees, plus $4,290.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 25,000 sq ft building, that comes to about $92,165.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Capital Connection Fee (Village of Indiantown Utility) — 1 ERC ($2,790.00 one-time) and Sewer Capital Connection Fee (Village of Indiantown Utility) — 1 ERC ($1,500.00 one-time).
County Impact Fee (Martin County - Indiantown, Office) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full fee schedule
- Water Capital Connection Fee (Village of Indiantown Utility) — 1 ERC$2,790.00 one-timeVillage of Indiantown Water & WastewaterVillage of Indiantown Utility, FY 2025-2026 Water and Wastewater Rate Schedule (eff. 10/1/2025), Exhibit 'A' — Water and Wastewater Capital Connection Fees (per ERC): Water = $2,790 per ERC. NONRES ERC BASIS CONFIRMED ON AUDIT 2026-07-14: Exhibit 'A' publishes the basis on its face — 'ERC Water (ADF) 250 gpd.' Nonres ERC count = average daily flow / 250 gpd; the published 1-ERC charge is entered as the default. No meter-size ladder exists for the capital connection fee (the monthly base facility charges ARE meter-tiered, but those are recurring, not capital). Physical connection charges (meter and line) are separate and quoted at cost + 10%. Village Master Fee Schedule (Res. 017-2021) confirms the Village levies no municipal impact fee and defers to Martin County. RE-READ AFTER 10/1/2026 — schedule is adopted on a fiscal-year basis. Resolves the prior 'multiplier unconfirmed' flag.
- Sewer Capital Connection Fee (Village of Indiantown Utility) — 1 ERC$1,500.00 one-timeVillage of Indiantown Water & WastewaterVillage of Indiantown Utility, FY 2025-2026 Water and Wastewater Rate Schedule (eff. 10/1/2025), Exhibit 'A' — Water and Wastewater Capital Connection Fees (per ERC): Wastewater = $1,500 per ERC. NONRES ERC BASIS CONFIRMED ON AUDIT 2026-07-14: Exhibit 'A' publishes the basis on its face — 'ERC Wastewater (MTMADF) 250 gpd' (max-month average daily flow). Nonres ERC count = flow / 250 gpd; the published 1-ERC charge is entered as the default. No meter-size ladder exists for the capital connection fee (the monthly general-service base facility charges ARE meter-tiered, but those are recurring, not capital). RE-READ AFTER 10/1/2026 — schedule is adopted on a fiscal-year basis. Resolves the prior 'multiplier unconfirmed' flag.
- City Impact Fee (Village of Indiantown, Office)$0.00Village of Indiantown$0 CONFIRMED — the Village of Indiantown levies no municipal impact fee. Master Fee Schedule (Res. No. 017-2021, eff. 4/8/2021) expressly defers to Martin County for impact fees. Only permit/review fees are charged. See County records for the applicable impact fee and the W/S table for the Village utility's capital connection fees.
- County Impact Fee (Martin County - Indiantown, Office)$3.52/sq ftRequires confirmationMartin County Board of County CommissionersRate = Martin County LDR Art. 6 Exhibit B, Fig. 6.1, Table 6, eff. 1/1/2026: ITE 710 Office = $3,515 per 1,000 sf. Phase-in: 1/1/2027 $3,832; 1/1/2028 $4,148. APPLICABILITY: LDR §6.3 reaches incorporated areas to the extent permitted by art. VIII, §1(f), Fla. Const. Indiantown levies no municipal impact fee and its Master Fee Schedule (Res. 017-2021) expressly defers to Martin County — no conflict, county fee applies. UNCONFIRMED: written confirmation of in-city collection — Growth Management (772) 288-5495.
Where in Martin County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Indiantown
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Indiantown, Florida?
A new single-family home in Indiantown pays $18,060.39 per unit in combined impact fees (rates sourced July 14, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
How much are commercial impact fees in Indiantown?
Commercial development in Indiantown pays $8.02 per square foot in impact fees, plus $4,290.00 in one-time water and sewer connection fees, about $405,490.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Indiantown charge its own impact fees?
Yes. Indiantown levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Indiantown, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Martin County impact fees page.