Ocean Breeze impact fees by project type
Ocean Breeze: Single-Family Impact Fees
A new single-family home in Ocean Breeze pays at least $3,810.00 per unit in impact fees (rates sourced July 14, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Capital Facility Charge (Martin County Utilities - Ocean Breeze) ($2,100.00) and Water Capital Facility Charge (Martin County Utilities - Ocean Breeze) ($1,710.00).
County Impact Fee (Martin County - Ocean Breeze) is set by the county and has no published standard rate. City Impact Fee (Town of Ocean Breeze) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Capital Facility Charge (Martin County Utilities - Ocean Breeze)$1,710.00Unknown — Ocean BreezeCONFIRMED 7/12/2026 — priced off a $0 placeholder. Provider resolved: Martin County Utilities is the water provider for Ocean Breeze (MCU's official department page states it 'provides service to unincorporated Martin County, the Town of Sewall's Point, and Ocean Breeze'). Rate = MCU Table 12 Capital Facility and Distribution Line Charges, eff. June 1, 2025: Single Family per ERC = $1,710. SFR = 1.0 ERC. MCU customer service (772) 221-1434.
- Sewer Capital Facility Charge (Martin County Utilities - Ocean Breeze)$2,100.00Unknown — Ocean BreezeCONFIRMED 7/12/2026 — priced off a $0 placeholder. Provider resolved: Martin County Utilities provides wastewater service to Ocean Breeze (MCU department page). Rate = MCU Table 12, eff. June 1, 2025: Single Family per ERC = $2,100. SFR = 1.0 ERC. MCU (772) 221-1434.
- City Impact Fee (Town of Ocean Breeze)Requires confirmationTown of Ocean Breeze$0 — the Town posts only Residential and Commercial building-permit fee schedules on its Building & Permitting page; no development impact fee schedule is published. The residential permit-fee PDF is image-only (no text layer). UNCONFIRMED: confirm the Town levies no city impact fee. Pam Orr, Town Clerk (772) 334-6826 / permits@townofoceanbreeze.org.
- County Impact Fee (Martin County - Ocean Breeze)Requires confirmationMartin County Board of County Commissioners$0 pending confirmation. Martin County's impact fee schedule is adopted as Exhibit B / Figure 6.1 of the county LDR (Article 6), which governs UNINCORPORATED Martin County; the county uses interlocal agreements with municipalities for some services. Whether the county fee is collected inside Ocean Breeze is unconfirmed — note that Indiantown's own fee schedule expressly defers to Martin County, so municipal collection does occur in at least one municipality. Verify with Martin County Growth Management (772) 288-5495.
Where in Martin County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Ocean Breeze: Multifamily Impact Fees
A new multifamily unit in Ocean Breeze pays at least $1,905.00 per unit in impact fees (rates sourced July 14, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Capital Facility Charge (Martin County Utilities - Ocean Breeze, MF) ($1,050.00) and Water Capital Facility Charge (Martin County Utilities - Ocean Breeze, MF) ($855.00).
County Impact Fee (Martin County - Ocean Breeze, MF) is set by the county and has no published standard rate. City Impact Fee (Town of Ocean Breeze, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Capital Facility Charge (Martin County Utilities - Ocean Breeze, MF)$855.00Unknown — Ocean BreezeCONFIRMED 7/12/2026 — priced off a $0 placeholder. Provider resolved: Martin County Utilities serves Ocean Breeze (MCU department page). MCU Table 12, eff. June 1, 2025: Multi-Family (one meter/two units, and master meter 3+ units in one building) = $855.00 PER UNIT. Per-unit basis is published in the schedule. MCU (772) 221-1434.
- Sewer Capital Facility Charge (Martin County Utilities - Ocean Breeze, MF)$1,050.00Unknown — Ocean BreezeCONFIRMED 7/12/2026 — priced off a $0 placeholder. Provider resolved: Martin County Utilities serves Ocean Breeze. MCU Table 12, eff. June 1, 2025: Multi-Family = $1,050.00 PER UNIT (both one-meter/two-unit and master-meter 3+ configurations). MCU (772) 221-1434.
- City Impact Fee (Town of Ocean Breeze, MF)Requires confirmationTown of Ocean Breeze$0 — the Town publishes only building-permit fee schedules (residential + commercial); no development impact fee schedule of any kind. UNCONFIRMED: confirm no city impact fee applies to multifamily. Pam Orr, Town Clerk (772) 334-6826.
- County Impact Fee (Martin County - Ocean Breeze, MF)Requires confirmationMartin County Board of County Commissioners$0 pending confirmation. If the county MF fee is collected inside Ocean Breeze it would be $5,309/du (Figure 6.1 Table 1, LUC 220/221, eff. 1/1/2026). The county schedule is adopted under LDR Art. 6, which governs UNINCORPORATED Martin County; municipal collection is unconfirmed. Martin County Growth Management (772) 288-5495.
Where in Martin County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Ocean Breeze: Commercial Impact Fees
Commercial development in Ocean Breeze pays $8.02 per square foot in impact fees, plus $3,810.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to at least $405,010.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Capital Facility Charge (Martin County Utilities - Ocean Breeze) — 1 ERC ($2,100.00 one-time) and Water Capital Facility Charge (Martin County Utilities - Ocean Breeze) — 1 ERC ($1,710.00 one-time).
County Impact Fee (Martin County - Ocean Breeze, Commercial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
City Impact Fee (Town of Ocean Breeze, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Capital Facility Charge (Martin County Utilities - Ocean Breeze) — 1 ERC$1,710.00 one-timeMartin County Utilities and Solid WasteProvider for Ocean Breeze = Martin County Utilities. MCU rate schedule, eff. 6/1/2025, Table 12: 'Single Family & Commercial per ERC' = $1,710.00 water. NONRES ERC BASIS CONFIRMED ON AUDIT 2026-07-14: Martin County LDR Sec. 4.181 — 'For nonresidential use ... one equivalent residential connection shall equal 250 gallons per day.' Nonres ERC count = average daily flow / 250 gpd; the published 1-ERC charge is entered as the default. No meter-size ladder exists for the CFC (meter/lateral charges are separate, Table 10). Shared $/ERC across customer classes — shared-ladder precedent, not residential contamination. Resolves the prior 'multiplier unconfirmed' flag.
- Sewer Capital Facility Charge (Martin County Utilities - Ocean Breeze) — 1 ERC$2,100.00 one-timeMartin County Utilities and Solid WasteProvider for Ocean Breeze = Martin County Utilities. MCU rate schedule, eff. 6/1/2025, Table 12: 'Single Family & Commercial per ERC' = $2,100.00 sewer. NONRES ERC BASIS CONFIRMED ON AUDIT 2026-07-14: Martin County LDR Sec. 4.262 — 'For nonresidential units, one equivalent residential connection shall equal 250 gallons per day (250 gpd).' Nonres ERC count = average daily flow / 250 gpd; the published 1-ERC charge is entered as the default. No meter-size ladder exists for the sewer CFC. Shared $/ERC across customer classes — shared-ladder precedent, not residential contamination. Resolves the prior 'multiplier unconfirmed' flag.
- City Impact Fee (Town of Ocean Breeze, Commercial)Requires confirmationTown of Ocean Breeze$0 pending confirmation. The Town of Ocean Breeze is on NO codifier (no Municode/eCode/American Legal presence) and publishes no ordinance index. Its Building & Permitting page posts only Residential and Commercial BUILDING-PERMIT fee schedules — no development impact fee schedule appears anywhere, and the posted permit-fee PDFs are image-only. No impact-fee ordinance was found, but the $0 cannot be proved from a published source. UNCONFIRMED: confirm the Town levies no municipal impact fee. Pam Orr, Town Clerk (772) 334-6826 / permits@townofoceanbreeze.org.
- County Impact Fee (Martin County - Ocean Breeze, Commercial)$8.02/sq ftRequires confirmationMartin County Board of County CommissionersRate = Martin County LDR Art. 6 Exhibit B, Fig. 6.1, Table 7, eff. 1/1/2026: ITE 821 Retail/Shopping Center (40,000-150,000 sfgla) = $8,024 per 1,000 sfgla (GLA basis). Phase-in: 1/1/2027 $8,826; 1/1/2028 $9,626. APPLICABILITY: LDR §6.3 applies Art. 6 to the unincorporated area AND to incorporated areas 'to the extent permitted by art. VIII, §1(f), Fla. Const.' — under §1(f) (non-charter county) county ordinances reach municipalities except to the extent of conflict. Ocean Breeze is on no codifier and posts only building-permit fee schedules; NO municipal impact-fee ordinance was found, so no conflict is apparent and the county fee should apply. UNCONFIRMED on both counts (no municipal impact fee + county collection in-town): Pam Orr, Town Clerk (772) 334-6826 / permits@townofoceanbreeze.org; Martin County Growth Management (772) 288-5495.
Where in Martin County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Ocean Breeze: Industrial Impact Fees
Industrial development in Ocean Breeze pays $2.70 per square foot in impact fees, plus $3,810.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to at least $138,710.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Capital Facility Charge (Martin County Utilities - Ocean Breeze) — 1 ERC ($2,100.00 one-time) and Water Capital Facility Charge (Martin County Utilities - Ocean Breeze) — 1 ERC ($1,710.00 one-time).
County Impact Fee (Martin County - Ocean Breeze, Industrial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
City Impact Fee (Town of Ocean Breeze, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Capital Facility Charge (Martin County Utilities - Ocean Breeze) — 1 ERC$1,710.00 one-timeMartin County Utilities and Solid WasteProvider for Ocean Breeze = Martin County Utilities. MCU rate schedule, eff. 6/1/2025, Table 12: 'Single Family & Commercial per ERC' = $1,710.00 water. NONRES ERC BASIS CONFIRMED ON AUDIT 2026-07-14: Martin County LDR Sec. 4.181 — 'For nonresidential use ... one equivalent residential connection shall equal 250 gallons per day.' Nonres ERC count = average daily flow / 250 gpd; the published 1-ERC charge is entered as the default. No meter-size ladder exists for the CFC (meter/lateral charges are separate, Table 10). Shared $/ERC across customer classes — shared-ladder precedent, not residential contamination. Resolves the prior 'multiplier unconfirmed' flag.
- Sewer Capital Facility Charge (Martin County Utilities - Ocean Breeze) — 1 ERC$2,100.00 one-timeMartin County Utilities and Solid WasteProvider for Ocean Breeze = Martin County Utilities. MCU rate schedule, eff. 6/1/2025, Table 12: 'Single Family & Commercial per ERC' = $2,100.00 sewer. NONRES ERC BASIS CONFIRMED ON AUDIT 2026-07-14: Martin County LDR Sec. 4.262 — 'For nonresidential units, one equivalent residential connection shall equal 250 gallons per day (250 gpd).' Nonres ERC count = average daily flow / 250 gpd; the published 1-ERC charge is entered as the default. No meter-size ladder exists for the sewer CFC. Shared $/ERC across customer classes — shared-ladder precedent, not residential contamination. Resolves the prior 'multiplier unconfirmed' flag.
- City Impact Fee (Town of Ocean Breeze, Industrial)Requires confirmationTown of Ocean Breeze$0 pending confirmation. Ocean Breeze is on no codifier and publishes no ordinance index; only building-permit fee schedules are posted, with no development impact fee schedule. (The Town is a ~0.1 sq mi manufactured-home community with no industrial zoning.) UNCONFIRMED: confirm no municipal impact fee. Pam Orr, Town Clerk (772) 334-6826.
- County Impact Fee (Martin County - Ocean Breeze, Industrial)$2.70/sq ftRequires confirmationMartin County Board of County CommissionersRate = Martin County LDR Art. 6 Exhibit B, Fig. 6.1, Table 9, eff. 1/1/2026: ITE 110 General Industrial = $2,698 per 1,000 sf. Phase-in: 1/1/2027 $2,926; 1/1/2028 $3,158. APPLICABILITY: LDR §6.3 reaches incorporated areas to the extent permitted by art. VIII, §1(f), Fla. Const.; no Ocean Breeze municipal impact-fee ordinance found, so no apparent conflict and the county fee should apply. UNCONFIRMED: Pam Orr, Town Clerk (772) 334-6826; Growth Management (772) 288-5495.
Where in Martin County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Ocean Breeze: Office Impact Fees
Office development in Ocean Breeze pays $3.52 per square foot in impact fees, plus $3,810.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 25,000 sq ft building, that comes to at least $91,685.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Capital Facility Charge (Martin County Utilities - Ocean Breeze) — 1 ERC ($2,100.00 one-time) and Water Capital Facility Charge (Martin County Utilities - Ocean Breeze) — 1 ERC ($1,710.00 one-time).
County Impact Fee (Martin County - Ocean Breeze, Office) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
City Impact Fee (Town of Ocean Breeze, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Capital Facility Charge (Martin County Utilities - Ocean Breeze) — 1 ERC$1,710.00 one-timeMartin County Utilities and Solid WasteProvider for Ocean Breeze = Martin County Utilities. MCU rate schedule, eff. 6/1/2025, Table 12: 'Single Family & Commercial per ERC' = $1,710.00 water. NONRES ERC BASIS CONFIRMED ON AUDIT 2026-07-14: Martin County LDR Sec. 4.181 — 'For nonresidential use ... one equivalent residential connection shall equal 250 gallons per day.' Nonres ERC count = average daily flow / 250 gpd; the published 1-ERC charge is entered as the default. No meter-size ladder exists for the CFC (meter/lateral charges are separate, Table 10). Shared $/ERC across customer classes — shared-ladder precedent, not residential contamination. Resolves the prior 'multiplier unconfirmed' flag.
- Sewer Capital Facility Charge (Martin County Utilities - Ocean Breeze) — 1 ERC$2,100.00 one-timeMartin County Utilities and Solid WasteProvider for Ocean Breeze = Martin County Utilities. MCU rate schedule, eff. 6/1/2025, Table 12: 'Single Family & Commercial per ERC' = $2,100.00 sewer. NONRES ERC BASIS CONFIRMED ON AUDIT 2026-07-14: Martin County LDR Sec. 4.262 — 'For nonresidential units, one equivalent residential connection shall equal 250 gallons per day (250 gpd).' Nonres ERC count = average daily flow / 250 gpd; the published 1-ERC charge is entered as the default. No meter-size ladder exists for the sewer CFC. Shared $/ERC across customer classes — shared-ladder precedent, not residential contamination. Resolves the prior 'multiplier unconfirmed' flag.
- City Impact Fee (Town of Ocean Breeze, Office)Requires confirmationTown of Ocean Breeze$0 pending confirmation. Ocean Breeze is on no codifier and publishes no ordinance index; only Residential and Commercial building-permit fee schedules are posted (image-only PDFs), with no development impact fee schedule anywhere. UNCONFIRMED: confirm no municipal impact fee. Pam Orr, Town Clerk (772) 334-6826 / permits@townofoceanbreeze.org.
- County Impact Fee (Martin County - Ocean Breeze, Office)$3.52/sq ftRequires confirmationMartin County Board of County CommissionersRate = Martin County LDR Art. 6 Exhibit B, Fig. 6.1, Table 6, eff. 1/1/2026: ITE 710 Office = $3,515 per 1,000 sf. Phase-in: 1/1/2027 $3,832; 1/1/2028 $4,148. APPLICABILITY: LDR §6.3 reaches incorporated areas to the extent permitted by art. VIII, §1(f), Fla. Const.; no Ocean Breeze municipal impact-fee ordinance found (town is on no codifier), so no apparent conflict and the county fee should apply. UNCONFIRMED: Pam Orr, Town Clerk (772) 334-6826; Growth Management (772) 288-5495.
Where in Martin County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Ocean Breeze
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Ocean Breeze, Florida?
A new single-family home in Ocean Breeze pays at least $3,810.00 per unit in combined impact fees (rates sourced July 14, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Ocean Breeze?
Commercial development in Ocean Breeze pays $8.02 per square foot in impact fees, plus $3,810.00 in one-time water and sewer connection fees, at least $405,010.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Ocean Breeze charge its own impact fees?
Yes. Ocean Breeze levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Ocean Breeze, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Martin County impact fees page.